CN210566944U - Water heating pipeline installation fixer - Google Patents

Water heating pipeline installation fixer Download PDF

Info

Publication number
CN210566944U
CN210566944U CN201921217926.0U CN201921217926U CN210566944U CN 210566944 U CN210566944 U CN 210566944U CN 201921217926 U CN201921217926 U CN 201921217926U CN 210566944 U CN210566944 U CN 210566944U
Authority
CN
China
Prior art keywords
block
movably
fixed block
rotating rod
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921217926.0U
Other languages
Chinese (zh)
Inventor
赵建存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xingye Radiator Manufacturing Co ltd
Original Assignee
Tianjin Xingye Radiator Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Xingye Radiator Manufacturing Co ltd filed Critical Tianjin Xingye Radiator Manufacturing Co ltd
Priority to CN201921217926.0U priority Critical patent/CN210566944U/en
Application granted granted Critical
Publication of CN210566944U publication Critical patent/CN210566944U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a hot-water heating pipe installation fixer, including the fixed block, its characterized in that: the two sides of the inside of the fixed block are movably provided with second rotating rods, the middle of the inside of the fixed block is movably provided with a first rotating rod, and bevel gears are movably arranged at the upper ends of one side, opposite to the second rotating rod, of the first rotating rod. The utility model discloses an all install the lead screw through the bearing in the outside both sides of fixed block, and still at spiral shell piece bottom front side, the rear side all has the snap ring through guide rail and guide block movable mounting, it is fixed with calorie hole activity butt joint again through the bullet knot through guide rail and guide block messenger snap ring and the outside both sides activity butt joint of body in the in-process of installation like this, then rotate when rotating the lead screw that drives bevel gear through rotating the movable block, and the lead screw of both sides is positive lead screw and anti-lead screw respectively, so can drive the spiral shell piece and move toward relative one side, the pipeline connection department that makes both ends carries out the steadiness when the activity butt joint increases the installation.

Description

Water heating pipeline installation fixer
Technical Field
The utility model relates to a piping erection technical field specifically is a hot-water heating piping erection fixer.
Background
The pipeline is a device which is connected by pipes, pipe connectors, valves and the like and used for conveying gas, liquid or fluid with solid particles, the pipeline is widely applied to multiple industries and multiple fields due to the unique characteristics of the pipeline, and the pipeline has wide application range and is mainly used for water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, hydraulic engineering and various industrial devices;
the traditional water heating pipeline mounting and fixing device has the following defects;
at present, all need use the hot-water heating pipeline in each aspect of life, and common mounting means all is that the manual work is installed, needs the manual work to carry out interim activity butt joint earlier when two pipelines of installation and then fixes the installation, not only convenient and cause the condition of dislocation easily not so.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hot-water heating piping erection fixer to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hot-water heating pipeline installation fixer, includes the fixed block, its characterized in that: the two sides in the fixed block are both movably provided with second rotating rods, the middle part in the fixed block is movably provided with a first rotating rod, one side of the second rotating rod opposite to the upper end of the first rotating rod is movably provided with bevel gears, the bevel gears are mutually meshed with the bevel gears, the middle parts of the two sides of the fixed block are both movably provided with lead screws, one side of the lead screws opposite to each other is movably butted with the second rotating rod, one ends of the lead screws far away from the fixed block are both movably provided with screw blocks, the front side and the rear side of the bottom end of each screw block are both movably provided with snap rings, the top ends of the snap rings are both movably provided with guide blocks, the middle parts of the bottom ends of the screw blocks are both provided with guide rails, the guide blocks are both in sliding connection with the guide rails, the bottom ends of the snap rings at the front side of, the left through groove of stabilizer bar is inside, the bottom all seted up flutedly, the inside equal activity of recess is provided with the spring, the spring is all movably provided with the kicking block in the one end of keeping away from the recess.
Preferably, the top end of the fixed block is movably provided with a movable block, the periphery of the outside of the movable block is movably provided with a convex block, and the middle part of the bottom end of the movable block is movably butted with the top end of the first rotating rod.
Preferably, a silica gel layer is movably arranged on one side opposite to the clamping ring.
Preferably, the opposite side in snap ring bottom all is provided with the connector link in the activity, a plurality of card holes have all been seted up to the inside both sides of guide rail, the equal activity in guide block both sides is provided with the bullet knot.
Preferably, the opposite sides of the jacking blocks are movably provided with rubber blocks, and the clamping ring, the stabilizing rod, the screw block, the first rotating rod and the like are made of alloy materials.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an all install the lead screw through the bearing in fixed block outside both sides, and still all have the snap ring through guide rail and guide block movable mounting at spiral shell piece bottom front side, rear side, make snap ring and body outside both sides movable docking through guide rail and guide block in the process of installation and fix through bullet knot and card hole movable docking again, then rotate and rotate while driving the lead screw through rotating the movable block and drive bevel gear, and the lead screw of both sides is positive lead screw and anti-lead screw respectively, so can drive the spiral shell piece and move toward relative one side, make the pipe connection department at both ends carry out movable docking and increase the steadiness when installing;
2. the utility model discloses still all install the connector through the welding in the snap ring bottom of front side simultaneously, and there is the stabilizer bar through leading to groove movable mounting between the connector, and left leading to inslot portion top, the spring is all installed through the recess in the bottom, and the ejector pad is all installed in the one end of keeping away from the recess to the spring, thereby can carry out nimble butt joint to the stabilizer bar through spring and ejector pad when connecting and play fixed effect, can increase the steadiness when the integrated device uses through connector and stabilizer bar like this.
Drawings
FIG. 1 is a schematic view of the overall structure of a water heating pipe mounting fixture of the present invention;
FIG. 2 is a structural view of a groove and a top block in the fixing device for installing a water heating pipe according to the present invention;
fig. 3 is a structural diagram of a guide rail and a guide block in the water heating pipe installation fixer of the present invention.
In the figure: 1. a connector; 2. a stabilizer bar; 3. a snap ring; 4. a screw block; 5. a screw rod; 6. a fixed block; 7. a movable block; 8. a bevel gear; 9. a first rotating lever; 10. a second rotating rod; 11. a groove; 12. a spring; 13. a through groove; 14. a top block; 15. a guide rail; 16. and a guide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a water heating pipeline mounting fixer comprises a fixed block 6, wherein second rotating rods 10 are movably mounted in the middle parts of two sides in the fixed block 6 through bearings, a first rotating rod 9 is movably mounted in the middle part in the fixed block 6 through bearings, bevel gears 8 are respectively mounted on one side, opposite to the second rotating rod 10, of the second rotating rod and the upper end of the first rotating rod 9 through welding, the bevel gears 8 and the bevel gears 8 are mutually meshed, lead screws 5 are movably mounted in the middle parts of two sides of the fixed block 6 through bearings, one side, opposite to the lead screws 5, of the lead screws 5 is movably mounted with screw blocks 4 at one ends far away from the fixed block 6, screw holes are respectively formed in the middle parts of the screw blocks 4, snap rings 3 are movably mounted on the front sides and the rear sides of the bottoms of the screw blocks 4, the snap rings 3 are respectively in a half-arc structure, guide blocks 16 are respectively mounted on the top ends of the snap rings 3 through welding, 3 bottoms of snap ring of 4 bottom front sides of spiral shell piece all have connector 1 through welded mounting, logical groove 13 has all been seted up at connector 1 middle part, it has stabilizer bar 2 to lead to equal movable mounting between the groove 13, 2 left logical groove 13 inside tops of stabilizer bar, the bottom has all been seted up recess 11, recess 11 is inside all to have spring 12 through welded mounting, spring 12 all has kicking block 14 through welded mounting in the one end of keeping away from recess 11.
The top end of the fixed block 6 is provided with a movable block 7 through a bearing, the periphery of the outside of the movable block 7 is provided with a convex block through welding, and the middle part of the bottom end of the movable block 7 is movably butted with the top end of the first rotating rod 9, so that the first rotating rod 9 can be conveniently rotated through the movable block 7; a silica gel layer is welded on one side opposite to the clamping ring 3, so that the friction force is increased conveniently; the connecting buckles are movably mounted on the opposite sides of the bottom end of the snap ring 3, a plurality of clamping holes are formed in the two sides of the interior of the guide rail 15, and the elastic buckles are movably mounted on the two sides of the guide block 16, so that the snap ring 3 can be flexibly fixed through the elastic buckles and the guide block 16 flexibly clamped in the clamping holes; the opposite side of the top block 14 is provided with a rubber block through welding, and the snap ring 3, the stabilizer bar 2, the screw block 4, the first rotating rod 9 and the like are made of alloy materials, so that the material is light and firmer.
The working principle is as follows: the utility model discloses an all install lead screw 5 through the bearing in 6 outside both sides of fixed block, and still at spiral shell 4 bottom front sides, the rear side all has snap ring 3 through guide rail 15 and guide 16 movable mounting, it is fixed through bullet knot and calorie hole activity butt joint again to make snap ring 3 and the outside both sides activity of body butt joint through guide rail 15 and guide 16 at the in-process of installation like this, then rotate when rotating thereby drive lead screw 5 through rotating movable block 7 drive bevel gear 8, and the lead screw 5 of both sides is positive lead screw and anti-lead screw respectively, so can drive spiral shell 4 and move toward relative one side, pipeline connection department when making both ends carries out the activity butt joint and increase the installation steadiness, still all install connector 1 through the welded connection in the snap ring 3 bottom of front side simultaneously, and there is stabilizer bar 2 through leading to groove 13 movable mounting between the connector 1, and the inside top of left logical groove 13, Spring 12 is all installed through recess 11 in the bottom, and spring 12 all installs kicking block 14 in the one end of keeping away from recess 11, thereby can carry out nimble butt joint to stabilizer bar 2 through spring 12 and kicking block 14 and play fixed effect when connecting, can increase the steadiness when the overall device uses through connector 1 and stabilizer bar 2 like this.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a hot-water heating pipeline installation fixer, includes fixed block (6), its characterized in that: the two sides inside the fixed block (6) are movably provided with second rotating rods (10), the middle inside the fixed block (6) is movably provided with a first rotating rod (9), one side opposite to the second rotating rod (10) and the upper end of the first rotating rod (9) are movably provided with bevel gears (8), the bevel gears (8) and the bevel gears (8) are mutually meshed, the middle parts of the two sides of the fixed block (6) are movably provided with screw rods (5), one side opposite to the screw rods (5) is movably butted with the second rotating rod (10), one end of each screw rod (5) far away from the fixed block (6) is movably provided with a screw block (4), the front side and the rear side of the bottom end of each screw block (4) are movably provided with clamping rings (3), the top ends of the clamping rings (3) are movably provided with guide blocks (16), and the middle parts of the bottom ends of the screw blocks (4) are respectively provided, guide block (16) all with guide rail (15) sliding connection, snap ring (3) bottom of spiral shell piece (4) bottom front side all the activity is provided with connector (1), logical groove (13) have all been seted up at connector (1) middle part, it is provided with stabilizer bar (2) to lead to all the activity between groove (13), stabilizer bar (2) left lead to the groove (13) inside top, bottom all set up fluted (11), the inside all activity of recess (11) is provided with spring (12), spring (12) are all movable and are provided with kicking block (14) in the one end of keeping away from recess (11).
2. The plumbing pipe installation fixture of claim 1, wherein: the movable block (7) is movably arranged at the top end of the fixed block (6), the protruding blocks are movably arranged around the outside of the movable block (7), and the middle of the bottom end of the movable block (7) is movably connected with the top end of the first rotating rod (9) in a butt joint mode.
3. The plumbing pipe installation fixture of claim 1, wherein: and a silica gel layer is movably arranged on one side opposite to the snap ring (3).
4. The plumbing pipe installation fixture of claim 1, wherein: the connecting buckle is movably arranged on one side, opposite to the bottom end of the clamping ring (3), of the connecting buckle, a plurality of clamping holes are formed in two sides of the inner portion of the guide rail (15), and elastic buckles are movably arranged on two sides of the guide block (16).
5. The plumbing pipe installation fixture of claim 1, wherein: the rubber blocks are movably arranged on one side, opposite to the top block (14), of the top block, and the snap ring (3), the stabilizer bar (2), the screw block (4), the first rotating rod (9) and the like are all made of alloy materials.
CN201921217926.0U 2019-07-31 2019-07-31 Water heating pipeline installation fixer Active CN210566944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921217926.0U CN210566944U (en) 2019-07-31 2019-07-31 Water heating pipeline installation fixer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921217926.0U CN210566944U (en) 2019-07-31 2019-07-31 Water heating pipeline installation fixer

Publications (1)

Publication Number Publication Date
CN210566944U true CN210566944U (en) 2020-05-19

Family

ID=70628802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921217926.0U Active CN210566944U (en) 2019-07-31 2019-07-31 Water heating pipeline installation fixer

Country Status (1)

Country Link
CN (1) CN210566944U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028171A (en) * 2021-03-11 2021-06-25 安徽铜陵科力阀门有限责任公司 Clamping connection device for pipeline and valve and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028171A (en) * 2021-03-11 2021-06-25 安徽铜陵科力阀门有限责任公司 Clamping connection device for pipeline and valve and using method thereof

Similar Documents

Publication Publication Date Title
CN210566944U (en) Water heating pipeline installation fixer
CN113510437B (en) Anti-leakage welding tool for butt joint of valve pipelines and using method thereof
CN207750628U (en) A kind of quick coupling device of pressure pipe
CN218364458U (en) Adjustable pipeline splicing device
CN208153924U (en) A kind of uniform internal diameter MULTILAYER COMPOSITE bend pipe
CN213512526U (en) Water supply and drainage pipeline joint for building capable of being disassembled and connected quickly
CN211232020U (en) Three-way joint convenient and rapid to insert
CN220770409U (en) Drainage pipeline coupling assembling
CN202791063U (en) Connecting structure of joint for corrugated pipes
CN220037793U (en) Water conservancy pipe of convenient connection
CN211639051U (en) Modular elbow end face machining clamp
CN218883193U (en) Pipeline fixed mounting triangle supporting seat
CN219151241U (en) Hydropower pipeline bending machine with limiting and clamping functions
CN215258198U (en) Water conservancy water and electricity pipeline installation bearing structure suitable for different diameters
CN215215060U (en) Water conservancy pipeline device
CN218671031U (en) Water supply and drainage pipeline connecting structure
CN211759859U (en) Water conservancy pipeline fixing device convenient to cutting and welding
CN219966964U (en) Pipeline welding electric welding machine
CN211059477U (en) Pipeline mounting bracket
CN213512504U (en) Drainage pipe for hydraulic engineering
CN211821170U (en) Sewage PVC composite pipe for home decoration
CN217596940U (en) Pipeline butt joint fixing device
CN214368323U (en) Inscription type stainless steel pipeline convenient to installation
CN220956903U (en) Ball valve with positioning mechanism
CN220058091U (en) Comprehensive well chamber combining drainage well and valve well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant