CN210566679U - Central air-conditioning pipeline hanging piece - Google Patents
Central air-conditioning pipeline hanging piece Download PDFInfo
- Publication number
- CN210566679U CN210566679U CN201921405623.1U CN201921405623U CN210566679U CN 210566679 U CN210566679 U CN 210566679U CN 201921405623 U CN201921405623 U CN 201921405623U CN 210566679 U CN210566679 U CN 210566679U
- Authority
- CN
- China
- Prior art keywords
- half ring
- ring
- groove
- mounting
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004378 air conditioning Methods 0.000 title claims abstract description 16
- 230000000694 effects Effects 0.000 claims abstract description 10
- 238000010030 laminating Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 16
- 238000005728 strengthening Methods 0.000 description 4
- 230000000087 stabilizing effect Effects 0.000 description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000002337 anti-port Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to the technical field of pipeline installation, and discloses a central air-conditioning pipeline hanging piece, which comprises an installation seat and an installation plate arranged above the installation seat, wherein the installation seat is provided with an installation ring; the mounting ring comprises a first half ring and a second half ring hinged with one side of the first half ring; the second half ring is provided with a clamping piece; the clamping piece comprises a sliding groove formed in the end face, close to the first half ring, of the second half ring, a sliding block arranged in the sliding groove in a sliding mode, and a first spring connecting the end face, away from the first half ring, of the sliding block and the bottom of the sliding groove; the end surface of the sliding block close to the first half ring is an arc surface, and the circle centers of the two arc surfaces are superposed with the circle center of the mounting ring; the end parts of the first half ring and the second half ring, which are far away from the hinged part of the first half ring and the second half ring, are provided with mounting blocks; the two mounting blocks are fixed through bolts. The utility model has the advantages of it is following and effect: it can guarantee the steadiness ability of piping erection.
Description
Technical Field
The utility model relates to a piping erection technical field, in particular to central air conditioning pipeline hangs sign indicating number piece.
Background
At present, in the pipe distribution process of a central air conditioner, an installer can adopt the hanging piece to limit and fix a plurality of positions on a pipeline, and the connection between air conditioner installation materials and a wall body can be realized. The arrangement of copper pipes in the central air conditioner is the most important step and the most time-consuming in the whole installation project, and the copper pipes are fixed on a wall or some objects through fixing devices and are generally installed by adopting hanging yards.
At present, chinese utility model patent that publication number is CN207132555U discloses a central air conditioning installation hanging sign indicating number, including fixed establishment, hoop board and sleeve pipe, fixed establishment includes the backup pad and locates the fixed plate that backup pad one end and backup pad set up perpendicularly, and it has a plurality of hoop board slots to open in the backup pad, and the both ends of hoop board are equipped with the hoop board plug, and the hoop board encircles the sleeve pipe and is fixed in the backup pad with the sleeve pipe in the hoop board slot through the hoop board plug joint at its both ends on, the sleeve pipe includes that two cross-sections are semicircular arc, and two arc are articulated through the hinge of one side.
Above-mentioned technical scheme can avoid hoop board and pipeline to take place the friction and lead to the pipeline to damage, has prolonged pipeline life, nevertheless has following defect: the sleeve pipes used for wrapping the pipelines are fixed by inserting the hoop plate plugs into different hoop plate slots, certain loosening allowance is reserved after the hoop plate is inserted into the hoop plate slots, and when the air conditioner compressor works, the refrigerant pipe can shake, so that the hoop plate plugs shake in the hoop plate slots, and the pipelines are not stably installed.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a central air conditioning pipeline hangs a yard piece, its steadiness ability that can guarantee the piping erection.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a central air-conditioning pipeline hanging piece comprises a mounting seat and a mounting plate arranged above the mounting seat, wherein a mounting ring is arranged on the mounting seat; the mounting ring comprises a first half ring and a second half ring hinged with one side of the first half ring; the second semi-ring is provided with a clamping piece; the clamping piece comprises a sliding groove formed in the end face, close to the first half ring, of the second half ring, a sliding block arranged in the sliding groove in a sliding mode, and a first spring connecting the end face, away from the first half ring, of the sliding block and the bottom of the sliding groove; the end surface of the sliding block close to the first half ring is an arc surface, and the circle centers of the two arc surfaces are superposed with the circle center of the mounting ring; the end parts of the first half ring and the second half ring, which are far away from the hinged part of the first half ring and the second half ring, are provided with mounting blocks; the two mounting blocks are fixed through bolts.
Through adopting above-mentioned technical scheme, set up the collar, conveniently fix the locking to the pipeline for the pipeline is fixed firm, is difficult for taking place not hard up. At first put into the first semi-ring with the pipeline, make to carry out a support to the pipeline, again through overturning the second semi-ring downwards, make the second semi-ring become complete installation space with first semi-ring, after two installation pieces passed through the bolt fastening, because the setting of first spring, make the slider produce an extrusion force to the pipeline all the time, thereby make the pipe-line erection fastening more stable, in addition, first spring and slider cooperation are used, can be suitable for the pipeline of multiple size, application scope is wide, the slider sets up the arcwall face, increase and the area of contact between the pipeline, further improve compressing tightly to the pipeline, make the pipe-line erection more stable, difficult production vibration, make the pipeline be difficult for producing wearing and tearing when rocking.
The utility model discloses further set up to, the holder is provided with two and the circumference equipartition setting of holder edge second semi-ring.
Through adopting above-mentioned technical scheme, set up two with the holder symmetry for produce the pressure of symmetry to the pipeline, make the pipeline atress even, the installation is more reliable and more stable.
The utility model is further arranged in such a way that a plurality of fixed slots are arranged at intervals on one side of the mounting seat and are uniformly distributed along the height direction of the mounting seat; the upper end of the fixed groove is provided with an adjusting groove; the adjusting groove is arranged along the length direction of the mounting seat and is communicated with the plurality of fixing grooves; the mounting ring is fixed on the sliding seat; the sliding seat is fixed on the mounting seat through a positioning piece.
Through adopting above-mentioned technical scheme, the slide can adjust the high position of collar along the fixed slot to can adjust the position of collar according to the pipeline of co-altitude not and fix. The number of the mounting rings can be increased according to the number of the pipelines to fix the pipelines, so that the device is high in practicability and can be suitable for different use requirements.
The utility model is further arranged that one side of the sliding seat close to the bottom of the fixed groove is provided with a placing groove; one side of the placing groove extends to the direction away from the sliding groove; the groove diameter of the thread groove is smaller than that of the placing groove; the positioning piece comprises a screw rod in threaded fit with the threaded groove, a positioning block arranged at the end part of the screw rod close to the fixing groove, and an adjusting block arranged at the end part of the screw rod away from the fixing groove; the end face of the positioning block, which is close to the bottom of the fixing groove, is provided with a first anti-skid rubber pad.
Through adopting above-mentioned technical scheme, after confirming the position of collar, through the knob regulating block for the screw rod rotates, thereby the locating piece supports tightly with the tank bottom of spout, because the setting of anti-skidding rubber pad makes the rigidity of collar firm, when the position of collar needs to be adjusted, only needs to pass through the regulating block with screw rod antiport, thereby make between slide and the spout mobile.
The utility model is further arranged that the second semi-ring is provided with a supporting piece; the supporting piece comprises a supporting piece arranged on the upper surface of the second semi-ring and a supporting ring arranged on the upper end surface of the supporting piece.
Through adopting above-mentioned technical scheme, set up the bearing piece, can be in fixed pipeline, carry out the effect that a support bearing to the pipeline of this pipeline top for to the piping erection is more stable, with the horizontal interval setting of collar, even the pipeline is longer, realize strengthening and stabilizing the position of same root pipeline difference through bearing collar and collar, make the integral erection more reliable.
The utility model discloses further set up to, support piece sets up the second spring of bottom surface in the activity post in the fixed column, connection activity post bottom surface and the fixed column including being fixed in fixed column, the slip on the second semi-ring upper surface.
Through adopting above-mentioned technical scheme, set support piece to the telescopic shape, can avoid the clearance undersize between the pipeline, can adapt to the pipeline bearing between the different intervals. This arrangement enables damping even if the pipe is subjected to impact vibration.
The utility model is further arranged that the upper end surface of the fixed column is provided with a baffle ring, and the inner diameter of the baffle ring is jointed with the outer surface of the movable column; the bottom of activity post is provided with spacing piece, and the circumference of spacing piece and the inner wall laminating of fixed column.
Through adopting above-mentioned technical scheme, set up and keep off ring and spacing piece, can guarantee the sliding connection between activity post and the fixed column for stable in structure performance is higher.
The utility model discloses further set up to, the slider is close to the terminal surface of first semi-ring and is provided with second anti-skidding rubber pad.
Through adopting above-mentioned technical scheme, set up second anti-skidding rubber pad for can not make the pipeline produce the damage when the slider compresses tightly the pipeline, be favorable to strengthening the protection to the pipeline, in addition, set up anti-skidding line, make the difficult production of pipeline rock, it is more firm to install.
To sum up, the utility model discloses a beneficial technological effect does:
1. the pipeline clamping device is suitable for pipelines with various sizes, and is wide in application range, the sliding blocks are arranged to be arc-shaped surfaces, so that the contact area between the sliding blocks and the pipelines is increased, the compression on the pipelines is improved, the pipeline installation is more stable, the vibration is not easy to generate, and the pipelines are not easy to wear when the pipelines shake;
2. the slide can adjust the high position of collar along the fixed slot to the position that can adjust the collar according to the pipeline of different heights is fixed. The number of the mounting rings can be increased according to the number of the pipelines to fix the pipelines, so that the device has stronger practicability and can be suitable for different use requirements;
3. set up the supporting piece, can carry out the effect that a support bearing to the pipeline of this pipeline top in fixed pipeline for to the piping erection more stable, set up the horizontal interval of collar, even the pipeline is longer, realize strengthening and stabilizing the position of same root pipeline difference through bearing ring and collar, make the integral erection more reliable.
Drawings
FIG. 1 is a schematic view of the overall structure of the embodiment;
FIG. 2 is a schematic view of a structure of a holder according to an embodiment;
fig. 3 is an enlarged schematic view of a in fig. 2.
Reference numerals: 1. a mounting seat; 11. mounting a plate; 12. fixing grooves; 13. an adjustment groove; 14. a slide base; 141. a placement groove; 142. a thread groove; 2. a mounting ring; 21. a first half ring; 22. a second half ring; 23. mounting blocks; 3. a clamping member; 31. a chute; 32. a slider; 33. a first spring; 34. a second anti-skid rubber pad; 4. a positioning member; 41. a screw; 42. positioning blocks; 43. an adjusting block; 44. a first anti-skid rubber pad; 5. a support member; 51. a support member; 511. fixing a column; 512. a movable post; 513. a second spring; 514. a baffle ring; 515. a limiting sheet; 52. a bearing ring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in FIG. 1, the central air-conditioning pipeline hanging bracket comprises a mounting base 1 and a mounting plate 11 mounted on the upper end surface of the mounting base 1. The mounting plate 11 is fixed to a wall or a ceiling by bolts.
A plurality of fixed slots 12 have been seted up at one side interval of mount pad 1, and fixed slot 12 sets up along the direction of height equipartition of mount pad 1, and the adjustment tank 13 with fixed slot 12 upper end intercommunication is seted up to the upper end of fixed slot 12, and adjustment tank 13 sets up along the length direction of mount pad 1.
A plurality of sliding seats 14 are slidably arranged in the fixing grooves 12, the cross section of the sliding seat 14 in the horizontal direction is in a T shape, and the sliding seat 14 is fixed on the mounting seat 1 through a positioning piece 4. The end face of the slide 14 facing away from the fastening groove 12 is fastened with a mounting ring 2.
As shown in fig. 2, the mounting ring 2 includes a first half ring 21 and a second half ring 22, the first half ring 21 is hinged to one side of the first half ring 21, and mounting blocks 23 are formed on end portions of the first half ring 21 and the second half ring 22 away from the hinged portion, and the two mounting blocks 23 are fixed by bolts. Clamping member 3 is installed on second half 22, and clamping member 3 includes that second half 22 is close to the spout 31 that the terminal surface of first half 21 seted up, slide block 32, the first spring 33 that connects slide block 32 and deviate from the terminal surface of first half 21 and the tank bottom of spout 31 in the spout 31 of sliding arrangement in spout 31. The end surface of the slide block 32 close to the first half ring 21 is an arc surface, and the circle centers of the two arc surfaces are superposed with the circle center of the mounting ring 2. Two clamping pieces 3 are installed, and two clamping pieces 3 are uniformly distributed along the circumferential direction of second half ring 22. The end surface of the slide block 32 close to the first half ring 21 is fixed with a second antiskid rubber pad 34.
A placement groove 141 is formed on the side of the slider 14 close to the bottom of the fixed groove 12, a screw groove 142 extends on the side of the placement groove 141 in a direction away from the slide groove 31, and the groove diameter of the screw groove 142 is smaller than that of the placement groove 141.
The positioning member 4 includes a screw 41 threadedly engaged with the threaded groove 142, a positioning block 42 mounted on an end portion of the screw 41 close to the fixing groove 12, and an adjusting block 43 mounted on an end portion of the screw 41 away from the fixing groove 12. A first anti-skid rubber pad 44 is fixed on the end surface of the positioning block 42 close to the groove bottom of the fixing groove 12.
Bearing member 5 is mounted on second half 22, and bearing member 5 includes a supporting member 51 mounted on the upper surface of second half 22 and a bearing ring 52 mounted on the upper end surface of supporting member 51. As shown in fig. 3, support 51 includes a fixed post 511 fixed on the upper surface of second half 22, a movable post 512 slidably disposed in fixed post 511, and a second spring 513 connecting the bottom surface of movable post 512 and the bottom surface of fixed post 511. A baffle ring 514 is formed on the upper end face of the fixed column 511, the inner diameter of the baffle ring 514 is attached to the outer surface of the movable column 512, a limiting sheet 515 is fixedly mounted at the bottom of the movable column 512, and the circumferential direction of the limiting sheet 515 is attached to the inner wall of the fixed column 511.
Preferably, can install the spool mounting on mount pad 1, the terminal surface that the spool mounting deviates from mount pad 1 has seted up the draw-in groove that the circular arc radian is 270.
In the embodiment, after the position of the mounting ring 2 is determined, the screw rod 41 is rotated through the knob adjusting block 43, so that the positioning block 42 abuts against the bottom of the sliding groove 31, the mounting ring 2 is fixed and stable due to the anti-skid rubber pad, and when the position of the mounting ring 2 needs to be adjusted, the screw rod 41 is rotated reversely only through the adjusting block 43, so that the sliding seat 14 and the sliding groove 31 can move.
Put into first semi-ring 21 with the pipeline for carry out a support to the pipeline, again through turning over second semi-ring 22 downwards, make second semi-ring 22 and first semi-ring 21 form complete installation space, after two installation pieces 23 pass through the bolt fastening, because the setting of first spring 33 makes slider 32 produce an extrusion force to the pipeline all the time, thereby makes the pipeline installation more fasten stably.
When fixed pipeline, carry out the effect that a support bearing to the pipeline of this pipeline top for to the piping erection more stable, with the setting of 2 horizontal intervals of collar, even the pipeline is longer, realize strengthening and stabilizing the position of same root pipeline difference through bearing ring 52 and collar 2, make the unit mount more reliable.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (8)
1. The utility model provides a central air conditioning pipeline hangs sign indicating number piece, includes mount pad (1), locates mounting panel (11) of mount pad (1) top, characterized by: the mounting seat (1) is provided with a mounting ring (2); the mounting ring (2) comprises a first half ring (21) and a second half ring (22) hinged with one side of the first half ring (21); the second half ring (22) is provided with a clamping piece (3); the clamping piece (3) comprises a sliding groove (31) formed in the end face, close to the first half ring (21), of the second half ring (22), a sliding block (32) arranged in the sliding groove (31) in a sliding mode, and a first spring (33) connecting the end face, away from the first half ring (21), of the sliding block (32) and the bottom of the sliding groove (31); the end surface of the sliding block (32) close to the first half ring (21) is an arc-shaped surface, and the circle centers of the two arc-shaped surfaces are superposed with the circle center of the mounting ring (2); the end parts of the first half ring (21) and the second half ring (22) departing from the hinged part of the first half ring and the second half ring are provided with mounting blocks (23); the two mounting blocks (23) are fixed through bolts.
2. The central air-conditioning duct hanging bracket as set forth in claim 1, which is characterized in that: the clamping pieces (3) are arranged in two and the clamping pieces (3) are uniformly distributed along the circumferential direction of the second half ring (22).
3. The central air-conditioning duct hanging bracket as set forth in claim 1, which is characterized in that: a plurality of fixing grooves (12) are formed in one side of the mounting seat (1) at intervals and are uniformly distributed along the height direction of the mounting seat (1); the upper end of the fixed groove (12) is provided with an adjusting groove (13); the adjusting groove (13) is arranged along the length direction of the mounting seat (1) and is communicated with the fixing grooves (12); the mounting ring (2) is fixed on the sliding seat (14); the sliding seat (14) is fixed on the mounting seat (1) through a positioning piece (4).
4. The central air-conditioning duct hanging bracket as set forth in claim 3, wherein: a placing groove (141) is formed in one side, close to the bottom of the fixing groove (12), of the sliding seat (14); a thread groove (142) extending from one side of the placing groove (141) in a direction away from the sliding groove (31); the groove diameter of the thread groove (142) is smaller than that of the placing groove (141); the positioning piece (4) comprises a screw rod (41) in threaded fit with the threaded groove (142), a positioning block (42) arranged at the end part of the screw rod (41) close to the fixing groove (12), and an adjusting block (43) arranged at the end part of the screw rod (41) far away from the fixing groove (12); and a first anti-skid rubber pad (44) is arranged on the end surface of the positioning block (42) close to the bottom of the fixing groove (12).
5. The central air-conditioning duct hanging bracket as set forth in claim 1, which is characterized in that: a bearing piece (5) is arranged on the second half ring (22); the supporting piece (5) comprises a supporting piece (51) arranged on the upper surface of the second half ring (22) and a supporting ring (52) arranged on the upper end surface of the supporting piece (51).
6. The central air-conditioning duct hanging bracket as set forth in claim 5, wherein: the supporting piece (51) comprises a fixed column (511) fixed on the upper surface of the second half ring (22), a movable column (512) arranged in the fixed column (511) in a sliding mode, and a second spring (513) connected with the bottom surface of the movable column (512) and the inner bottom surface of the fixed column (511).
7. The central air-conditioning duct hanging bracket as set forth in claim 6, wherein: a baffle ring (514) is arranged on the upper end surface of the fixed column (511), and the inner diameter of the baffle ring (514) is attached to the outer surface of the movable column (512); the bottom of activity post (512) is provided with spacing piece (515), and the circumference of spacing piece (515) and the inner wall laminating of fixed column (511).
8. The central air-conditioning duct hanging bracket as set forth in claim 1, which is characterized in that: and a second anti-skid rubber pad (34) is arranged on the end surface of the sliding block (32) close to the first half ring (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921405623.1U CN210566679U (en) | 2019-08-27 | 2019-08-27 | Central air-conditioning pipeline hanging piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921405623.1U CN210566679U (en) | 2019-08-27 | 2019-08-27 | Central air-conditioning pipeline hanging piece |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210566679U true CN210566679U (en) | 2020-05-19 |
Family
ID=70645678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921405623.1U Expired - Fee Related CN210566679U (en) | 2019-08-27 | 2019-08-27 | Central air-conditioning pipeline hanging piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210566679U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114877133A (en) * | 2022-05-31 | 2022-08-09 | 南通装配式建筑与智能结构研究院 | A assembled mounting bracket for fire sprinkler pipe |
-
2019
- 2019-08-27 CN CN201921405623.1U patent/CN210566679U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114877133A (en) * | 2022-05-31 | 2022-08-09 | 南通装配式建筑与智能结构研究院 | A assembled mounting bracket for fire sprinkler pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210566679U (en) | Central air-conditioning pipeline hanging piece | |
CN204227362U (en) | Outdoor lights mounting bracket | |
CN209213192U (en) | A kind of Pipe installing support frame | |
CN110829317B (en) | Waterproof wire passing system based on aviation plug wire passing plug | |
CN214368233U (en) | Heating pipe clamping device with adjustable tension force | |
CN208442397U (en) | A kind of pipeline fixing device for building | |
KR101968550B1 (en) | Cradle for conditioner outdoor unit | |
JP7179467B2 (en) | Electrical insulating plate and piping fixture using the same | |
JP2008292062A (en) | Refrigerant vessel fixing device of compressor piping | |
CN215295350U (en) | Auxiliary positioning accessory for refrigeration air conditioner | |
CN109654298B (en) | Adjustable central air conditioner pipeline mounting bracket convenient to hoist and mount | |
CN212056137U (en) | Pipe clamp for fixing heating ventilation air conditioner pipeline | |
CN212536938U (en) | Supporting base for pipeline installation and fixation | |
CN207406917U (en) | A kind of anti-race device of water conservancy vertical pipeline | |
CN214379906U (en) | Suspended spool fixing device | |
CN104075284B (en) | A kind of lamp installation assembly and light fixture | |
CN209840023U (en) | Easy-force clamping sleeve piece | |
CN201606571U (en) | Elastic cable hook and fixing device of cable hook | |
CN219734455U (en) | Water supply and drainage heating ventilation fixed mounting structure | |
CN219721788U (en) | Fire control pipe stable support device | |
CN101737763A (en) | Lamp for ventilation fan | |
CN108953767A (en) | A kind of novel pipeline hanging bracket | |
CN204692947U (en) | Photographic goods bearing | |
CN218118866U (en) | High-stability pipeline installation buckle | |
CN211738564U (en) | Projector overlapping hanging box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 230000 room d1114, block D, Ligang Yinhe Plaza, Ziyun Road, Baohe District, Hefei City, Anhui Province Patentee after: Anhui Zhongtong Construction Group Co.,Ltd. Address before: 230000 room d1114, block D, Ligang Yinhe Plaza, Ziyun Road, Baohe District, Hefei City, Anhui Province Patentee before: Anhui Zhongtong Environmental Engineering Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200519 |
|
CF01 | Termination of patent right due to non-payment of annual fee |