CN210563281U - Scaffold for building engineering - Google Patents

Scaffold for building engineering Download PDF

Info

Publication number
CN210563281U
CN210563281U CN201921418216.4U CN201921418216U CN210563281U CN 210563281 U CN210563281 U CN 210563281U CN 201921418216 U CN201921418216 U CN 201921418216U CN 210563281 U CN210563281 U CN 210563281U
Authority
CN
China
Prior art keywords
frame
footboard
scaffold
piece
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921418216.4U
Other languages
Chinese (zh)
Inventor
平克余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921418216.4U priority Critical patent/CN210563281U/en
Application granted granted Critical
Publication of CN210563281U publication Critical patent/CN210563281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a scaffold frame for building engineering, its structure includes first cat ladder, support frame, guardrail, footboard, antiskid, second cat ladder, cross bracing pole, backing plate, encloses the frame, the utility model discloses an improve constructor sole and the support nature of footboard, be equipped with antiskid on the aspect that corresponds the cat ladder, through even piece one with the installation characteristic of even piece two, fix the mounting body of frame as the structure at the footboard on the surface, both sides arc ring specifically has the leakproofness, can obviously improve the interval nature of structure sideline, the frame plate surface is equipped with integrated into one piece's rubber layer, the complete nothing of aspect meets absolutely and the surface is equipped with the space bar that can the secondary protection, has improved constructor sole antiskid nature, can effectively improve the protection to constructor at the cat ladder in-process from top to bottom, and then reduce the emergence probability of accident danger.

Description

Scaffold for building engineering
Technical Field
The utility model relates to a scaffold frame for building engineering belongs to construction technical field.
Background
In the high-rise building construction, mainly adopt steel pipe fastener scaffold frame and portal frame formula combination scaffold frame at present, present portal frame formula combination scaffold frame top all is fixed and is equipped with the footboard that can supply the workman to stand, and the footboard is as the human body support surface that stands of going up and down the cat ladder, and the contact of raising the foot and face produces the friction, very easily causes the emergence of dangerous accident when sole support nature is not enough.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a scaffold frame for building engineering to solve the equal fixed footboard that can supply the execution workman to stand that is equipped with in current portal frame formula combination scaffold frame top, the footboard is the human body holding surface of cat ladder from top to bottom, and the contact of face produces the friction when lifting the foot, very easily causes the problem of the emergence of dangerous accident when sole support nature is not enough.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the utility model provides a scaffold frame for building engineering, its structure includes first cat ladder, support frame, guardrail, footboard, antiskid, second cat ladder, alternately vaulting pole, backing plate, encloses the frame, support frame upper portion and guardrail welding are integrative, the second cat ladder is installed on the guardrail bottom side position that corresponds the horizontal pole, alternately vaulting pole has been installed in the slope of support frame both sides, alternately vaulting pole lower extreme with enclose a frame joint looks welding, enclose to erect fixed establishing on support frame lower part frame face, be equipped with the footboard of flat installation on the support frame, the antiskid has been installed to footboard surface both sides.
Further, the antiskid unit comprises a rubber layer, a frame plate, a first connecting piece, an arc-shaped ring, spacing strips and a second connecting piece, wherein the spacing strips which are arranged at equal intervals are attached to the surface of the rubber layer in a covering mode, the spacing strips are installed on the middle layer surfaces of the first connecting piece and the second connecting piece in a corresponding mode, the second connecting piece and the first connecting piece are matched with bolts to enable the frame plate to be fixed on the surface of the pedal, and the arc-shaped ring is attached to the two sides of the frame plate in a sleeving mode.
Furthermore, a first ladder stand which is vertically installed is arranged at the opening position of the guardrail.
Furthermore, the first ladder stand and the second ladder stand are installed at intervals.
Further, a first ladder stand fixedly connected with the front side of the guardrail is assembled.
Furthermore, a plurality of bolt holes are cut in the first connecting piece and the second connecting piece.
Furthermore, the spacing strips are molded by adopting a metal composite rubber material.
Further, the bottom surface of the frame plate is attached to the surface of the pedal.
Advantageous effects
The utility model relates to a scaffold frame for building engineering, in order to improve constructor sole and the support nature of footboard, be equipped with the antiskid on the aspect that corresponds the cat ladder, through even piece one and the installation characteristic of even piece two, fix the mounting body of frame plate as the structure on the footboard surface, both sides arc ring specifically has the leakproofness, can obviously improve the interval nature of structure sideline, the frame plate surface is equipped with integrated into one piece's rubber layer, the complete nothing of aspect meets absolutely and the surface is equipped with the space bar that can secondary protection, constructor sole antiskid nature has been improved, can effectively improve the protection to constructor at cat ladder in-process from top to bottom, and then reduce the emergence probability of dangerous accident.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of a scaffold for construction engineering of the present invention;
fig. 2 is a schematic view of the antiskid device assembly structure of the present invention.
In the figure: the ladder comprises a first ladder stand-1, a support frame-2, a guardrail-3, a pedal-4, an antiskid device-5, a rubber layer-A, a frame plate-B, a connecting piece-C, an arc-shaped ring-D, a spacing bar-E, a connecting piece-II, a second ladder stand-6, a cross brace-7, a base plate-8 and a surrounding frame-9.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-2, the present invention provides a technical solution: a scaffold for building engineering structurally comprises a first ladder stand 1, a support frame 2, a guardrail 3, a pedal 4, an antiskid device 5, a second ladder stand 6, cross support rods 7, a base plate 8 and a surrounding frame 9, wherein the upper portion of the support frame 2 is welded with the guardrail 3 into a whole, the second ladder stand 6 is arranged on the bottom side of the guardrail 3 corresponding to a cross rod, the cross support rods 7 are obliquely arranged on two sides of the support frame 2, the lower ends of the cross support rods 7 are welded with the connecting points of the surrounding frame 9, the surrounding frame 9 is fixedly arranged on the lower frame face of the support frame 2, the pedal 4 which is horizontally arranged is arranged on the support frame 2, the antiskid device 5 is arranged on two sides of the surface of the pedal 4, the antiskid device 5 comprises a rubber layer A, a frame plate B, a connecting piece C, an arc-shaped ring D, spacing strips E and a connecting piece II F, a plurality of spacing strips E which are arranged at equal intervals are arranged on the surface of the rubber layer A, the spacing strips, even piece two F and even piece C cooperation bolt make frame plate B fix at footboard 4 on the surface, frame plate B both sides cover pastes arc ring D, 3 open position of guardrail are equipped with the first cat ladder 1 of perpendicular installation, first cat ladder 1 and the installation of second cat ladder 6 looks interval, 3 front sides of guardrail are equipped with fixed continuous first cat ladder 1, even piece C and even piece two F surely are equipped with a plurality of bolt holes, the material shaping that the space stop E adopted metal compound rubber, frame plate B bottom surface subsides connect footboard 4 surfaces.
The rubber layer A is a supporting member which is formed by bonding a plurality of layers of natural rubber and is fixed on the surface of the frame plate B, and can be used as a contact layer for supporting the weight of a worker standing on the surface of the frame plate B in advance.
For example: when using, in order to improve constructor sole and footboard 4's support nature, be equipped with antiskid 5 on the aspect that corresponds the cat ladder, through the installation characteristic of even piece C and even piece two F, fix the mounting body of frame B as the structure on the footboard 4 is surperficial, both sides arc ring D specifically has the leakproofness, can obviously improve the distancing of structure sideline, frame B surface is equipped with integrated into one piece's rubber layer A, the complete not broken joint of aspect and surface are equipped with the spacer E that can secondary protection, constructor sole antiskid nature has been improved, can effectively improve the protection to constructor at the cat ladder in-process from top to bottom, and then reduce the emergence probability of dangerous accident.
The utility model provides a problem be current portal frame formula combination scaffold top all fixed be equipped with can supply the footboard that the execution workman stood, the footboard is as the human body holding surface that stands of cat ladder from top to bottom, and produce the friction with the face contact when lifting the foot, very easily causes the emergence of dangerous accident when sole support nature is not enough, the utility model discloses a combination of each other of above-mentioned parts is equipped with the antiskid ware on the aspect that corresponds the cat ladder for improving constructor sole and footboard support nature, can effectively improve the protection to constructor at the cat ladder in-process from top to bottom, and then reduces the emergence probability of dangerous accident.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a scaffold for building engineering, its structure includes first cat ladder (1), support frame (2), guardrail (3), footboard (4), antiskid unit (5), second cat ladder (6), cross brace rod (7), backing plate (8), encloses frame (9), its characterized in that:
support frame (2) upper portion and guardrail (3) welding are integrative, second cat ladder (6) are installed on guardrail (3) bottom side position that corresponds the horizontal pole, cross bracing piece (7) have been installed in support frame (2) both sides slope, cross bracing piece (7) lower extreme with enclose frame (9) contact and weld mutually, enclose frame (9) fixed establishing on support frame (2) lower part frame face, be equipped with on support frame (2) and put footboard (4) of installation flatly, antiskid (5) have been installed to footboard (4) surface both sides.
2. A scaffold for construction engineering according to claim 1, characterized in that: antiskid unit (5) include rubber layer (A), framed panel (B), even piece (C), arc ring (D), space bar (E), even piece two (F), rubber layer (A) surface covers and pastes space bar (E) that a plurality of equidistance were arranged, space bar (E) are installed and are being corresponded even piece (C) and even on the middle part aspect of piece two (F), even piece two (F) and even piece one (C) cooperation bolt make framed panel (B) fix footboard (4) on the surface, framed panel (B) both sides cover and paste arc ring (D).
3. A scaffold for construction engineering according to claim 1, characterized in that: the opening of the guardrail (3) is provided with a first ladder (1) which is vertically arranged.
4. A scaffold for construction engineering according to claim 1, characterized in that: the first ladder stand (1) and the second ladder stand (6) are installed at intervals.
5. A scaffold for construction engineering according to claim 1, characterized in that: the front side of the guardrail (3) is provided with a first ladder stand (1) which is fixedly connected.
CN201921418216.4U 2019-08-29 2019-08-29 Scaffold for building engineering Expired - Fee Related CN210563281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921418216.4U CN210563281U (en) 2019-08-29 2019-08-29 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921418216.4U CN210563281U (en) 2019-08-29 2019-08-29 Scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN210563281U true CN210563281U (en) 2020-05-19

Family

ID=70638363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921418216.4U Expired - Fee Related CN210563281U (en) 2019-08-29 2019-08-29 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN210563281U (en)

Similar Documents

Publication Publication Date Title
CN210563281U (en) Scaffold for building engineering
CN204663020U (en) Assembling temporary protection railing
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN205907599U (en) Bridge view buffering guardrail
CN214696537U (en) Just adorn formula glass guardrail mounting structure
CN210530504U (en) Multifunctional protective railing for construction site
CN209874424U (en) Building assembled safety scaffold
CN220284826U (en) Protective net structure for high-rise building deep foundation pit supporting engineering
CN201363157Y (en) Gauge protecting member combined by steel bar supporting beam and W steel protecting plate
CN210948733U (en) Mine reinforcing apparatus for coal mine engineering
CN214786182U (en) A protector for civil engineering safety construction
CN210828407U (en) Building engineering protective bracket
CN218562982U (en) Climbing frame protection device
CN214883276U (en) Wall body protection buffer stop
CN213144114U (en) Rail transit construction safety rail guard
CN215107955U (en) Guardrail device for building engineering
CN213477718U (en) High-rise operation protection frame for construction
CN220643868U (en) Detachable operation platform for high-speed rail hanging fence construction
CN217001254U (en) Novel deep basal pit struts protection network structure for engineering
CN215553017U (en) Novel side protection assembly
CN211666121U (en) Single-layer steel structure stair
CN215107139U (en) Civil engineering is with construction support
CN220621173U (en) Face limit protection device of assembled building
CN218667188U (en) Interim guardrail in bridge mound top
CN218261808U (en) Hydraulic jacking device for floor holding pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519

Termination date: 20210829