CN210562988U CN201920895869.5U CN201920895869U CN210562988U CN 210562988 U CN210562988 U CN 210562988U CN 201920895869 U CN201920895869 U CN 201920895869U CN 210562988 U CN210562988 U CN 210562988U
Authority
CN
China
Prior art keywords
steel column
column
butt joint
steel
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920895869.5U
Other languages
Chinese (zh)
Inventor
卜延渭
樊威武
殷楠
杨石彬
张艾武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC Mechanized Construction Group Co ltd
Original Assignee
SCEGC Mechanized Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCEGC Mechanized Construction Group Co ltd filed Critical SCEGC Mechanized Construction Group Co ltd
Priority to CN201920895869.5U priority Critical patent/CN210562988U/en
Application granted granted Critical
Publication of CN210562988U publication Critical patent/CN210562988U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an interior picture peg formula steel-pipe column butt joint node, this node include hypomere steel column, upper segment steel column, interior picture peg, welt and steel wedge. During construction, the lower part of the upper section steel column is inserted into the lower section steel column, the assembling gap between the upper section steel column and the lower section steel column is controlled through a plurality of steel wedges, butt joint is completed, and a butt joint welding line is welded after the perpendicularity of the steel columns is corrected. The utility model discloses this kind of to inserting formula steel-pipe column butt joint node that adopts has that the installation is convenient, butt joint simple process and reduced steel use amount, saves advantages such as cost of labor.

Description

Interior picture peg formula steel-pipe column butt joint node
Technical Field
The utility model belongs to the technical field of steel construction engineering, especially, relate to an interior plug-in board formula steel-pipe column butt joint node.
Background
In the prior art, the rectangular steel pipe column is in a conventional steel column form, and the conventional method for splicing the rectangular steel pipe column comprises the steps of adding splicing lug plates on the outer side of the steel column and connecting the splicing lug plates through high-strength bolts. However, the following problems also exist: need to weld the connecting plate on upper column lower extreme, lower post upper end surface, the quantity reaches 16 as many, need demolish after the butt joint is accomplished and polish, and is time-consuming and labouring.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the technical problem mentioned above, and provides an interior insertion plate formula steel-pipe column butt joint node that location is simple and convenient, practice thrift steel and process are less.
The utility model discloses a realize through following technical scheme:
an inner inserting plate type steel pipe column butt joint node comprises a lower section steel column, an upper section steel column, an inner inserting plate, a lining plate and a steel wedge; wherein the content of the first and second substances,
the lower section steel column and the upper section steel column are both steel pipe columns; the inner inserting plates are vertically arranged on the inner wall of the lower section of the steel column, the tops of the inner inserting plates exceed the top of the lower section of the steel column by not less than 150mm, and the lining plates are arranged on the inner wall of the lower section of the steel column;
when the steel column is in use, the lower part of the upper section steel column is inserted into the lower section steel column, the assembling gap between the upper section steel column and the lower section steel column is controlled through a plurality of steel wedges, the butt joint is completed, and then the upper section steel column and the lower section steel column are connected into a whole through welding.
The utility model discloses further improvement lies in, the wall thickness of hypomere steel column be not less than the wall thickness of upper segment steel column.
The utility model discloses a further improvement lies in, interior baord have the hoist and mount otic placode function.
The utility model discloses further improvement lies in, interior picture peg have steel-pipe column butt joint direction and limit function.
The utility model discloses a further improvement lies in, interior interpolation board weld on the inner wall of hypomere steel column, and all faces of four all around each interpolation board of welded fastening.
The utility model discloses a further improvement lies in, the welt pass through four faces of welded fastening all around at hypomere steel column inner wall to surpass hypomere steel column capital and be not less than 15 mm.
The utility model discloses further improvement lies in, clearance control steel wedge have 5 mm's installation clearance when being used for controlling hypomere steel column and upper segment steel column butt joint.
The utility model discloses further improvement lies in that the butt joint department of upper segment steel column lower extreme pipe wall and hypomere steel column has seted up the welding groove.
The utility model discloses following profitable technological effect has:
the utility model provides an interior inserting plate type steel pipe column butt joint node, through setting up interior inserting plate, welt and steel wedge, can direct and spacing the form that the direct insertion is inserted when the steel pipe column docks from top to bottom, simple process; meanwhile, the conventional method that the lug plate is welded outside the center pillar, the high-strength bolt is installed, and the follow-up work of dismantling, polishing, paint repairing and the like is omitted, so that the use amount of steel is reduced, and the labor cost is saved.
Drawings
Fig. 1 is a front view of an inner insert plate type steel pipe column butt joint node of the present invention;
fig. 2 is a sectional view taken along line a-a of fig. 1.
Description of reference numerals:
1-lower section steel column, 2-upper section steel column, 3-inner inserting plate, 4-lining plate and 5-steel wedge.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
As shown in fig. 1 and 2, the inner insert plate type steel pipe column butt joint node provided by the present invention includes a lower steel column 1, an upper steel column 2, an inner insert plate 3, a lining plate 4 and a steel wedge 5; wherein, hypomere steel column 1 and upper segment steel column 2 are the steel-pipe column, during the construction, carry out hypomere steel column 1 hoist and mount as the hoist and mount otic placode through the interior picture peg earlier, carry out the hoist and mount of upper segment steel column 2 after finishing, in the interior picture peg 3 of hypomere steel column 1 inserts upper segment steel column 2 completely in the upper segment steel column 2 of upper segment steel column 2 hoist and mount position, set up steel wedge 5 in the lateral wall upper surface of hypomere steel column 1 this moment, the outside of steel-pipe column sets up a plurality of and evenly distributed. After the upper section steel column 2 is located, the butt joint of the steel columns is measured by using a welding seam detection ruler, whether the misalignment of the upper and lower steel pipe column pipe walls is within a standard allowable deviation (less than or equal to 3mm) is checked, uniform alignment is carried out, and the position with larger misalignment is corrected by using a steel wedge 5 until the standard requirement is met. The cable wind rope is simultaneously pulled in four directions of the steel column and is used for adjusting the verticality of the upper steel column 2 and ensuring the stability of the upper steel column, and after the verticality and the plane position of the upper steel column 2 are adjusted, the upper steel column can be tightly attached to the lower steel column 1 through the steel wedge 5.
As shown in fig. 1, after the installation of the upper-section steel column 2 is completed and the planar position of the upper-section steel column is accurate, the cable wind rope can be tensioned, the butt welding seam is subjected to tack welding in the groove, the thickness of the welding seam is not more than 3mm, the length of the welding seam is not less than 40 mm, and the distance between the welding seam and the groove is 300 mm-600 mm; and taking out the steel wedge 5 after the positioning welding is finished. The butt welding seam is symmetrically welded by two welders at the same time (as shown in figure 2), and in the welding process, because the metal filling amount of the welding seam is large, the welding shrinkage is large, interlayer tearing is easy to generate, multilayer multi-pass welding is adopted, and the swing width is not easy to be overlarge.
Welding sequence of butt welding seam: each steel column is welded simultaneously at equal speed by two welders at symmetrical positions. And starting welding at the position in the steel pipe column in the anticlockwise direction. After welding one layer, the second layer and the subsequent layers are welded at the position 30 mm-50 mm away from the welding starting point of the previous layer. The welding slag should be carefully checked every welding pass. The final layer of cover weld seam can be welded by adopting small current. In the welding process, the two layers of crosses are welded alternately once.
The interposer 3 plays a role of: (1) the lower steel column is used as a lifting lug plate when being installed; (2) a limiting device used when the upper end steel column is installed; (3) the rigidity of the lower steel column 1 is increased, and deformation generated in the welding and installation processes is prevented. The function of the lining plate 4 is: (1) limiting the upper section of steel column during installation; (2) the steel column side wall is prevented from being punctured during full penetration welding, and root penetration welding is guaranteed. The steel wedge 5 has the following functions: (1) ensuring the splicing gap of 5 mm; (2) prevent the occurrence of welding defects such as poor penetration of the root portion and slag inclusion.
The above embodiments are only used for illustrating the technical solutions of the present invention and are not limited thereto, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered by the scope of the technical solutions of the present invention.

Claims (6)

1. An inner inserting plate type steel pipe column butt joint node is characterized by comprising a lower section steel column (1), an upper section steel column (2), an inner inserting plate (3), a lining plate (4) and a steel wedge (5); wherein the content of the first and second substances,
the lower section steel column (1) and the upper section steel column (2) are both steel pipe columns; the inner inserting plates (3) are vertically arranged on the inner wall of the lower section steel column (1), the tops of the inner inserting plates exceed the top of the lower section steel column (1), and the lining plates (4) are arranged on the inner wall of the lower section steel column (1);
when the steel column is in use, the upper part of the lower section steel column (1) is inserted into the upper section steel column (2), the gap between the upper section steel column (2) and the lower section steel column (1) is controlled through a plurality of steel wedges (5), butt joint is completed, and the upper section steel column (2) and the lower section steel column (1) are connected into a whole through welding.
2. An inner-plate steel pipe column butt joint according to claim 1, wherein the wall thickness of the lower section steel column (1) is not smaller than that of the upper section steel column (2).
3. An inner-plate type steel pipe column butt joint node according to claim 1, wherein the inner plate (3) is welded to the inner wall of the lower steel column (1), and one inner plate (3) is welded to each of the front, rear, left, and right sides.
4. An inner-inserting plate type steel pipe column butt joint node according to claim 1, wherein the lining plates (4) are fixed on the front, back, left and right surfaces of the inner wall of the lower steel column (1) through welding, and exceed the top of the lower steel column by no less than 15 mm.
5. An internal-insert steel pipe column butt joint according to claim 1, wherein the steel wedge (5) is used for controlling the installation clearance of 5mm when the lower steel column (1) and the upper steel column (2) are butted.
6. The inner-inserting-plate type steel pipe column butt joint node as claimed in claim 1, wherein a welding groove is formed at the butt joint of the lower end pipe wall of the upper section steel column (2) and the lower section steel column (1).
CN201920895869.5U 2019-06-14 2019-06-14 Interior picture peg formula steel-pipe column butt joint node Expired - Fee Related CN210562988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920895869.5U CN210562988U (en) 2019-06-14 2019-06-14 Interior picture peg formula steel-pipe column butt joint node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920895869.5U CN210562988U (en) 2019-06-14 2019-06-14 Interior picture peg formula steel-pipe column butt joint node

Publications (1)

Publication Number Publication Date
CN210562988U true CN210562988U (en) 2020-05-19

Family

ID=70627597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920895869.5U Expired - Fee Related CN210562988U (en) 2019-06-14 2019-06-14 Interior picture peg formula steel-pipe column butt joint node

Country Status (1)

Country Link
CN (1) CN210562988U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method

Similar Documents

Publication Publication Date Title
CN107498269B (en) A kind of large-scale ship reception chamber manufacturing method suitable for dry type ship compartment room
CN102489947B (en) Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN104805961B (en) Oblique bracket girders layer steel column of slab abnormity and preparation method thereof
CN103934693B (en) The processing technology of box-structure post/beam shaping
CN102861972A (en) Welding method for vertically spliced super-thick steel plate
CN109972837A (en) A kind of wooden frame template and its application method
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN210562988U (en) Interior picture peg formula steel-pipe column butt joint node
CN108031957A (en) A kind of welding manufacture method of weather-proof all welded steel structured stiff girder suspension bridge
CN111645826A (en) Control method for integrated construction precision of container cabin opening circumference
CN113401309B (en) Segmented construction method for bottom side cabin of bulk cargo ship
CN111571072A (en) Welding precision control method for box-type slender beam
CN109811725B (en) Non-water-cut-off quick maintenance method for water delivery channel
CN202780329U (en) Three-dimensional adjusting structure for butt-jointing welding pieces
CN111590229A (en) Combined connection method for concrete beam steel bars and section steel columns
CN115383407B (en) Machining and manufacturing method of wall-mounted cross crane beam
CN215105049U (en) Large-scale ship-berthing component support system suitable for assembled high-pile wharf
CN115365764A (en) Manufacturing method of steel shell tower section with four-corner arc section and variable cross section and reinforcing bars
CN207904734U (en) Upper shaped edge main beam structure
CN114809270B (en) Nuclear power station steel lining variable cross-section special-shaped lining plate structure and manufacturing method thereof
CN113358315B (en) Installation and construction method of large drop test platform
CN112247387B (en) Method for splicing, welding and manufacturing ultra-long angle steel
CN213979914U (en) Limiting and supporting device for arc-angle square column formwork construction
CN216075815U (en) Node structure for connecting floor bearing plate and template
CN116571842B (en) Automatic welding method for construction site of bridge tower with oversized-section steel structure