CN210554997U - Handling device is used in hydraulic engineering pile foundation construction - Google Patents

Handling device is used in hydraulic engineering pile foundation construction Download PDF

Info

Publication number
CN210554997U
CN210554997U CN201921724910.9U CN201921724910U CN210554997U CN 210554997 U CN210554997 U CN 210554997U CN 201921724910 U CN201921724910 U CN 201921724910U CN 210554997 U CN210554997 U CN 210554997U
Authority
CN
China
Prior art keywords
pile foundation
motor
base
guide frame
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921724910.9U
Other languages
Chinese (zh)
Inventor
冯晓宁
魏然
宋晓婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921724910.9U priority Critical patent/CN210554997U/en
Application granted granted Critical
Publication of CN210554997U publication Critical patent/CN210554997U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a handling device is used in hydraulic engineering pile foundation construction, including base, first motor, second motor and electric putter, the base internal fixation has first motor, and the output of first motor is connected with the guide frame to the guide frame is located the top of base, the bottom edge of guide frame is fixed with the gag lever post, and the bottom of gag lever post is located the spacing inslot, the second motor is installed to the inboard at guide frame top, and the output of second motor is connected with the screw rod, threaded connection has the mounting bracket on the screw rod, and mounting bracket and screw rod all are located the activity inslot to the inboard of guide frame is seted up in the activity inslot, the bottom edge welding of mounting bracket has the fixing base, the axle is connected with the gear in the fixing base, the top edge of base is fixed with places the board. This handling device is used in hydraulic engineering pile foundation construction can carry out automatic pickup and transport in batches to the pile foundation, keeps the stable of pile foundation to place simultaneously.

Description

Handling device is used in hydraulic engineering pile foundation construction
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a handling device is used in hydraulic engineering pile foundation construction.
Background
Hydraulic engineering surveys, plans, design, construction to the water conservancy project, in water conservancy construction, can use the pile foundation to carry out the construction of basis usually, involves carrying the pile foundation, uses pile foundation handling device, and current handling device nevertheless has following problem:
pile foundation among the hydraulic engineering is mostly heavier, and artifical transport is wasted time and energy usually, need carry out the automatic pickup and the transport of pile foundation, need use a large amount of pile foundations among the hydraulic engineering simultaneously, for improving work efficiency, need carry the pile foundation in batches.
In order to solve the above problems, innovative design based on the original carrying device is urgently needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a handling device is used in hydraulic engineering pile foundation construction to solve above-mentioned background art and provide current handling device, need carry out automatic pickup to the pile foundation, need carry out the problem of transport in batches to the pile foundation simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: a carrying device for hydraulic engineering pile foundation construction comprises a base, a first motor, a second motor and an electric push rod, wherein the first motor is fixed in the base, the output end of the first motor is connected with a guide frame, the guide frame is positioned above the base, a limiting rod is fixed at the bottom edge of the guide frame, the bottom of the limiting rod is positioned in a limiting groove, the limiting groove is formed in the upper end face of the base, the second motor is installed on the inner side of the top of the guide frame, the output end of the second motor is connected with a screw rod, a mounting frame is in threaded connection with the screw rod, the mounting frame and the screw rod are both positioned in a movable groove, the movable groove is formed in the inner side of the guide frame, a fixing seat is welded at the bottom edge of the mounting frame, a push block is connected in the fixing seat through the electric push rod, a clamping block is fixed on the outer side of the push block, and the clamping rod is installed in the outside of gear to the clamping rod is located the below of fixing base, the top edge of base is fixed with places the board.
Preferably, the limiting rod is rotatably connected with the limiting groove, and the limiting groove is designed into a circular ring type structure.
Preferably, sliding connection between the end of the mounting rack and the movable groove, and the outer side of the end of the mounting rack and the inner wall of the movable groove are mutually attached.
Preferably, the clamping blocks are distributed on the pushing block at equal intervals, and the clamping blocks are meshed with the gear.
Preferably, the clamping rod is designed to be in an L-shaped structure, and the clamping rod and the gear are in a welding integrated structure.
Preferably, the placing plate is designed to be of a concave structure, and the number of the placing plates is 2, wherein the number of the placing plates is symmetrical about the central axis of the base.
Compared with the prior art, the beneficial effects of the utility model are that: the carrying device for hydraulic engineering pile foundation construction;
1. the limiting rod is rotatably connected with the limiting groove, and meanwhile, the end part of the mounting frame is slidably connected with the movable groove, so that the guide frame can be kept to stably rotate through the sliding of the limiting rod in the limiting groove, and meanwhile, the mounting frame can vertically slide in the movable groove and is matched with the rotation of the guide frame, the position of the fixing seat is adjusted, and the pile foundation can be conveniently grabbed and placed;
2. through intermeshing between the fixture block that sets up and the gear, the clamping bar is "L" style of calligraphy structural design simultaneously for electric putter when the drive ejector pad slides from top to bottom, can drive the rotation of gear through the fixture block in the ejector pad outside, thereby drive the expansion and fold of two clamping bars, pick up the pile foundation in proper order through two clamping bars, two are placed the board and are concave style of calligraphy structural design simultaneously, can carry out fixed placing in batches to the pile foundation, conveniently carry.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic top view of the cross-sectional structure of the present invention;
FIG. 3 is a schematic view of the top-view cross-sectional structure of the fixing base of the present invention;
fig. 4 is a schematic structural diagram of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a first motor; 3. a guide frame; 4. a limiting rod; 5. a limiting groove; 6. a second motor; 7. a screw; 8. a mounting frame; 9. a movable groove; 10. a fixed seat; 11. an electric push rod; 12. a push block; 13. a clamping block; 14. a gear; 15. a clamping bar; 16. placing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a carrying device for hydraulic engineering pile foundation construction comprises a base 1, a first motor 2, a guide frame 3, a limiting rod 4, a limiting groove 5, a second motor 6, a screw 7, a mounting frame 8, a movable groove 9, a fixing seat 10, an electric push rod 11, a push block 12, a clamping block 13, a gear 14, a clamping rod 15 and a placing plate 16, wherein the first motor 2 is fixed in the base 1, the output end of the first motor 2 is connected with the guide frame 3, the guide frame 3 is positioned above the base 1, the limiting rod 4 is fixed at the bottom edge of the guide frame 3, the bottom of the limiting rod 4 is positioned in the limiting groove 5, the limiting groove 5 is arranged on the upper end surface of the base 1, the second motor 6 is arranged on the inner side of the top of the guide frame 3, the output end of the second motor 6 is connected with the screw 7, the mounting frame 8 is in threaded connection with the screw 7, the mounting frame 8 and the screw 7 are both positioned in the movable groove 9, the movable groove 9 is arranged on the, a fixed seat 10 is welded at the bottom edge of the mounting frame 8, a push block 12 is connected in the fixed seat 10 through an electric push rod 11, a clamping block 13 is fixed on the outer side of the push block 12, a gear 14 is connected in the fixed seat 10, a clamping rod 15 is installed on the outer side of the gear 14, the clamping rod 15 is located below the fixed seat 10, and a placing plate 16 is fixed at the top edge of the base 1;
the limiting rod 4 is rotatably connected with the limiting groove 5, the limiting groove 5 is in a circular ring type structural design, and when the first motor 2 drives the guide frame 3 to rotate, the limiting rod 4 at the bottom of the guide frame 3 rotates in the limiting groove 5 to keep the guide frame 3 stably supported;
the end part of the mounting frame 8 is in sliding connection with the movable groove 9, the outer side of the end part of the mounting frame 8 is attached to the inner wall of the movable groove 9, and when the second motor 6 drives the screw 7 to rotate, the mounting frame 8 in threaded connection with the screw 7 can be driven to slide up and down in the movable groove 9, so that the pile foundation can be conveniently lifted, placed and taken after being clamped;
the clamping blocks 13 are distributed on the push block 12 at equal intervals, the clamping blocks 13 are meshed with the gear 14, and when the electric push rod 11 drives the push block 12 to slide up and down, the clamping blocks 13 on the outer side of the push block 12 are meshed with the gear 14 to drive the gear 14 to rotate;
the clamping rods 15 are designed to be L-shaped structures, welding integrated structures are formed between the clamping rods 15 and the gears 14, and when the clamping rods 15 rotate along with the gears 14, the pile foundation can be clamped and fixed through the 2 clamping rods 15, so that the pile foundation can be conveniently taken and transported;
place board 16 and be type of calligraphy structural design, and place board 16 and be provided with 2 about base 1's the central axis symmetry, can leave the both ends of pile foundation in placing board 16, fix the pile foundation in batches through placing board 16, make things convenient for the batch transport of pile foundation and take.
The working principle is as follows: when the carrying device for hydraulic engineering pile foundation construction is used, as shown in fig. 1, firstly, a base 1 is pushed to a pile foundation to be carried, a first motor 2 is started, a guide frame 3 is driven by the first motor 2 to rotate on the base 1, the transverse positions of an installation frame 8 and a fixed seat 10 on the guide frame 3 are adjusted, meanwhile, a limiting rod 4 at the bottom of the guide frame 3 rotates along with a limiting groove 5 in the rotating process, the stability of the guide frame 3 is kept, then a second motor 6 is started, and the second motor 6 drives a screw 7 to rotate, so that the installation frame 8 in threaded connection with the screw 7 in fig. 1-2 slides downwards in a movable groove 9, the heights of the installation frame 8 and the fixed seat 10 are adjusted until a clamping rod 15 at the bottom of the fixed seat 10 reaches the pile foundation;
then, as shown in fig. 1 and fig. 3-4, the electric push rod 11 is started, the electric push rod 11 drives the push block 12 to move downwards, the fixture block 13 outside the push block 12 is in meshing contact with the gear 14 to drive the gear 14 to rotate, the clamping rod 15 at the bottom of the gear 14 expands outwards, then according to the above steps, the fixing seat 10 moves downwards until 2 clamping rods 15 reach the bottom of the pile foundation, then the electric push rod 11 reversely drives the push block 12 to contract the 2 clamping rods 15 inwards to clamp the pile foundation, then according to the above operation, the mounting frame 8 is lifted, and simultaneously the guide frame 3 rotates back to the original position until the clamped pile foundation reaches the position above the placing plate 16 in fig. 1-2, then the pile foundation is lowered, the 2 clamping rods 15 are released, the end part of the pile foundation is placed into the 2 placing plates 16, the automatic pile foundation pickup is completed, according to the above operation, accomplish the automatic pickup of a plurality of pile foundations in proper order, then promote base 1 to work area, realize the transport of pile foundation.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a handling device is used in hydraulic engineering pile foundation construction, includes base (1), first motor (2), second motor (6) and electric putter (11), its characterized in that: the automatic positioning device is characterized in that a first motor (2) is fixed in the base (1), the output end of the first motor (2) is connected with a guide frame (3), the guide frame (3) is positioned above the base (1), a limiting rod (4) is fixed at the bottom edge of the guide frame (3), the bottom of the limiting rod (4) is positioned in a limiting groove (5), the limiting groove (5) is arranged on the upper end surface of the base (1), a second motor (6) is installed on the inner side of the top of the guide frame (3), the output end of the second motor (6) is connected with a screw rod (7), a mounting frame (8) is in threaded connection with the screw rod (7), the mounting frame (8) and the screw rod (7) are both positioned in a movable groove (9), the movable groove (9) is arranged on the inner side of the guide frame (3), a fixing seat (10) is welded at the bottom edge of the mounting frame (8), and a pushing block (12) is connected in the fixing seat (10) through an electric pushing, and the outside of ejector pad (12) is fixed with fixture block (13), axle connection has gear (14) in fixing base (10), and the outside of gear (14) is installed clamping bar (15), and clamping bar (15) are located the below of fixing base (10), the top edge of base (1) is fixed with places board (16).
2. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the limiting rod (4) is rotatably connected with the limiting groove (5), and the limiting groove (5) is designed into a circular ring type structure.
3. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the end part of the mounting rack (8) is in sliding connection with the movable groove (9), and the outer side of the end part of the mounting rack (8) is attached to the inner wall of the movable groove (9).
4. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the clamping blocks (13) are distributed on the push block (12) at equal intervals, and the clamping blocks (13) are meshed with the gear (14).
5. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the clamping rod (15) is designed to be L-shaped, and the clamping rod (15) and the gear (14) are welded into a whole.
6. The carrying device for the construction of the hydraulic engineering pile foundation of claim 1, wherein: the placing plates (16) are designed to be of a concave structure, and 2 placing plates (16) are symmetrically arranged around the central axis of the base (1).
CN201921724910.9U 2019-10-15 2019-10-15 Handling device is used in hydraulic engineering pile foundation construction Expired - Fee Related CN210554997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921724910.9U CN210554997U (en) 2019-10-15 2019-10-15 Handling device is used in hydraulic engineering pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921724910.9U CN210554997U (en) 2019-10-15 2019-10-15 Handling device is used in hydraulic engineering pile foundation construction

Publications (1)

Publication Number Publication Date
CN210554997U true CN210554997U (en) 2020-05-19

Family

ID=70623250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921724910.9U Expired - Fee Related CN210554997U (en) 2019-10-15 2019-10-15 Handling device is used in hydraulic engineering pile foundation construction

Country Status (1)

Country Link
CN (1) CN210554997U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112550416A (en) * 2020-12-30 2021-03-26 温州市建筑废土处置有限公司 Hydraulic engineering pile foundation construction is with transport apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112550416A (en) * 2020-12-30 2021-03-26 温州市建筑废土处置有限公司 Hydraulic engineering pile foundation construction is with transport apparatus

Similar Documents

Publication Publication Date Title
CN210554997U (en) Handling device is used in hydraulic engineering pile foundation construction
CN210188922U (en) Automatic aligning device for connection welding
CN209896961U (en) Support arrangement for conveniently carry out local change to photovoltaic board
CN201838568U (en) Silicon wafer pushing device
CN216506388U (en) Limiting device for processing injection mold
CN213135153U (en) Drilling precision clamp of communication part
CN212169362U (en) Solar street lamp is battery board laser cutting device for production and processing
CN112318754B (en) Multi-wire cutting machine for processing solar cell panel
CN211907451U (en) Super-white photovoltaic glass packaging device
CN113275687A (en) Welding bottom plate device and battery string production equipment
CN219131306U (en) Machining tool for wind turbine generator support
CN214980622U (en) Pipeline installation positioner
CN112831822A (en) Device for improving electroplating uniformity of VCP electroplating line
CN214266715U (en) Frame type mould axial assembling work fixture frame
CN211997307U (en) Tray type goods shelf
CN214767876U (en) Improvement of seamless steel pipe cold-drawing die
CN216370907U (en) Automatic welding machine for welding teeth on end face of tubular steel structure
CN211071998U (en) Novel elbow cutting equipment for automatic production
CN220612379U (en) Photovoltaic support drilling specialized tool
CN214766648U (en) Novel balancing weight tectorial membrane device
CN213937822U (en) Photovoltaic panel capable of being automatically cleaned
CN218575310U (en) Turnover welding device for solar cell
CN219074785U (en) Pipeline welding clamping device
CN213293618U (en) Liftable storage goods shelves
CN218612376U (en) Typesetting and welding device for solar flexible battery piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519