CN210554298U - Quick charging's electric pile that fills - Google Patents

Quick charging's electric pile that fills Download PDF

Info

Publication number
CN210554298U
CN210554298U CN201921574877.6U CN201921574877U CN210554298U CN 210554298 U CN210554298 U CN 210554298U CN 201921574877 U CN201921574877 U CN 201921574877U CN 210554298 U CN210554298 U CN 210554298U
Authority
CN
China
Prior art keywords
electric pile
fills
screw rod
pile body
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921574877.6U
Other languages
Chinese (zh)
Inventor
董建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jingruihuan Science And Technology Co ltd
Original Assignee
Chengdu Jingruihuan Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jingruihuan Science And Technology Co ltd filed Critical Chengdu Jingruihuan Science And Technology Co ltd
Priority to CN201921574877.6U priority Critical patent/CN210554298U/en
Application granted granted Critical
Publication of CN210554298U publication Critical patent/CN210554298U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a quick charge's electric pile that fills belongs to and fills the electric pile field, a quick charge fills electric pile, including installing at the crane span structure body of ceiling downside and installing the electric pile body that fills of crane span structure body downside, fill the top power transmission portion of electric pile body and installed the spool, the mounting panel has been installed on the top of spool, on the mounting panel, the position that corresponds the spool port is equipped with first through wires hole, the bottom of crane span structure body, the position that corresponds first through wires hole are equipped with the second through wires hole. The positive rotating rod drives the threaded cylinder to rotate downwards along the second screw rod, the inserting column is completely inserted into the inserting cylinder, the lower end of the inserting column is pressed against the bottom inside the inserting cylinder, the position of the lower side of the threaded cylinder is stabilized, and the lower side of the charging pile body can be effectively supported through the connecting support of the second screw rod and the threaded cylinder.

Description

Quick charging's electric pile that fills
Technical Field
The utility model relates to a quick charge's electric pile that fills.
Background
Fill its function of electric pile and be similar to the tanker aircraft of filling station the inside, install in public building and residential quarter parking area or charging station, can charge for the electric automobile of various models according to the voltage class of difference, fill electric pile's input and alternating current network lug connection, the output all is equipped with the charging plug and is used for charging for electric automobile, it generally provides two kinds of charging methods of conventional charging and quick charge to fill electric pile, people can use specific charging card to punch the card and use on the human-computer interaction operation interface that fills electric pile and provide, carry out corresponding charging method, the time of charging, operations such as expense data printing, it can show the charging amount to fill electric pile display screen, the expense, data such as the time of.
Some charging stations, the charging pile is installed on the bottom of a bridge installed on a ceiling, the power transmission part of the charging pile is connected with a wire pipe, the top of the wire pipe is provided with a mounting plate, the mounting plate is provided with a threading hole corresponding to the port of the wire pipe, the left side and the right side of the upper end of the mounting plate are provided with screw rods, the bottom of the bridge is provided with a threading hole corresponding to the threading hole, the bottom of the bridge is provided with a mounting hole corresponding to the distribution positions of the two screw rods, the screw rods can be inserted into the mounting holes in a one-to-one correspondence manner to enable the screw rods to be inserted into the bridge, the screw rods can be locked through nuts, so that the mounting plate is tightly pressed on the bottom surface of the bridge, the charging pile can be stably installed on the lower side of the bridge, the threading holes on the bridge are communicated, the purpose of design like this utilizes the crane span structure to total transmission cable's laying and the holding power of crane span structure self, can fill electric pile along the even installation of crane span structure direction, but because the crane span structure wall thickness is thinner, when filling electric pile and receiving other things lateral impact, the mounting panel can support and press the crane span structure bottom and cause the crane span structure bottom to warp.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a quick charge's electric pile that fills to solve the problem of proposing among the above-mentioned background art.
In order to achieve the above objects, an embodiment of the present invention provides a fast charging pile, including a bridge body installed on a lower side of a ceiling and a charging pile body installed on a lower side of the bridge body, wherein a wire pipe is installed at a top power transmission portion of the charging pile body, a mounting plate is installed at a top end of the wire pipe, a first threading hole is formed in a position corresponding to a port of the wire pipe on the mounting plate, a second threading hole is formed in a position corresponding to the first threading hole at a bottom of the bridge body, first screws are installed on both sides of the mounting plate, mounting holes are respectively formed in a bottom of the bridge body and a distribution position corresponding to each first screw, the first screws are inserted into the bridge body through the mounting holes, a section of the first screws inserted into the bridge body is locked by nuts, and a second screw is installed at a center position of a bottom end of the charging pile, the second screw rod threaded connection has a screw thread section of thick bamboo, the bottom of a screw thread section of thick bamboo has been installed and has been supported the clamp plate, support the bottom of clamp plate and have been installed and insert the post, the hypomere cover of inserting the post is equipped with and inserts a section of thick bamboo and insert a section of thick bamboo pre-buried in filling the concrete ground of electric pile body downside.
Furthermore, the spool is the pipe structure, and the mounting panel is square plate structure.
Furthermore, the pressing plate is of a circular plate structure, and a rotating rod is distributed on the outer edge of the pressing plate.
Furthermore, the inserting column is of a cylindrical structure, and the inserting cylinder is of a cylindrical structure.
Furthermore, the bottom of the inserting cylinder is provided with a grounding pipe which is of a round pipe structure.
To sum up, the utility model has the advantages of it is following:
first, the positive rotating rod drives a thread cylinder to move downwards along a second screw rod in a rotating mode until an inserting column is completely inserted into the inserting cylinder, the lower end of the inserting column is abutted to press the inner bottom end of the inserting cylinder, the position of the lower side of the thread cylinder is stabilized, and the lower side of a charging pile body can be effectively supported through the connecting support of the second screw rod and the thread cylinder.
The second, when filling electric pile body surface electric leakage, accessible second screw rod, a screw thread section of thick bamboo, support the clamp plate, insert the post and insert a section of thick bamboo with the electric current guide to the earthing tube on, guide the electric current to the underground through the earthing tube, realize the effect of natural ground connection.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present invention;
fig. 2 is a schematic view partially cut away from the front view in one embodiment of the present invention;
fig. 3 is an enlarged schematic structural diagram of a position a in an embodiment of the present invention;
FIG. 4 is a schematic view of the distribution of the first screws in one embodiment of the present invention;
fig. 5 is a schematic view of the distribution of the swing rods according to an embodiment of the present invention.
Wherein, 1 crane span structure body, 2 fill electric pile body, 3 spool, 4 mounting panels, 5 first through wires holes, 6 second through wires holes, 7 first screw rods, 8 mounting holes, 9 nuts, 10 second screw rods, 11 screw thread section of thick bamboos, 12 are supported clamp plate, 13 swing arms, 14 are inserted the post, 15 are inserted a section of thick bamboo, 16 ground pipes.
Detailed Description
Referring to fig. 2, 3 and 4, a quick charging pile comprises a bridge frame body 1 installed on the lower side of a ceiling and a charging pile body 2 installed on the lower side of the bridge frame body 1, the type of the charging pile body 2 is AC700-AG-05, and is a quick charging pile, a line pipe 3 is installed on a top power transmission part of the charging pile body 2, the power transmission part of the charging pile body 2 is arranged at the top center position of the charging pile body 2, a lower port of the line pipe 3 is welded to the top center position of the charging pile body 2, a mounting plate 4 is installed on the top end of the line pipe 3, the top end of the line pipe 3 is welded to the lower center position of the mounting plate 4, the line pipe 3 is in a circular pipe structure, the mounting plate 4 is in a square plate structure, a first threading hole 5 is arranged on the mounting plate 4 at a position corresponding to the port of the line pipe, the bottom of the bridge frame body 1 and the position corresponding to the first threading hole 5 are provided with second threading holes 6, the second threading holes 6 are of a circular hole structure, the second threading holes 6 are uniformly arranged on the inner side of the bottom of the bridge frame body 1 along the laying direction of the bridge frame body 1, the first threading holes 5 are communicated with the second threading holes 6, the power transmission wires of the charging pile body 2 can penetrate into the bridge frame body 1 through the wire tubes 3, the first threading holes 5 and the second threading holes 6 and respectively connect the end parts of the power transmission wires with the general power transmission cables in the bridge frame body 1, both sides of the mounting plate 4 are respectively provided with a first screw 7, the first screws 7 are symmetrically arranged on the left side and the right side of the upper end surface of the mounting plate 4, the lower end of the first screw 7 is welded with the mounting plate 4, the bottom of the bridge frame body 1 and the distribution positions corresponding to the first screws 7 are respectively provided with mounting holes 8, the mounting holes 8 are of a, the first screw 7 is inserted into the bridge frame body 1 through the mounting hole 8, one section of the first screw 7 inserted into the bridge frame body 1 is locked through the nut 9, and the first screws 7 on the left side and the right side are locked through the nuts 9 on the left side and the right side, so that the mounting plate 4 upwards compresses the bottom of the bridge frame body 1.
Referring to fig. 1, 2 and 5, a second screw rod 10 is installed at the bottom center of a charging pile body 2, the bottom center of the charging pile body 2 is welded to the upper end of the second screw rod 10, the second screw rod 10 has a length of 3 m, the second screw rod 10 is in threaded connection with a threaded cylinder 11, the threaded cylinder 11 is in a cylindrical structure with an internal thread on the inner wall, a pressing plate 12 is installed at the bottom of the threaded cylinder 11, the lower end of the threaded cylinder 11 is welded to the upper center of the pressing plate 12, the pressing plate 12 is in a circular plate structure, a rotating rod 13 is arranged on the outer edge of the pressing plate 12, the number of the rotating rods 13 is 4, the rotating rods 13 are uniformly arranged on the outer edge of the pressing plate 12 in a circular shape, the pressing plate 12 and the rotating rod 13 are made of a fusion-casting integrated piece, the rotating rod 13 drives the threaded cylinder 11 to rotate upward or downward on the second screw rod 10, an insert column 14 is installed at the bottom end of the pressing plate 12, and the, the lower section of the plug post 14 is sleeved with an insert cylinder 15, the insert cylinder 15 is pre-embedded in a concrete ground surface on the lower side of the charging pile body 2, the plug post 14 is of a cylindrical structure, the insert cylinder 15 is of a cylindrical structure, the plug post 14 is in sliding insertion fit with the inner wall of the insert cylinder 15, when the plug post 14 is completely inserted into the insert cylinder 15, the length of the plug post 14 protruding out of the insert cylinder 15 is 15 cm, the bottom of the insert cylinder 15 is provided with a grounding pipe 16, the central position of the bottom of the insert cylinder 15 is welded and connected with the upper end of the grounding pipe 16, the length of the grounding pipe 16 is 5 m, the insert cylinder 15 and the grounding pipe 16 are pre-embedded in the concrete ground surface on the lower side of the charging pile body 2, the second screw rod 10, the threaded cylinder 11, the abutting plate 12, the plug post 14, the insert cylinder 15 and the grounding pipe 16 are all made of stainless steel, and have conductivity, when electricity leaks from the outer surface of the charging pile body 2, the second screw rod 10, the threaded, the current is guided to the underground through the grounding pipe 16, so that the effect of natural grounding is realized, and the grounding pipe 16 is of a circular pipe structure.
Before installation, each assembly part is in a separated state, the threaded cylinder 11 is completely sleeved into the second screw rod 10, the two first screw rods 7 on the left side and the right side of the upper end of the mounting plate 4 can be respectively inserted into the two mounting holes 8 on the left side and the right side of the bottom of the bridge body 1 correspondingly, finally, the first screw rods 7 are inserted into the locking nuts 9 at one end of the bridge body 1, so that the mounting plate 4 upwards compresses the lower end of the bridge body 1, before the insertion, a power transmission wire of the charging pile body 2 can be inserted into the bridge body 1 through the wire tube 3, the first threading holes 5 and the second threading holes 6, the end parts of the power transmission wire are respectively connected with a main power transmission cable in the bridge body 1, the position of the charging pile body 2 can be preliminarily stabilized, at the moment, the insertion column 14 corresponds to the upper port of the pre-buried insertion cylinder 15 on the concrete ground, the forward rotating rod 13 drives the threaded cylinder 11 to rotate downwards along the second, and the lower extreme of inserting post 14 supports presses and inserts the inside bottom of a section of thick bamboo 15, the position of screw thread section of thick bamboo 11 downside has been stabilized, and the joint support through second screw rod 10 and screw thread section of thick bamboo 11, can effectively support for the downside that fills electric pile body 2, when filling electric pile body 2 and receiving transverse impact, the position of electric pile body 2 is stably filled, be difficult for causing mounting panel 4 to support and press bridging body 1 bottom and make the crane span structure body 1 bottom warp, screw thread section of thick bamboo 11 and the cooperation of second screw rod 10 spiral, can support for the electric pile body 2 of filling of the installation of crane span structure body 1 downside installation of different arrangement heights, when filling electric pile body 2 surface electric leakage, accessible second screw rod 10, screw thread section of thick bamboo 11, press plate 12, insert post 14 and insert a section of thick bamboo 15 and guide the electric current to ground pipe 16, guide to the underground through ground.
While the present invention has been described in detail and with reference to the accompanying drawings, it is not to be considered as limited to the scope of the invention. Various modifications and changes may be made by those skilled in the art without inventive step within the scope of the appended claims.

Claims (5)

1. The utility model provides a quick charge's electric pile that fills, is including installing crane span structure body (1) of ceiling downside and installing electric pile body (2) that fills of crane span structure body (1) downside, its characterized in that: the utility model discloses a cable bridge, including fill electric pile body (2), the top power transmission portion of electric pile body has installed spool (3), mounting panel (4) have been installed on the top of spool (3), on mounting panel (4), the position that corresponds spool (3) port is equipped with first through wires hole (5), the bottom of bridge body (1), the position that corresponds first through wires hole (5) are equipped with second through wires hole (6), first screw rod (7) have all been installed to the both sides of mounting panel (4), the bottom of bridge body (1), the distribution position that corresponds each first screw rod (7) are equipped with mounting hole (8) respectively, first screw rod (7) insert bridge body (1) through mounting hole (8) in, insert one section in bridge body (1) on first screw rod (7) and pass through nut (9) locking, fill the bottom central point of electric pile body (2) and put and install second screw rod (10), the utility model discloses a concrete ground that fills electric pile body (2) downside, second screw rod (10) threaded connection has a screw thread section of thick bamboo (11), the bottom of a screw thread section of thick bamboo (11) has been installed and has been supported clamp plate (12), support the bottom of clamp plate (12) and have been installed and insert post (14), the hypomere cover of inserting post (14) is equipped with and inserts a section of thick bamboo (15) and insert a section of thick bamboo (15) pre-buried in the concrete ground that fills electric pile body.
2. A rapid-charging stake of claim 1, wherein: the line pipe (3) is of a circular pipe structure, and the mounting plate (4) is of a square plate structure.
3. A rapid-charging stake of claim 1, wherein: the pressing plate (12) is of a circular plate structure, and a rotating rod (13) is arranged on the outer edge of the pressing plate (12).
4. A rapid-charging stake of claim 1, wherein: the inserting column (14) is of a cylindrical structure, and the inserting cylinder (15) is of a cylindrical structure.
5. The fast-charging stake of claim 4, wherein: the bottom of the inserting cylinder (15) is provided with a grounding pipe (16), and the grounding pipe (16) is of a circular pipe structure.
CN201921574877.6U 2019-09-21 2019-09-21 Quick charging's electric pile that fills Expired - Fee Related CN210554298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921574877.6U CN210554298U (en) 2019-09-21 2019-09-21 Quick charging's electric pile that fills

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921574877.6U CN210554298U (en) 2019-09-21 2019-09-21 Quick charging's electric pile that fills

Publications (1)

Publication Number Publication Date
CN210554298U true CN210554298U (en) 2020-05-19

Family

ID=70627137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921574877.6U Expired - Fee Related CN210554298U (en) 2019-09-21 2019-09-21 Quick charging's electric pile that fills

Country Status (1)

Country Link
CN (1) CN210554298U (en)

Similar Documents

Publication Publication Date Title
US20210025554A1 (en) Modular assembled outdoor lighting device and installation method thereof, light pole structure
CN103259228A (en) Connecting method of wall electrical pipe line of prefabricated assembly type house
CN210554298U (en) Quick charging's electric pile that fills
CN208615741U (en) A kind of packaging charging pilework of charging pile module
CN209723222U (en) A kind of frame structure of building construction
CN107167888B (en) Optical cable plugging device
CN103683110A (en) L-LF type insulator string ground potential live replacement method
CN201018008Y (en) Bus bar compression joint type horizontal connection structure
CN213484182U (en) Connecting device of lightning rod
CN103683109A (en) 220kV line L-LF type insulator string live replacement tool
CN201038348Y (en) Transmission line bracket maintenance-free earthing network
CN103036191A (en) Cable terminal for European-style branch box and ring main unit
CN209355198U (en) A kind of outer assembly type street lamp wire connection device
CN206922361U (en) A kind of multi-cavity circuit and its connector
CN213905680U (en) Electric automobile alternating-current charging stake power input hidden quick socket
CN206657040U (en) A kind of ammeter box fixed mount
CN111376768A (en) Fill electric pile easy to assemble
CN206211446U (en) A kind of cable bearer
CN220253502U (en) Pre-buried appurtenance of ground connection socket
CN219154275U (en) Charging pile of power cord of removable specification
CN205894388U (en) Bathroom assemble structure
CN220742751U (en) New energy automobile fills electric pile
CN211166506U (en) Wall-hanging electric pile that fills
CN216709056U (en) New forms of energy fill electric pile's reason line device
CN217106412U (en) Composite glass fiber reinforced plastic cross arm device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519