CN210551985U - Multi-layer wooden building template based on plate edge wax brushing technology - Google Patents

Multi-layer wooden building template based on plate edge wax brushing technology Download PDF

Info

Publication number
CN210551985U
CN210551985U CN201920858556.2U CN201920858556U CN210551985U CN 210551985 U CN210551985 U CN 210551985U CN 201920858556 U CN201920858556 U CN 201920858556U CN 210551985 U CN210551985 U CN 210551985U
Authority
CN
China
Prior art keywords
building template
sliding
template body
grooves
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920858556.2U
Other languages
Chinese (zh)
Inventor
卢立凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Guren Building Formwork Products Co Ltd
Original Assignee
Huizhou Guren Building Formwork Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Guren Building Formwork Products Co Ltd filed Critical Huizhou Guren Building Formwork Products Co Ltd
Priority to CN201920858556.2U priority Critical patent/CN210551985U/en
Application granted granted Critical
Publication of CN210551985U publication Critical patent/CN210551985U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a multilayer wood system building templates based on flange brush wax technique, including building templates body, baffle, first spout, first slider, fastening bolt, shifting chute, screw hole and floating device, its characterized in that: first spout has all been seted up in building templates body top face both sides, at the inside baffle that is provided with of building templates body, has first slider at the equal fixed mounting in baffle both ends, and first slider and the cooperation of first spout, two the shifting chute has all been seted up in the first spout outside, the utility model discloses structure scientific and reasonable, convenience safe in utilization, building templates body formula structure as an organic whole need not assemble, can directly carry out concrete placement for construction period, make first slider remove along first spout direction through removing the baffle to adjustable volume that need pour is adjusted and is closely cooperated through fastening bolt and screw hole after accomplishing, thereby fixes the baffle position.

Description

Multi-layer wooden building template based on plate edge wax brushing technology
Technical Field
The utility model relates to a building templates field specifically is a multilayer wood system building templates based on flange brush wax technique.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
But the building templates in the existing market are complex in structure and single in function, and in the existing building template technology, the concrete pouring volume can not be effectively adjusted according to actual requirements, and meanwhile, the concrete surface can not be effectively trowelled after the concrete pouring is finished.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a multilayer wood system building templates based on flange wax brushing technique to solve the problem that proposes in the above-mentioned background art.
The purpose of the utility model can be realized by the following technical scheme: the utility model provides a multilayer wood system building templates based on flange brush wax technique, includes building templates body, baffle, first spout, first slider, fastening bolt, shifting chute, screw hole and floating device, its characterized in that: first spout has all been seted up in building templates body top face both sides, is provided with the baffle in building templates body inside, has first slider at the equal fixed mounting in baffle both ends, and first slider and first spout cooperation, two the shifting chute has all been seted up in the first spout outside, two the inside fastening bolt that all is provided with of shifting chute, two first slider is close to shifting chute side face and all has seted up the screw hole, and fastening bolt is connected with the screw hole cooperation, is provided with floating device on building templates body top.
As a further aspect of the present invention: the building template body comprises a pine board core, reinforcing steel bars, a fiber surface skin and demolding wax, the reinforcing steel bars are inserted into the pine board core in a penetrating mode, the fiber surface skin is arranged on the outer side of the pine board core, and the demolding wax is coated on the outer side of the fiber surface skin.
As a further aspect of the present invention: trowelling device includes second spout, second slider, connecting rod, scraper blade, receipts workbin, fixture block and draw-in groove, the second spout has all been seted up to building templates body both sides face, two the inside second slider that all is provided with of second spout, two connect through the connecting rod between the second slider, the fixed scraper blade that has cup jointed in connecting rod middle part, the building templates body is close to the scraper blade end outside and is provided with and receives the workbin, it is close to the equal fixed mounting in building templates body top face both sides and has the fixture block to receive the workbin, the building templates body is close to scraper blade end top face both sides and all corresponds and has seted up the draw-in groove, and draw-in groove and fixture.
As a further aspect of the present invention: the whole building template body is of an integrated structure.
As a further aspect of the present invention: the two sides of the scraper are both provided with baffles, and the two baffles are fixedly connected with the scraper through fixing bolts.
As a further aspect of the present invention: the included angle of the scraper and the horizontal line is 30 degrees.
The utility model has the advantages that: the utility model has scientific and reasonable structure, safe and convenient use, integrated structure of the building template body, no need of assembly, concrete pouring can be directly carried out, the construction period is shortened, the first sliding block is moved along the first sliding chute direction by moving the partition plate, thereby adjusting the volume to be poured, after the adjustment is finished, the screw hole is tightly matched with the fastening bolt, thereby fixing the position of the clapboard, after the concrete pouring is finished, the second slide block moves towards the direction of the material receiving box in the second chute by pulling the scraper blade, so as to smooth the concrete poured in the building template body, simultaneously scraping the redundant concrete out to enable the redundant concrete to fall into the material receiving box, taking out the material receiving box through the clamping block and the clamping groove, the redundant concrete is processed in a centralized mode, the strength of the building template body is effectively enhanced through the steel bars, and the fiber surface skin and the demolding wax are more beneficial to demolding the solidified concrete.
Drawings
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is a schematic view of the overall structure of the present invention.
Figure 2 is the utility model discloses a building templates body inside cross-sectional view.
Fig. 3 is a schematic view of the installation structure of the floating device of the present invention.
Fig. 4 is a cross-sectional view of the inside of the first slider.
In the figure: 1. a building template body; 2. a partition plate; 3. a first chute; 4. a first slider; 5. fastening a bolt; 6. a moving groove; 7. a threaded hole; 8. a troweling device; 81. a second chute; 82. a second slider; 83. a connecting rod; 84. a squeegee; 85. a material receiving box; 86. a clamping block; 87. a card slot; 9. a pine board core; 10. reinforcing steel bars; 11. a fibrous dough cover; 12. and (4) demolding wax.
Detailed Description
As shown in fig. 1-4, a multi-layer wooden building template based on plate edge wax brushing technology comprises a building template body 1, a partition plate 2, a first sliding groove 3, a first sliding block 4, a fastening bolt 5, a moving groove 6, a threaded hole 7 and a leveling device 8, wherein the first sliding groove 3 is formed in each of two sides of the top plate surface of the building template body 1, the building template body 1 is integrally formed, the building template body 1 is better convenient to use, and the assembling time is saved, the building template body 1 comprises a pine plate core 9, a steel bar 10, a fiber skin 11 and a mold release wax 12, the steel bar 10 is inserted into the pine plate core 9, the fiber skin 11 is arranged on the outer side of the pine plate core 9, and the mold release wax 12 is coated on the outer side of the fiber skin 11. The building template comprises a building template body 1, wherein a partition plate 2 is arranged inside the building template body 1, first sliding blocks 4 are fixedly arranged at two ends of the partition plate 2, the first sliding blocks 4 are matched with first sliding grooves 3, moving grooves 6 are formed in the outer sides of the two first sliding grooves 3, fastening bolts 5 are arranged inside the two moving grooves 6, threaded holes 7 are formed in the side plate surfaces, close to the moving grooves 6, of the two first sliding blocks 4, the fastening bolts 5 are matched and connected with the threaded holes 7, a floating device 8 is arranged at the top end of the building template body 1, the floating device 8 comprises a second sliding groove 81, a second sliding block 82, a connecting rod 83, a scraper 84, a material receiving box 85, a clamping block 86 and a clamping groove 87, the second sliding grooves 81 are formed in the two side plate surfaces of the building template body 1, the second sliding blocks 82 are arranged inside the two second sliding grooves 81, the two second sliding blocks 82 are connected through the connecting rod 83, and be fixing bolt fixed connection between two baffles and the scraper blade 84, better getting rid of unnecessary concrete, scraper blade 84 is 30 with the water flat line contained angle, better troweling the concrete, building templates body 1 is close to scraper blade 84 and holds the outside and is provided with receipts workbin 85, it has fixture block 86 to receive workbin 85 to be close to the equal fixed mounting in 1 top face both sides of building templates body, building templates body 1 is close to scraper blade 84 and holds the top face both sides and all correspond and seted up draw-in groove 87, and draw-in groove 87 and fixture block 86 cooperation.
The utility model discloses a theory of operation: the building template body 1 is of an integrated structure, does not need to be assembled, can directly carry out concrete pouring, quickens the construction period, enables the first slide block 4 to move along the first sliding chute 3 by moving the clapboard 2, thereby adjusting the volume to be poured, tightly matching the threaded hole 7 through the fastening bolt 5 after the adjustment is finished, thereby fixing the position of the partition board 2, after the concrete pouring is finished, the second sliding block 82 moves towards the receiving box 85 in the second sliding groove 81 by pulling the scraping plate 84, so as to level the concrete poured in the building template body 1, meanwhile, the redundant concrete is scraped out, the redundant concrete falls into the material receiving box 85, the material receiving box 85 is taken out through the fixture block 86 and the clamping groove 87, the redundant concrete is processed in a centralized mode, the reinforcing steel bars 10 effectively enhance the strength of the building formwork body 1, and the fiber surface skin 11 and the demolding wax 12 are more beneficial to demolding the solidified concrete.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A multi-layer wooden building template based on a plate edge wax brushing technology comprises a building template body (1), a partition plate (2), first sliding grooves (3), first sliding blocks (4), fastening bolts (5), moving grooves (6), threaded holes (7) and a floating device (8), and is characterized in that the first sliding grooves (3) are formed in two sides of the top plate surface of the building template body (1), the partition plate (2) is arranged in the building template body (1), the first sliding blocks (4) are fixedly arranged at two ends of the partition plate (2), the first sliding blocks (4) are matched with the first sliding grooves (3), the moving grooves (6) are formed in the outer sides of the first sliding grooves (3), the fastening bolts (5) are arranged in the moving grooves (6), and the threaded holes (7) are formed in the side plate surfaces, close to the moving grooves (6), of the first sliding blocks (4), and the fastening bolt (5) is matched and connected with the threaded hole (7), and the floating device (8) is arranged at the top end of the building template body (1).
2. The multi-storey wooden building formwork of claim 1 based on board edge wax brushing technique, wherein: building templates body (1) is including pine board core (9), reinforcing bar (10), fibre face skin (11) and release wax (12), the inside interlude of pine board core (9) has reinforcing bar (10), the pine board core (9) outside is provided with fibre face skin (11), release wax (12) have been paintd in fibre face skin (11) outside.
3. The multi-storey wooden building formwork of claim 1 based on board edge wax brushing technique, wherein: the trowelling device (8) comprises a second sliding groove (81), a second sliding block (82), a connecting rod (83), a scraping plate (84), a material receiving box (85), a clamping block (86) and clamping grooves (87), wherein the second sliding grooves (81) are formed in the surfaces of the two sides of the building template body (1), the second sliding blocks (82) are arranged inside the second sliding grooves (81), the second sliding blocks (82) are connected through the connecting rod (83), the scraping plate (84) is fixedly connected to the middle of the connecting rod (83), the material receiving box (85) is arranged on the outer side, close to the scraping plate (84), of the building template body (1), the clamping block (86) is fixedly mounted on the two sides, close to the top end plate surface of the scraping plate (84), of the building template body (1), the clamping grooves (87) are correspondingly formed in the two sides of the top end plate surface, close to the scraping plate (, and the clamping groove (87) is matched with the clamping block (86).
4. The multi-storey wooden building formwork of claim 1 based on board edge wax brushing technique, wherein: the building template body (1) is integrally structured.
5. The multi-storey wooden building panel based on board edge waxing technique as claimed in claim 3, wherein: the two sides of the scraper (84) are provided with baffle plates, and the two baffle plates are fixedly connected with the scraper (84) through fixing bolts.
6. The multi-storey wooden building formwork based on the board edge waxing technology as claimed in claim 5, wherein: the scraper (84) forms an angle of 30 degrees with the horizontal.
CN201920858556.2U 2019-06-10 2019-06-10 Multi-layer wooden building template based on plate edge wax brushing technology Active CN210551985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920858556.2U CN210551985U (en) 2019-06-10 2019-06-10 Multi-layer wooden building template based on plate edge wax brushing technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920858556.2U CN210551985U (en) 2019-06-10 2019-06-10 Multi-layer wooden building template based on plate edge wax brushing technology

Publications (1)

Publication Number Publication Date
CN210551985U true CN210551985U (en) 2020-05-19

Family

ID=70623621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920858556.2U Active CN210551985U (en) 2019-06-10 2019-06-10 Multi-layer wooden building template based on plate edge wax brushing technology

Country Status (1)

Country Link
CN (1) CN210551985U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112643852A (en) * 2020-12-18 2021-04-13 杭州林杰建材科技有限公司 Casting molding method for precast concrete PC (polycarbonate) component
CN112709358A (en) * 2020-12-25 2021-04-27 浙江东设建筑设计有限公司 Shear force wall and integrative connection structure of pouring of infilled wall and template structure thereof
CN112959473A (en) * 2021-03-30 2021-06-15 中铁第四勘察设计院集团有限公司 Prefabricating equipment
CN113001718A (en) * 2021-04-06 2021-06-22 彭飞飞 Brick making machine for building brick forming
CN114654565A (en) * 2022-04-19 2022-06-24 中建八局第二建设有限公司 High-precision casting template for prefabricated track beam

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112643852A (en) * 2020-12-18 2021-04-13 杭州林杰建材科技有限公司 Casting molding method for precast concrete PC (polycarbonate) component
CN112643852B (en) * 2020-12-18 2022-02-08 张家界远大住宅工业有限公司 Casting molding method for precast concrete PC (polycarbonate) component
CN112709358A (en) * 2020-12-25 2021-04-27 浙江东设建筑设计有限公司 Shear force wall and integrative connection structure of pouring of infilled wall and template structure thereof
CN112959473A (en) * 2021-03-30 2021-06-15 中铁第四勘察设计院集团有限公司 Prefabricating equipment
CN113001718A (en) * 2021-04-06 2021-06-22 彭飞飞 Brick making machine for building brick forming
CN114654565A (en) * 2022-04-19 2022-06-24 中建八局第二建设有限公司 High-precision casting template for prefabricated track beam
CN114654565B (en) * 2022-04-19 2023-11-14 中建八局第二建设有限公司 Pouring template of high-precision prefabricated track beam

Similar Documents

Publication Publication Date Title
CN210551985U (en) Multi-layer wooden building template based on plate edge wax brushing technology
CN109049294B (en) Concrete prefabricated wallboard and production process thereof
CN209620585U (en) Strip, which is poured, after a kind of assembled architecture laminated floor slab hangs die body system
CN112976280A (en) Prefabricated part forming and processing equipment and method for prefabricated building
CN111236494A (en) MY high-performance spraying and building wall construction method
CN214925429U (en) Prefabricated steel mould of brickwork
CN114000646A (en) Reverse-beating integrated wallboard of precast concrete composite heat-insulation template and preparation method
CN208310193U (en) A kind of external angle formwork of wall
CN114382212B (en) Composite hollow filling floor support plate and floor slab free of suspended ceiling punching and demolding
CN112647469B (en) Construction method of self-waterproof water channel structure with complex section
CN209976019U (en) Sink tank template assembly for toilet
CN213412364U (en) Novel combination adjustable superimposed sheet mould
CN213774460U (en) Light steel keel paper surface gypsum board partition wall ridge
CN110725532B (en) Supporting system for small formwork of bare concrete decorative wall and construction process
CN209179173U (en) Tooling without mould concrete
CN101250905B (en) Construction method and device for pouring thermal insulation on wall
CN108979136B (en) Anti-bank's of bathroom integrative construction formwork structure of pouring
CN220840824U (en) Prestressed concrete goose-shaped roof plate mould system
CN209195001U (en) Mould mold is hung for sunk type kitchen and bath
CN214402718U (en) Novel green building environmental protection template
CN215549566U (en) But side forms of quick assembly disassembly component production with magnetism box
CN216109136U (en) Decorate insulation construction integration wallboard
CN216992445U (en) Casting mold for achieving good mirror effect on surface of prestressed concrete beam
CN214819443U (en) Prefabricated mould for water retaining platform of pipe well
CN214220328U (en) Light-duty assembled prefabricated stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant