CN210543695U - Tunnel construction waste water cyclic utilization device - Google Patents

Tunnel construction waste water cyclic utilization device Download PDF

Info

Publication number
CN210543695U
CN210543695U CN201920120575.5U CN201920120575U CN210543695U CN 210543695 U CN210543695 U CN 210543695U CN 201920120575 U CN201920120575 U CN 201920120575U CN 210543695 U CN210543695 U CN 210543695U
Authority
CN
China
Prior art keywords
wall
welded
box
plate
tunnel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920120575.5U
Other languages
Chinese (zh)
Inventor
张栋樑
张旭恒
周强
冯诗洋
林纪涛
张光宇
张志强
张仕硕
赵庆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Infrastructure Co Ltd
Original Assignee
China Construction Infrastructure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Infrastructure Co Ltd filed Critical China Construction Infrastructure Co Ltd
Priority to CN201920120575.5U priority Critical patent/CN210543695U/en
Application granted granted Critical
Publication of CN210543695U publication Critical patent/CN210543695U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to a waste water cyclic utilization technical field specifically discloses a tunnel construction waste water cyclic utilization device to the inconvenient clearance of current tunnel construction waste water impurity, leads to the lower problem of waste water utilization ratio, now proposes following scheme, the power distribution box comprises a box body, the welding of one side of the top outer wall of box has the fixed plate, one side top fixedly connected with feeder hopper of fixed plate, the below of feeder hopper is equipped with places the board with the inner wall welded of box, the top of placing the board is close to one side of fixed plate and is connected with the spring, the top of spring is connected with the fixed block, the fixed block has seted up the fixed slot near one side of fixed plate, the internal connection of fixed slot has vibrating motor, the top of fixed block is connected with the. The utility model relates to a novelty, easy operation, the impurity in the waste water is filtered to the convenience, but also the convenient impurity clearance with filtering falls, is favorable to the extraction of water pump like this, improves the utilization ratio of water resource.

Description

Tunnel construction waste water cyclic utilization device
Technical Field
The utility model relates to a waste water cyclic utilization technical field especially relates to a tunnel construction waste water cyclic utilization device.
Background
Need use a large amount of water among the tunnel construction process, for example need carry out the water-cooling to the drill bit when driling, nevertheless waste water after the water-cooling can cause the waste if direct discharge, especially in the tunnel in wild, its water resource is more valuable, consequently need collect these waste water and carry out cyclic utilization, current tunnel construction waste water is owing to contain a lot of impurity, its impurity does not have fine cleaning equipment, be unfavorable for the work of water pump, thereby lead to the utilization ratio of waste water lower, we provide a tunnel construction waste water cyclic utilization device for this reason.
SUMMERY OF THE UTILITY MODEL
The utility model provides a tunnel construction waste water cyclic utilization device has solved the inconvenient clearance of current tunnel construction waste water impurity, leads to the lower problem of waste water utilization.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a tunnel construction wastewater recycling device comprises a box body, wherein a fixed plate is welded on one side of the outer wall of the top of the box body, a feed hopper is fixedly connected on the top of one side of the fixed plate, a placing plate welded with the inner wall of the box body is arranged below the feed hopper, one side, close to the fixed plate, of the top of the placing plate is connected with a spring, the top end of the spring is connected with a fixed block, one side, close to the fixed plate, of the fixed block is provided with a fixed groove, the inside of the fixed groove is connected with a vibrating motor, the top of the fixed block is connected with a filter screen, one side, far away from the fixed block, of the bottom of the filter screen is hinged with the placing plate, two first supporting plates are welded on the inner wall of the bottom of the box body, the top of, the welding of one side outer wall of box has the workbin that connects, connect the bottom inner wall of workbin to install receiving device, the top welding that the workbin kept away from one side outer wall of box has the connecting plate, the top welding of connecting plate has two second backup pads, two the top of one side that the second backup pad is close to each other is rotated and is connected with the second cylinder, the outer lane winding of first cylinder and second cylinder has the conveyer belt.
Preferably, receiving device includes driving motor, screw rod and fly leaf, driving motor's bottom passes through bolted connection with the bottom inner wall that connects the workbin, the terminal welding of driving motor's output shaft has the screw rod, the outer lane screw thread of screw rod has cup jointed the fly leaf, the welding of the top of screw rod has the limiting plate.
Preferably, the box body and the box wall at one side close to the material receiving box are both provided with a first discharge hole, the bottom of the material guide plate is welded with the inner wall of the first discharge hole, and baffles are welded on two sides of the top of the material guide plate.
Preferably, a second discharge hole is formed in the box wall of the box body on one side close to the second roller, and the conveyor belt penetrates through the second discharge hole.
Preferably, the box wall at the top of the box body is provided with a feed hole, the filter screen penetrates through the feed hole, and the placing plate is internally provided with a plurality of through holes in an array mode.
Preferably, a water pump connected with the inner wall of the bottom of the box body is arranged under the spring, one end of the water pump is connected with a water pipe, and the water pipe penetrates through the box body.
Preferably, one side of one of the second supporting plates, which is far away from the second roller, is connected with a servo motor through a bolt, and an output shaft of the servo motor is welded with the second roller.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an installation places structures such as board, spring, fixed block, vibrating motor and filter screen, and wherein the waste water that contains impurity falls on the filter screen through the feeder hopper and filters, and vibrating motor in the fixed block then drives whole filter screen and shakes, and the spring then provides the buffering, makes things convenient for like this that the impurity in the waste water is fine to filter, and the waste water after the filtration rethread on placing the board flows to the box and deposits;
2. the utility model discloses an installation first backup pad, the second backup pad, first cylinder, the second cylinder, the conveyer belt, the stock guide, connect workbin, driving motor, screw rod and fly leaf isotructure, wherein servo motor drives the second cylinder and rotates, the second cylinder drives the first cylinder rotation through the drive belt again, make things convenient for the impurity of interception on the filter screen to fall on the conveyer belt and be sent out the box in like this, and the stock guide is then further collected the impurity that drops, make the impurity that drops get into on the fly leaf in connecing the workbin through the stock guide, and driving motor can drive the screw rod and rotate, the screw rod rotates and can make the fly leaf move up, conveniently clear up impurity;
to sum up, the device modern design, easy operation conveniently filters the impurity in the waste water, and still conveniently clears up filterable impurity, is favorable to the extraction of water pump like this, improves the utilization ratio of water resource.
Drawings
Fig. 1 is a schematic front view of a tunnel construction wastewater recycling device provided by the utility model;
fig. 2 is a schematic view of a three-dimensional structure of a material guide plate of the tunnel construction wastewater recycling device provided by the utility model;
fig. 3 is the utility model provides a structural schematic is overlooked to placing board of tunnel construction waste water cyclic utilization device.
In the figure: the automatic feeding device comprises a box body 1, a fixing plate 2, a feeding hopper 3, a placing plate 4, a spring 5, a fixing block 6, a fixing groove 7, a vibration motor 8, a filter screen 9, a first supporting plate 10, a first roller 11, a material guide plate 12, a material receiving box 13, a driving motor 14, a screw rod 15, a movable plate 16, a connecting plate 17, a second supporting plate 18, a second roller 19, a conveyor belt 20 and a water pump 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a tunnel construction wastewater recycling device, comprising a box body 1, a fixed plate 2 welded on one side of the outer wall of the top of the box body 1, a feed hopper 3 fixedly connected on the top of one side of the fixed plate 2, a placing plate 4 welded with the inner wall of the box body 1 below the feed hopper 3, a spring 5 connected on one side of the top of the placing plate 4 close to the fixed plate 2, a fixed block 6 connected on the top of the spring 5, a fixed groove 7 formed on one side of the fixed block 6 close to the fixed plate 2, a vibrating motor 8 connected inside the fixed groove 7, a filter screen 9 connected on the top of the fixed block 6, a placing plate 4 hinged on one side of the bottom of the filter screen 9 far from the fixed block 6, two first supporting plates 10 welded on the inner wall of the bottom of the box body 1, a first roller 11 rotatably connected on the top of one side of the two first supporting, the welding of one side outer wall of box 1 has the workbin 13 that connects, and receiving device is installed to the bottom inner wall of workbin 13 that connects, and the top welding that connects the workbin 13 to keep away from one side outer wall of box 1 has connecting plate 17, and the welding of the top of connecting plate 17 has two second backup pads 18, and the top of one side that two second backup pads 18 are close to each other rotates and is connected with second cylinder 19, and the outer lane winding of first cylinder 11 and second cylinder 19 has conveyer belt 20.
The material receiving device comprises a driving motor 14, a screw rod 15 and a movable plate 16, the bottom of the driving motor 14 is connected with the inner wall of the bottom of a material receiving box 13 through a bolt, the screw rod 15 is welded at the tail end of an output shaft of the driving motor 14, the movable plate 16 is sleeved on the outer ring thread of the screw rod 15, a limiting plate is welded at the top end of the screw rod 15, a first discharge hole is formed in one side box wall of the box body 1, which is close to the material receiving box 13, the bottom of a material guide plate 12 is welded with the inner wall of the first discharge hole, baffles are welded on two sides of the top of the material guide plate 12, a second discharge hole is formed in one side box wall of the box body 1, which is close to a second roller 19, a conveyor belt 20 penetrates through the second discharge hole, a feed hole is formed in the top box wall of the box body 1, a filter screen, one end of the water pump 21 is connected with a water pipe, the water pipe penetrates through the box body 1, one side, far away from the second roller 19, of the second supporting plate 18 is connected with a servo motor through a bolt, and an output shaft of the servo motor is welded with the second roller 19.
In this embodiment, first, the wastewater containing impurities is dropped on the filter screen 9 through the feed hopper 3 for filtering, the vibration motor 8 in the fixed block 6 drives the whole filter screen 9 to vibrate, the spring 5 provides buffer, thus facilitating the good filtration of impurities in the wastewater, the filtered wastewater flows into the box body 1 through the through holes on the placing plate 4 for storage, the servo motor drives the second roller 19 to rotate, the second roller 19 drives the first roller 11 to rotate through the transmission belt 20, so that the impurities intercepted on the filter screen 9 fall on the conveyor belt 20 and are sent out of the box body 1, the material guiding plate 12 further collects the fallen impurities, so that the fallen impurities enter the movable plate 16 in the material receiving box 13 through the material guiding plate 12, the driving motor 14 can drive the screw rod 15 to rotate, and the rotation of the screw rod 15 can move the movable plate 16 upwards, so that the impurities can be conveniently cleaned.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a tunnel construction waste water cyclic utilization device, includes box (1), its characterized in that, the welding of one side of the top outer wall of box (1) has fixed plate (2), one side top fixedly connected with feeder hopper (3) of fixed plate (2), the below of feeder hopper (3) is equipped with places board (4) with the inner wall welding of box (1), the top of placing board (4) is close to one side of fixed plate (2) and is connected with spring (5), the top of spring (5) is connected with fixed block (6), fixed slot (7) have been seted up to one side of fixed block (6) close to fixed plate (2), the internal connection of fixed slot (7) has vibrating motor (8), the top of fixed block (6) is connected with filter screen (9), and the bottom of filter screen (9) is kept away from one side of fixed block (6) and is articulated with placing board (4), two first supporting plates (10) are welded on the inner wall of the bottom of the box body (1), the top of one side, close to each other, of the two first supporting plates (10) is rotatably connected with a first roller (11), a material guide plate (12) welded with the first supporting plate (10) is arranged below the first roller (11), a material receiving box (13) is welded on the outer wall of one side of the box body (1), a material receiving device is installed on the inner wall of the bottom of the material receiving box (13), the top of the outer wall of one side of the material receiving box (13) far away from the box body (1) is welded with a connecting plate (17), two second supporting plates (18) are welded at the top of the connecting plate (17), a second roller (19) is rotatably connected at the top of one side of the two second supporting plates (18) which are close to each other, and a conveyor belt (20) is wound on the outer rings of the first roller (11) and the second roller (19).
2. The tunnel construction wastewater recycling device according to claim 1, wherein the material receiving device comprises a driving motor (14), a screw rod (15) and a movable plate (16), the bottom of the driving motor (14) is connected with the inner wall of the bottom of the material receiving box (13) through a bolt, the screw rod (15) is welded at the tail end of an output shaft of the driving motor (14), the movable plate (16) is sleeved on the outer ring of the screw rod (15) in a threaded manner, and a limiting plate is welded at the top end of the screw rod (15).
3. The tunnel construction wastewater recycling device according to claim 1, wherein a first discharge hole is formed in one side wall of the box body (1) and one side wall of the material receiving box (13) which are close to each other, the bottom of the material guide plate (12) is welded to the inner wall of the first discharge hole, and baffles are welded to two sides of the top of the material guide plate (12).
4. The tunnel construction wastewater recycling device according to claim 1, wherein a second discharge hole is opened on one side wall of the box body (1) near the second roller (19), and the conveyor belt (20) penetrates through the second discharge hole.
5. The recycling device of tunnel construction wastewater according to claim 1, wherein a feeding hole is opened on the top wall of the box body (1), the filter screen (9) penetrates through the feeding hole, and a plurality of through holes are opened in the placing plate (4) in an array manner.
6. The tunnel construction wastewater recycling device according to claim 1, characterized in that a water pump (21) connected with the bottom inner wall of the box body (1) is arranged right below the spring (5), one end of the water pump (21) is connected with a water pipe, and the water pipe penetrates through the box body (1).
7. The tunnel construction wastewater recycling device according to claim 1, characterized in that one side of the second support plate (18) far away from the second roller (19) is connected with a servo motor through a bolt, and an output shaft of the servo motor is welded with the second roller (19).
CN201920120575.5U 2019-01-24 2019-01-24 Tunnel construction waste water cyclic utilization device Active CN210543695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920120575.5U CN210543695U (en) 2019-01-24 2019-01-24 Tunnel construction waste water cyclic utilization device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920120575.5U CN210543695U (en) 2019-01-24 2019-01-24 Tunnel construction waste water cyclic utilization device

Publications (1)

Publication Number Publication Date
CN210543695U true CN210543695U (en) 2020-05-19

Family

ID=70668692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920120575.5U Active CN210543695U (en) 2019-01-24 2019-01-24 Tunnel construction waste water cyclic utilization device

Country Status (1)

Country Link
CN (1) CN210543695U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113941185A (en) * 2021-08-26 2022-01-18 鄂州职业大学 Waste water recovery device used in green building construction and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113941185A (en) * 2021-08-26 2022-01-18 鄂州职业大学 Waste water recovery device used in green building construction and use method thereof

Similar Documents

Publication Publication Date Title
CN210543695U (en) Tunnel construction waste water cyclic utilization device
CN216856998U (en) Fine solid powder coating vibration filtering device
CN219220335U (en) Device for separating mud and drilling slag of bored pile
CN218742209U (en) Crushing device for recycling waste batteries
CN204486236U (en) A kind of tea deblocking of low injury tolerance trembles screen(ing) machine
CN213377779U (en) Sand and stone separator convenient to separate for concrete recovery
CN214886935U (en) Drilling waste liquid and rock debris separating device
CN212702976U (en) Environment-friendly vibrating screen
CN210906888U (en) Seed screening device for corn breeding
CN209920590U (en) Herbaceous purification device
CN208803296U (en) A kind of broken 3-stage dust-removal device of stalk
CN208449841U (en) A kind of feed processing that Novel impurity-cleaning effect is good screening exclusion device
CN219559928U (en) Crushing pair roller screening equipment rack
CN220111598U (en) Raw material separation sieving mechanism is used in rapeseed oil processing
CN215387842U (en) Screening device for improving cleanliness of papermaking wastewater
CN214159760U (en) Full-automatic slag sample machine
CN217190742U (en) Pinellia ternata classified screening mechanism
CN219187092U (en) Crushing equipment for powder production
CN210730113U (en) Water immersion type desliming sieve
CN213133591U (en) Calcium carbonate powdered ore refines edulcoration equipment
CN220110558U (en) Cryolite ground paste filter equipment
CN221753890U (en) Rice removes stone equipment
CN216539575U (en) Specific gravity stoner for grain processing
CN213468193U (en) Combined type tailing recycling equipment convenient to adjust
CN221183692U (en) Multistage seed selection case is planted to corn

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant