CN210530085U - Steel bar truss building carrier plate device - Google Patents

Steel bar truss building carrier plate device Download PDF

Info

Publication number
CN210530085U
CN210530085U CN201920875025.4U CN201920875025U CN210530085U CN 210530085 U CN210530085 U CN 210530085U CN 201920875025 U CN201920875025 U CN 201920875025U CN 210530085 U CN210530085 U CN 210530085U
Authority
CN
China
Prior art keywords
plate
locking
block
floor
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920875025.4U
Other languages
Chinese (zh)
Inventor
孙刚
郑智明
张赞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Duowei Lvjian Technology Tianjin Co ltd
Duowei Union Group Co Ltd
Original Assignee
Duowei Lvjian Technology Tianjin Co ltd
Duowei Union Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duowei Lvjian Technology Tianjin Co ltd, Duowei Union Group Co Ltd filed Critical Duowei Lvjian Technology Tianjin Co ltd
Priority to CN201920875025.4U priority Critical patent/CN210530085U/en
Application granted granted Critical
Publication of CN210530085U publication Critical patent/CN210530085U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a steel bar truss building carrier plate device, including first building carrier plate, second building carrier plate, the bottom plate, the fixed block, first supporting block can protect quick locking fixed plate structure, adjustable slip fixed plate structure, can peg graft sealed leak protection connecting plate structure, buffer spring, the buffer tube, the second supporting block, the supporting connector board, the bracing reinforcing bar, top tight backup pad and rubber slab. The utility model discloses the setting of connecting seat, first threaded rod, quick locking plate and wing nut is favorable to quick fixed building carrier plate, conveniently carries out building carrier plate installation and fixed work; the arrangement of the butt joint plate, the insertion block, the locking leakage-proof plate, the rubber ring and the round-head screws is favorable for preventing the water leakage at the joint of the floor bearing plate and influencing the service life of the floor bearing plate; connect the setting of locking plate, foam-rubber cushion, anticreep board and sliding connection pole, be favorable to connecting panel, make things convenient for building carrier plate upper end installation panel.

Description

Steel bar truss building carrier plate device
Technical Field
The utility model belongs to the technical field of the building carrier plate device, especially, relate to a steel bar truss building carrier plate device.
Background
The steel bar truss floor bearing plate is composed of steel bars, trusses and floor bearing plates, is improved on the basis of a profiling floor bearing plate, and is a novel building material. The steel bar truss is processed in a background processing field in a shaping mode, and the length can be prefabricated. And the anti-rust film is wound and sealed by adopting the rust removing and anti-rust process technologies such as sheet metal welding, silanization, pure manganese phosphating, washing and drying, galvanization and the like. In site construction, the truss floor bearing plate needs to be placed at a correct position firstly, steel bars are welded and manufactured, studs are welded, the steel bars are placed on site for binding, and concrete is poured after customer acceptance.
But the inconvenient fixed work that carries on of in-process still having to use of current steel bar truss building carrier plate, the problem of water leakage and inconvenient connection panel appears easily in the junction of building carrier plate.
Therefore, it is very necessary to invent a steel bar truss floor support plate device.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a steel bar truss building carrier plate device to there is the inconvenient work of fixing that carries on of in-process that uses in solving current steel bar truss building carrier plate, the problem of water leakage and inconvenient connection panel appears easily in the junction of building carrier plate. A steel bar truss floor support plate device comprises a first floor support plate, a second floor support plate, a bottom plate, a fixing block, a first supporting block, a protective quick locking fixing plate structure, an adjustable sliding fixing plate structure, a pluggable sealing leakage-proof connecting plate structure, a buffer spring, a buffer tube, a second supporting block, a supporting connecting plate, a diagonal bracing steel bar, a jacking supporting plate and a rubber plate, wherein the fixing block is glued between the first floor support plate and the second floor support plate; the first supporting block is glued and connected to the right side between the second floor support plate and the bottom plate; the second supporting block is connected to the left side between the second floor bearing plate and the bottom plate in a gluing mode; the protective quick locking fixing plate structures are respectively arranged on the left side and the right side of the lower end of the first floor bearing plate; the adjustable sliding fixing plate structure is arranged at the upper end of the first floor bearing plate; the pluggable sealing leakproof connecting plate is arranged on the right side between the second floor bearing plate and the bottom plate; the buffer spring is inserted at the bottom end of the buffer tube; the supporting connecting plates are respectively welded at the left side and the right side of the middle position of the upper end of the bottom plate; the lower ends of the diagonal bracing reinforcing steel bars are respectively welded in the middle of the upper ends of the supporting connecting plates; the upper ends of the diagonal bracing reinforcing steel bars are respectively welded on the left side and the right side of the lower end of the jacking support plate; the rubber plate is glued to the upper end of the abutting support plate; the protective quick locking fixing plate structure comprises a connecting seat, a first threaded rod, a quick locking plate, an asbestos pad, a compression plate and a wing nut, wherein the first threaded rod is in threaded connection with the middle position inside the lower end of the connecting seat; the asbestos pad is crossed at the upper end of the quick locking plate; the lower end of the first threaded rod penetrates through the middle positions inside the left side and the right side of the quick locking plate respectively; the compression plate is welded on the upper part of the outer wall of the first threaded rod; the wing nut is in threaded connection with the outer wall of the end of the first threaded rod.
Preferably, the adjustable sliding fixing plate structure comprises a second threaded rod, a connecting locking plate, a spongy cushion, a square-head nut, an anti-falling plate and a sliding connecting rod, wherein the second threaded rod penetrates through the middle positions of the inner parts of the left side and the right side of the connecting locking plate respectively; the sponge pad is glued at the lower end of the connecting and locking plate; the square-head nuts are respectively in threaded connection with the outer wall of the upper end of the second threaded rod; the sliding connecting rods are respectively welded in the middle of the upper ends of the anti-falling plates; the sliding connecting rods are respectively connected with the sliding holes arranged on the left side and the right side of the locking plate in a penetrating way.
Preferably, the pluggable sealing leakage-proof connecting plate structure comprises a butt-joint plate, a plugging block, a locking leakage-proof plate, a rubber ring, a round-head screw and a sealing connecting plate, wherein the plugging block is respectively spliced at the middle positions of the left side and the right side of the butt-joint plate; the rubber ring is sleeved on the upper part of the outer wall of the round head screw; the round head screw penetrates through the middle position inside the locking leak-proof plate; the round head screw is in threaded connection with the middle position inside the upper end of the butt joint plate; the lower end of the butt joint plate is glued at the middle position of the upper end of the sealing connecting plate.
Preferably, the rapid locking plate is a stainless steel plate with through holes on the left and right sides; the connecting seat adopts a stainless steel seat with a through hole arranged in the middle of the lower end.
Preferably, the fixed block is a silica gel block; the first supporting block and the second supporting block are respectively rubber blocks; the upper end of the rubber plate is in contact with the middle position of the lower end of the second floor bearing plate.
Preferably, the connecting seats are respectively welded at the left side and the right side of the lower end of the first floor support plate; the first threaded rod sequentially penetrates through the second floor bearing plate, the buffer pipe and the bottom plate from top to bottom; the quick locking plate is arranged at the lower end of the bottom plate; the compression plate is inserted in the middle of the upper end of the buffer tube.
Preferably, the connecting and locking plate is a stainless steel plate with sliding holes formed in the middle positions of the left side and the right side; the anti-falling plate is a stainless steel plate; the sliding connecting rod adopts a stainless steel threaded rod.
Preferably, the second threaded rods are respectively welded at the left side and the right side of the upper end of the first floor support plate.
Preferably, the sealing connecting plate is a silica gel plate; the locking leak-proof plate is a stainless steel plate of which the lower end is glued with a sealing gasket; the plug-in block adopts a silica gel block.
Preferably, the inserting block is inserted at the right side between the second floor bearing plate and the bottom plate; the left side of the locking leakage-proof plate is arranged on the right side of the upper end of the first floor bearing plate; the left side of the sealing connecting plate is arranged on the right side of the lower end of the bottom plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, connecting seat, first threaded rod, quick locking plate and wing nut's setting is favorable to quick fixed building carrier plate, conveniently carries out building carrier plate installation and fixed work.
2. The utility model discloses in, butt joint board, the piece of pegging graft, locking leak protection plate, the setting of rubber circle and button head screw is favorable to preventing that the junction of building carrier plate from appearing leaking, influences the life of building carrier plate.
3. The utility model discloses in, connection locking plate, the foam-rubber cushion, anticreep board and sliding connection pole's setting is favorable to connecting panel, makes things convenient for building carrier plate upper end installation panel.
4. The utility model discloses in, buffer spring, buffer tube, the setting of first threaded rod and compression plate are favorable to increasing the cushioning effect of building carrier plate, prevent that the building carrier plate from receiving the damage and influencing installation work.
5. The utility model discloses in, the second threaded rod, connect the locking board, the setting of foam-rubber cushion and square head nut is favorable to fixed connection locking board, conveniently carries out panel and connects fixed work.
6. The utility model discloses in, the support connection board, the bracing reinforcing bar, the setting of the tight backup pad in top and rubber slab is favorable to supporting the building carrier plate, prevents that the building carrier plate from receiving the too big building carrier plate work of influence of pressure.
7. The utility model discloses in, butt joint board, the piece of pegging graft, locking leak protection board and sealing connection board's setting is favorable to carrying out building carrier plate joint work, makes things convenient for the building carrier plate to install.
8. The utility model discloses in, first building carrier plate, second building carrier plate, the bottom plate, the fixed block, the setting of first supporting shoe and second supporting shoe is favorable to protecting first building carrier plate and second building carrier plate and bottom plate, prevents to warp at the in-process first building carrier plate of installation and second building carrier plate and bottom plate and influences the installation work.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the protectable quick locking fixing plate structure of the present invention.
Fig. 3 is a schematic structural diagram of the slidable fixing plate structure of the present invention.
Fig. 4 is a schematic structural view of the pluggable sealing leakproof connection plate structure of the present invention.
In the figure:
1. a first floor deck; 2. a second floor deck; 3. a base plate; 4. a fixed block; 5. a first support block; 6. the fixing plate structure can be protected and locked quickly; 61. a connecting seat; 62. a first threaded rod; 63. a quick locking plate; 64. an asbestos pad; 65. a compression plate; 66. wing nuts; 7. an adjustable sliding fixed plate structure; 71. a second threaded rod; 72. connecting a locking plate; 73. a sponge cushion; 74. a square head nut; 75. an anti-drop plate; 76. a sliding connecting rod; 8. the structure of the leak-proof connecting plate can be plugged; 81. a butt plate; 82. an insertion block; 83. locking the anti-leakage plate; 84. a rubber ring; 85. a round head screw; 86. sealing the connecting plate; 9. a buffer spring; 10. a buffer tube; 11. a second support block; 12. supporting the connecting plate; 13. diagonal bracing steel bars; 14. tightly supporting the supporting plate; 15. a rubber plate.
Detailed Description
The present invention is described in detail with reference to the accompanying drawings, as shown in fig. 1 and fig. 2, a steel bar truss floor support plate device comprises a first floor support plate 1, a second floor support plate 2, a bottom plate 3, a fixing block 4, a first supporting block 5, a protective fast locking fixing plate structure 6, an adjustable sliding fixing plate structure 7, a pluggable sealing and leakage-proof connecting plate structure 8, a buffer spring 9, a buffer tube 10, a second supporting block 11, a supporting connecting plate 12, an inclined supporting steel bar 13, a propping supporting plate 14 and a rubber plate 15, wherein the fixing block 4 is glued between the first floor support plate 1 and the second floor support plate 2; the first supporting block 5 is glued and connected to the right side between the second floor support plate 2 and the bottom plate 3; the second supporting block 11 is glued on the left side between the second floor bearing plate 2 and the bottom plate 3; the protective quick locking fixing plate structures 6 are respectively arranged on the left side and the right side of the lower end of the first floor bearing plate 1; the adjustable sliding fixing plate structure 7 is arranged at the upper end of the first floor bearing plate 1; the pluggable sealing leakproof connecting plate structure 8 is arranged on the right side between the second floor bearing plate 2 and the bottom plate 3; the buffer spring 9 is inserted at the bottom end of the buffer tube 10; the supporting connecting plates 12 are respectively welded at the left side and the right side of the middle position of the upper end of the bottom plate 3; the lower ends of the diagonal bracing steel bars 13 are respectively welded in the middle of the upper ends of the support connecting plates 12; the upper ends of the diagonal bracing steel bars 13 are respectively welded on the left side and the right side of the lower end of the jacking support plate 14; the rubber plate 15 is glued at the upper end of the abutting support plate 14; the protective quick locking fixing plate structure 6 comprises a connecting seat 61, a first threaded rod 62, a quick locking plate 63, an asbestos pad 64, a compression plate 65 and a wing nut 66, wherein the first threaded rod 62 is in threaded connection with the middle position inside the lower end of the connecting seat 61; the asbestos pad 64 is connected with the upper end of the quick locking plate 63; the lower end of the first threaded rod 62 penetrates through the middle positions of the inner parts of the left side and the right side of the quick locking plate 63 respectively; the compression plate 65 is welded on the upper part of the outer wall of the first threaded rod 62; the wing nut 66 is in threaded connection with the outer wall of the end of the first threaded rod 62; during the use, hoist suitable position with first building carrier plate 1 and second building carrier plate 2 and bottom plate 3 through outside hoisting equipment, loosen wing nut 66, will lock board 63 fast and take off, make first threaded rod 62 run through suitable position, cup joint locking board 63 fast in the outer wall lower part of first threaded rod 62, screw up wing nut 66, conveniently install and the fixed work, prevent through buffer spring 9 and buffer pipe 10 that connecting seat 61 from damaging the surface of first building carrier plate 1 and second building carrier plate 2 simultaneously.
In this embodiment, referring to fig. 3, the adjustable sliding fixing plate structure 7 includes a second threaded rod 71, a connecting locking plate 72, a sponge pad 73, a square nut 74, an anti-dropping plate 75 and a sliding connecting rod 76, wherein the second threaded rod 71 is respectively connected to the middle positions inside the left and right sides of the locking plate 72 in a penetrating manner; the spongy cushion 73 is glued at the lower end of the connecting and locking plate 72; the square-head nuts 74 are respectively in threaded connection with the outer wall of the upper end of the second threaded rod 71; the sliding connecting rods 76 are respectively welded at the middle position of the upper end of the anti-falling plate 75; the sliding connecting rods 76 are respectively connected with sliding holes formed in the left side and the right side of the locking plate 72 in a penetrating manner; use the building carrier plate to build the back, cup joint the outer wall at second threaded rod 71 to connecting locking plate 72, screw up square head nut 74, fixed good connection locking plate 72, will fix the panel of building carrier plate upper end and prevent in the upper end of connecting locking plate 72, move the inside that runs through panel to suitable position to sliding connection pole 76, use the fixed good panel of nut, conveniently carry out panel fixed and installation work.
In this embodiment, referring to fig. 4, the pluggable sealing leakproof connection plate structure 8 includes a butt plate 81, a plugging block 82, a locking leakproof plate 83, a rubber ring 84, a round-head screw 85 and a sealing connection plate 86, wherein the plugging block 82 is respectively glued to the middle positions of the left side and the right side of the butt plate 81; the rubber ring 84 is sleeved on the upper part of the outer wall of the round head screw 85; the round head screw 85 penetrates through the middle position inside the locking leakage-proof plate 83; the round head screw 85 is in threaded connection with the middle position inside the upper end of the butt plate 81; the lower end of the butt joint plate 81 is glued at the middle position of the upper end of the sealing connecting plate 86; after fixing first building carrier plate 1 and second building carrier plate 2 and bottom plate 3, will peg graft the block 82 and peg graft in the junction of second building carrier plate 2 and bottom plate 3, conveniently carry out building carrier plate joint work, simultaneously sealed building carrier plate between the junction prevent the emergence accident of leaking, influence the quality and the life of building carrier plate.
In this embodiment, specifically, the quick locking plate 63 is a stainless steel plate with through holes formed in the left and right sides; the connecting seat 61 is a stainless steel seat with a through hole formed in the middle of the lower end.
In this embodiment, specifically, the fixing block 4 is a silica gel block; the first supporting block 5 and the second supporting block 11 are respectively rubber blocks; the upper end of the rubber plate 15 contacts the middle position of the lower end of the second floor deck 2.
In this embodiment, specifically, the connecting seats 61 are respectively welded to the left and right sides of the lower end of the first floor support plate 1; the first threaded rod 62 sequentially penetrates through the second floor bearing plate 2, the buffer pipe 10 and the bottom plate 3 from top to bottom; the quick locking plate 63 is arranged at the lower end of the bottom plate 3; the compression plate 65 is inserted within the upper end of buffer tube 10 at an intermediate location.
In this embodiment, specifically, the connecting and locking plate 72 is a stainless steel plate with a sliding hole formed in the middle of the left and right sides; the anti-drop plate 75 is a stainless steel plate; the sliding connecting rod 76 is made of a stainless steel threaded rod.
In this embodiment, specifically, the second threaded rods 71 are respectively welded to the left and right sides of the upper end of the first floor support plate 1.
In this embodiment, specifically, the sealing connection plate 86 is a silica gel plate; the locking anti-leakage plate 83 is a stainless steel plate of which the lower end is glued with a sealing gasket; the plug-in block 82 is a silica gel block.
In this embodiment, specifically, the insertion block 82 is inserted and connected to the right side between the second floor support plate 2 and the bottom plate 3; the left side of the locking leakage-proof plate 83 is arranged at the right side of the upper end of the first floor bearing plate 1; the left side of the sealing connecting plate 86 is arranged at the right side of the lower end of the bottom plate 3.
Principle of operation
In the utility model, when in use, the first floor bearing plate 1, the second floor bearing plate 2 and the bottom plate 3 are hoisted to proper positions through external hoisting equipment, the wing nut 66 is loosened, the quick locking plate 63 is taken down, the first threaded rod 62 is made to penetrate through proper positions, the quick locking plate 63 is sleeved at the lower part of the outer wall of the first threaded rod 62, the wing nut 66 is screwed, the installation and the fixing work are convenient, meanwhile, the buffer spring 9 and the buffer pipe 10 prevent the connecting seat 61 from damaging the surfaces of the first floor bearing plate 1 and the second floor bearing plate 2, after the first floor bearing plate 1, the second floor bearing plate 2 and the bottom plate 3 are fixed, the inserting block 82 is inserted at the joint of the second floor bearing plate 2 and the bottom plate 3, the floor bearing plate connecting work is convenient to be carried out, meanwhile, the joint between the floor bearing plates is sealed, the water leakage accident is prevented, the quality and the service life of the floor bearing plate are influenced, after the floor bearing plate is, connect the locking plate 72 and cup joint the outer wall at second threaded rod 71, screw up square-head nut 74, fix and connect locking plate 72, will need to fix the panel of building carrier plate upper end and prevent in the upper end of connecting locking plate 72, move sliding connection pole 76 to the inside that suitable position runs through panel, use the nut to fix panel, conveniently carry out panel fixed and installation work.
Utilize technical scheme, or technical personnel in the field are in the utility model discloses under technical scheme's the inspiration, design similar technical scheme, and reach above-mentioned technological effect, all fall into the utility model discloses a protection scope.

Claims (10)

1. A steel bar truss floor support plate device is characterized by comprising a first floor support plate (1), a second floor support plate (2), a bottom plate (3), a fixing block (4), a first supporting block (5), a protective quick locking fixing plate structure (6), an adjustable sliding fixing plate structure (7), a pluggable sealing and leakage-proof connecting plate structure (8), a buffer spring (9), a buffer tube (10), a second supporting block (11), a supporting connecting plate (12), diagonal reinforcing steel bars (13), a jacking supporting plate (14) and a rubber plate (15), wherein the fixing block (4) is glued between the first floor support plate (1) and the second floor support plate (2); the first supporting block (5) is glued on the right side between the second floor bearing plate (2) and the bottom plate (3); the second supporting block (11) is glued on the left side between the second floor bearing plate (2) and the bottom plate (3); the protective quick locking fixing plate structures (6) are respectively arranged on the left side and the right side of the lower end of the first floor bearing plate (1); the adjustable sliding fixing plate structure (7) is arranged at the upper end of the first floor bearing plate (1); the pluggable sealing leakproof connecting plate structure (8) is arranged on the right side between the second floor bearing plate (2) and the bottom plate (3); the buffer spring (9) is inserted at the bottom end of the buffer tube (10); the supporting connecting plates (12) are respectively welded at the left side and the right side of the middle position of the upper end of the bottom plate (3); the lower ends of the diagonal bracing steel bars (13) are respectively welded in the middle of the upper ends of the support connecting plates (12); the upper ends of the diagonal bracing reinforcing steel bars (13) are respectively welded on the left side and the right side of the lower end of the jacking supporting plate (14); the rubber plate (15) is glued at the upper end of the abutting support plate (14); the protective quick locking fixing plate structure (6) comprises a connecting seat (61), a first threaded rod (62), a quick locking plate (63), an asbestos pad (64), a compression plate (65) and a wing nut (66), wherein the first threaded rod (62) is in threaded connection with the middle position inside the lower end of the connecting seat (61); the asbestos pad (64) is connected to the upper end of the quick locking plate (63); the lower end of the first threaded rod (62) penetrates through the middle positions of the inner parts of the left side and the right side of the quick locking plate (63) respectively; the compression plate (65) is welded on the upper part of the outer wall of the first threaded rod (62); the wing nut (66) is in threaded connection with the outer wall of the end of the first threaded rod (62).
2. The steel bar truss floor deck device as claimed in claim 1, wherein the adjustable sliding fixed plate structure (7) comprises a second threaded rod (71), a connecting locking plate (72), a sponge pad (73), a square-head nut (74), an anti-dropping plate (75) and a sliding connecting rod (76), wherein the second threaded rod (71) penetrates through the middle position of the inner parts of the left side and the right side of the connecting locking plate (72) respectively; the sponge cushion (73) is glued at the lower end of the connecting and locking plate (72); the square-head nuts (74) are respectively in threaded connection with the outer wall of the upper end of the second threaded rod (71); the sliding connecting rods (76) are respectively welded in the middle of the upper end of the anti-falling plate (75); the sliding connecting rods (76) are respectively connected with sliding holes arranged on the left side and the right side of the locking plate (72) in a penetrating way.
3. The steel bar truss floor deck device as claimed in claim 1, wherein the pluggable sealing leak-proof connection plate structure (8) comprises a butt plate (81), a plugging block (82), a locking leak-proof plate (83), a rubber ring (84), a round head screw (85) and a sealing connection plate (86), wherein the plugging block (82) is respectively glued at the middle position of the left side and the right side of the butt plate (81); the rubber ring (84) is sleeved on the upper part of the outer wall of the round head screw (85); the round head screw (85) penetrates through the middle position inside the locking anti-leakage plate (83); the round head screw (85) is in threaded connection with the middle position inside the upper end of the butt plate (81); the lower end of the butt joint plate (81) is glued at the middle position of the upper end of the sealing connecting plate (86).
4. The steel bar truss floor deck device according to claim 1, wherein the quick locking plate (63) is a stainless steel plate with through holes on the left and right sides; the connecting seat (61) is a stainless steel seat with a through hole formed in the middle of the lower end.
5. The steel bar truss floor deck device as claimed in claim 1, wherein the fixing block (4) is a silica gel block; the first supporting block (5) and the second supporting block (11) are respectively rubber blocks; the upper end of the rubber plate (15) is contacted with the middle position of the lower end of the second floor bearing plate (2).
6. The steel bar truss floor deck device according to claim 1, wherein the connecting seats (61) are welded to the left and right sides of the lower end of the first floor deck (1), respectively; the first threaded rod (62) sequentially penetrates through the second floor bearing plate (2), the buffer pipe (10) and the bottom plate (3) from top to bottom; the quick locking plate (63) is arranged at the lower end of the bottom plate (3); the compression plate (65) is inserted in the middle of the upper end of the buffer tube (10).
7. The steel bar truss floor deck device according to claim 2, wherein the connecting and locking plate (72) is a stainless steel plate with a slide hole formed in the middle of the left side and the right side; the anti-falling plate (75) is a stainless steel plate; the sliding connecting rod (76) adopts a stainless steel threaded rod.
8. The steel bar truss floor deck device according to claim 2, wherein the second threaded rods (71) are welded to the left and right sides of the upper end of the first floor deck (1), respectively.
9. The steel bar truss floor deck device according to claim 3, wherein the sealing connecting plate (86) is a silicone plate; the locking leakage-proof plate (83) is a stainless steel plate of which the lower end is connected with a sealing gasket in an adhesive manner; the plug-in block (82) adopts a silica gel block.
10. The steel bar truss floor deck device as claimed in claim 3, wherein the plug block (82) is plugged at the right side between the second floor deck (2) and the bottom plate (3); the left side of the locking leakage-proof plate (83) is arranged on the right side of the upper end of the first floor bearing plate (1); the left side of the sealing connecting plate (86) is arranged at the right side of the lower end of the bottom plate (3).
CN201920875025.4U 2019-06-12 2019-06-12 Steel bar truss building carrier plate device Expired - Fee Related CN210530085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920875025.4U CN210530085U (en) 2019-06-12 2019-06-12 Steel bar truss building carrier plate device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920875025.4U CN210530085U (en) 2019-06-12 2019-06-12 Steel bar truss building carrier plate device

Publications (1)

Publication Number Publication Date
CN210530085U true CN210530085U (en) 2020-05-15

Family

ID=70594715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920875025.4U Expired - Fee Related CN210530085U (en) 2019-06-12 2019-06-12 Steel bar truss building carrier plate device

Country Status (1)

Country Link
CN (1) CN210530085U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095874A (en) * 2020-09-16 2020-12-18 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095874A (en) * 2020-09-16 2020-12-18 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure
CN112095874B (en) * 2020-09-16 2021-12-17 江苏万年达杭萧钢构有限公司 Detachable steel construction building carrier plate structure

Similar Documents

Publication Publication Date Title
CN210530085U (en) Steel bar truss building carrier plate device
KR101747754B1 (en) Maintenance method of concrete wall swimming pool with stainless steel
CN210263912U (en) Floor support plate connecting piece
CN210239680U (en) Shield constructs repair fixture structure of section of jurisdiction
CN218409570U (en) Monitoring device for monitoring natural gas pipeline
KR20170056123A (en) Protection device for water leak of concrete water
CN105888247A (en) Construction method for expansion joint of industrial pond
CN213449604U (en) Industrial and civil building wall reinforcing device
CN111024026B (en) Device with stone brick flatness detects and restores function
CN211974327U (en) Floor pipeline plugging device
CN204402004U (en) A kind of Simple general type outer scaffold wall connector
CN210800230U (en) Liquefied gas pipeline supporting equipment
CN209991009U (en) Pump pipe fixer with shock attenuation effect
CN206903675U (en) A kind of waterstop positioner
CN211082537U (en) Hinge for anti-seismic support and hanger
CN216361193U (en) Connecting structure of fire-fighting pipe fitting
CN216524217U (en) Dipperstick for hydraulic engineering
CN215443213U (en) Vertical prefabricated component's auxiliary fixtures that takes one's place
CN220891274U (en) Deformation joint manufacturing device
CN218396797U (en) Butt joint device for welding pipeline
CN212351821U (en) Butt joint equipment for pressure vessel pipeline installation
CN214333736U (en) Electric power iron tower angle steel detects repair equipment
CN220042816U (en) Electromechanical construction sleeve pipe pre-buried device
CN214401838U (en) Hydraulic engineering slope bearing structure
CN210687446U (en) Building engineering composite pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200515

Termination date: 20210612