CN210528364U - Construction platform special for steel structure - Google Patents
Construction platform special for steel structure Download PDFInfo
- Publication number
- CN210528364U CN210528364U CN201921551945.7U CN201921551945U CN210528364U CN 210528364 U CN210528364 U CN 210528364U CN 201921551945 U CN201921551945 U CN 201921551945U CN 210528364 U CN210528364 U CN 210528364U
- Authority
- CN
- China
- Prior art keywords
- plunger
- steel construction
- base
- welding
- discharge pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a special construction platform of steel construction, the on-line screen storage device comprises a base, base top surface left side bolt connection has left plunger, there is the press lever left side plunger top through the bolt fastening, the suction tube has been seted up on left side plunger bottom right side, the discharge pipe has been seted up in left side plunger bottom left side. The utility model discloses a press the depression bar, left plunger, the discharge pipe, the suction tube, the setting of ascending spacing and right plunger, remove the steel construction to the workstation on, the rethread pushes down the depression bar and makes left plunger push down, pass through the discharge pipe by the air current and get into ascending spacing below, it makes the spacing extrusion cylinder that constantly rises of going on the line drive right plunger to make the workstation rise along with rising to push down the depression bar many times, the fixing of the scaffold frame of the steel construction of being convenient for, the welding of the base welding of some steel constructions of also being convenient for simultaneously or connecting piece, avoid manpower or large-scale machinery to carry the wasting time and energy of steel construction to the workstation, the cost is lower, it is more convenient to use.
Description
Technical Field
The utility model relates to a special construction platform technical field of steel construction specifically is a special construction platform of steel construction.
Background
The steel construction of present building construction is unified purchase mostly, and the steel construction still need carry out scaffold frame fixed or base welding, detach some must eminences and carry out outside the fixed scaffold, prepare the work well outside the steel construction on ground, need special construction platform, and the patent number is CN201821168431.9, because the steel construction is heavier no matter it is artifical or mechanical transport upper mounting plate takes trouble and laboursome, the practicality is poor, therefore we propose a special construction platform of steel construction, it is fixed that the workman of being convenient for will lift the steel construction take the altitude to carry out base or scaffold frame, reduce the cost of mechanical transport.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a special construction platform of steel construction has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a special construction platform of steel construction, includes the base, base top surface left side bolt connection has left plunger, there is the press bar on left side plunger top through the bolt fastening, the suction tube has been seted up on left side plunger bottom right side, the discharge pipe has been seted up in left side plunger bottom left side, base top surface right-hand member is installed and is risen spacingly, the spacing outer wall welding that rises has the cylinder, the spacing top bolt welding that rises has right plunger.
As a preferred embodiment of the utility model, the base right side is rotated and is connected with the bolt that resets, the bolt that resets is located the spacing below that rises.
As a preferred embodiment of the utility model, the suction pipe and the discharge pipe inner wall are all welded with the check valve.
As a preferred embodiment of the utility model, the welding of right side plunger top has the crossbearer, the welding of crossbearer top has L type workstation.
As an optimized implementation manner of the utility model, the cutting of workstation right-hand member has the slope.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a special construction platform of steel construction, through pressing the depression bar, left side plunger, the discharge pipe, inhale the pipe, the setting of ascending spacing and right plunger, remove the steel construction to the workstation on, the rethread pushes down the depression bar and makes left side plunger push down, pass through the discharge pipe by the air current and get into ascending spacing below, it makes the spacing extrusion cylinder that constantly rises that goes up to go up the line to drive right plunger to push down the depression bar many times, make the workstation along with rising, the fixing of the scaffold frame of the steel construction of being convenient for, the welding of the base welding of some steel constructions of also being convenient for simultaneously or connecting piece, avoid manpower or large-scale machine to carry the steel construction to the workstation waste time and energy, the cost is.
2. The utility model discloses a special construction platform of steel construction, through the setting on slope, when the steel construction removed to the workstation, the workman of being convenient for removed the steel construction to the workstation through the slope on, can reduce the workman hard to a certain extent, improves work efficiency.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a schematic view of the overall structure of the construction platform special for steel structure of the present invention;
fig. 2 is the utility model discloses special construction platform's of steel construction workstation schematic structure.
In the figure: 1. a discharge pipe; 2. a suction tube; 3. a left plunger; 4. a pressing lever; 5. a one-way valve; 6. a right plunger; 7. a cylinder; 8. a work table; 9. a slope; 10. resetting the bolt; 11. ascending and limiting; 12. a transverse frame.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a special construction platform of steel construction, includes base 13, base 13 top surface left side bolt connection has left plunger 3, there is press bar 4 on 3 tops of left side plunger through the bolt fastening, suction tube 2 has been seted up on 3 bottom right sides of left side plunger, discharge pipe 1 has been seted up on 3 bottom left sides of left side plunger, 13 top surface right-hand member of base is installed ascending spacing 11, the outer wall welding of ascending spacing 11 has cylinder 7, the bolt welding of ascending spacing 11 tops has right plunger 6.
In this embodiment, please refer to fig. 1 through removing the steel construction to workstation 8 on, rethread pushes down and presses the pressure lever 4 to make left plunger 3 push down, get into the spacing 11 below that rises through discharge pipe 1 by the air current, it makes the spacing 11 constantly rising extrusion cylinder 7 of going up line rise to drive right plunger 6 and rise to press the pressure lever 4 to push down many times, make workstation 8 along with rising, be convenient for the fixing of the scaffold frame of steel construction, also be convenient for the welding of the base welding of some steel constructions or connecting piece simultaneously, avoid manpower or large-scale machinery to carry the steel construction to the workstation waste time and energy, the cost is lower, it is more convenient to use.
The right side of the base 13 is rotatably connected with a reset bolt 10, and the reset bolt 10 is located below the ascending limit 11.
In the embodiment, referring to fig. 1, by rotating the reset bolt 10, the air flow in the air cylinder 7 is removed, so that the air flow flows back to the suction pipe 2, the ascending limit 11 is reset, and the right plunger 6 descends accordingly.
Wherein, the inner walls of the suction pipe 2 and the discharge pipe 1 are welded with one-way valves 5.
In this embodiment, referring to fig. 1, the one-way valve 5 controls the one-way flow of the air in the suction pipe 2 and the discharge pipe 1.
Wherein, the right end of the workbench 8 is cut with a slope 9.
In this embodiment, please refer to fig. 2, when the steel structure moves to the workbench 8, the worker can move the steel structure to the workbench 8 through the slope 9, which can reduce the labor of the worker to a certain extent and improve the working efficiency.
It should be noted that the utility model relates to a construction platform special for steel structure, which comprises a discharge pipe 1, a suction pipe 2, a left plunger 3, a pressing rod 4, a one-way valve 5, a right plunger 6, a cylinder 7, a workbench 8, a slope 9, a reset bolt 10, a lifting limit 11 and a cross frame 12, all of which are parts known by general standard parts or those skilled in the art, the structure and principle of which are known by technical manuals or conventional experimental methods, when the steel structure moves to the workbench 8 in work, a worker can move the steel structure to the workbench 8 through the slope 9, then the left plunger 3 is pressed down by pressing the pressing rod 4, the air flow enters the lower part of the lifting limit 11 through the discharge pipe 1, the pressing rod 4 is pressed down for many times to enable the upper line limit 11 to continuously lift the cylinder 7 to drive the right plunger 6 to lift, so that the workbench 8 rises, when the plunger piston 6 needs to be reset, the reset bolt 10 is rotated to unload the air flow in the air cylinder 7, so that the air flow flows back to the suction pipe 2, the ascending limit 11 is reset, and the right plunger piston 6 descends along with the ascending limit.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The utility model provides a special construction platform of steel construction, includes base (13), its characterized in that: base (13) top surface left side bolt connection has left plunger (3), there is press bar (4) on left side plunger (3) top through the bolt fastening, suction tube (2) have been seted up on left side plunger (3) bottom right side, discharge pipe (1) have been seted up on left side plunger (3) bottom left side, base (13) top surface right-hand member is installed and is risen spacing (11), it has cylinder (7) to rise spacing (11) outer wall welding, it has right plunger (6) to rise spacing (11) top bolt welding.
2. The special construction platform for steel structures of claim 1, wherein: the right side of the base (13) is rotatably connected with a reset bolt (10), and the reset bolt (10) is located below the ascending limit (11).
3. The special construction platform for steel structures of claim 1, wherein: check valves (5) are welded on the inner walls of the suction pipe (2) and the discharge pipe (1).
4. The special construction platform for steel structures of claim 1, wherein: the welding of right side plunger (6) top has crossbearer (12), the welding of crossbearer (12) top has L type workstation (8).
5. The special construction platform of steel construction of claim 4, characterized in that: the right end of the workbench (8) is cut with a slope (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921551945.7U CN210528364U (en) | 2019-09-18 | 2019-09-18 | Construction platform special for steel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921551945.7U CN210528364U (en) | 2019-09-18 | 2019-09-18 | Construction platform special for steel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210528364U true CN210528364U (en) | 2020-05-15 |
Family
ID=70605778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921551945.7U Expired - Fee Related CN210528364U (en) | 2019-09-18 | 2019-09-18 | Construction platform special for steel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210528364U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113955667A (en) * | 2021-11-18 | 2022-01-21 | 芜湖天航重工股份有限公司 | Steel structure processing lifting machine |
-
2019
- 2019-09-18 CN CN201921551945.7U patent/CN210528364U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113955667A (en) * | 2021-11-18 | 2022-01-21 | 芜湖天航重工股份有限公司 | Steel structure processing lifting machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210528364U (en) | Construction platform special for steel structure | |
CN206344239U (en) | A kind of punch structure for being easy to double faced adhesive tape to carry paper tape hole stamp stripping | |
CN204194498U (en) | Simple wire plate compacting right angle, job site instrument | |
CN205651442U (en) | It is adjustable apart from formula punching machine | |
CN202715658U (en) | Metal plate leveling machine | |
CN209876328U (en) | Height increasing bracket for jack | |
CN205551925U (en) | Row of inserting base feedway of row's of plugging in kludge | |
CN205089545U (en) | Automatic air water pumper | |
CN212419241U (en) | Aluminum profile bending device | |
CN205096844U (en) | Be used for indisputable tray member processing equipment | |
CN209740484U (en) | Air cooler tube bundle lifting lug convenient to disassemble | |
CN203755225U (en) | Snow removing mechanism used for factories | |
CN201645220U (en) | Pressing beam mechanism of edge milling machine | |
CN208246745U (en) | A kind of cutting of large scale machine parts and welding processing platform | |
CN207737912U (en) | A kind of horizontal refuse compressor | |
CN101920460A (en) | Beam pressing mechanism for edge milling machine | |
CN211054486U (en) | Old and useless metalwork compression packing apparatus | |
CN203917578U (en) | A kind of multifunction hydraulic punch press | |
CN210080622U (en) | Convenient hydraulic electro-hydraulic hammer for constructional engineering | |
CN203956485U (en) | A kind of portable mounting plate | |
CN205271315U (en) | Hydraulic support back timber maintenance press | |
CN213763685U (en) | Burr-proof barrel cover punching device | |
CN220053908U (en) | Open-air gas construction pipeline conveyer | |
CN209921575U (en) | Oil top auxiliary fixtures | |
CN210387678U (en) | Perforating device for assembling steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.492 Xingyuan Road, Yuhang Economic and Technological Development Zone, Yuhang District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Longliang Steel Structure Co.,Ltd. Address before: No.492 Xingyuan Road, Yuhang Economic and Technological Development Zone, Yuhang District, Hangzhou City, Zhejiang Province Patentee before: Hangzhou Longliang Steel Structure Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200515 Termination date: 20210918 |
|
CF01 | Termination of patent right due to non-payment of annual fee |