CN210522074U - Exhaust gas purification device before exhaust of thermal power factory - Google Patents
Exhaust gas purification device before exhaust of thermal power factory Download PDFInfo
- Publication number
- CN210522074U CN210522074U CN201920781239.5U CN201920781239U CN210522074U CN 210522074 U CN210522074 U CN 210522074U CN 201920781239 U CN201920781239 U CN 201920781239U CN 210522074 U CN210522074 U CN 210522074U
- Authority
- CN
- China
- Prior art keywords
- gas purification
- thermal power
- exhaust gas
- main body
- exhaust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Filtering Of Dispersed Particles In Gases (AREA)
- Processes For Solid Components From Exhaust (AREA)
Abstract
The utility model discloses a waste gas purification device before thermal power factory exhausts, including main part, blow vent and the fan of ventilating, the apron is installed to the outer wall of main part, and the outer wall of apron is provided with the handle, run through respectively all around of apron has the screw, and is threaded connection between apron and the screw, the blow vent runs through in the left and right sides of main part, the fan of ventilating is installed in the inside of main part, and ventilates and be swing joint between fan and the main part, the one end of ventilating fan links up the wind groove. This exhaust gas purification device before thermal power factory exhausts is provided with the ventilation fan, through opening the ventilation fan, makes it with the exhaust gas purification device that inhales more fast to improved work efficiency, saved operating time, the waste gas that flows in the wind channel filters in getting into high-efficient filter layer through the connecting pipe, thereby makes the waste gas of process simply filter, makes some small particles in the waste gas leave, thereby reaches clear effect.
Description
Technical Field
The utility model relates to a waste gas purification device technical field specifically is a waste gas purification device before thermal power factory exhausts.
Background
A thermal power plant, which is a plant for producing electric energy by using combustible materials (such as coal) as fuel, generates a large amount of waste gas, and needs to be provided with a certain waste gas purification device, wherein the waste gas purification mainly refers to the treatment of industrial waste gas generated in industrial places, such as dust particles, smoke, dust, peculiar smell and toxic and harmful gases.
The installation process of the waste gas purification device in the market is complex, so that the working personnel can consume too long time when installing the purification device, the phenomenon of influencing the working efficiency is caused, meanwhile, the waste gas of most of purification devices is not completely filtered, and the air is easily polluted when being discharged.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a waste gas purification device before thermal power factory exhausts to solve the waste gas purification device installation process that provides in the above-mentioned background art comparatively loaded down with trivial details, thereby lead to staff's consumption time overlength when installing purifier, the phenomenon that influences work efficiency takes place, and most purifier exhaust filtration is incomplete simultaneously, the easy contaminated air's of discharge problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a waste gas purification device before thermal power factory exhausts, includes main part, blow vent and the fan of ventilating, the apron is installed to the outer wall of main part, and the outer wall of apron is provided with the handle, it has the screw to run through respectively all around of apron, and is threaded connection between apron and the screw, the blow vent runs through in the left and right sides of main part, the fan of ventilating is installed in the inside of main part, and ventilates and be swing joint between fan and the main part, the one end of ventilating fan has linked up the wind groove, and the one end of wind groove runs through there is the connecting pipe, the one end of connecting pipe is provided with high efficiency filter layer, closely laminate between connecting pipe and the high efficiency filter layer, the one end of high efficiency filter layer has linked up the flow equalizing plate, the.
Preferably, the main body and the cover plate form a detachable structure through screws, and the main body and the cover plate are tightly attached.
Preferably, the blow vent contains fixed plate, bolt head and screw thread post, the fixed plate is installed to the outer wall of blow vent, and the inside of fixed plate runs through there is the screw thread post, the bolt head is installed to the one end of screw thread post.
Preferably, the vent hole is perpendicular to the fixing plate, and the bolt head and the fixing plate form a detachable structure through a threaded column.
Preferably, the ventilating fan and the connecting pipe form a communicating structure through the air groove, the connecting pipe and the high-efficiency filter layer are tightly attached, and the high-efficiency filter layer and the flow equalizing plate form a parallel structure.
Preferably, the main body is fixedly connected with the air diffusing port, and the air diffusing port is of a V-shaped structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the waste gas purification device before exhaust of the thermal power plant is provided with the cover plate, and the cover plate can be simply and conveniently pulled out of the main body by a worker through the handle by rotating the screw, so that the interior of the waste gas purification device can be simply and conveniently checked and maintained, meanwhile, the screw is designed, so that the worker can more conveniently disassemble and assemble, and the complex process of assembling by consuming a large amount of time is avoided;
2. the exhaust gas purification device before exhaust of the thermal power plant is provided with the vent hole, the exhaust pipe is attached to the fixed plate fixed on the vent hole, and then the bolt head is rotated to drive the threaded column to be fixed with the exhaust pipe, so that the exhaust gas purification device is more simply and conveniently installed on the exhaust pipe of the thermal power plant, and the threaded column is fixed to enable the threaded column and the exhaust pipe to be fixed more firmly, so that the phenomenon that the exhaust pipe and the exhaust gas purification device fall off due to buffer force caused by gas during exhaust of the exhaust gas is avoided;
3. this exhaust gas purification device before thermal power factory exhausts is provided with the ventilation fan, through opening the ventilation fan, make it with the exhaust gas faster suction exhaust gas purification device, thereby work efficiency has been improved, operating time has been saved, the waste gas that flows in the wind groove filters in getting into high-efficient filter layer through the connecting pipe, thereby make the waste gas of process can simply filter, some small particles leave in making the waste gas, thereby reach clear effect, thereby install the scattered gas port at both ends about the main part and make the more convenient exhaust gas that discharges away after filtering, thereby improve air discharge's efficiency, operating time is saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
fig. 3 is a schematic view of the top view structure of the present invention.
In the figure: 1. a main body; 2. a cover plate; 3. a handle; 4. a screw; 5. a vent; 501. a fixing plate; 502. a bolt head; 503. a threaded post; 6. ventilating fans; 7. an air duct; 8. a connecting pipe; 9. a high-efficiency filter layer; 10. a flow equalizing plate; 11. the air diffuser is provided with an air diffuser opening.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a waste gas purification device before exhaust of a thermal power plant comprises a main body 1, a cover plate 2, a handle 3, screws 4, air vents 5, a fixing plate 501, a bolt head 502, threaded columns 503, an air ventilating fan 6, an air duct 7, a connecting pipe 8, a high-efficiency filter layer 9, an equalizing plate 10 and an air diffusing port 11, wherein the cover plate 2 is installed on the outer wall of the main body 1, the handles 3 are arranged on the outer wall of the cover plate 2, the screws 4 penetrate through the periphery of the cover plate 2 respectively, the cover plate 2 is in threaded connection with the screws 4, the main body 1 and the cover plate 2 form a detachable structure through the screws 4, the main body 1 and the cover plate 2 are tightly attached, and by rotating the screws 4, a worker can simply and conveniently pull out the cover plate 2 from the main body 1 through the handles 3, so that the interior of the waste gas purification device can be simply and conveniently inspected and maintained, and the design of the screws, avoiding the complex process of assembling by consuming a large amount of time, wherein the vent 5 penetrates through the left side and the right side of the main body 1, the vent 5 comprises a fixing plate 501, a bolt head 502 and a threaded column 503, the fixing plate 501 is installed on the outer wall of the vent 5, the threaded column 503 penetrates through the inside of the fixing plate 501, the bolt head 502 is installed at one end of the threaded column 503, the vent 5 and the fixing plate 501 are perpendicular to each other, the bolt head 502 and the fixing plate 501 form a detachable structure through the threaded column 503, the exhaust pipe is attached to the fixing plate 501 fixed on the vent 5, then the bolt head 502 is rotated to drive the threaded column 503 to be fixed with the exhaust pipe, so that the exhaust gas purification device is more simply and conveniently installed on the exhaust pipe of the thermal power plant, meanwhile, the threaded column 503 is fixed more firmly, and the buffer force caused by gas is avoided when, the exhaust pipe and the exhaust gas purification device fall off;
the ventilating fan 6 is arranged inside the main body 1, the ventilating fan 6 is movably connected with the main body 1, one end of the ventilating fan 6 is connected with the air groove 7, one end of the air groove 7 is penetrated by the connecting pipe 8, one end of the connecting pipe 8 is provided with the high-efficiency filter layer 9, the connecting pipe 8 is tightly attached to the high-efficiency filter layer 9, one end of the high-efficiency filter layer 9 is connected with the flow equalizing plate 10, the ventilating fan 6 and the connecting pipe 8 form a communicating structure through the air groove 7, the connecting pipe 8 is tightly attached to the high-efficiency filter layer 9, the high-efficiency filter layer 9 and the flow equalizing plate 10 form a parallel structure, the ventilating fan 6 is opened, so that the waste gas is sucked into the waste gas purifying device more quickly, the working efficiency is improved, the working time is saved, the waste gas flowing into the air groove 7 enters the high-efficiency filter layer 9 through the connecting pipe 8 to be filtered, some tiny particles leave in making waste gas to reach clear effect, the top of main part 1 is run through and is had air diffuser 11, and main part 1 and air diffuser 11 are fixed connection between, and air diffuser 11's shape is "V" style of calligraphy structure, thereby installs the air diffuser 11 at main part 1 upper and lower both ends and make the more convenient of waste gas after filtering discharge away, thereby improve air discharge's efficiency, save operating time.
The working principle is as follows: for the exhaust gas purification device, firstly, the exhaust pipe is attached to the fixing plate 501 fixed on the vent 5, then the bolt head 502 is rotated to drive the threaded column 503 and the exhaust pipe to be fixed, so that the exhaust gas purification device is more simply and conveniently installed on the exhaust pipe of the thermal power plant, then the exhaust fan 6 is opened to more rapidly suck the exhaust gas into the exhaust gas purification device, the exhaust gas flowing into the air duct 7 enters the high-efficiency filter layer 9 through the connecting pipe 8 to be filtered, so that the passing exhaust gas can be simply filtered, meanwhile, the air diffusing ports 11 installed at the upper end and the lower end of the main body 1 are arranged so that the filtered exhaust gas can be more conveniently discharged, and finally, when the purification device needs to be maintained, the screw 4 can be rotated, so that a worker can simply and conveniently pull the cover plate 2 out of the main body 1 through the handle 3, thereby make inside simple convenient the inspection maintenance that carries on of exhaust gas purification device, thereby the design of screw 4 makes the staff dismantle the installation more convenient simultaneously, accomplishes whole exhaust gas purification device's use just so.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an exhaust gas purification device before thermal power factory exhausts, includes main part (1), blow vent (5) and ventilating fan (6), its characterized in that: a cover plate (2) is arranged on the outer wall of the main body (1), a handle (3) is arranged on the outer wall of the cover plate (2), screws (4) penetrate through the periphery of the cover plate (2) respectively, the cover plate (2) is in threaded connection with the screw (4), the vent holes (5) penetrate through the left side and the right side of the main body (1), the ventilating fan (6) is installed inside the main body (1), the ventilating fan (6) is movably connected with the main body (1), one end of the ventilating fan (6) is connected with an air groove (7), and one end of the air duct (7) is penetrated with a connecting pipe (8), one end of the connecting pipe (8) is provided with a high-efficiency filter layer (9), the connecting pipe (8) is tightly attached to the high-efficiency filter layer (9), one end of the high-efficiency filter layer (9) is connected with a flow equalizing plate (10), and an air diffusing port (11) penetrates through the top of the main body (1).
2. The exhaust gas purification apparatus before exhaust of a thermal power plant according to claim 1, characterized in that: the main body (1) and the cover plate (2) form a detachable structure through screws (4), and the main body (1) and the cover plate (2) are tightly attached.
3. The exhaust gas purification apparatus before exhaust of a thermal power plant according to claim 1, characterized in that: vent (5) contain fixed plate (501), bolt head (502) and screw thread post (503), fixed plate (501) are installed to the outer wall of vent (5), and threaded post (503) have been run through to the inside of fixed plate (501), bolt head (502) are installed to the one end of screw thread post (503).
4. The exhaust gas purification apparatus before exhaust of a thermal power plant according to claim 3, characterized in that: the vent (5) is perpendicular to the fixing plate (501), and the bolt head (502) and the fixing plate (501) form a detachable structure through the threaded column (503).
5. The exhaust gas purification apparatus before exhaust of a thermal power plant according to claim 1, characterized in that: the ventilating fan (6) is communicated with the connecting pipe (8) through the air groove (7), the connecting pipe (8) and the high-efficiency filter layer (9) are tightly attached, and the high-efficiency filter layer (9) and the flow equalizing plate (10) form a parallel structure.
6. The exhaust gas purification apparatus before exhaust of a thermal power plant according to claim 1, characterized in that: the main body (1) is fixedly connected with the air diffusing port (11), and the air diffusing port (11) is of a V-shaped structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920781239.5U CN210522074U (en) | 2019-05-28 | 2019-05-28 | Exhaust gas purification device before exhaust of thermal power factory |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920781239.5U CN210522074U (en) | 2019-05-28 | 2019-05-28 | Exhaust gas purification device before exhaust of thermal power factory |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210522074U true CN210522074U (en) | 2020-05-15 |
Family
ID=70593858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920781239.5U Active CN210522074U (en) | 2019-05-28 | 2019-05-28 | Exhaust gas purification device before exhaust of thermal power factory |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210522074U (en) |
-
2019
- 2019-05-28 CN CN201920781239.5U patent/CN210522074U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206406730U (en) | A kind of vehicular air purifier | |
CN103398441A (en) | Fresh air purification device | |
CN210522074U (en) | Exhaust gas purification device before exhaust of thermal power factory | |
CN204704947U (en) | The new wind devices of window | |
CN108843367B (en) | Device convenient for tunnel ventilation for bridge | |
CN206530551U (en) | Centrifugal smoke exhaust fan | |
CN206755396U (en) | A kind of fresh air purifier | |
CN209971468U (en) | Dust-absorbing and smoke-discharging system for extruder | |
CN209877214U (en) | Novel medical instrument operation air purification device | |
CN208574417U (en) | A kind of waste gas air purification device | |
CN220771316U (en) | Multifunctional air curtain for paint workshop | |
CN102865096B (en) | Ventilation air methane (VAM) suction device | |
CN202303751U (en) | Ventilation device of warehouse | |
CN212396240U (en) | Efficient furniture processing lacquer house exhaust treatment device | |
CN220781742U (en) | Environmental ventilation device for laboratory | |
CN211514075U (en) | A exhaust purification processing apparatus for chemical industry | |
CN205025610U (en) | A air filtration system that makes an uproar falls in tertiary high efficiency for gas turbine | |
CN219141011U (en) | Multi-duct air purifying equipment | |
CN211913183U (en) | Combustion waste gas purification device | |
CN214513539U (en) | Air interchanger between coating and paint | |
CN218924220U (en) | Waste gas treatment tower | |
CN218296094U (en) | Laboratory purifies ventilation unit | |
CN219865099U (en) | Quick air supply, exhaust and dust removal device for narrow and small closed space of manual hole digging pile hole | |
CN217746306U (en) | Detachable exhaust treatment device with filtering structure | |
CN219539941U (en) | Waste gas purification environmental protection equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.3, Yingxiong Road, Wangbu village, hi tech Zone, Zibo City, Shandong Province Patentee after: Shandong Baolan Environmental Protection Co.,Ltd. Address before: No.3, Yingxiong Road, Wangbu village, hi tech Zone, Zibo City, Shandong Province Patentee before: SHANDONG BAOLAN EP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |