CN210507420U - Gap structure for elevation reduction of large-diameter cast-in-place pile - Google Patents
Gap structure for elevation reduction of large-diameter cast-in-place pile Download PDFInfo
- Publication number
- CN210507420U CN210507420U CN201921161150.5U CN201921161150U CN210507420U CN 210507420 U CN210507420 U CN 210507420U CN 201921161150 U CN201921161150 U CN 201921161150U CN 210507420 U CN210507420 U CN 210507420U
- Authority
- CN
- China
- Prior art keywords
- bored concrete
- concrete pile
- longitudinal rib
- breach
- steel reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a major diameter bored concrete pile falls breach structure of elevation belongs to building engineering technical field. The utility model discloses a major diameter bored concrete pile falls breach structure of elevation, including the bored concrete pile body and steel reinforcement cage, corresponding bored concrete pile body and the steel reinforcement cage upper end are equipped with bored concrete pile body breach and steel reinforcement cage breach, to pour cement concrete in the steel reinforcement cage and form the bored concrete pile body, wherein steel reinforcement cage breach department forms bored concrete pile body breach. The utility model discloses major diameter bored concrete pile comprises steel reinforcement cage and integrative cast-in-place bored concrete pile body, has improved the efficiency of construction of pouring of major diameter bored concrete pile on the one hand, and on the other hand has guaranteed major diameter bored concrete pile's bulk strength, and this structure is simple, and the feasibility is high.
Description
Technical Field
The utility model relates to a building engineering technical field, concretely relates to major diameter bored concrete pile falls breach structure of elevation.
Background
The concrete cast-in-place pile is a pile formed by placing concrete or reinforced concrete in a hole. At present, in pile-raft foundation design construction of large-diameter cast-in-place piles, elevator shafts or water collecting shafts are often encountered, the general method is to cast the large-diameter cast-in-place piles in a standard-lowering mode, and then cast and pile-splicing are carried out on the large-diameter cast-in-place piles to reach specified elevation. The method divides the pouring construction of the large-diameter pouring pile into two steps, not only reduces the pouring construction efficiency of the large-diameter pouring pile, but also divides the large-diameter pouring pile into an upper part and a lower part, and weakens the overall strength of the large-diameter pouring pile.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the defect that exists among the prior art, provide a major diameter bored concrete pile and fall breach structure of elevation, this structure has improved the efficiency of construction of pouring of major diameter bored concrete pile on the one hand, and on the other hand has guaranteed the bulk strength of major diameter bored concrete pile, and this structure is simple, and the feasibility is high.
In order to realize the above purpose, the technical scheme of the utility model a breach structure of major diameter bored concrete pile height reduction elevation is designed, including the bored concrete pile body and steel reinforcement cage, corresponding bored concrete pile body breach and the steel reinforcement cage breach of being equipped with in bored concrete pile body and the steel reinforcement cage upper end, to it forms the bored concrete pile body to pour cement concrete in the steel reinforcement cage, and wherein steel reinforcement cage breach department forms the bored concrete pile body breach.
The utility model discloses major diameter bored concrete pile comprises steel reinforcement cage and integrative cast-in-place bored concrete pile body, has improved the efficiency of construction of pouring of major diameter bored concrete pile on the one hand, and on the other hand has guaranteed major diameter bored concrete pile's bulk strength, and this structure is simple, and the feasibility is high.
For the convenience of this major diameter bored concrete pile falls smooth preparation implementation of breach structure of elevation, preferred technical scheme is, steel reinforcement cage includes the basic cage body and is located the breach cage body of basic cage body top, the basic cage body is indulged muscle and stirrup by first muscle, second of indulging and is constituteed, and first muscle and the second of indulging is indulged the muscle and is followed the interior week side evenly distributed of stirrup, and just the length of first muscle of indulging > the length that the muscle was indulged to the second, the breach cage body is indulged muscle, breach stirrup and first indulges the part that the muscle upper end extends the basic cage body by the addition and is constituteed, and the muscle is indulged with first the muscle in the interior week side evenly distributed of breach stirrup to the addition, and the upper end of muscle and the upper end of first muscle of indulging flush, and the muscle lower extreme extends to the.
Further preferably, the distance from the lower end of the additional longitudinal bar to the inside of the basic cage body is more than or equal to 500 mm. The connection firmness between the foundation cage body and the gap cage body is improved, and the integral stress consistency of the pile body of the cast-in-place pile is ensured.
Further preferably, the lower end of the additional longitudinal rib is provided with a horizontal bending section, and the length of the horizontal bending section is more than or equal to 500 mm. In order to prevent the additional longitudinal bars from loosening in the use process of the large-diameter cast-in-place pile, the overall firmness of the large-diameter cast-in-place pile is ensured.
Further preferably, the stirrup is a spiral stirrup.
The utility model has the advantages and the beneficial effects that:
1. the utility model discloses major diameter bored concrete pile comprises steel reinforcement cage and integrative cast-in-place bored concrete pile body, has improved the efficiency of construction of pouring of major diameter bored concrete pile on the one hand, and on the other hand has guaranteed major diameter bored concrete pile's bulk strength, and this structure is simple, and the feasibility is high.
2. The utility model discloses steel reinforcement cage simple structure makes this major diameter bored concrete pile fall the feasible height of the breach structure of elevation.
Drawings
Fig. 1 is a plan view of a gap structure at a drop height of a large-diameter cast-in-place pile in example 1;
FIG. 2 is a plan view showing a notch structure at the elevation of a large-diameter cast-in-place pile according to example 2;
FIG. 3 is a plan view showing a gap structure at the elevation of a large-diameter cast-in-place pile according to example 3;
fig. 4 is a right side view of a gap structure at the elevation of a large-diameter cast-in-place pile according to example 3.
In the figure: 1. a base cage body; 2. a notched cage body; 3. a first longitudinal rib; 4. a second longitudinal rib; 5. hooping; 6. adding longitudinal ribs; 7. a notch stirrup; 8. and (7) horizontally bending.
Detailed Description
The following description will further describe embodiments of the present invention with reference to the accompanying drawings and examples. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
Example 1
As shown in fig. 1, the utility model relates to a major diameter bored concrete pile falls breach structure of elevation, wherein the basic cage body 1 of major diameter bored concrete pile is cylindrical structure, and the breach of breach cage body 2 is the right angle, including bored concrete pile body and steel reinforcement cage, corresponding bored concrete pile body and the steel reinforcement cage upper end are equipped with bored concrete pile body breach and steel reinforcement cage breach, to pour cement concrete in the steel reinforcement cage and form the bored concrete pile body, wherein steel reinforcement cage breach department forms bored concrete pile body breach. The steel reinforcement cage includes the basic cage body 1 and is located the breach cage body 2 of the 1 top of the basic cage body, the basic cage body 1 is indulged muscle 4 and stirrup 5 by first muscle 3, the second of indulging and is constituteed, and first muscle 3 of indulging is indulged muscle 4 with the second and is followed the interior week side evenly distributed of stirrup 5, and the first length of indulging muscle 3 > the length that muscle 4 is indulged to the second, the breach cage body 2 is indulged muscle 6, breach stirrup 7 and first indulges the muscle 3 upper end by the addition and is extended basic cage body 1's part and constitute, and muscle 6 and first muscle 3 of indulging are indulged to the addition and are followed the interior week side evenly distributed of breach stirrup 7, and the upper end of muscle 6 and the first upper end of indulging the muscle 3 of indulging flush, and the muscle 6 lower. The distance from the lower end of the additional longitudinal bar 6 to the inside of the basic cage body 1 is more than or equal to 500 mm. The lower end of the additional longitudinal rib 6 is provided with a horizontal bending section 8, and the length of the horizontal bending section 8 is more than or equal to 500 mm. The stirrup 5 is a spiral stirrup 5.
Example 2
As shown in fig. 2, the present invention relates to a gap structure for elevation reduction of a large-diameter cast-in-place pile, and the difference between the embodiment 2 and the embodiment 1 is that the basic cage body 1 of the large-diameter cast-in-place pile is an elliptical structure.
Example 3
As shown in fig. 3-4, the utility model relates to a breach structure of major diameter bored concrete pile height reduction height, embodiment 2 lies in with embodiment 1's difference, and wherein the basic cage body 1 of major diameter bored concrete pile is circular structure, and the breach of the breach cage body is the arc structure.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the technical principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.
Claims (5)
1. The utility model provides a major diameter bored concrete pile falls breach structure of elevation, a serial communication port, including bored concrete pile body and steel reinforcement cage, corresponding bored concrete pile body breach and steel reinforcement cage breach that is equipped with in bored concrete pile body and the steel reinforcement cage upper end, to pour cement concrete in the steel reinforcement cage and form the bored concrete pile body, wherein steel reinforcement cage breach department forms bored concrete pile body breach.
2. The structure of claim 1, wherein the reinforcement cage includes a base cage body and a notch cage body located above the base cage body, the base cage body is composed of a first longitudinal rib, a second longitudinal rib and a stirrup, the first longitudinal rib and the second longitudinal rib are uniformly distributed along the inner peripheral side of the stirrup, the length of the first longitudinal rib is greater than that of the second longitudinal rib, the notch cage body is composed of an additional longitudinal rib, a notch stirrup and a portion of the upper end of the first longitudinal rib extending out of the base cage body, the additional longitudinal rib and the first longitudinal rib are uniformly distributed along the inner peripheral side of the notch stirrup, the upper end of the additional longitudinal rib and the upper end of the first longitudinal rib are flush, and the lower end of the additional longitudinal rib extends into the interior of the base cage body.
3. The elevation-reducing notch structure of the large-diameter cast-in-place pile as claimed in claim 2, wherein the lower end of the additional longitudinal bar extends to the inside of the foundation cage body by a distance of more than or equal to 500 mm.
4. The elevation-reducing notch structure of the large-diameter cast-in-place pile according to claim 3, wherein the lower end of the additional longitudinal rib is provided with a horizontal bending section, and the length of the horizontal bending section is more than or equal to 500 mm.
5. The elevation reducing notch structure of the large-diameter cast-in-place pile according to claim 4, wherein the stirrup is a spiral stirrup.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921161150.5U CN210507420U (en) | 2019-07-23 | 2019-07-23 | Gap structure for elevation reduction of large-diameter cast-in-place pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921161150.5U CN210507420U (en) | 2019-07-23 | 2019-07-23 | Gap structure for elevation reduction of large-diameter cast-in-place pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210507420U true CN210507420U (en) | 2020-05-12 |
Family
ID=70584807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921161150.5U Expired - Fee Related CN210507420U (en) | 2019-07-23 | 2019-07-23 | Gap structure for elevation reduction of large-diameter cast-in-place pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210507420U (en) |
-
2019
- 2019-07-23 CN CN201921161150.5U patent/CN210507420U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905455A (en) | A kind of precast concrete bar connecting grout sleeve and preparation method thereof | |
CN210562975U (en) | Prefabricated assembled hollow sandwich concrete-filled steel tube component | |
CN210766743U (en) | High resistance to compression concrete tubular pile | |
CN109235413B (en) | Device for reinforcing soft soil foundation by transverse reinforced rigid-flexible composite piles and construction method | |
CN202730755U (en) | H-shaped support pile | |
CN207749513U (en) | A kind of Novel anti-impact abrasion toughening prestressed concrete pipe pile | |
CN204753567U (en) | Arrangement of reinforcement high pressure jet struts pilework | |
CN204780883U (en) | Prefab with hollow structure | |
CN210507420U (en) | Gap structure for elevation reduction of large-diameter cast-in-place pile | |
CN219175268U (en) | Support pile and support panel connection fixing structure | |
CN214993084U (en) | Stiffening steel pipe-high performance concrete composite structure bridge tower with built-in steel reinforcement cage | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN209669861U (en) | Prestressed reinforced concrete screw thread tubular pole | |
CN109537586B (en) | Pile with large head | |
CN208293754U (en) | A kind of steel core concrete column-steel plate concrete ring beam joint | |
CN203113320U (en) | H-shaped supporting pile | |
CN219930943U (en) | End structure of rear dowel steel filling pile reinforcement cage | |
CN207846656U (en) | A kind of strong ties construction of assembled vertical member and basis | |
CN203654276U (en) | Pre-stressed concrete square pile | |
CN207193949U (en) | A kind of pile for prestressed pipe of convenient construction | |
CN207193966U (en) | A kind of prestressed concrete pipe pile | |
CN101302759A (en) | Prestress square pile | |
CN103835290A (en) | Pile foundation structure suitable for marine soft soil and design method thereof | |
CN217810963U (en) | Composite pile with built-in precast tubular pile | |
CN204781613U (en) | Cage space grid column structure steel bar connector of an area awl section of thick bamboo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200512 Termination date: 20210723 |
|