CN210503093U - Combined dredging pipeline floating body - Google Patents

Combined dredging pipeline floating body Download PDF

Info

Publication number
CN210503093U
CN210503093U CN201921699835.5U CN201921699835U CN210503093U CN 210503093 U CN210503093 U CN 210503093U CN 201921699835 U CN201921699835 U CN 201921699835U CN 210503093 U CN210503093 U CN 210503093U
Authority
CN
China
Prior art keywords
hinge
groove
pipeline
combined dredging
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921699835.5U
Other languages
Chinese (zh)
Inventor
宋政昌
周成龙
高雄杰
肖楠
吴世琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Jianshui Environmental Technology Co ltd
Original Assignee
Gansu PowerChina Port Navigation Shipbuilding Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu PowerChina Port Navigation Shipbuilding Engineering Co Ltd filed Critical Gansu PowerChina Port Navigation Shipbuilding Engineering Co Ltd
Priority to CN201921699835.5U priority Critical patent/CN210503093U/en
Application granted granted Critical
Publication of CN210503093U publication Critical patent/CN210503093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a combined dredging pipeline floating body, which comprises two bodies, wherein the outer side wall of the body is provided with a reinforcing rib, the inner side wall of the body is provided with a pipe groove, one side of the body is hinged through a hinge structure, the other side of the body is locked through a locking structure, the hinge structure comprises a hinge and a hinge shaft, and the hinge is arranged on one body, the utility model saves the complexity of assembling and disassembling when in bolt connection through the matching arrangement of the hinge structure and the locking structure, does not need a wrench, can complete the assembling and disassembling by bare hands, is convenient and rapid when in actual engineering use, can improve the engineering progress, simultaneously, the proper pipe grooves are reserved at the proper positions of the inner centers and the side edges of the two bodies, and the proper pipe grooves are reserved according to the diameter and the quantity of the pipeline and the cable which need to pass through the floating body so as to simultaneously bear the pipeline and, the problem of being only suitable for a single pipeline is overcome.

Description

Combined dredging pipeline floating body
Technical Field
The utility model relates to a pipeline body technical field, the concrete field is a modular dredging pipeline body.
Background
The pipeline floating body is used for being bound on tubular objects such as a mud pipe, an oil pipeline, a cable and the like to provide buoyancy for the objects, so that the plastic objects can float on the water surface, and generally, light and non-absorbent materials such as expanded polyurethane, EPS foam and the like are filled in the pipeline floating body to enhance the safety of the pipeline floating body after being damaged.
During the operations of river channel dredging, reservoir capacity expansion, slurry pumping of a sediment treatment plant, underwater clearing of box culvert dredging robots and the like, most of the devices are provided with electric power units, a mud discharge pipe is needed to discharge mud water from water to a bank, a power cable is needed to transmit electric power to a ship or a slurry pump, and a monitoring signal cable and a weak current control cable are needed to be arranged on equipment with high automation degree.
Traditional pipeline body all is HALF shape, adopts bolted connection, and every body need be equipped with four groups of bolts at least, and its installation and dismantlement need adopt specialized tool such as box spanner, and the time is longer, when using in actual engineering, influences the engineering progress.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a modular dredging pipeline body to solve the traditional pipeline body that proposes in the above-mentioned background art and adopt bolted connection, every body need be equipped with four group's bolts at least, and its installation needs to adopt specialized tool such as box spanner with the dismantlement, and the time is longer, when using in actual engineering, influences the problem of engineering progress.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a modular dredging pipeline body, includes two bodies, the lateral wall of body is equipped with the strengthening rib, the inside wall of body is equipped with the chase, one side of body is articulated through hinge structure, the opposite side of body is locked through locking structure.
Preferably, the hinge structure comprises a hinge and a hinge shaft, the hinge is arranged on one body, a hinge embedding groove is formed in the other body relative to the hinge, a mounting hole is formed between the hinge embedding grooves, two ends of the mounting hole penetrate through two end faces of the body respectively, and the hinge shaft penetrates through the mounting hole and the hinge and is fastened through a hinge fastening bolt.
Preferably, locking structure includes spring tower and detains the couple with spring tower, one be equipped with tower knot embedded groove on the body, spring tower is detained and is set up in tower knot embedded groove, another relatively on the body the position that spring tower was detained is equipped with the couple embedded groove, spring tower is detained the couple and is set up in the couple embedded groove.
Preferably, the pipe chase comprises a pipe chase and a cable chase, the pipe chase is disposed in the middle of the inner side wall of the body, and the cable chase is disposed on both sides of the inner side wall of the body.
Preferably, one end face of the body is provided with a ventilation process hole, and a ventilation cock is arranged in the ventilation process hole.
Preferably, the reinforcing ribs, the hinge structures and the locking structures are all provided in three numbers.
Preferably, the tower buckle embedded groove and the hook embedded groove are both arranged on the reinforcing rib.
Preferably, the inner layer of the body is made of polystyrene material, and the outer layer of the body is made of polyethylene LLDPE material.
Compared with the prior art, the beneficial effects of the utility model are that: a combined dredging pipe float, through the cooperation setting of the pipe groove and the cable groove, can fix the electric wire and cable while fixing the pipeline, through the cooperation setting of the hinge, the hinge axis and the hinge fastening bolt included in the hinge structure, make the two bodies into an integrated structure, because the hinge axis can rotate in the mounting hole and the hinge linking hole, so can turn between the two bodies, through the cooperation setting of the spring tower buckle and the spring tower buckle hook included in the locking structure, when the spring tower buckle is buckled on the spring tower buckle hook, the pretightening force of the spring tower buckle can ensure the two bodies to buckle, and clasp the mounting pipe and the electric wire and cable in the pipe groove and the cable groove, the utility model, through the cooperation setting of the hinge structure and the locking structure, the trouble of disassembling and assembling during the bolt connection is saved, the spanner is not needed, the disassembling and assembling can be completed by bare hand, when actual engineering uses, convenient and fast can improve the engineering progress, and the inside center of two bodies simultaneously and the suitable position department of side leave the pipe chase and the cable groove that run through, pass the pipeline of body, the diameter and the quantity of cable as required, reserve suitable pipe chase and cable groove to bear pipeline and wire and cable simultaneously, overcome the problem that only is applicable to single pipeline.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic view of the structure of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2;
FIG. 4 is an enlarged view of the structure at B in FIG. 2;
fig. 5 is a schematic diagram of the right-side view structure of the present invention;
fig. 6 is a schematic rear view of the present invention;
FIG. 7 is an enlarged view of the structure of FIG. 6 at C;
fig. 8 is a schematic perspective view of a main body of the present invention;
fig. 9 is a schematic perspective view of another body of the present invention.
In the figure: the structure comprises a body 1, a reinforcing rib 2, a pipe groove 3, a pipe groove 301, a cable groove 302, a hinge structure 4, a hinge 401, a hinge 402, a hinge embedded groove 403, a mounting hole 404, a hinge shaft 405, a hinge fastening bolt, a locking structure 5, a spring tower buckle 501, a spring tower buckle hook 502, a tower buckle embedded groove 503, a hook embedded groove 504, a ventilation process hole 6 and a ventilation cock 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-9, the present invention provides a technical solution: the utility model provides a modular dredging pipeline body, includes two bodies 1, the lateral wall of body 1 is equipped with strengthening rib 2, has set up strengthening rib 2 structure, makes 1 intensity of body more reliable, non-deformable, the inside wall of body 1 is equipped with tube seat 3, one side of body 1 is articulated through hinge structure 4, the opposite side of body 1 is locked through locking structure 5.
Specifically, the hinge structure 4 includes a hinge 401 and a hinge shaft 404, the hinge shaft 404 is an internal hexagonal screw, the hinge 401 is disposed on one body 1, another body 1 is provided with a hinge insertion groove 402 opposite to the hinge 401, a mounting hole 403 is disposed between the hinge insertion grooves 402, two ends of the mounting hole 403 respectively penetrate through two end faces of the body 1, when the two bodies 1 are buckled, the hinge 401 is disposed in the hinge insertion groove 402, the hinge insertion groove 402 can prevent the hinge 401 from interfering with the body 1 during mounting, and the hinge shaft 404 penetrates through the mounting hole 403 and the hinge 401 and the hinge shaft 404 is fastened by a hinge fastening bolt 405.
Specifically, locking structure 5 includes that spring tower detains 501 and spring tower detains couple 502, one be equipped with tower knot embedded groove 503 on the body 1, spring tower detains 501 setting in tower knot embedded groove 503, another relatively on the body 1 spring tower detains 501's position and is equipped with couple embedded groove 504, spring tower detains couple 502 sets up in couple embedded groove 504, and pre-buried corresponding bolted connection hole when moulding plastics, through tower knot bolt fixed connection spring tower detains 501 and its body 1 that corresponds in tower knot embedded groove 503, through couple bolt fixed connection spring tower detains couple 502 and its body 1 that corresponds in couple embedded groove 504.
Specifically, the pipe chase 3 includes a pipe chase 301 and a cable chase 302, the pipe chase 301 is disposed at a middle position of an inner side wall of the body 1, and the cable chase 302 is disposed at both side positions of the inner side wall of the body 1, so that the electric wire and the cable can be fixed while the pipe is fixed.
Specifically, a ventilation process hole 6 is formed in one end face of the body 1, a ventilation cock 7 is arranged in the ventilation process hole 6, and the ventilation cock 7 is in threaded connection with the ventilation process hole 6.
Particularly, strengthening rib 2, hinge structure 4 and locking structure 5 all are provided with threely, can make the overall arrangement even, do not influence pleasing to the eye and intensity.
Specifically, the tower-hook fitting groove 503 and the hanger fitting groove 504 are both provided on the reinforcing bar 2.
Specifically, the inner layer of the body 1 is made of polystyrene material, the outer layer of the body 1 is made of polyethylene LLDPE material, the polystyrene material is adopted, the filling volume is increased, the body is lighter, the outer layer structure of the body is firmer, and the service life is longer.
Particularly, body 1 is the semicircle column shape, body 1's both ends face is equipped with the chamfer, when the surface of water drags, receives the resistance of water littleer, and it is more convenient to migrate.
The working principle is as follows: the utility model relates to a combined dredging pipeline floating body, which can fix the electric wire and cable while fixing the pipeline through the matching arrangement of the pipeline groove 301 and the cable groove 302, so that the pipeline has multifunctionality on the whole structure, the situation that a plurality of floating bodies are used simultaneously is saved during the dredging operation, the maintenance and the management are convenient, two bodies 1 are integrated through the matching arrangement of a hinge 401, a hinge shaft 404 and a hinge fastening bolt 405 included by a hinge structure 4, because the hinge shaft 404 can rotate in a connecting hole of a mounting hole 403 and the hinge 401, the two bodies 1 can be turned over so as to be convenient for mounting the pipeline and the electric wire and cable, through the matching arrangement of a spring tower buckle 501 and a spring tower buckle hook 502 included by a locking structure 5, when the spring tower buckle 501 is buckled on the spring tower buckle hook 502, the pretightening force of the spring tower buckle 501 can ensure the two bodies, and hold the installation pipeline and the electric wire in pipeline groove 301 and cable groove 302 tightly, because hinge 401, spring tower buckle 501 and spring tower buckle couple 502 all correspond to the position of three strengthening ribs 2, and whole embedded arrangements, can make the overall arrangement even, do not influence pleasing to the eye and intensity, and the body does not have the outer hourglass piece that surpasss the appearance structure, has avoided cutting to scratch, the risk of hook card surface of water floater, can effectively reduce the maintenance number of times in the operation process, the utility model discloses, through the cooperation setting of hinge structure 4 and locking structure 5, the loaded down with trivial details of dismouting when having saved bolted connection, do not need the spanner, bare-handed completion dismouting, when actual engineering uses, convenient and fast can improve the engineering progress, and the pipeline groove 301 and the cable groove 302 that run through are left to the suitable position department in the inside center of two bodies and side simultaneously, pass the pipeline of body as required, The diameter and the number of the cables reserve proper pipeline grooves 301 and cable grooves 302 so as to simultaneously bear the pipelines and the electric wires and cables, and the problem that the pipeline is only suitable for a single pipeline is solved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a pipeline body is dredged to modular which characterized in that: the pipe joint is characterized by comprising two bodies (1), wherein the outer side wall of each body (1) is provided with a reinforcing rib (2), the inner side wall of each body (1) is provided with a pipe groove (3), one side of each body (1) is hinged through a hinge structure (4), and the other side of each body (1) is locked through a locking structure (5).
2. A combined dredging pipe float of claim 1, wherein: the hinge structure (4) comprises a hinge (401) and a hinge shaft (404), the hinge (401) is arranged on one body (1), the other body (1) is provided with hinge embedded grooves (402) relative to the hinge (401), mounting holes (403) are formed between the hinge embedded grooves (402), two ends of each mounting hole (403) penetrate through two end faces of the body (1) respectively, and the hinge shaft (404) penetrates through the mounting holes (403) and the hinge (401) and is fastened through hinge fastening bolts (405).
3. A combined dredging pipe float of claim 1, wherein: locking structure (5) are including spring tower knot (501) and spring tower knot couple (502), one be equipped with tower knot embedded groove (503) on body (1), spring tower knot (501) set up in tower knot embedded groove (503), another it is relative on body (1) the position of spring tower knot (501) is equipped with couple embedded groove (504), spring tower knot couple (502) set up in couple embedded groove (504).
4. A combined dredging pipe float of claim 1, wherein: the pipe groove (3) comprises a pipe groove (301) and a cable groove (302), the pipe groove (301) is arranged in the middle of the inner side wall of the body (1), and the cable groove (302) is arranged on two sides of the inner side wall of the body (1).
5. A combined dredging pipe float of claim 1, wherein: one end face of the body (1) is provided with a ventilation process hole (6), and a ventilation cock (7) is arranged in the ventilation process hole (6).
6. A combined dredging pipe float of claim 1, wherein: the reinforcing ribs (2), the hinge structures (4) and the locking structures (5) are all provided with three.
7. A combined dredging pipe float according to claim 3, characterized in that: the tower buckle embedded groove (503) and the hook embedded groove (504) are both arranged on the reinforcing rib (2).
8. A combined dredging pipe float of claim 1, wherein: the inner layer of the body (1) is made of polystyrene material, and the outer layer of the body (1) is made of polyethylene LLDPE material.
9. A combined dredging pipe float of claim 1, wherein: the body (1) is in a semi-cylindrical shape, and chamfers are arranged on two end faces of the body (1).
CN201921699835.5U 2019-10-12 2019-10-12 Combined dredging pipeline floating body Active CN210503093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921699835.5U CN210503093U (en) 2019-10-12 2019-10-12 Combined dredging pipeline floating body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921699835.5U CN210503093U (en) 2019-10-12 2019-10-12 Combined dredging pipeline floating body

Publications (1)

Publication Number Publication Date
CN210503093U true CN210503093U (en) 2020-05-12

Family

ID=70572640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921699835.5U Active CN210503093U (en) 2019-10-12 2019-10-12 Combined dredging pipeline floating body

Country Status (1)

Country Link
CN (1) CN210503093U (en)

Similar Documents

Publication Publication Date Title
CN210503093U (en) Combined dredging pipeline floating body
WO2009051357A2 (en) Block for submarine tunnel
KR20150046416A (en) Improved Float and Manufacturing Method of the Same
CN103526777B (en) Immersed tube tunnel semi-rigid pipe joint
CN101761691B (en) Bound floating pipeline towing pipe method process
CN109291009B (en) Underwater flange quick connector
CN207830708U (en) Pipe laying end socket
CN213839864U (en) PE water supply pipe capable of preventing joint from bursting
KR100985138B1 (en) Apparatus For Connecting Floating Structures in Sea
CN210135318U (en) Stainless steel water pipe
CN211018066U (en) Submarine cable anchoring device
CN112359828A (en) Concrete pipe pile extension device
CN211951683U (en) Pipeline fixing device is used in hydraulic engineering construction
CN207595194U (en) A kind of hydraulic engineering warning buoy
CN111794492A (en) Wall connecting piece structure of scaffold and construction method thereof
US8651149B2 (en) Fluid filled jacket for concrete pipe
CN201050639Y (en) Waterborne floater for laying pipe
CN110932218A (en) Integral submarine cable protection device
CN218917726U (en) Reinforcing rib reinforcing protection tube
CN210135317U (en) Stainless steel water pipe
CN209975482U (en) Hydraulic pressure dam controlling means connecting piece
CN218378317U (en) Temporary plugging waterproof device for water conservancy pipeline
CN211901806U (en) Plastic pipeline for laying in water
JP4217144B2 (en) Joint structure for butt connection
CN212131515U (en) A water conservancy pipeline supports connection structure for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210204

Address after: 518127 415, Yanluo Anxin building, Shanmen community, Yanluo street, Bao'an District, Shenzhen City, Guangdong Province

Patentee after: China Power Jianshui Environmental Technology Co.,Ltd.

Address before: 731600 No. 97, Chuannan Road, Liujiaxia Town, Yongjing County, Linxia Hui Autonomous Prefecture, Gansu Province

Patentee before: GANSU POWERCHINA PORT NAVIGATION SHIPBUILDING ENGINEERING Co.,Ltd.

TR01 Transfer of patent right