- Prior art keywords
- hydraulic engineering
- inserted bar
- landing leg
- management device
- progress management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a hydraulic engineering progress management device, including exhibition board case, exhibition board case upper portion is equipped with the carton, exhibition board case front side is equipped with the light-passing board, and the light-passing board evenly is equipped with a plurality of LED fluorescent tubes at the back, exhibition board case lower part left and right sides is equipped with the landing leg of falling T shape, landing leg lower extreme symmetry is equipped with two universal wheels, and landing leg lower part bilateral symmetry is equipped with telescopic mechanism of inserting ground, be equipped with the crank of drive mechanism of inserting ground between the landing leg. Compared with the prior art, the utility model the advantage lie in: the movement of the construction site is convenient to convert, the floor-inserting mechanism can increase the stability, the fixation is more firm, and the falling of the outdoor wind and sand is prevented; the device is provided with the paper pen, so that managers can conveniently scribble and demonstrate, and the management efficiency of the progress of the hydraulic engineering is improved.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically indicates a hydraulic engineering progress management device.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Hydraulic engineering needs to build different types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like, and the hydraulic engineering is large in scale, complex in technology, long in construction period, high in investment and required to be carried out according to basic construction procedures during construction.
Hydraulic engineering's progress needs plan and management, adopts the show board to demonstrate usually to the main progress information in the construction, and the show board is fixed in fixed position usually, is not convenient for shift when changing the construction site, and simultaneously, when the managers need use the paper to sketch or demonstrate, also is not convenient for take, consequently needs a hydraulic engineering progress management device convenient to remove and scribble the demonstration urgently.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to solve above-mentioned problem, provide a hydraulic engineering progress management device.
In order to solve the technical problem, the utility model provides a technical scheme does: the utility model provides a hydraulic engineering progress management device, includes the exhibition board case, exhibition board case upper portion is equipped with the carton, exhibition board case front side is equipped with the light-passing board, and the light-passing board evenly is equipped with a plurality of LED fluorescent tubes at the back, exhibition board case lower part left and right sides is equipped with the landing leg of falling T shape, landing leg lower extreme symmetry is equipped with two universal wheels, and landing leg lower part bilateral symmetry is equipped with the telescopic and inserts ground mechanism, be equipped with the crank that the drive inserted ground mechanism between the landing leg.
As the improvement, it includes that the inserted bar props up a section of thick bamboo and inserted bar to insert ground mechanism, the inserted bar props up a section of thick bamboo upper end symmetric connection in landing leg lower part both sides, and the inserted bar props up a section of thick bamboo middle part and connects on the crossbeam of landing leg lower extreme, the circumference is equipped with the retaining ring in inserted bar props up a section of thick bamboo upper portion, inserted bar lower part circumference is equipped with the baffle, inserted bar sliding connection just cup joints with the retaining ring in the inserted bar props up a section of thick bamboo, it is equipped with the spring to lie in on the inserted bar and cup joint between retaining ring and the baffle, and the inserted bar injects ground after being pushed out.
As the improvement, the stand of landing leg is hollow structure, the lower part rotates the vertical fixed pulley that is equipped with two symmetries in the stand, upper portion is equipped with horizontal fixed pulley in the stand, be equipped with the hollow beam between the landing leg, hollow beam middle part internal rotation is equipped with the pivot, outside and cranking hand fixed connection before the pivot extends to the hollow beam, the inserted bar upper end is connected and is equipped with the haulage rope, the haulage rope is connected with the pivot after vertical fixed pulley and horizontal fixed pulley successively, and vertical fixed pulley and horizontal fixed movement track are with the haulage rope tensioning, prevent its derailment, and the cranking hand rotates the pivot, and the inserted bar is drawn to pivot winding haulage rope, makes the inserted bar retract in the inserted bar prop up a section of thick bamboo.
As an improvement, the inserted bar is of a sharp conical structure, so that the inserted bar can be conveniently inserted into the ground, the inserted bar is deeper, and the fixation is firmer.
As an improvement, the front side of the lower part of the paper box is provided with a paper outlet, the upper edge and the lower edge of the paper outlet are of a saw-toothed structure, and the paper outlet can be torn through saw teeth after being pulled out from the paper outlet, so that the cut is tidy.
As an improvement, the hooks are symmetrically arranged on two sides of the front part of the display board box, the paper pressing rods are arranged on the hooks, and the paper pressing rods enable paper to be smoothly attached to the light-transmitting plate.
As an improvement, a drawer with a forward opening is arranged at the lower part of the board-spreading box and is used for containing articles such as pens, rulers and the like.
As an improvement, a mobile power supply is arranged in the display board box, the LED lamp tubes are connected in series through a lead and are electrically connected with the mobile power supply, an external power supply is not needed, and the limitation of a site is avoided.
As an improvement, the handle is provided with a limiting bolt for fixing the handle and preventing the handle from being pulled by the traction rope.
Compared with the prior art, the utility model the advantage lie in: the movement of the construction site is convenient to convert, the floor-inserting mechanism can increase the stability, the fixation is more firm, and the falling of the outdoor wind and sand is prevented; the device is provided with the paper pen, so that managers can conveniently scribble and demonstrate, and the management efficiency of the progress of the hydraulic engineering is improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the side of the present invention.
As shown in the figure: 1. the board box that opens up, 1.1, the couple, 1.2, the fly, 1.3, the drawer, 2, the carton, 2.1, the exit slot, 3, the light-passing board, 4, the LED fluorescent tube, 5, the landing leg, 6, insert ground mechanism, 6.1, the inserted bar prop up a section of thick bamboo, 6.2, the inserted bar, 6.3, the retaining ring, 6.4, the baffle, 6.5, the spring, 7, the shaking hand, 7.1, vertical fixed pulley, 7.2, horizontal fixed pulley, 7.3, hollow beam, 7.4, the pivot, 7.5, the haulage rope, 8, the stock form.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
With reference to the attached drawings 1-2, a hydraulic engineering progress management device comprises a board showing box 1, wherein a paper box 2 is arranged at the upper part of the board showing box 1, a paper outlet 2.1 is arranged at the front side of the lower part of the paper box 2, the upper edge and the lower edge of the paper outlet 2.1 are of a sawtooth structure, a light-transmitting plate 3 is arranged at the front side of the board showing box 1, a plurality of LED lamp tubes 4 are uniformly arranged at the back of the light-transmitting plate 3, inverted T-shaped supporting legs 5 are arranged at the left side and the right side of the lower part of the board showing box 1, two universal wheels 5.1 are symmetrically arranged at the lower end of each supporting leg 5, telescopic board inserting mechanisms 6 are symmetrically arranged at the two sides of the lower part of each supporting leg 5, each board inserting mechanism 6 comprises a pin supporting tube 6.1 and an inserting rod 6.2, the upper ends of the pin supporting tubes 6.1 are symmetrically connected to the two sides of the lower parts of the supporting legs 5, a baffle ring 6.3 is circumferentially arranged in the upper parts, the inserting rod 6.2 is connected in the inserting rod support tube 6.1 in a sliding manner and is sleeved with a retainer ring 6.3, a spring 6.5 is sleeved and arranged between the retainer ring 6.3 and a baffle 6.4 on the inserting rod 6.2, the inserting rod 6.2 is of a sharp conical structure, a hand crank 7 for driving the ground inserting mechanism 6 is arranged between the supporting legs 5, a limiting bolt is arranged on the hand crank 7, a stand column of the supporting leg 5 is of a hollow structure, two symmetrical longitudinal fixed pulleys 7.1 are rotatably arranged at the lower part in the stand column, a transverse fixed pulley 7.2 is arranged at the upper part in the stand column, a hollow beam 7.3 is arranged between the supporting legs 5, a rotating shaft 7.4 is rotatably arranged in the middle of the hollow beam 7.3, the rotating shaft 7.4 extends to the front outer side of the hollow beam 7.3 and is fixedly connected with the hand crank 7, a traction rope 7.5 is connected at the upper end of the inserting rod 6.2, the traction rope 7.5 is connected with the rotating shaft 7.4 after sequentially passing through the longitudinal fixed pulley 7.1 and the transverse fixed pulley 7.2, hooks, couple 1.1 is total two sets ofly, is respectively in the upper portion and the lower part of panel case 1, be equipped with the dancer bar 1.2 on the couple 1.1, panel case 1 lower part is equipped with drawer 1.3 that the opening is preceding, be equipped with portable power source in the panel case 1, through the wire series connection and be connected with portable power source electricity between the LED fluorescent tube 4.
The utility model discloses a theory of operation: when the paper winding device is used, the roll paper 8 is pulled out from the paper outlet 2.1 and attached to the light-transmitting plate 3, then the paper pressing rod 1.2 is placed on the hook 1.1, the roll paper 8 is pressed by the paper pressing rod 1.2, and if the external ambient light is poor, the LED lamp tube 4 can be opened to provide background light, so that the pictures and texts of the roll paper 8 are clearer; when the movable type electric bicycle is required to move, the rocking handle 7 is shaken to drive the rotating shaft 7.4 to rotate, the rotating shaft 7.4 is tightly wound with the traction rope 7.5, the inserted link 6.2 is pulled to be away from the ground and retracted into the inserted link supporting barrel 6.1, then the rocking handle 7 is locked by the limiting bolt, the inserted link 6.2 does not extend out any more, when the movable type electric bicycle is moved in place and needs to be fixed, the limiting bolt is pulled out again, and the inserted link 6.2 is bounced into the ground by the spring 6.5 to be fixed.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (9)
1. The utility model provides a hydraulic engineering progress management device, includes exhibition board case (1), its characterized in that: exhibition board case (1) upper portion is equipped with carton (2), exhibition board case (1) front side is equipped with light-passing board (3), and light-passing board (3) evenly are equipped with a plurality of LED fluorescent tubes (4) at the back, exhibition board case (1) lower part left and right sides is equipped with landing leg (5) of falling T shape, landing leg (5) lower extreme symmetry is equipped with two universal wheels (5.1), and landing leg (5) lower part bilateral symmetry is equipped with telescopic ground mechanism (6) of inserting, be equipped with the hand crank (7) of drive ground mechanism (6) between landing leg (5).
2. The hydraulic engineering progress management device according to claim 1, characterized in that: insert ground mechanism (6) including inserted bar a section of thick bamboo (6.1) and inserted bar (6.2), inserted bar a section of thick bamboo (6.1) upper end symmetric connection is in landing leg (5) lower part both sides, and inserted bar a section of thick bamboo (6.1) middle part is connected on the crossbeam of landing leg (5) lower extreme, circumference is equipped with retaining ring (6.3) in inserted bar a section of thick bamboo (6.1) upper portion, inserted bar (6.2) lower part circumference is equipped with baffle (6.4), inserted bar (6.2) sliding connection just cup joints with retaining ring (6.3) in inserted bar a section of thick bamboo (6.1), it is equipped with spring (6.5) to lie in cup joint between retaining ring (6.3) and baffle (6.4) on inserted bar (6.2).
3. The hydraulic engineering progress management device according to claim 2, characterized in that: the stand of landing leg (5) is hollow structure, the lower part rotates vertical fixed pulley (7.1) that is equipped with two symmetries in the stand, upper portion is equipped with horizontal fixed pulley (7.2) in the stand, be equipped with hollow beam (7.3) between landing leg (5), hollow beam (7.3) middle part internal rotation is equipped with pivot (7.4), outside and crank (7) fixed connection before hollow beam (7.3) are extended to pivot (7.4), inserted bar (6.2) upper end is connected and is equipped with haulage rope (7.5), haulage rope (7.5) are connected with pivot (7.4) after successively through vertical fixed pulley (7.1) and horizontal fixed pulley (7.2).
4. The hydraulic engineering progress management device according to claim 2, characterized in that: the inserted bar (6.2) is in a sharp conical structure.
5. The hydraulic engineering progress management device according to claim 1, characterized in that: the front side of the lower part of the paper box (2) is provided with a paper outlet (2.1), and the upper edge and the lower edge of the paper outlet (2.1) are of a sawtooth structure.
6. The hydraulic engineering progress management device according to claim 1, characterized in that: the two sides of the front part of the board unfolding box (1) are symmetrically provided with hooks (1.1), and paper pressing rods (1.2) are arranged on the hooks (1.1).
7. The hydraulic engineering progress management device according to claim 1, characterized in that: the lower part of the board-spreading box (1) is provided with a drawer (1.3) with a forward opening.
8. The hydraulic engineering progress management device according to claim 1, characterized in that: the LED display panel is characterized in that a mobile power supply is arranged in the display panel box (1), and the LED lamp tubes (4) are connected in series through a lead and are electrically connected with the mobile power supply.
9. The hydraulic engineering progress management device according to claim 1, characterized in that: and a limiting bolt is arranged on the handle (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921848204.5U CN210489183U (en) | 2019-10-30 | 2019-10-30 | Hydraulic engineering progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921848204.5U CN210489183U (en) | 2019-10-30 | 2019-10-30 | Hydraulic engineering progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210489183U true CN210489183U (en) | 2020-05-08 |
Family
ID=70510548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921848204.5U Expired - Fee Related CN210489183U (en) | 2019-10-30 | 2019-10-30 | Hydraulic engineering progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210489183U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113593450A (en) * | 2021-08-03 | 2021-11-02 | 中国建筑第五工程局有限公司 | Construction progress display device for building project |
-
2019
- 2019-10-30 CN CN201921848204.5U patent/CN210489183U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113593450A (en) * | 2021-08-03 | 2021-11-02 | 中国建筑第五工程局有限公司 | Construction progress display device for building project |
CN113593450B (en) * | 2021-08-03 | 2023-01-24 | 中国建筑第五工程局有限公司 | Construction progress display device for building project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210489183U (en) | Hydraulic engineering progress management device | |
CN109098741A (en) | A kind of intelligent anchor rod drilling machine is from movable plate net laying net device | |
CN109763853A (en) | A kind of door frame Anchor Care machine | |
CN213458949U (en) | A overall arrangement display device for town and country planning | |
CN206649750U (en) | A kind of management teaching Graphic Panel | |
CN110529659B (en) | Auxiliary device for connecting and transporting escape pipeline | |
CN110240075B (en) | Plug borer device | |
CN206459705U (en) | A kind of portable environment monitor | |
CN207314788U (en) | A kind of easy-to-dismount scaffold of high-building construction | |
CN113520108A (en) | Foldable outdoor art media device | |
CN204891047U (en) | Portable hand formula lift horizontal bar | |
CN209123798U (en) | A kind of dispersion machine with removal residual textile auxiliary's function | |
CN207122116U (en) | A kind of Architecture Outer Curtain Wall scaffold | |
CN210406413U (en) | Sun shading device | |
CN207472604U (en) | A kind of Multifunctional environment water sample acquisition device | |
CN206027007U (en) | Inflating football gate | |
CN213183206U (en) | Public management science teaching information display device | |
CN221188638U (en) | Subway overhauls part conveyer | |
CN220745215U (en) | Rope guiding mechanism of reciprocating winch easy to disassemble | |
CN211396524U (en) | Scaffold frame that can dismantle fast | |
CN209780933U (en) | coal mine tunneling support device | |
CN217584337U (en) | LED lamp support frame for construction | |
CN216074603U (en) | Material transporting device for roadbed high slope construction | |
CN210691850U (en) | Novel gardens signboard | |
CN212130121U (en) | Geotechnical engineering reconnaissance is with portable fender device that encloses |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200508 Termination date: 20201030 |
|
CF01 | Termination of patent right due to non-payment of annual fee |