CN210482968U - Temporary combined operation frame suitable for construction of elevator shaft and outer wall - Google Patents

Temporary combined operation frame suitable for construction of elevator shaft and outer wall Download PDF

Info

Publication number
CN210482968U
CN210482968U CN201921241297.5U CN201921241297U CN210482968U CN 210482968 U CN210482968 U CN 210482968U CN 201921241297 U CN201921241297 U CN 201921241297U CN 210482968 U CN210482968 U CN 210482968U
Authority
CN
China
Prior art keywords
insert
standard plate
face
seted
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921241297.5U
Other languages
Chinese (zh)
Inventor
张永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921241297.5U priority Critical patent/CN210482968U/en
Application granted granted Critical
Publication of CN210482968U publication Critical patent/CN210482968U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model discloses an interim combination handling frame suitable for elevartor shaft and outer wall construction, including two girders, pole setting, standard plate, the up end of girder has seted up the first inserted block inserted hole of a plurality of from a left side to the right side in proper order, the girder has all been keeping away from the relative face end and has seted up the first screw hole of a plurality of from a left side to the right side in proper order, the equal fixed mounting of bottom face that the pole setting was equipped with a plurality of and pole setting has first inserted block, the second screw hole has been seted up to the top face of pole setting, and threaded connection has the U support in the second screw hole simultaneously, the standard plate is equipped with bottom front side, the rear side of a plurality of and standard plate and has a plurality of second inserted block from the past backward fixed mounting in proper order, the third screw hole has all been kept away. The utility model discloses not only the workman's operation of being convenient for, the equipment mode is simple, can ensure the security when workman's operation construction moreover to the used material of this product can have enough to meet the need the use, thereby has reduced the extravagant phenomenon of material.

Description

Temporary combined operation frame suitable for construction of elevator shaft and outer wall
Technical Field
The utility model relates to an elevartor shaft and outer wall construction technical field specifically are a temporary combination handling frame suitable for elevartor shaft and outer wall construction.
Background
In the construction main body and the building construction stage, temporary construction operation in an elevator shaft, such as treatment of a screw rod of the elevator shaft or plugging of a hole in the shaft, is often difficult due to the absence of an operation platform, and the temporary building operation of an air conditioner plate near an outer wall hole and the like all need a temporary operation frame, so that the construction is facilitated, and meanwhile, an important protection effect is played on the safety of operators;
the conventional apparatus has the following disadvantages:
at present, the existing operation frames are all integrated, so that the operation frames are not suitable for elevator shafts and outer wall construction; and most of the operation frames have lower safety and certain potential safety hazard, so that temporary combined operation frames which are consistently suitable for construction of elevator shafts and outer walls are needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a make up handling frame temporarily suitable for elevartor shaft and outer wall construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides an interim combination handling frame suitable for elevartor shaft and outer wall construction, includes two girders, pole setting, standard plate, the up end of girder has seted up the first inserted block inserted hole of a plurality of from a left side to the right side in proper order, the girder all has seted up the first screw hole of a plurality of from a left side to the right side keeping away from relative face end in proper order, the equal fixed mounting of bottom face that the pole setting was equipped with a plurality of and pole setting has first inserted block, the second screw hole has been seted up to the top face of pole setting, and threaded connection has the U support in the second screw hole simultaneously, the bottom front side, the rear side that the standard plate was equipped with a plurality of and standard plate have a plurality of second inserted block from the past backward fixed mounting in proper order, the third screw hole has all been seted up keeping away from relative face end to the second inserted block inserted hole, and the second inserted hole has all been seted up to the up in the up end front side, rear side department of standard plate, the equal And simultaneously, the bottom ends of the support rods are fixedly provided with third insertion blocks.
Preferably, two adjacent outer wall surfaces of the support rods are provided with main mounting holes from top to bottom, two adjacent outer wall surfaces of the support rods are provided with connecting plates from top to bottom, the connecting plates are provided with auxiliary mounting holes, and the main mounting holes and the auxiliary mounting holes are the same in aperture.
Preferably, the standard plate is replaced by a Z-shaped plate.
Preferably, the distance between the first insert insertion openings is 300mm, the size of the first insert insertion openings is 50 × 50mm, and the size of the second insert insertion openings is 50 × 50 mm.
Preferably, the standard plate, the upright stanchion, the main girder and the stay bar are all made of aluminum alloy materials.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model is provided with the first insert block, the first insert block insertion hole, the second insert block insertion hole, the third insert block, the first threaded hole and the second threaded hole, thereby not only facilitating the operation of workers, but also having very simple assembly mode;
2. the utility model has the advantages that the safety of workers in operation and construction can be ensured by arranging the protective net, the support columns, the main mounting holes, the auxiliary mounting holes and the connecting plates, and the use is very convenient;
3. the utility model is not only suitable for the holes with different sizes, but also the used materials can be used in a turnover way, thus the application range is wider, the material waste phenomenon is reduced, and the use effect is very good;
4. the vertical rod of the utility model can be integrated, and can also be assembled according to the processing of 0.9, 1.2, 1.5 and the like, thereby being suitable for various layer heights; and can satisfy the outer wall construction operation of part special part through processing Z template, the patent of this application adds the repacking slightly and can satisfy the interim handling frame service function at multiple different construction positions, and the effect is very good.
Drawings
Fig. 1 is a schematic view of a sectional front view structure of a temporary combined handling frame suitable for construction of an elevator shaft and an outer wall of the utility model;
fig. 2 is a schematic view of a cross-sectional top-view connection structure in a temporary combined handling frame suitable for construction of an elevator shaft and an outer wall of the utility model;
fig. 3 is a schematic view of a connection structure of a Z-shaped plate in a temporary combined handling frame suitable for construction of an elevator shaft and an outer wall of the utility model in a top view;
fig. 4 is a schematic view of a three-dimensional connection structure of a main beam and a standard plate in a temporary combined handling frame suitable for construction of an elevator shaft and an outer wall of the utility model;
fig. 5 is the utility model relates to a two adjacent vaulting poles, connecting plate connection structure sketch maps in interim combination handling frame suitable for elevartor shaft and outer wall construction.
In the figure: 1. a main beam; 2. a first insert block; 3. erecting a rod; 4. u support; 5. a stay bar; 6. a standard plate; 7. a first insert insertion port; 8. a first threaded hole; 9. a second threaded hole; 10. a second insert block; 11. a third threaded hole; 12. a second insert pocket; 13. a protective net; 14. a third insert block; 15. a main mounting hole; 16. a connecting plate; 17. a secondary mounting hole; 18. and a Z-shaped plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the temporary assembly handling frame suitable for construction of elevator shaft and exterior wall of the present invention comprises two main beams 1, a vertical rod 3, and a standard plate 6, wherein the upper end surface of the main beam 1 is sequentially provided with a plurality of first insert insertion holes 7 from left to right, the main beam 1 is sequentially provided with a plurality of first threaded holes 8 from left to right away from the opposite end, the vertical rod 3 is provided with a plurality of first insert blocks 2, the bottom end surface of the vertical rod 3 is fixedly provided with the first insert blocks 2, the top end surface of the vertical rod 3 is provided with the second threaded holes 9, the second threaded holes 9 are threadedly connected with a U-shaped support 4, the standard plate 6 is provided with a plurality of second insert blocks 10, the front side and the rear side of the bottom end of the standard plate 6 are sequentially and fixedly provided with a plurality of second insert insertion holes 12 from front to rear, the third threaded holes 11 are respectively provided on the second insert blocks 10 away from the opposite end, and the front side and the, the upper end right flank and the front and back both sides side of standard board 6 are all vertical to be installed protection network 13 and the equal fixed mounting in both sides of protection network 13 has vaulting pole 5, and the equal fixed mounting in bottom of vaulting pole 5 has third inserted block 14 simultaneously.
Main mounting hole 15 has all been seted up from top to bottom to the outer wall of two adjacent vaulting poles 5, all installs connecting plate 16 and has all seted up vice mounting hole 17 on connecting plate 16 from top to bottom on the outer wall of two adjacent vaulting poles 5, and main mounting hole 15, vice mounting hole 17's aperture is the same simultaneously.
The standard plate 6 is replaced by a Z-shaped plate 18.
The spacing between the first insert insertion openings 7 is 300mm, while the dimensions of the first insert insertion openings 7 are 50 x 50mm and the dimensions of the second insert insertion openings 12 are 50 x 50 mm.
The standard plate 6, the upright stanchion 3, the main beam 1 and the stay bar 5 are all made of aluminum alloy materials.
The working principle is as follows: when the utility model is used, the distance between the main beams 1 is adjusted according to the size of the opening, then the U support 4 is connected with the top end of the upright stanchion 3 by screw thread, then the main beams 1 are respectively arranged on the floor, the first inserting blocks 2 at the bottom ends of the vertical rods 3 are inserted into the first inserting block inserting holes 7, then the bolt or the steel bar is inserted from the first threaded hole 8 of the main beam 1 until the bolt or the steel bar is abutted against the second threaded hole 9, then the U support 4 is rotated to enable the top end of the U support 4 to be propped against the floor at the top end, the second inserting blocks 10 at the bottom ends of the plurality of standard plates 6 are inserted into the first inserting block inserting holes 7, the bolts or the steel bars are inserted into the first threaded holes 8 of the main beam 1 until the bolts or the steel bars are propped against the third threaded holes 11, then, the third insertion block 14 at the bottom end of the stay bar 5 is inserted into the second insertion block insertion hole 12, and the connecting plate 16 is connected with the stay bar 5 by using a bolt for use; the upright stanchion 3 can be integrated and can be assembled according to the processing of 0.9, 1.2, 1.5 and the like so as to adapt to various layer heights; and the outer wall construction operation of part of special parts (such as the overhanging part shown in figure 3) can be met by processing the Z-shaped plate 18, and the application patent can meet the use functions of temporary operation frames of various different construction parts by slightly modifying.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a temporary combination handling frame suitable for elevartor shaft and outer wall construction, includes two girder (1), pole setting (3), standard plate (6), its characterized in that: the upper end face of the main beam (1) is sequentially provided with a plurality of first insert holes (7) from left to right, the main beam (1) is sequentially provided with a plurality of first threaded holes (8) from left to right away from the opposite face end, the upright rod (3) is provided with a plurality of first insert blocks (2) fixedly mounted on the bottom end face of the upright rod (3), the top end face of the upright rod (3) is provided with a second threaded hole (9), meanwhile, a U support (4) is in threaded connection with the second threaded hole (9), the standard plate (6) is provided with a plurality of second insert blocks (10) fixedly mounted on the front side and the rear side of the bottom end of the standard plate (6) from front to rear, the second insert blocks (10) are provided with third threaded holes (11) away from the opposite face end, and the front side and the rear side of the upper end face of the standard plate (6) are provided with second insert holes (12), the upper end right flank and the equal vertical both sides side of installing protection network (13) and protection network (13) in front and back both sides side of standard board (6) all fixed mounting have vaulting pole (5), and the equal fixed mounting in bottom of vaulting pole (5) has third inserted block (14) simultaneously.
2. The temporary combined operating frame applicable to elevator shafts and exterior wall construction as claimed in claim 1, wherein: adjacent two main mounting hole (15) have all been seted up from top to bottom to the outer wall of vaulting pole (5), adjacent two connecting plate (16) and connecting plate (16) are all installed from top to bottom to the outer wall of vaulting pole (5) and have all been seted up vice mounting hole (17) on, and the aperture of main mounting hole (15), vice mounting hole (17) is the same simultaneously.
3. The temporary combined operating frame applicable to elevator shafts and exterior wall construction as claimed in claim 1, wherein: the standard plate (6) is replaced by a Z-shaped plate (18).
4. The temporary combined operating frame applicable to elevator shafts and exterior wall construction as claimed in claim 1, wherein: the spacing between the first insert insertion openings (7) is 300mm, the size of the first insert insertion openings (7) is 50 x 50mm, and the size of the second insert insertion openings (12) is 50 x 50 mm.
5. The temporary combined operating frame applicable to elevator shafts and exterior wall construction as claimed in claim 1, wherein: the standard plate (6), the upright stanchion (3), the main beam (1) and the stay bar (5) are all made of aluminum alloy materials.
CN201921241297.5U 2019-08-02 2019-08-02 Temporary combined operation frame suitable for construction of elevator shaft and outer wall Active CN210482968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921241297.5U CN210482968U (en) 2019-08-02 2019-08-02 Temporary combined operation frame suitable for construction of elevator shaft and outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921241297.5U CN210482968U (en) 2019-08-02 2019-08-02 Temporary combined operation frame suitable for construction of elevator shaft and outer wall

Publications (1)

Publication Number Publication Date
CN210482968U true CN210482968U (en) 2020-05-08

Family

ID=70534028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921241297.5U Active CN210482968U (en) 2019-08-02 2019-08-02 Temporary combined operation frame suitable for construction of elevator shaft and outer wall

Country Status (1)

Country Link
CN (1) CN210482968U (en)

Similar Documents

Publication Publication Date Title
CN108894372B (en) Modeling plate curtain wall assembly structure
CN204676879U (en) Model sheetinstallat structure
CN103615112A (en) Construction process of metal reinforced frame bamboo plywood fabricated formwork
CN107818223B (en) Bearing capacity checking calculation and construction method for mounting lifter on underground garage roof
CN210482968U (en) Temporary combined operation frame suitable for construction of elevator shaft and outer wall
CN107035042B (en) Stone-imitated curtain wall system and construction method thereof
CN203271096U (en) Operating platform
CN113323425B (en) Multi-purpose nondestructive rapid mounting and dismounting edge-facing protective net
CN212562647U (en) Can have enough to meet need modularization secondary structure wall body and build system construction model
CN206128645U (en) Lower string of platform stabilizing mean of creeping formwork
CN211714558U (en) Hanging stirrup for nuclear power template
CN210032577U (en) Light steel light concrete wall form support frame
CN211736363U (en) Stair template for building construction
CN210598156U (en) Steel shotcrete demolishs auxiliary device
CN214034741U (en) Aluminum alloy roof template
CN217537989U (en) Elevator shaft protection device
CN206942132U (en) Hang mould and building mould in toilet
CN210798496U (en) Protective enclosure
CN213151568U (en) Cable overhead device
KR200292762Y1 (en) The fixers of a central supporting bar to construct Al-forms for a wall
CN208363615U (en) A kind of door opening template mounting structure
CN212053348U (en) Connection structure for skeleton plate
CN215631411U (en) Quick assembly disassembly scaffold frame is used in construction in room
CN109763627A (en) A kind of construction of elevator shaft in high-rise building structure and construction method
CN215564287U (en) Engineering construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant