CN210482512U - Temporary sewage discharge system for building - Google Patents

Temporary sewage discharge system for building Download PDF

Info

Publication number
CN210482512U
CN210482512U CN201921115396.9U CN201921115396U CN210482512U CN 210482512 U CN210482512 U CN 210482512U CN 201921115396 U CN201921115396 U CN 201921115396U CN 210482512 U CN210482512 U CN 210482512U
Authority
CN
China
Prior art keywords
supporting
support
placing frame
pipe
blow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921115396.9U
Other languages
Chinese (zh)
Inventor
段俊
潘登
蒋超
邹海林
康福友
杨�远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN201921115396.9U priority Critical patent/CN210482512U/en
Application granted granted Critical
Publication of CN210482512U publication Critical patent/CN210482512U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a temporary sewage discharging system for buildings, which comprises a sewage discharging pipe and a plurality of supporting components which are parallel to each other, wherein each supporting component comprises a supporting table and supporting legs arranged at the bottom of the supporting table, the length of each supporting leg can be adjusted, a detachable placing frame is arranged at the top of each supporting plate, the placing frame is of a U-shaped structure, a damping component is arranged in a groove of the placing frame, and the sewage discharging pipe is arranged on the damping component; the fixing pieces of the L-shaped structures are arranged on two sides of the inner wall of the placing frame, and the blow-off pipe can be fixed in the placing frame through the fixing pieces. The utility model discloses when buildding the blow off pipe, directly hang the blow off pipe and put in the rack, utilize the mounting to fix the blow off pipe in the rack to realized quick buildding the blow off pipe, and easily the later stage is demolishd the blow off pipe fast, improved the efficiency of construction.

Description

Temporary sewage discharge system for building
Technical Field
The utility model relates to a construction technical field, concretely relates to interim drainage that building was used.
Background
At the in-process of tunnel construction, when meetting the secret river, generally adopt to connect the blow off pipe to the secret river upper reaches, change the secret river, play the effect of interim blowdown to guarantee tunnel construction safety, at present, when putting up the blow off pipe, generally with the support frame welding of blow off pipe and steel material together, the construction is comparatively troublesome, and the later stage is difficult to demolish the blow off pipe, current support frame function is comparatively single simultaneously, can't satisfy the user demand under the different operating modes.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that overcome not enough among the prior art, aim at provides an interim drainage that building used, can realize the installation and the dismantlement to the blow off pipe fast, improves the efficiency of construction to satisfy the user demand under the different work condition.
The utility model discloses a following technical scheme realizes:
a temporary sewage discharge system for buildings comprises a sewage discharge pipe and a plurality of support assemblies which are parallel to each other, wherein each support assembly comprises a support table and support legs arranged at the bottom of the support table, the length of each support leg can be adjusted, a detachable placing frame is arranged at the top of each support plate, each placing frame is of a U-shaped structure, a damping assembly is arranged in a groove of each placing frame, and the sewage discharge pipe is arranged on the damping assembly; the fixing pieces of the L-shaped structures are arranged on two sides of the inner wall of the placing frame, and the blow-off pipe can be fixed in the placing frame through the fixing pieces.
Furthermore, a connecting bolt is arranged at the bottom of the supporting platform and penetrates through the supporting platform to be connected with the bottom of the placing frame.
Further, the supporting leg includes stand, bracing piece, be equipped with in the stand and place the chamber, bracing piece one end is stretched into to placing the intracavity, and the other end is connected with the bottom of brace table, still be equipped with a plurality of layers of supporting shoe on placing the inner wall in chamber, the both ends of supporting shoe respectively with place the interior wall connection in chamber, the bottom of bracing piece is equipped with the backup pad, and the supporting shoe can support the backup pad.
Furthermore, a fracture is arranged at the central position of the supporting block, and the width of the fracture is larger than that of the supporting plate.
Furthermore, the support rod is further provided with a limiting block, the limiting block is connected with the support rod through threads, and the limiting block can be connected with the top of the stand column through the threads.
Further, still be equipped with two horizontal poles between the supporting component, the horizontal pole is in proper order the level alternate on a supporting bench, solid fixed ring is all established to the both sides of a supporting bench to gu fixed ring passes through the screw thread and is connected with the horizontal pole.
Further, damper includes arc backing sheet, a plurality of damper, the both ends of backing sheet are located the recess insole of rack, damper one end is connected with the recess insole of rack, and the other end is connected with the bottom of backing sheet.
Further, the both ends of backing sheet all are equipped with the slider, be equipped with the spout that matches with the slider on the recess inner bottom of rack, the slider can remove in the spout.
Further, the elastic pieces are arranged on two sides of the inner wall of the groove of the placing frame and connected with the sliding blocks.
Further, the both sides of rack all are equipped with the chimb, all be equipped with down the depression bar on the chimb, the depression bar passes through the screw thread and is connected with the chimb is vertical, the both sides of rack all are equipped with the bar mouth, are equipped with the connecting rod in the bar mouth, and the connecting rod passes the bar mouth and is connected with the mounting, rotatory depression bar down, the depression bar can promote the connecting rod and move down along the bar mouth.
Compared with the prior art, the utility model, following advantage and beneficial effect have:
1. the utility model relates to an interim blowdown system that building used, when putting up the blow off pipe, directly hoist the blow off pipe in the rack, utilize the mounting to fix the blow off pipe in the rack to realize quick putting up the blow off pipe, and easily later stage demolish the blow off pipe fast, improved the efficiency of construction;
2. the utility model relates to a temporary sewage discharge system used for buildings, when the supporting legs are used, the height of the supporting plate is adjusted according to the supporting plate placed on the supporting blocks with different heights, so as to meet the building requirements of the sewage discharge pipe with different heights;
3. the utility model relates to an interim drainage that building used, the damper assembly who sets up can play certain shock attenuation effect to the blow off pipe, plays certain guard action to the blow off pipe, prolongs the turnover number of times of blow off pipe.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
FIG. 3 is a schematic structural view of the supporting leg of the present invention;
FIG. 4 is a schematic structural view of the present invention A-A;
fig. 5 is a side view of the placing frame of the present invention;
fig. 6 is a top view of the rack of the present invention.
Reference numbers and corresponding part names in the drawings:
1-supporting legs, 2-elastic pieces, 3-connecting bolts, 4-sliding blocks, 5-placing frames, 6-sewage draining pipes, 7-supporting pieces, 8-shock absorbing pieces, 9-fixing pieces, 10-lower pressing rods, 11-convex edges, 12-connecting rods, 13-supporting tables, 14-fixing rings, 15-cross rods, 16-placing cavities, 17-supporting blocks, 18-limiting blocks, 19-supporting rods, 20-supporting plates, 21-stand columns, 22-sliding grooves, 23-strip-shaped openings and 24-fractures.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the following examples and drawings, and the exemplary embodiments and descriptions thereof of the present invention are only used for explaining the present invention, and are not intended as limitations of the present invention.
Examples
As shown in fig. 1 to 6, the temporary drainage system for buildings of the present invention includes a drainage pipe 6, the cross section of the drainage pipe 6 is a rectangular structure, and further includes a plurality of support assemblies parallel to each other, each support assembly includes a support platform 13 and two support legs 1, the two support legs 1 are respectively located at two sides of the bottom of the support platform 13, each support leg 1 includes a column 21 and a support rod 19, a placing cavity 16 is arranged inside the column 21, one end of the support rod 19 is connected with the bottom of the support platform 13, the other end is vertically inserted into the placing cavity 16 of the column 21, and the support rod 19 can move in the placing cavity 16 to adjust the height of the support platform 13; a plurality of supporting blocks 17 are arranged on the inner wall of the placing cavity 16, the supporting blocks 17 are sequentially distributed on the inner wall of the placing cavity 16 from top to bottom, two ends of the supporting block 17 are respectively welded with two sides of the inner wall of the placing cavity 16, so that the supporting block 17 can be stably fixed on the inner wall of the placing cavity 16, a fracture 24 is arranged at the central position of the supporting block 17, the supporting rod 19 is provided with a supporting plate 20 at the end of the placing cavity 16, the length of the supporting plate 20 is larger than the width of the fracture 24, and the width of the support plate 20 is smaller than that of the fracture 24, so that the support block 17 can support the support plate 20, when the height of the supporting rod needs to be adjusted, the supporting rod 19 is rotated, so that the supporting plate 20 and the supporting block 17 are staggered, the supporting plate 20 can move in the placing cavity 16 through the fracture 24, and the supporting plate 20 is placed on the supporting blocks 17 with different heights, so that the height of the supporting table 13 is adjusted; still be equipped with stopper 18 on the bracing piece 19, stopper 18 is connected with bracing piece 19 through the screw thread to the top of stand 21 still is equipped with the spread groove that matches with stopper 18, and stopper 18 can be connected with the spread groove through the screw thread, utilizes stopper 18 to fix bracing piece 19 in stand 21, avoids bracing piece 19 to take place to rotate by oneself.
Still be equipped with two horizontal poles 15 between the supporting component, two horizontal poles 15 are the level interlude in proper order respectively on a supporting bench 13, and two horizontal poles 15 are located the axis both sides of a supporting bench 13 respectively to a supporting bench 13 can move on horizontal pole 15, changes the interval between the adjacent supporting bench 13, the both sides of a supporting bench 13 still are equipped with solid fixed ring 14 to solid fixed ring 14 passes through the screw thread and is connected with horizontal pole 15, utilizes solid fixed ring 14 to fix a supporting bench 13 on horizontal pole 15.
The top of each support table 13 is provided with a placing frame 5, each placing frame 5 is of a U-shaped structure, the bottom of each support table 13 is further provided with a connecting bolt 3, each connecting bolt 3 penetrates through each support table 13, each connecting bolt 3 is connected with the bottom of each placing frame 5 through threads, each placing frame 5 can be fixed on each support table 13 through each connecting bolt 3, and the placing frames 5 can be conveniently and quickly detached in the later period; be equipped with spout 22 on rack 5's the recess inner bottom, be equipped with two sliders 4 that match with spout 22 in the spout, slider 4 can remove in spout 22, still be equipped with damper in rack 5's the recess, damper includes arc backing sheet 7 and a plurality of damper 8, the both ends of backing sheet 7 are connected with two sliders 4 respectively, and backing sheet 7 adopts the spring steel to make and forms, has certain elasticity, damper 8 is the spring, has certain elasticity, and damper 8's one end is connected with rack 5 recess inner bottom, and the other end is connected with backing sheet 7's arc bottom, rack 5's recess inner wall both sides all are equipped with elastic component 2, and elastic component 2 is the spring, has certain elasticity, 2 one end of elastic component and 5 recess inner wall connections in standing groove, and the other end is connected with slider 4.
The top at backing sheet 7 is placed to blow off pipe 6, backing sheet 7 and damper 8 are used for supporting blow off pipe 6, when sewage flows in blow off pipe 6, the damper 8 of setting can play certain cushioning effect to blow off pipe 6, the life of extension blow off pipe 6, improve the turnover number of times of blow off pipe 6, and blow off pipe 6 is when pushing down backing sheet 7, slider compression elastic component 2 can be forced at the both ends of backing sheet 7, further improve the shock attenuation effect to blow off pipe 6.
Convex edges 11 are arranged on two sides of the placing frame 5, a lower pressing rod 10 is arranged on each convex edge 11, and each lower pressing rod 10 is vertically connected with the corresponding convex edge 11 through threads; the both sides of rack 5 all are equipped with bar mouth 23, be equipped with connecting rod 12 in the bar mouth 23, connecting rod 12 level alternates in bar mouth 23, rotatory depression bar 10 down, and the depression bar can promote connecting rod 12 and remove in bar mouth 23 down, connecting rod 12 still is equipped with mounting 9 on being located the recess end of rack 5, mounting 9 is L type structure, and the one end of mounting 9 is located the top of blow off pipe 6, and when depression bar 10 promoted connecting rod 12 and removed down, connecting rod 12 drove mounting 9 and removed down together for mounting 9 hooks the top of blow off pipe 6 down, thereby fixes blow off pipe 6 on damper steadily.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A temporary sewage discharge system for buildings comprises a sewage discharge pipe (6) and is characterized by further comprising a plurality of support assemblies which are parallel to each other, wherein each support assembly comprises a support table (13) and support legs (1) arranged at the bottom of the support table (13), the length of each support leg (1) can be adjusted, a detachable placing frame (5) is arranged at the top of each support table (13), each placing frame (5) is of a U-shaped structure, a damping assembly is arranged in a groove of each placing frame (5), and the sewage discharge pipe (6) is placed on the damping assembly; the inner wall both sides of rack (5) all are equipped with mounting (9) of L type structure, mounting (9) can be fixed the blow off pipe in rack (5).
2. A temporary sewage system for building use according to claim 1, characterized in that the bottom of said support platform (13) is provided with connecting bolts (3) which pass through the support platform (13) and connect with the bottom of the placing frame (5).
3. The temporary sewage system for buildings according to claim 1, wherein the supporting leg (1) comprises an upright post (21) and a supporting rod (19), a placing cavity (16) is arranged in the upright post (21), one end of the supporting rod (19) extends into the placing cavity (16), the other end of the supporting rod is connected with the bottom of the supporting platform (13), a plurality of layers of supporting blocks (17) are further arranged on the inner wall of the placing cavity (16), two ends of each supporting block (17) are respectively connected with the inner wall of the placing cavity (16), a supporting plate (20) is arranged at the bottom end of the supporting rod (19), and the supporting blocks (17) can support the supporting plate (20).
4. A temporary soil drainage system for construction use as claimed in claim 3, wherein a cut-off (24) is provided at a central position of said support block (17), and a width of the cut-off (24) is greater than a width of the support plate (20).
5. A temporary sewage system for buildings according to claim 3, wherein the support bar (19) is further provided with a limiting block (18), the limiting block (18) is connected with the support bar (19) through a thread, and the limiting block (18) is connected with the top of the upright post (21) through a thread.
6. A temporary drainage system for buildings according to claim 1, wherein two cross bars (15) are further arranged between the supporting components, the cross bars (15) are sequentially and horizontally inserted on the supporting platform (13), fixing rings (14) are arranged on both sides of the supporting platform (13), and the fixing rings (14) are connected with the cross bars (15) through threads.
7. The temporary sewage system for buildings according to claim 1, wherein the shock absorbing assembly comprises an arc-shaped supporting plate (7) and a plurality of shock absorbing members (8), two ends of the supporting plate (7) are positioned at the inner bottom of the groove of the placing frame (5), one end of each shock absorbing member (8) is connected with the inner bottom of the groove of the placing frame (5), and the other end of each shock absorbing member is connected with the bottom of the supporting plate (7).
8. A temporary sewage system for building use according to claim 7, wherein the supporting sheet (7) is provided with sliding blocks (4) at both ends, a sliding groove (22) matched with the sliding block (4) is arranged on the groove inner bottom of the placing frame (5), and the sliding block (4) can move in the sliding groove (22).
9. A temporary drainage system for buildings according to claim 8, characterized in that the elastic member (2) is arranged on both sides of the inner wall of the groove of the placing frame (5), and the elastic member (2) is connected with the sliding block (4).
10. The temporary sewage discharge system for buildings according to claim 1, wherein the rack (5) is provided with a convex edge (11) at both sides, the convex edge (11) is provided with a lower pressure rod (10), the lower pressure rod (10) is vertically connected with the convex edge (11) through a thread, the rack (5) is provided with bar-shaped openings (23) at both sides, connecting rods (12) are arranged in the bar-shaped openings (23), the connecting rods (12) penetrate through the bar-shaped openings (23) to be connected with the fixing member (9), the lower pressure rod (10) is rotated, and the lower pressure rod (10) can push the connecting rods (12) to move downwards along the bar-shaped openings (23).
CN201921115396.9U 2019-07-16 2019-07-16 Temporary sewage discharge system for building Active CN210482512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921115396.9U CN210482512U (en) 2019-07-16 2019-07-16 Temporary sewage discharge system for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921115396.9U CN210482512U (en) 2019-07-16 2019-07-16 Temporary sewage discharge system for building

Publications (1)

Publication Number Publication Date
CN210482512U true CN210482512U (en) 2020-05-08

Family

ID=70531602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921115396.9U Active CN210482512U (en) 2019-07-16 2019-07-16 Temporary sewage discharge system for building

Country Status (1)

Country Link
CN (1) CN210482512U (en)

Similar Documents

Publication Publication Date Title
CN106602430A (en) Damping and impact-resistant base for power distribution cabinet
CN210482512U (en) Temporary sewage discharge system for building
CN109577485B (en) Steel structure net rack
CN109458001B (en) Steel net rack rod assembly type replacement device
CN207905342U (en) A kind of scaffold for building with self-locking function
CN210947692U (en) Movable positioning pile structure of suspension bracket
CN209353235U (en) Steel form is used in a kind of construction of bridge concrete
CN213870918U (en) Multifunctional support for cast-in-place floor
CN210828248U (en) Assembly beam structure for assembly building
CN111237592B (en) Detachable integrated prefabricated base with anti-seismic structure for pump station
CN211431609U (en) Article placing shelf
CN108086660B (en) Annular steel structure supporting platform
CN206513047U (en) The outer protector of high-supported formwork support body
CN211143493U (en) Concrete wide flat beam structure with column caps
CN215760856U (en) Net rack convenient to install
CN205116740U (en) Concrete pump pipe fixes cassette
CN204767129U (en) Multi -functional domestic body -building apparatus
CN219794362U (en) Warehouse roof steel frame structure
CN217268710U (en) Building construction is with having building scaffold of anti-falling
CN214008538U (en) Water pump demountable installation seat
CN216446652U (en) Steel construction encloses fender based on building energy saving technology
CN216380716U (en) Expansion type temporary auxiliary supporting structure with adjustable supporting area for steel structure beam
CN216740982U (en) Guardrail for building
CN211548694U (en) Portable scaffold for interior decoration
CN215716565U (en) Plug-in type steel structure stand column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant