CN210462051U - Industrial gas separation and purification device - Google Patents

Industrial gas separation and purification device Download PDF

Info

Publication number
CN210462051U
CN210462051U CN201921492388.6U CN201921492388U CN210462051U CN 210462051 U CN210462051 U CN 210462051U CN 201921492388 U CN201921492388 U CN 201921492388U CN 210462051 U CN210462051 U CN 210462051U
Authority
CN
China
Prior art keywords
flange
wall
main body
half bolt
butt joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921492388.6U
Other languages
Chinese (zh)
Inventor
郭思成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HUATEPENG SPECIALTY GASES CO Ltd
Original Assignee
SHENZHEN HUATEPENG SPECIALTY GASES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN HUATEPENG SPECIALTY GASES CO Ltd filed Critical SHENZHEN HUATEPENG SPECIALTY GASES CO Ltd
Priority to CN201921492388.6U priority Critical patent/CN210462051U/en
Application granted granted Critical
Publication of CN210462051U publication Critical patent/CN210462051U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Flanged Joints, Insulating Joints, And Other Joints (AREA)

Abstract

The utility model discloses a device for separating and purifying industrial gas, which comprises a gas-water separator and a pipeline butt joint main body, the pipeline butt joint main body comprises a fastening main body, a first flange, a second flange and a butt joint pipe, the first flange is fixedly and hermetically arranged on the rear wall of the second flange through the fastening main body, the fastening main body comprises a first half bolt, a pressing main body, a nut and a second half bolt, one end of the first half bolt is fixedly connected with the outer wall of the second flange, the inner wall of the pressing main body is in sliding clamping connection with the outer walls of the first flange and the second flange, the first half bolt is in movable clamping connection with the inner wall of the second half bolt, the nut is installed on the outer walls of the first half bolt and the second half bolt in a threaded mode, one end of the second half bolt is fixedly connected to the outer wall of the first flange, and one side wall of the second half bolt is supported on the outer wall of the pressing main body. The utility model discloses made things convenient for the device to carry out the pipeline butt joint with external device, better satisfying the use needs.

Description

Industrial gas separation and purification device
Technical Field
The utility model relates to a from purification industrial gas equipment technical field, specifically be a separation purification industrial gas device.
Background
The butt joint structure of the gas-water separator mainly depends on a flange to seal and fix through a screw when a pipeline of the gas-water separator is in butt joint with a target pipeline, and because the mode is screwed through a wrench, the wrench cannot continuously screw a nut, and two wrenches are needed for reinforcement work, more than three screws need to be fastened to complete the butt joint work of the pipeline, so that the problem of great trouble in safety is caused, and a device capable of solving the problem is urgently needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a separation and purification industrial gas device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the industrial gas separating and purifying apparatus includes gas-water separator; the pipeline butt joint device comprises a pipeline butt joint main body, wherein the pipeline butt joint main body comprises a fastening main body, a first flange, a second flange and a butt joint pipe, the first flange is fixedly and hermetically arranged on the rear wall of the second flange through the fastening main body, the fastening main body comprises a first half bolt, a pressing main body, a nut and a second half bolt, one end of the first half bolt is fixedly connected to the outer wall of the second flange, the inner wall of the pressing main body is in sliding clamping connection with the outer walls of the first flange and the second flange, the first half bolt is movably clamped with the inner wall of the second half bolt, the nut is in threaded connection with the outer walls of the first half bolt and the second half bolt, one end of the second half bolt is fixedly connected to the outer wall of the first flange, one side wall of the second half bolt is supported on the outer wall of the pressing main body, the pressing main body comprises a connecting block, a clamping block and a V-shaped clamping, the fixture block is clamped on the outer walls of the first flange and the second flange through the V-shaped clamping groove, the front wall of the connecting block is fixedly connected to the center of the rear wall of the fixture block, and the connecting block and the fixture block are of an integrated structure.
Preferably, the pipeline butt joint main part still includes the connecting pipe, the antetheca fixed connection of connecting pipe is at the back wall of first flange, connecting pipe and first flange structure as an organic whole, the connecting pipe is in the same place with deareator fixed connection, the pipeline butt joint main part passes through connecting pipe symmetry fixed mounting at deareator's front end and rear end, deareator link up with the inner space of connecting pipe and links to each other.
Preferably, the fastening main body further comprises a spring, one end of the spring is fixedly connected with the connecting block, and the other end of the spring is fixedly connected through a connecting pipe.
Preferably, the pipeline butt joint main body further comprises a butt joint pipe, the butt joint pipe is fixedly connected with the second flange into a whole, and the second flange is communicated with the inner space of the butt joint pipe.
Preferably, the pressing main body further comprises a sliding hole, the sliding hole is hollowed in the side wall of the fixture block, and the first half bolt and the second half bolt are both slidably mounted on the inner wall of the sliding hole.
Preferably, the fastening main body is three, and three fastening main bodies are uniformly fixed and are clamped on the outer walls of the first flange and the second flange through the uniform fixing of the V-shaped clamping grooves, the fastening main bodies are fixedly connected with the first flange through second half bolts, and the fastening main bodies are fixedly connected with the second flange through the first half bolts.
Compared with the prior art, the beneficial effects of the utility model are as follows:
when the gas-water separator needs to be in butt joint with an external device, the front end of a butt joint pipe and the front end of the butt joint pipe are welded with the external device, then a first half bolt is aligned to the inner wall of a second half bolt, the rear wall of a second flange is in butt joint with the front wall of a first flange, then a nut is screwed by means of an external wrench, the nut is screwed to the outer wall of the first half bolt along the other end of the second half bolt, the purpose of fixing the first half bolt and the second half bolt together through the nut is achieved, the nut is screwed continuously, a clamping block is extruded inwards by the nut, the outer walls of the first flange and the second flange are extruded by a V-shaped clamping groove formed in the clamping block, the pressure between the first flange and the second flange is increased through the V-shaped clamping groove, the purpose of tightly sealing the first flange and the second flange together is achieved, and the nut is convenient to be screwed continuously by the external wrench manually through the, and only need to revolve to twist three nut and can accomplish first flange and second flange sealing fixed, utilize the V-arrangement draw-in groove to provide even sealing pressure for first flange and second flange.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
fig. 2 is a schematic structural view of the main body of the pipe butt joint of the present invention;
FIG. 3 is a schematic view of the fastening main body structure of the present invention;
fig. 4 is a schematic view of the main structure of the compressing device of the present invention.
In the figure: 1. a gas-water separator; 2. a pipe butt joint body; 3. a fastening body; 4. a connecting pipe; 5. a first flange; 6. a second flange; 7. butt-joint pipes; 8. a first half bolt; 9. compressing the main body; 10. a nut; 11. a second half bolt; 12. a spring; 13. connecting blocks; 14. a slide hole; 15. a clamping block; 16. v-shaped clamping grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: the industrial gas separating and purifying apparatus includes gas-water separator 1; the pipeline butt joint device further comprises a pipeline butt joint main body 2, the pipeline butt joint main body 2 comprises a fastening main body 3, a first flange 5, a second flange 6 and a butt joint pipe 7, the first flange 5 is fixedly and hermetically arranged on the rear wall of the second flange 6 through the fastening main body 3, the fastening main body 3 comprises a first half bolt 8, a pressing main body 9, a nut 10 and a second half bolt 11, one end of the first half bolt 8 is fixedly connected to the outer wall of the second flange 6, the inner wall of the pressing main body 9 is in sliding clamping connection with the outer walls of the first flange 5 and the second flange 6, the first half bolt 8 is movably clamped on the inner wall of the second half bolt 11, the nut 10 is in threaded connection with the outer walls of the first half bolt 8 and the second half bolt 11, one end of the second half bolt 11 is fixedly connected to the outer wall of the first flange 5, one side wall of the second half bolt 11 is supported on the outer wall of the pressing main body 9, the pressing, the V-shaped clamping groove 16 is formed in the inner wall of the clamping block 15, the clamping block 15 is clamped on the outer walls of the first flange 5 and the second flange 6 through the V-shaped clamping groove 16, the front wall of the connecting block 13 is fixedly connected to the center of the rear wall of the clamping block 15, the connecting block 13 and the clamping block 15 are of an integral structure, when the gas-water separator 1 needs to be in pipeline butt joint with external equipment, the front ends of the butt joint pipe 7 and the external equipment are welded together with an external equipment pipeline, then the first half bolt 8 is aligned to the inner wall of the second half bolt 11, the rear wall of the second flange 6 is in butt joint with the front wall of the first flange 5, then the nut 10 is screwed by means of an external spanner, the nut 10 is screwed to the outer wall of the first half bolt 8 along the other end of the second half bolt 11, the purpose of fixing the first half bolt 8 and the second half bolt 11 together through the nut 10 is, utilize the V-arrangement draw-in groove 16 extrusion first flange 5 that fixture block 15 was seted up and the outer wall of second flange 6, increase the pressure between first flange 5 and the second flange 6 through V-arrangement draw-in groove 16, reach the purpose tightly sealed together first flange 5 and second flange 6, through the characteristics that nut 10 does not have the sheltering from all around, made things convenient for manually to twist in succession through plus spanner and twisted nut 10, and only need twist soon three nut 10 and can accomplish first flange 5 and second flange 6 sealed fixed, utilize V-arrangement draw-in groove 16 to provide even sealing pressure for first flange 5 and second flange 6.
The pipeline butt joint main body 2 further comprises a connecting pipe 4, the front wall of the connecting pipe 4 is fixedly connected with the rear wall of the first flange 5, the connecting pipe 4 and the first flange 5 are of an integral structure, the connecting pipe 4 is fixedly connected with the gas-water separator 1, the pipeline butt joint main body 2 is symmetrically and fixedly arranged at the front end and the rear end of the gas-water separator 1 through the connecting pipe 4, the gas-water separator 1 is communicated with the inner space of the connecting pipe 4, the fastening main body 3 further comprises a spring 12, one end of the spring 12 is fixedly connected with a connecting block 13, the other end of the spring 12 is fixedly connected with the connecting pipe 4, the pipeline butt joint main body 2 further comprises a butt joint pipe 7, the butt joint pipe 7 is fixedly connected with the second flange 6 into a whole, the second flange 6 is communicated with the inner space of the butt joint pipe 7, the pressing main body 9 further comprises a sliding hole 14, the sliding hole 14 is hollowed out of the side wall of the clamping block 15, the fastening main part 3 is equipped with threely, and three fastening main part 3 is even fixed to be connected at the outer wall of first flange 5 and second flange 6 through the even fixed joint of V-arrangement draw-in groove 16, and the fastening main part 3 all is in the same place through second half bolt 11 and first flange 5 fixed connection, and the fastening main part 3 all is in the same place through first half bolt 8 and second flange 6 fixed connection.
The working principle is as follows: when the gas-water separator 1 needs to be in pipeline butt joint with external equipment, the front ends of a butt joint pipe 7 and the front end of the butt joint pipe are welded together with the external equipment pipeline, then a first half bolt 8 is aligned to the inner wall of a second half bolt 11, the rear wall of a second flange 6 is in butt joint with the front wall of a first flange 5, then a nut 10 is screwed by an external wrench, the nut 10 is screwed to the outer wall of the first half bolt 8 along the other end of the second half bolt 11, the purpose of fixing the first half bolt 8 and the second half bolt 11 together through the nut 10 is achieved, the nut 10 is screwed continuously, a clamping block 15 is extruded inwards by the nut 10, the outer walls of the first flange 5 and the second flange 6 are extruded by a V-shaped clamping groove 16 formed in the clamping block 15, the pressure between the first flange 5 and the second flange 6 is increased through the V-shaped clamping groove 16, and the purpose of tightly sealing the first flange 5 and the second flange 6, through the characteristics that the periphery of the nut 10 is not shielded, the nut 10 can be conveniently and continuously screwed by an additional wrench manually, the first flange 5 and the second flange 6 can be sealed and fixed only by screwing the three nuts 10, and the V-shaped clamping groove 16 is utilized to provide uniform sealing pressure for the first flange 5 and the second flange 6.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a separation and purification industrial gas device, includes gas-water separator (1), its characterized in that: the pipeline butt joint device is characterized by further comprising a pipeline butt joint main body (2), the pipeline butt joint main body (2) comprises a fastening main body (3), a first flange (5), a second flange (6) and a butt joint pipe (7), the first flange (5) is fixedly and hermetically arranged on the rear wall of the second flange (6) through the fastening main body (3), the fastening main body (3) comprises a first half bolt (8), a pressing main body (9), a nut (10) and a second half bolt (11), one end of the first half bolt (8) is fixedly connected to the outer wall of the second flange (6), the inner wall of the pressing main body (9) is slidably clamped on the outer walls of the first flange (5) and the second flange (6), the first half bolt (8) is movably clamped on the inner wall of the second half bolt (11), and the nut (10) is installed on the outer walls of the first half bolt (8) and the second half bolt (11) in a threaded manner, one end fixed connection of half bolt of second (11) is at the outer wall of first flange (5), a lateral wall of half bolt of second (11) supports the outer wall that compresses tightly main part (9), compress tightly main part (9) including connecting block (13), fixture block (15) and V-arrangement draw-in groove (16), the inner wall at fixture block (15) is seted up in V-arrangement draw-in groove (16), fixture block (15) are at the outer wall of first flange (5) and second flange (6) through V-arrangement draw-in groove (16) joint, the antetheca fixed connection of connecting block (13) is at the back wall center of fixture block (15), connecting block (13) and fixture block (15) structure as an organic whole.
2. The apparatus for separating and purifying industrial gas according to claim 1, wherein: pipeline butt joint main part (2) still includes connecting pipe (4), the antetheca fixed connection of connecting pipe (4) is at the back wall of first flange (5), connecting pipe (4) and first flange (5) structure as an organic whole, connecting pipe (4) are in the same place with deareator (1) fixed connection, pipeline butt joint main part (2) are through the front end and the rear end of connecting pipe (4) symmetry fixed mounting in deareator (1), deareator (1) link up continuously with the inner space of connecting pipe (4).
3. The apparatus for separating and purifying industrial gas according to claim 1, wherein: the fastening main body (3) further comprises a spring (12), one end of the spring (12) is fixedly connected with the connecting block (13), and the other end of the spring (12) is fixedly connected with the connecting pipe (4).
4. The apparatus for separating and purifying industrial gas according to claim 1, wherein: the pipeline butt joint main body (2) further comprises a butt joint pipe (7), the butt joint pipe (7) is fixedly connected with the second flange (6) into a whole, and the second flange (6) is communicated with the inner space of the butt joint pipe (7).
5. The apparatus for separating and purifying industrial gas according to claim 1, wherein: the pressing main body (9) further comprises a sliding hole (14), the sliding hole (14) is hollowed out in the side wall of the clamping block (15), and the first half bolt (8) and the second half bolt (11) are installed on the inner wall of the sliding hole (14) in a sliding mode.
6. The apparatus for separating and purifying industrial gas according to claim 1, wherein: fastening main part (3) are equipped with threely, and three fastening main part (3) are evenly fixed to be connected in the outer wall of first flange (5) and second flange (6) through the even fixed joint of V-arrangement draw-in groove (16), fastening main part (3) all are in the same place through half bolt of second (11) and first flange (5) fixed connection, fastening main part (3) all are in the same place through half bolt of first (8) and second flange (6) fixed connection.
CN201921492388.6U 2019-09-09 2019-09-09 Industrial gas separation and purification device Expired - Fee Related CN210462051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921492388.6U CN210462051U (en) 2019-09-09 2019-09-09 Industrial gas separation and purification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921492388.6U CN210462051U (en) 2019-09-09 2019-09-09 Industrial gas separation and purification device

Publications (1)

Publication Number Publication Date
CN210462051U true CN210462051U (en) 2020-05-05

Family

ID=70433510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921492388.6U Expired - Fee Related CN210462051U (en) 2019-09-09 2019-09-09 Industrial gas separation and purification device

Country Status (1)

Country Link
CN (1) CN210462051U (en)

Similar Documents

Publication Publication Date Title
CN210462051U (en) Industrial gas separation and purification device
CN103698206A (en) Sealing clamp used for internal pressure resistance test of plastic pipe and using method of sealing clamp
CN113113785B (en) Cable junction device convenient to detach and detect for electric power engineering
CN211449876U (en) Staple bolt for natural gas line
CN218468511U (en) Corrugated pipe compensator with strong compression-resistant structure
CN218094901U (en) Pipeline sealing device for pipeline hydrostatic test
CN217874694U (en) Stainless steel joint with high sealing performance
CN203614929U (en) Thin-wall test piece outgoing cable sealing device
CN215981270U (en) Air conditioner pipeline connector with good sealing effect
CN212027684U (en) Oil production pipe connecting clamp
CN201875311U (en) Seal joint in hydraulic system
CN210968651U (en) Sleeve for disassembling and assembling narrow space sealing head
CN211733878U (en) Industrial sewage purification device for environmental protection
CN105987226A (en) Dynamic load pipe clamp cross arm
CN215968466U (en) Multifunctional wrench head for fixing force
CN210531815U (en) Flange pipeline clamp
CN102011905A (en) Sealing joint in hydraulic system
CN213481431U (en) Industrial gas flowmeter convenient to replace
CN214836970U (en) Dismantle convenient vacuum pump
CN217463711U (en) Convenient and fast two-piece type quick leaking stoppage device
CN211118144U (en) Air purification pipeline structure for pharmaceutical factory building
CN215000145U (en) Device convenient for fixing GIS accessory pipeline to GIS bus pipe
CN203577581U (en) Air purifying device of large movable covered part
CN221198839U (en) Wire harness air tightness test jig
CN220354238U (en) Connecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200505

CF01 Termination of patent right due to non-payment of annual fee