CN210460011U - Assembled pier stud reinforcement bed-jig of accurate positioning - Google Patents

Assembled pier stud reinforcement bed-jig of accurate positioning Download PDF

Info

Publication number
CN210460011U
CN210460011U CN201921115312.1U CN201921115312U CN210460011U CN 210460011 U CN210460011 U CN 210460011U CN 201921115312 U CN201921115312 U CN 201921115312U CN 210460011 U CN210460011 U CN 210460011U
Authority
CN
China
Prior art keywords
reinforcement
reinforcing bar
steel
positioning
array
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921115312.1U
Other languages
Chinese (zh)
Inventor
肖尧
谭强
田世宽
吴成刚
徐博
蒙宁
雷步瀚
邓翔
彭成东
孙帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201921115312.1U priority Critical patent/CN210460011U/en
Application granted granted Critical
Publication of CN210460011U publication Critical patent/CN210460011U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled pier stud reinforcement bed-jig of accurate positioning, first I-steel including the array distribution, be equipped with the reinforcing bar locating rack of array distribution on the first I-steel, reinforcing bar locating rack top all is equipped with first reinforcing bar and takes the pole, reinforcing bar locating rack below all is equipped with the second reinforcing bar and takes the pole, be equipped with the reinforcing bar access board reinforcing bar locating rack that the mirror image distributes between first reinforcing bar access board and the second reinforcing bar access pole, the reinforcing bar locating rack includes the second I-steel, be equipped with the third I-steel of array distribution on the second I-steel, third I-steel top is equipped with the first locating hole of array distribution, third I-steel below is equipped with the second locating hole of array distribution, third I-steel one side is equipped with the third locating hole of array distribution, still be equipped with the bearing diagonal pole between third I-steel and the second I-steel. The utility model discloses a reinforcement cage bed-jig of stereotyping carries out the ligature of reinforcing bar, ensures that the reinforcing bar pinpoints, stable in structure, and easy operation, has greatly improved the efficiency of construction, and the efficiency of construction is high.

Description

Assembled pier stud reinforcement bed-jig of accurate positioning
Technical Field
The utility model relates to a building appliances field specifically is an assembled pier stud reinforcement bed-jig of accurate positioning.
Background
The reinforcing steel bar is steel for reinforced concrete and prestressed reinforced concrete, and the cross section of the reinforcing steel bar is circular or square with round corners. The steel bars for reinforced concrete are straight bar or wire rod-shaped steel for reinforcing the reinforced concrete, the shapes of the steel bars are smooth steel bars and deformed steel bars, the delivery state is a straight bar or wire rod, and the smooth steel bars are actually small round bars and wire rods of common low-carbon steel. Deformed bars are surface ribbed bars, usually with 2 longitudinal ribs and transverse ribs distributed uniformly along the length. The cross ribs are 3 types of spiral, herringbone and crescent shapes. Expressed in millimeters of nominal diameter. The nominal diameter of the deformed steel bar is equivalent to the nominal diameter of the smooth steel bar with the same cross section. The nominal diameter of the steel bars is 8-50 mm, and the recommended diameters are 8, 12, 16, 20, 25, 32 and 40 mm. Steel grade: 20MnSi, 20MnV, 25MnSi, BS20 MnSi. The steel reinforcement is mainly subjected to tensile stress in the concrete. The deformed reinforcing steel bar has larger bonding capacity with concrete due to the action of the ribs, so that the deformed reinforcing steel bar can better bear the action of external force. Reinforcing bars are widely used in various building structures. Especially large, heavy, light-duty thin-walled and high-rise building structures. The steel bar binding is not only a very tedious work, the workload is large, and the binding and positioning are very important, and aiming at the situation, the assembly type pier stud steel bar binding jig frame with accurate positioning is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled pier stud reinforcement bed-jig of accurate positioning, the reinforcement cage bed-jig that adopts the design carries out the ligature of reinforcing bar, ensure reinforcing bar accurate positioning, assembled pier stud reinforcement adopts simple and easy positioner in the past, there is phenomenons such as deformation after the repetitious usage, it is different to lead to pier stud reinforcing bar interval, shaped steel processing forms, stable in structure, according to positioner of bed-jig put into a root with the reinforcing bar ligature can, can ensure reinforcing bar accurate positioning, and easy operation has greatly improved the efficiency of construction, the efficiency of construction is high, can ensure reinforcing bar accurate positioning.
The purpose of the utility model can be realized by the following technical scheme:
the utility model provides an assembled pier stud reinforcement bed-jig of accurate positioning, includes the first I-steel that the array distributes, be equipped with the bar location frame that the array distributes on the first I-steel, bar location frame top all is equipped with first reinforcing bar take the pole, and bar location frame below all is equipped with the second reinforcing bar take the pole, is equipped with the reinforcing bar access board that the mirror image distributes between first reinforcing bar take the pole and the second reinforcing bar take the pole.
Further, the interval between the steel bar locating racks at the two ends of the steel bar locating rack on the first I-shaped steel is smaller than the interval between the middle steel bar locating racks.
Furthermore, the steel bar positioning frame comprises a second I-beam, third I-beams distributed in an array manner are arranged on the second I-beam, first positioning holes distributed in an array manner are arranged above the third I-beam, second positioning holes distributed in an array manner are arranged below the third I-beam, third positioning holes distributed in an array manner are arranged on one side of the third I-beam, and an inclined support rod is further arranged between the third I-beam and the second I-beam.
Furthermore, the two ends of the first steel bar lapping rod are provided with fourth positioning holes distributed in an array manner, and the first steel bar lapping rod is also provided with first steel bar positioning grooves distributed in an array manner.
Further, the first steel bar lapping rod and the second steel bar lapping rod are the same in structure.
Furthermore, be equipped with the fifth locating hole of array distribution on the reinforcing bar attachment strap, reinforcing bar attachment strap one side is equipped with the extension board of array distribution, all is equipped with second reinforcing bar constant head tank on the extension board
Furthermore, the first steel bar lapping rod, the second steel bar lapping rod and the steel bar lapping plate are fixed on the steel bar positioning frame through screws.
The utility model has the advantages that:
1. the utility model adopts the shaped steel reinforcement cage jig frame to bind the steel reinforcement, thereby ensuring the accurate positioning of the steel reinforcement; the conventional assembly type pier column reinforcing steel bar binding adopts a simple positioning device, and has the phenomena of deformation and the like after being used for many times, so that the intervals of the pier column reinforcing steel bars are different;
2. the utility model is formed by processing section steel, has stable structure, can ensure accurate positioning of the steel bar by binding the steel bar one by one according to the positioning device of the jig frame, has simple operation and greatly improves the construction efficiency;
3. the utility model discloses the efficiency of construction is high, can ensure that the reinforcing bar pinpoints.
Drawings
The present invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic structural view of the precisely positioned assembled pier stud reinforcement jig of the present invention;
FIG. 2 is a schematic view of the structure of the accurately positioned assembly type pier stud reinforcement jig of the present invention;
FIG. 3 is a schematic view of the structure of the accurately positioned assembly type pier stud reinforcement jig of the present invention;
FIG. 4 is a schematic structural view of a part of the accurately positioned assembled pier stud reinforcement jig of the present invention;
fig. 5 is the structural schematic diagram of the steel bar lapping plate of the utility model.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "open hole", "upper", "lower", "thickness", "top", "middle", "length", "inner", "around", and the like, indicate positional or positional relationships, are merely for convenience in describing the present invention and to simplify the description, and do not indicate or imply that the components or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
The utility model provides an assembled pier stud reinforcement bed-jig of accurate positioning, including array distribution's first I-steel 1, as shown in fig. 1, be equipped with array distribution's reinforcing bar locating rack 2 on the first I-steel 1, 2 tops of reinforcing bar locating rack all are equipped with first reinforcing bar take pole 3, 2 below of reinforcing bar locating rack all are equipped with second reinforcing bar take pole 4, be equipped with mirror image distribution's reinforcing bar access board 5 between first reinforcing bar take pole 3 and the second reinforcing bar take pole 4, the interval between 2 reinforcing bar locating racks at the both ends of reinforcing bar locating rack 2 on first I-steel 1 is less than the interval between 2 reinforcing bar locating racks in the middle of.
The steel bar positioning frame 2 comprises a second i-beam 21, as shown in fig. 2, 3 and 4, third i-beams 22 distributed in an array are arranged on the second i-beam 21, first positioning holes 221 distributed in an array are arranged above the third i-beam 22, second positioning holes 222 distributed in an array are arranged below the third i-beam 22, third positioning holes 223 distributed in an array are arranged on one side of the third i-beam 22, and an inclined support rod 23 is further arranged between the third i-beam 22 and the second i-beam 21.
The two ends of the first steel bar lapping rod 3 are both provided with fourth positioning holes 31 distributed in an array manner, as shown in fig. 3, the first steel bar lapping rod 3 is also provided with first steel bar positioning grooves 32 distributed in an array manner, and the first steel bar lapping rod 3 and the second steel bar lapping rod 4 are identical in structure.
The reinforcement strap 5 is provided with fifth positioning holes 51 distributed in an array, as shown in fig. 5, one side of the reinforcement strap 5 is provided with extending plates 52 distributed in an array, and the extending plates 52 are provided with second reinforcement positioning grooves 53.
First reinforcing bar take pole 3, second reinforcing bar take pole 4 and reinforcing bar take board 5 all fix on reinforcing bar locating rack 2 through screw 6.
During the use, use screw 6 to fix first reinforcing bar take pole 3, second reinforcing bar take pole 4 and reinforcing bar access board 5 on reinforcing bar locating rack 2, place the reinforcing bar in first reinforcing bar constant head tank 32 and second reinforcing bar constant head tank 53, use the steel wire with the reinforcing bar frame ligature on placing the reinforcing bar in first reinforcing bar constant head tank 32 and second reinforcing bar constant head tank 53.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (7)

1. The utility model provides an assembled pier stud reinforcement bed-jig of accurate positioning, includes first I-steel (1) that the array distributes, its characterized in that, be equipped with the reinforcing bar locating rack (2) that the array distributes on first I-steel (1), reinforcing bar locating rack (2) top all is equipped with first reinforcing bar take pole (3), and reinforcing bar locating rack (2) below all is equipped with second reinforcing bar take pole (4), is equipped with reinforcing bar take board (5) that the mirror image distributes between first reinforcing bar take pole (3) and second reinforcing bar take pole (4).
2. The assembly type pier column reinforcement binding jig frame with the accurate positioning function according to claim 1, wherein the distance between the reinforcement positioning frames (2) at two ends of the reinforcement positioning frame (2) on the first I-shaped steel (1) is smaller than the distance between the reinforcement positioning frames (2) in the middle.
3. The assembly type pier column reinforcement binding jig frame with the accurate positioning function according to claim 1, wherein the reinforcement positioning frame (2) comprises a second I-shaped steel (21), third I-shaped steels (22) distributed in an array mode are arranged on the second I-shaped steel (21), first positioning holes (221) distributed in an array mode are formed in the upper portion of the third I-shaped steel (22), second positioning holes (222) distributed in an array mode are formed in the lower portion of the third I-shaped steel (22), third positioning holes (223) distributed in an array mode are formed in one side of the third I-shaped steel (22), and inclined supporting rods (23) are further arranged between the third I-shaped steel (22) and the second I-shaped steel (21).
4. The assembly type pier column reinforcement jig frame with precise positioning according to claim 1, wherein the first reinforcement bar (3) is provided with fourth positioning holes (31) distributed in an array at both ends, and the first reinforcement bar (3) is further provided with first reinforcement positioning grooves (32) distributed in an array.
5. The assembly type pier stud reinforcement jig frame with precise positioning according to claim 1, wherein the first reinforcement bar (3) and the second reinforcement bar (4) are identical in structure.
6. The assembly type pier stud reinforcement tire frame with precise positioning according to claim 1, wherein the reinforcement access plate (5) is provided with fifth positioning holes (51) distributed in an array, one side of the reinforcement access plate (5) is provided with extension plates (52) distributed in an array, and the extension plates (52) are provided with second reinforcement positioning grooves (53).
7. The assembly type pier column reinforcement jig frame with the accurate positioning function according to claim 1, wherein the first reinforcement bar (3), the second reinforcement bar (4) and the reinforcement slab (5) are fixed on the reinforcement positioning frame (2) through screws (6).
CN201921115312.1U 2019-07-16 2019-07-16 Assembled pier stud reinforcement bed-jig of accurate positioning Expired - Fee Related CN210460011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921115312.1U CN210460011U (en) 2019-07-16 2019-07-16 Assembled pier stud reinforcement bed-jig of accurate positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921115312.1U CN210460011U (en) 2019-07-16 2019-07-16 Assembled pier stud reinforcement bed-jig of accurate positioning

Publications (1)

Publication Number Publication Date
CN210460011U true CN210460011U (en) 2020-05-05

Family

ID=70445725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921115312.1U Expired - Fee Related CN210460011U (en) 2019-07-16 2019-07-16 Assembled pier stud reinforcement bed-jig of accurate positioning

Country Status (1)

Country Link
CN (1) CN210460011U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111570684A (en) * 2020-06-12 2020-08-25 河南凯煌模板有限公司 Reinforcing cage binding jig frame for prefabricated pier stud/bent cap and construction method thereof
CN114837424A (en) * 2021-02-01 2022-08-02 广东博智林机器人有限公司 Steel reinforcement cage shaping positioning device and steel reinforcement cage shaping machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111570684A (en) * 2020-06-12 2020-08-25 河南凯煌模板有限公司 Reinforcing cage binding jig frame for prefabricated pier stud/bent cap and construction method thereof
CN114837424A (en) * 2021-02-01 2022-08-02 广东博智林机器人有限公司 Steel reinforcement cage shaping positioning device and steel reinforcement cage shaping machine
CN114837424B (en) * 2021-02-01 2024-03-15 广东博智林机器人有限公司 Reinforcement cage forming and positioning equipment and reinforcement cage forming machine

Similar Documents

Publication Publication Date Title
CN210460011U (en) Assembled pier stud reinforcement bed-jig of accurate positioning
CN214090616U (en) Adjustable steel bar protection layer cushion block
CN210791489U (en) Assembled bent cap reinforcement bed-jig of accurate positioning
CN208073013U (en) A kind of anti-offset positioning supporting frame of prestressing force bellows positioning
CN217353789U (en) Buckling restrained brace and concrete frame connection structure
CN211803592U (en) A utensil that is arranged in building field to strengthen reinforcing bar group stability
CN113187117A (en) Aluminum alloy inner core assembled buckling restrained brace of full angle steel restraint
CN217891358U (en) Reinforcing steel bar positioning jig frame
CN110593475A (en) Anti-floating metal combined core mold for hollow floor
CN211548218U (en) Edge column structure of reinforced concrete shear wall and shear wall
JP3042513B2 (en) Reinforcing bar holder
CN219118758U (en) Aluminum alloy square column template combination reinforced structure for building
CN215211568U (en) Reinforced concrete beam and steel column connecting structure
CN210659235U (en) Device for reducing temporary construction of assembled steel bar truss floor
CN213390846U (en) Precast beam with strong bearing capacity
CN220521749U (en) Concrete filled steel tubular column structure
CN214995099U (en) Novel building floor of reducible support piece
CN214575149U (en) Simple limiting split heads for supporting upper and lower layers of reinforcing steel bars
CN219520356U (en) Simple steel reinforcement cage processingequipment
CN214090617U (en) Steel bar protective layer cushion block capable of being freely divided for use
CN219732518U (en) Anchoring plate for constructional column stress steel bar
CN214461633U (en) Building floor slab capable of reducing supporting pieces
CN112647650B (en) Mechanical anchoring structure for steel bars of building constructional column
CN216893241U (en) Reinforced ribbed steel bar net
CN215887879U (en) Concrete box girder and positioning steel frame thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200505