CN210459991U - Concrete pouring chute - Google Patents

Concrete pouring chute Download PDF

Info

Publication number
CN210459991U
CN210459991U CN201920866171.0U CN201920866171U CN210459991U CN 210459991 U CN210459991 U CN 210459991U CN 201920866171 U CN201920866171 U CN 201920866171U CN 210459991 U CN210459991 U CN 210459991U
Authority
CN
China
Prior art keywords
plate body
chute
chain
manual telescopic
butt joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920866171.0U
Other languages
Chinese (zh)
Inventor
程炳勇
张睿
梁晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201920866171.0U priority Critical patent/CN210459991U/en
Application granted granted Critical
Publication of CN210459991U publication Critical patent/CN210459991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chutes (AREA)

Abstract

The utility model discloses a concrete placement chute, including first plate body and second plate body, the top of first plate body is equipped with the butt joint groove, and installs the second plate body through the butt joint board butt joint in the butt joint groove, the top movable mounting of second plate body has the third plate body, the both sides at third plate body top fixed mounting respectively has link and chain, the front of second plate body has the backup pad through the manual telescopic link movable mounting of second, the positive bottom fixed mounting of first plate body has first manual telescopic link. The utility model discloses the performance of equipment operation has been reached between the chain link that sets up and the chain messenger plate body, has avoided the complicated condition of traditional complicated structure of installation, makes the chute make things convenient for vertical member concrete placement simultaneously through adjusting, guarantees that the concrete does not shed on the horizontal component template, and the manual telescopic link of setting can support the chute fixedly, has not only guaranteed the holistic stability of chute, and the practicality is strong, convenient to popularize and use.

Description

Concrete pouring chute
Technical Field
The utility model relates to a building technical field specifically is a concrete placement chute.
Background
In the construction engineering that vertical component and horizontal component once only pour, concrete placement order is: the vertical member is poured firstly, then the horizontal member is poured, and in order to overcome the phenomenon that concrete is easily thrown on a horizontal member template in the existing concrete pouring process, the chute has an especially important function.
Although the prior concrete pouring chute achieves the basic operation performance, the prior concrete pouring chute still has the following defects: 1. the tradition is because vertical component thickness is less, and the concrete is shed easily on the horizontal component template during pouring, causes the pollution of horizontal component template, influences the concrete placement quality and the shaping effect of horizontal component, 2, overall structure is comparatively fixed simultaneously, and is comparatively loaded down with trivial details during the installation, leads to bringing more inconvenience for the staff, consequently needs to improve this to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement chute is in order to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete placement chute, includes first plate body and second plate body, the top of first plate body is equipped with the butt joint groove, and the butt joint groove is through the butt joint board butt joint install the second plate body, the top movable mounting of second plate body has the third plate body, the both sides at third plate body top fixed mounting respectively has link and chain, the front of second plate body has the backup pad through second manual telescopic link movable mounting, the positive bottom fixed mounting of first plate body has first manual telescopic link.
Preferably, the bottom of the first manual telescopic rod is fixedly provided with a conical head.
Preferably, the third plate body, the chain buckle and the chain are fixedly connected, and the chain buckle is matched with the chain for use.
Preferably, a handle is fixedly installed at the center of the top of the third plate body.
Preferably, a limiting part used in cooperation with the third plate body is movably mounted at the top of the front surface of the second plate body.
Preferably, the first manual telescopic rod and the first plate body and the second manual telescopic rod and the second plate body are movably mounted through mounting seats.
Compared with the prior art, the beneficial effects of the utility model are that: this concrete placement chute is for the tradition chute of pouring, the plate body of setting makes the chute reach the function of dismantling the butt joint through butt joint groove and butt joint plate, the staff can dismantle the transport to the chute according to actual conditions, it is more laborsaving convenient to make the staff when the operation, the operating efficiency is improved, the performance of equipment operation has been arrived between the chain link of setting and the chain messenger plate body, the complicated condition of traditional complicated structure of installation has been avoided, make the chute make things convenient for vertical member concrete placement simultaneously through adjusting, guarantee that the concrete is not shed on the horizontal component template, the manual telescopic link of setting can support fixedly to the chute, the holistic stability of chute has not only been guaranteed, the working strength of chute has been guaranteed again simultaneously, application scope has been enlarged, therefore, the clothes hanger is strong in practicability, and convenient for popularization and use.
Drawings
Fig. 1 is a schematic view of the internal structure of the present invention;
fig. 2 is a schematic front structural view of the present invention;
fig. 3 is a schematic view of the combined state structure of the present invention.
In the figure: 1. a first manually operated telescoping rod; 101. a conical head; 2. a first plate body; 201. a butt plate; 202. a butt joint groove; 3. a second plate body; 301. a limiting member; 4. a third plate body; 401. a chain buckle; 402. a chain; 403. a handle; 5. a second manual telescopic rod; 6. and a support plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a concrete pouring chute comprises a first plate body 2 and a second plate body 3, wherein the top of the second plate body 3 is movably provided with a third plate body 4, two sides of the top of the third plate body 4 are respectively and fixedly provided with a chain buckle 401 and a chain 402, the chain buckle 401 and the chain 402 enable the plate bodies to reach the performance of assembly operation, the complex structure of the traditional installation is avoided, meanwhile, the chute is convenient for vertical member concrete pouring through adjustment, concrete is guaranteed not to be thrown on a horizontal member template, the front surface of the second plate body 3 is movably provided with a support plate 6 through a second manual telescopic rod 5, the bottom of the front surface of the first plate body 2 is fixedly provided with a first manual telescopic rod 1, the manual telescopic rod can support and fix the chute, the integral stability of the chute is guaranteed, the operation strength of the chute is guaranteed, the application range is expanded, the top of the first plate body 2 is provided with a butt joint groove 202, and the butt joint groove 202 is butt-jointed with the second plate body 3 through the butt joint plate 201, the plate body enables the chute to achieve the function of dismounting and butt joint through the butt joint groove 202 and the butt joint plate 201, and a worker can dismount and carry the chute according to actual conditions, so that the worker is more labor-saving and convenient during operation, and the operation efficiency is improved.
Further, a conical head 101 is fixedly installed at the bottom of the first manual telescopic rod 1. In the embodiment, the stability of the chute when being installed is ensured by the first manual telescopic rod 1 through the conical head 101, and the practicability of the chute is improved.
Further, the third plate 4 is fixedly connected to the fastener 401 and the chain 402, and the fastener 401 is used in cooperation with the chain 402. In the embodiment, the combination of the chain buckle 401 and the chain 402 enables the plate bodies to be assembled, and meanwhile, the chute can be conveniently detached by workers.
Further, a handle 403 is fixedly installed at a central position of the top of the third plate body 4. In an embodiment, the handle 403 improves the stability of the worker during operation, and the worker can carry the chute through the handle 403.
Further, a limiting member 301 used in cooperation with the third plate 4 is movably mounted on the top of the front surface of the second plate 3. In an embodiment, the limiting member 301 is connected to the second plate 3 through a shaft rod, so as to achieve movable adjustment, and the limiting member 301 ensures the adhesion between the second plate 3 and the third plate 4.
Further, the first manual telescopic rod 1 and the first plate body 2 and the second manual telescopic rod 5 and the second plate body 3 are movably mounted through mounting seats. In the embodiment, first manual telescopic link 1 and second manual telescopic link 5 have reached the function that the activity was adjusted through the mount pad, make things convenient for the staff to adjust the angle of manual telescopic link, are connected through the axostylus axostyle between mount pad and first manual telescopic link 1 and the second manual telescopic link 5.
The working principle is as follows: during the operation, carry the chute to suitable operation position, stretch into the middle gap of vertical component reinforcing bar and vertical component template with first manual telescopic link 1 again, then support manual telescopic link 5 of second on vertical component reinforcing bar and vertical component template, guarantee that the bottom is placed firmly, launch third plate body 4, fix through locating part 301, make up fixedly through link 401 on chain 402 and another plate body at last.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a concrete placement chute, includes first plate body (2) and second plate body (3), its characterized in that: the top of first plate body (2) is equipped with butt joint groove (202), and butt joint groove (202) through buttcover plate (201) butt joint install second plate body (3), the top movable mounting of second plate body (3) has third plate body (4), the both sides at third plate body (4) top fixed mounting respectively has link (401) and chain (402), the front of second plate body (3) has backup pad (6) through second manual telescopic link (5) movable mounting, the positive bottom fixed mounting of first plate body (2) has first manual telescopic link (1).
2. A concrete pouring chute according to claim 1 wherein: the bottom of the first manual telescopic rod (1) is fixedly provided with a conical head (101).
3. A concrete pouring chute according to claim 1 wherein: the third plate body (4) is fixedly connected with the chain buckle (401) and the chain (402), and the chain buckle (401) is matched with the chain (402) for use.
4. A concrete pouring chute according to claim 1 wherein: a handle (403) is fixedly arranged at the center of the top of the third plate body (4).
5. A concrete pouring chute according to claim 1 wherein: the top of the front surface of the second plate body (3) is movably provided with a limiting piece (301) matched with the third plate body (4).
6. A concrete pouring chute according to claim 1 wherein: the first manual telescopic rod (1) and the first plate body (2) and the second manual telescopic rod (5) and the second plate body (3) are movably mounted through mounting seats.
CN201920866171.0U 2019-06-11 2019-06-11 Concrete pouring chute Expired - Fee Related CN210459991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920866171.0U CN210459991U (en) 2019-06-11 2019-06-11 Concrete pouring chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920866171.0U CN210459991U (en) 2019-06-11 2019-06-11 Concrete pouring chute

Publications (1)

Publication Number Publication Date
CN210459991U true CN210459991U (en) 2020-05-05

Family

ID=70440249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920866171.0U Expired - Fee Related CN210459991U (en) 2019-06-11 2019-06-11 Concrete pouring chute

Country Status (1)

Country Link
CN (1) CN210459991U (en)

Similar Documents

Publication Publication Date Title
CN210459991U (en) Concrete pouring chute
CN210421756U (en) Leveling connection structure and installation structure of assembled wallboard
CN208633538U (en) A kind of jockey and the building template device comprising the fixture
CN210508192U (en) Floor support convenient to fixed calandria
CN210219116U (en) Box body angle positioner for installing LED arc-shaped screen
CN211873799U (en) Scaffold fastener for building construction
CN208236010U (en) Diagonal brace drawing device for in-situ concrete wall shuttering supporting
CN207892230U (en) A kind of novel aluminum alloy pattern plate
CN219081473U (en) Folding hard ladder for overhauling draft tube
CN216109848U (en) Detachable safety net fixing device
CN217924177U (en) Built-in heated board is with fixed knot structure and built-in heated board cast in situ concrete wall
CN212562503U (en) Connecting and locking device for building template
CN214090382U (en) Connection structure of light gauge steel
CN214885444U (en) Aluminum alloy template
CN216889832U (en) Special fixture for tower crane wall-attached support
CN215634209U (en) Multifunctional rod piece equipment fixing locker
CN220521828U (en) Steel joist structure
CN219548440U (en) Assembled building wall body installation component
CN209875671U (en) Quick T type bolt and connection structure thereof
CN220621308U (en) Communication tower bottom fixing device
CN212002163U (en) Novel decorate construction support body
CN216865688U (en) Assembled novel color steel plate that can splice
CN219411907U (en) Quick positioner of steel construction daylighting top purlin
CN211391388U (en) Device for quickly fixing chassis
CN220504678U (en) Novel hanging hoop pulley for sunshade sail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200505

Termination date: 20210611

CF01 Termination of patent right due to non-payment of annual fee