CN210459980U - Cast-in-place seam template fixing tool - Google Patents

Cast-in-place seam template fixing tool Download PDF

Info

Publication number
CN210459980U
CN210459980U CN201920890817.9U CN201920890817U CN210459980U CN 210459980 U CN210459980 U CN 210459980U CN 201920890817 U CN201920890817 U CN 201920890817U CN 210459980 U CN210459980 U CN 210459980U
Authority
CN
China
Prior art keywords
template
screw rod
fixed
nut
fixed head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920890817.9U
Other languages
Chinese (zh)
Inventor
刘时伟
陈龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Mengxi Construction Group Co ltd
Original Assignee
Inner Mongolia Mengxi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Mengxi Construction Engineering Co Ltd filed Critical Inner Mongolia Mengxi Construction Engineering Co Ltd
Priority to CN201920890817.9U priority Critical patent/CN210459980U/en
Application granted granted Critical
Publication of CN210459980U publication Critical patent/CN210459980U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a fixed frock of cast-in-place seam template, including fixed head, to drawing screw rod, pin, template, nut, to drawing screw rod one end and fixed head fixed connection, seted up the fixed orifices on the fixed head, the opening direction of fixed orifices is perpendicular with to drawing screw rod length direction, and the pin runs through and sets up in the fixed orifices, and the spiro union has the nut on drawing the screw rod, and the cover is equipped with the template on drawing the screw rod to between fixed head and nut. The utility model discloses when using, at first will twist in the screw hole of fixed head to the one end of drawing the screw rod, insert the fixed orifices of fixed head with the pin in the groove that shears of side fascia with the both ends card of pin, pass the template to the other end of drawing the screw rod, the inboard of side fascia is hugged closely to the template, then sheathe gasket in the one end of passing the template to drawing the screw rod to tighten the nut. The operation personnel avoid taking the scaffold outside at the inside operation of building main part completely, have guaranteed the security of production, have reduced operation personnel's operation risk, have promoted production efficiency.

Description

Cast-in-place seam template fixing tool
The technical field is as follows:
the utility model relates to a fixed frock of cast-in-place seam template belongs to building prefabricated component installation built-in fitting.
Background art:
the prefabricated building refers to a building assembled on a construction site by using prefabricated components. The building has the advantages of high building speed, less restriction by climatic conditions, labor saving and building quality improvement.
Fabricated buildings have become of interest since the beginning of the 20 th century and have been realized through the sixties. The first attempts made in English, French, Soviet Union, etc. The assembly type building has high construction speed and low production cost, and is rapidly popularized and developed all over the world.
The characteristics of the fabricated building: 1. a large amount of building components, for example side fascia, interior wallboard, superimposed sheet, balcony, air conditioner board, stair, precast beam, prefabricated post etc. are all accomplished by workshop production and processing, and centralized production greatly reduced engineering cost also more does benefit to quality control simultaneously. 2. The building parts produced by the factory are transported to the site for assembly, so that the template engineering and the manual workload are reduced, the construction speed is accelerated, and the method has great significance for reducing the construction cost. 3. The assembly construction changes the whole building from one project to one product. The more standard the component, the higher the production efficiency and the lower the cost, and the performance price of the whole assembly type building is far comparable to that of the traditional construction mode by matching with the digital management of a factory. 4. Unlike traditional building, which has to finish the main body before decoration, the assembled building can complete the decoration of the prefabricated parts before assembling, so as to realize the synchronization between decoration project and main body project, reduce construction process and lower construction cost. 5. The building materials of the fabricated building are selected more flexibly, and various energy-saving and environment-friendly materials such as light steel and wood boards are applied, so that the fabricated building is more consistent with the concept of green buildings.
When the prefabricated component is installed on site, the prefabricated part needs to be connected through the extending steel bars, then a template is erected on the cast-in-place seam, concrete is poured into the erected template, the template and the template need to be pulled together through split bolts in order to prevent the template from expanding, the templates on two sides of the cast-in-place seam of the inner wallboard are fixed through split screws, the method for processing the cast-in-place seam of the outer wallboard comprises the steps that an operator puts up a scaffold on the outer side of the outer wall, an outer template is erected on the outer side of the building, and the outer template and the inner template of the outer wall are pulled together through the split screws.
The existing fixing tool for the external wall panel generally adopts a through-wall split bolt 2 as shown in fig. 2 to fix templates 4 on two sides of the external wall panel 9, the templates 4 are attached to the inner side and the outer side of a gap between two external wall panels 9, a split screw 2 is inserted between the two templates 4, nuts 5 are sleeved on two ends of the split screw 2, and the two templates 5 are fixed; a closed gap is formed between the two templates 5 and the two external wall panels 9 so as to carry out cast-in-place operation; although the cast-in-situ seam template can be fixed by the design, an operator needs to build a scaffold outside the building main body for operation, so that the operation risk is increased, the measure cost is increased, the construction site environment is influenced, and the occupied area of a construction site is increased. The assembly type building has high cost, and the development of the market of the assembly type building is restricted to a certain extent.
The utility model has the following contents:
in order to solve the technical problem, an object of the utility model is to provide a frock is fixed to cast-in-place seam template.
The utility model discloses by following technical scheme implement: the utility model provides a fixed frock of cast-in-place seam template, includes fixed head, counter-pull screw rod, pin, template, nut, counter-pull screw rod one end and fixed head fixed connection, the fixed orifices has been seted up on the fixed head, the opening direction of fixed orifices with counter-pull screw rod length direction is perpendicular, the pin run through in the fixed orifices sets up the nut has been joined in marriage to the screw rod of pulling the spiro union fixed head with between the nut the cover is equipped with the template on the counter-pull screw rod.
Furthermore, a screw hole matched with the oppositely-pulling screw rod is formed in the fixing head, and the oppositely-pulling screw rod is in threaded connection with the fixing head.
Furthermore, a gasket is sleeved on the oppositely-pulling screw rod between the nut and the template.
The utility model has the advantages that: the utility model discloses when using, at first will twist in the screw hole of fixed head to the one end of drawing the screw rod, insert the fixed orifices of fixed head with the pin in the groove that shears of side fascia with the both ends card of pin, pass the template to the other end of drawing the screw rod, the inboard of side fascia is hugged closely to the template, then sheathe gasket in the one end of passing the template to drawing the screw rod to tighten the nut. In the process, the operator completely works inside the building main body, the scaffold is prevented from being built outside, the production safety is guaranteed, the operation risk of the operator is reduced, and the production efficiency is improved.
Description of the drawings:
in order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of a conventional cast-in-place formwork fixing tool;
FIG. 2 is a diagrammatic view of the use state of FIG. 1;
fig. 3 is a schematic structural view of the present embodiment.
In the figure: the cast-in-place concrete wall comprises a fixing head 1, a split screw 2, a pin 3, a template 4, a nut 5, a fixing hole 6, a screw hole 7, a gasket 8, an external wall panel 9, a shear groove 10 and a cast-in-place seam 11.
The specific implementation mode is as follows:
the technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The utility model provides a fixed frock of cast-in-place seam template, includes fixed head 1, to drawing screw rod 2, pin 3, template 4, nut 5, to drawing 2 one end of screw rod and fixed head 1 fixed connection, fixed orifices 6 have been seted up on the fixed head 1, the opening direction of fixed orifices 6 with to drawing 2 length direction of screw rod perpendicular, pin 3 runs through and sets up in fixed orifices 6, the spiro union has nut 5 on drawing screw rod 2, the cover is equipped with template 4 on drawing screw rod 2 between fixed head 1 and nut 5.
The fixed head 1 is a straight thread sleeve with a variable cross section, a fixed hole 6 is formed in the larger outer diameter straight thread sleeve, a screw hole 7 matched with the oppositely-pulling screw rod 2 is formed in the smaller outer diameter straight thread sleeve, and the oppositely-pulling screw rod 2 is in threaded connection with the fixed head 1.
A gasket 8 is sleeved on the split screw rod 2 between the nut 5 and the template 4.
This fixed frock is when using, at first will to drawing in screw 2's one end twists screw 7 of fixed head 1, insert pin 3 in fixed orifices 6 of fixed head 1, block the both ends card of pin 3 in the groove 10 that shears of side fascia 9, pass template 4 to drawing screw 2's the other end, template 4 hugs closely the inboard of side fascia 9, then sheathes gasket 8 in the end that passes template 4 to drawing screw 2 to screw up nut 5. In the process, the operator completely works inside the building main body, the scaffold is prevented from being built outside, the production safety is guaranteed, the operation risk of the operator is reduced, and the production efficiency is improved.
When the fixing tool is used, firstly, the fixing tool for the cast-in-place seam template is temporarily fixed, the pin 3 is inserted into the fixing hole 6, the fixed tool for the cast-in-place seam template and the template 4 are pulled together in a split mode, the construction process is optimized, the template 4 can be fixed on one side, the using amount of the in-place template 4 is reduced, the external scaffold is prevented from being externally taken to support the external wall panel 9, and the installation cost is reduced. The pin 3 is clamped in the shear grooves 10 of the external wall panels 9 on two sides of the cast-in-place seam 11, the opposite-pull screw rods 2 are tensioned, the opposite-pull screw rods 2 penetrate through opposite-pull holes of the template 4, then the gaskets 8 are penetrated, and the opposite-pull nuts 5 are screwed down. After the cast-in-place seam 11 is well maintained, the nuts 5, the gaskets 8, the templates 4 and the tension screws 2 are disassembled in the building main body, the fixing heads 1 and the pins 3 are fixed in the wall body, the risk of falling objects is controlled to the maximum extent, the safety is superior to that of the existing wall-penetrating tension rods, and the project cost is reduced from the aspects of manpower, materials, environmental protection and the like.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The utility model provides a cast-in-place seam template fixing tool, its characterized in that, it includes fixed head, split screw, pin, template, nut, split screw one end and fixed head fixed connection, the fixed orifices has been seted up on the fixed head, the opening direction of fixed orifices with split screw length direction is perpendicular, the pin run through in the fixed orifices sets up the nut has been screwed on the split screw the fixed head with between the nut the cover is equipped with the template on the split screw.
2. The cast-in-place seam template fixing tool according to claim 1, wherein a screw hole matched with the counter-pulling screw rod is formed in the fixing head, and the counter-pulling screw rod is in threaded connection with the fixing head.
3. The cast-in-place seam formwork fixing tool according to claim 1 or 2, wherein a gasket is sleeved on a split screw between the nut and the formwork.
CN201920890817.9U 2019-06-13 2019-06-13 Cast-in-place seam template fixing tool Active CN210459980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920890817.9U CN210459980U (en) 2019-06-13 2019-06-13 Cast-in-place seam template fixing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920890817.9U CN210459980U (en) 2019-06-13 2019-06-13 Cast-in-place seam template fixing tool

Publications (1)

Publication Number Publication Date
CN210459980U true CN210459980U (en) 2020-05-05

Family

ID=70440617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920890817.9U Active CN210459980U (en) 2019-06-13 2019-06-13 Cast-in-place seam template fixing tool

Country Status (1)

Country Link
CN (1) CN210459980U (en)

Similar Documents

Publication Publication Date Title
CN209924120U (en) Assembled light steel frame structure building system
CN106968360A (en) A kind of prefabricated hollow formula opens perps concrete shear force wall
CN108678256A (en) A kind of assembled modularization roofing and its attachment device
CN206538969U (en) Assembled wall decoration structure
CN206016247U (en) A kind of wall form support system
CN107100296A (en) A kind of integrated inner partition plate of framework spinning bolt-type and its installation method
CN210459980U (en) Cast-in-place seam template fixing tool
CN212613640U (en) Improved generation building scaffold frame of encorbelmenting
CN210289154U (en) Cast-in-place seam fixed knot of prefabricated side fascia constructs
CN206917010U (en) A kind of framework spinning bolt-type integrates inner partition plate
CN211899069U (en) Prefabricated component of assembled shear wall
CN113090025B (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN216276880U (en) Arc roofing construction structures
CN206539218U (en) A kind of interior door assembling structure
CN209620774U (en) Assembled courtyard wall
CN212336742U (en) Building templates that be convenient for aggregate erection that building engineering used
CN209854969U (en) L-shaped connecting structure of light steel keel composite wall
CN206646645U (en) The connecting joint structure of girder steel and column
CN206917072U (en) A kind of overall spinning bolt-type integrates inner partition plate
CN211200704U (en) A L C wallboard bearing house
CN216276905U (en) Regular hexagon fair-faced concrete column steel-wood mixed template reinforcing system
CN220150900U (en) Multistage formula stagnant water bolt consolidates multiple wall body construction structures
CN110847592A (en) Aluminum profile aluminum template convenient to disassemble and used for building
CN218028339U (en) Pure flat keel light steel keel partition wall system
CN215484653U (en) Building construction lintel shaping fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210909

Address after: 016000 No.8, beierjiefang, Shuangyong West Street, Haibowan District, Wuhai City, Inner Mongolia Autonomous Region

Patentee after: Inner Mongolia Mengxi Construction Engineering Co.,Ltd.

Patentee after: INNER MONGOLIA MENGXI CONSTRUCTION GROUP Co.,Ltd.

Address before: 016000 No.8, beierjiefang, Shuangyong West Street, Haibowan District, Wuhai City, Inner Mongolia Autonomous Region

Patentee before: Inner Mongolia Mengxi Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221207

Address after: 016099 No.8, North Second Street, Shuangyong West Street, Haibowan District, Wuhai City, Inner Mongolia Autonomous Region

Patentee after: INNER MONGOLIA MENGXI CONSTRUCTION GROUP CO.,LTD.

Address before: 016000 No.8, beierjiefang, Shuangyong West Street, Haibowan District, Wuhai City, Inner Mongolia Autonomous Region

Patentee before: Inner Mongolia Mengxi Construction Engineering Co.,Ltd.

Patentee before: INNER MONGOLIA MENGXI CONSTRUCTION GROUP CO.,LTD.

TR01 Transfer of patent right