CN210457605U - Ozone tower drainage device - Google Patents

Ozone tower drainage device Download PDF

Info

Publication number
CN210457605U
CN210457605U CN201920819687.XU CN201920819687U CN210457605U CN 210457605 U CN210457605 U CN 210457605U CN 201920819687 U CN201920819687 U CN 201920819687U CN 210457605 U CN210457605 U CN 210457605U
Authority
CN
China
Prior art keywords
funnel
drain pipe
connecting ring
ozone
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920819687.XU
Other languages
Chinese (zh)
Inventor
熊刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huaxinda Drink Technology Co ltd
Original Assignee
Suzhou Huaxinda Drink Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huaxinda Drink Technology Co ltd filed Critical Suzhou Huaxinda Drink Technology Co ltd
Priority to CN201920819687.XU priority Critical patent/CN210457605U/en
Application granted granted Critical
Publication of CN210457605U publication Critical patent/CN210457605U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Water By Oxidation Or Reduction (AREA)

Abstract

The utility model belongs to the technical field of ozone tower technique and specifically relates to an ozone tower drainage device, comprising a tower body, the bottom level intercommunication of tower body has the drain pipe, install the control valve on the drain pipe, a pot head of drain pipe is equipped with the return bend, be connected through sealing mechanism between drain pipe and the return bend, the one end that the drain pipe was kept away from to the return bend is equipped with the funnel, be connected through locking mechanism between funnel and the drain pipe, just the inside cleaning mechanism that is equipped with of funnel. The utility model is provided with the sealing mechanism, so that the drain pipe and the bent pipe can be tightly connected, and the side leakage phenomenon in the drainage process is avoided; the locking mechanism is arranged, so that the bent pipe and the funnel can be tightly connected, water in the tower body can be conveniently discharged, and water accumulation on the ground is avoided; set up actuating mechanism and clean the mechanism, can clean the funnel inner wall automatically, avoid the dirt of aquatic to adhere on the funnel.

Description

Ozone tower drainage device
Technical Field
The utility model relates to an ozone tower technical field especially relates to an ozone tower drainage device.
Background
Ozone enters the bottom of the mixing tower through a pipeline, passes through the aerator and is diffused into other micro bubbles through the microporous bubbler, and the bubbles fully dissolve the ozone into water in the rising process. The water is scattered from the top of the ozone tower and naturally flows away from the top of the ozone tower, so that the sufficient time for mixing the ozone and the water is ensured. The top is furnished with exhaust emissions and overflow mouth again, guarantees that unnecessary ozone can not be detained indoor generally, and ozone and water contact's time is longer more abundant, and ozone sterilization's is effectual, and the gas distribution board gas pocket is less, and ozone is cut into the bubble and is less, and ozone and water contact's area is just bigger, and the effect of so mixing is just better, and the effect of disinfecting is just also better. The existing ozone tower sampling valve is provided with no water outlet and no water drain pipe, and the ozone tower sampling valve directly flows to the ground to cause water accumulation during sampling or ozone detection water drainage at each time, so that bad points are formed, and the sanitary cleaning workload is increased, thereby providing the ozone tower water drainage device.
Disclosure of Invention
The utility model aims at solving the problem that the water directly flows to the ground to cause water accumulation when the water is drained in the prior art, and providing the ozone tower drainage device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an ozone tower drainage device, includes the tower body, the bottom level intercommunication of tower body has the drain pipe, install the control valve on the drain pipe, a pot head of drain pipe is equipped with the return bend, be connected through sealing mechanism between drain pipe and the return bend, the one end that the drain pipe was kept away from to the return bend is equipped with the funnel, be connected through locking mechanism between funnel and the drain pipe, just the inside mechanism that cleans that is equipped with of funnel, clean the mechanism and include vertical setting in the inside pivot of funnel, the outside symmetric connection of pivot has two brush boards, the sponge brush is all installed to one side that the brush board is close to the funnel inner wall, sponge brush and the contact of funnel inner wall the top of pivot is connected with actuating mechanism.
Preferably, sealing mechanism includes that a plurality of equidistance connect the card lamella at the return bend tip, the card lamella clamps in the drain pipe outside jointly, and the outside of card lamella all is the slope form setting, and is a plurality of the solid fixed ring of screw thread joint jointly is passed through in the outside of card lamella.
Preferably, the outer side of the drain pipe is sleeved with a rubber sealing sleeve, and the inner wall of the bent pipe is tightly attached to the rubber sealing sleeve.
Preferably, locking mechanism is including cup jointing the last go-between at return bend one end tip, go up the lower go-between in the funnel top outside that the go-between corresponds the position, upward the go-between with go-between equidistance be connected with a plurality of retaining members down, just the seal groove has been seted up to the top annular of go-between down, the inside cartridge of seal groove has the sealing washer, the sealing washer is connected in last go-between bottom.
Preferably, the filter screen is horizontally arranged at the bottom end in the funnel.
Preferably, the driving mechanism comprises a fixed support fixedly installed at the top end inside the funnel, a bearing is fixedly installed in the middle of the fixed support, a fixed shaft is vertically clamped inside the bearing, the rotating shaft is vertically connected to the bottom end of the fixed shaft, a plurality of rotating blades are equidistantly connected to the outer side of the fixed shaft along the circumferential direction, and the rotating blades are obliquely arranged.
The utility model provides a pair of ozone tower drainage device, beneficial effect lies in:
1. the utility model is provided with the sealing mechanism, so that the drain pipe and the bent pipe can be tightly connected, and the side leakage phenomenon in the drainage process is avoided;
2. the locking mechanism is arranged, so that the bent pipe and the funnel can be tightly connected, water in the tower body can be conveniently discharged, and water accumulation on the ground is avoided;
3. set up actuating mechanism and clean the mechanism, can clean the funnel inner wall automatically, avoid the dirt of aquatic to adhere on the funnel.
Drawings
FIG. 1 is a schematic structural view of an ozone tower drainage device provided by the present invention;
FIG. 2 is a schematic view of a sectional structure of a funnel of an ozone tower drainage device according to the present invention;
fig. 3 is a schematic structural view of a driving mechanism of the ozone tower drainage device provided by the utility model.
In the figure: the device comprises a tower body 1, a water discharge pipe 2, a control valve 3, a clamping flap 4, a fixing ring 5, an elbow 6, a locking piece 7, a funnel 8, a lower connecting ring 9, an upper connecting ring 10, a fixing support 11, a brush plate 12, a rotating shaft 13, a filter screen 14, a sponge brush 15, a fixing shaft 16, a rotating blade 17, a bearing 18 and a sealing groove 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an ozone tower drainage device comprises a tower body 1, a drain pipe 2 is horizontally communicated with the bottom of the tower body 1, a control valve 3 is installed on the drain pipe 2, an elbow pipe 6 is sleeved at one end of the drain pipe 2, the drain pipe 2 is connected with the elbow pipe 6 through a sealing mechanism, a funnel 8 is arranged at one end, away from the drain pipe 2, of the elbow pipe 6, the funnel 8 is connected with the drain pipe 2 through a locking mechanism, a cleaning mechanism is arranged inside the funnel 8 and comprises a rotating shaft 13 vertically arranged inside the funnel 8, two brush plates 12 are symmetrically connected to the outer side of the rotating shaft 13, a sponge brush 15 is installed on one side, close to the inner wall of the funnel 8, of each brush plate 12, the sponge brush 15 is in contact with the inner wall of; through setting up return bend 6 and funnel 8 to be convenient for discharge the water of 1 inside tower bodies, avoid causing ponding subaerial, through setting up pivot 13, thereby can drive brush board 12 and rotate, brush board 12 can drive sponge brush 15 and clean the dirt on the 8 inner walls of funnel at rotatory in-process, avoids the dirt of aquatic to adhere to on the funnel.
The sealing mechanism comprises a plurality of clamping flaps 4 which are connected to the end part of the elbow 6 at equal intervals, the clamping flaps 4 are clamped on the outer side of the drain pipe 2 together, the outer sides of the clamping flaps 4 are arranged in an inclined manner, and the outer sides of the clamping flaps 4 are sleeved with fixing rings 5 together through threads; through setting up card lamella 4 and solid fixed ring 5 to can increase the connection stability between drain pipe 2 and the return bend 6, avoid appearing the obscission.
The outer side of the water discharge pipe 2 is sleeved with a rubber sealing sleeve, and the inner wall of the bent pipe 6 is tightly attached to the rubber sealing sleeve; through setting up the rubber seal cover to can improve the leakproofness between drain pipe 2 and return bend 6, avoid appearing the edge leakage phenomenon at the in-process of drainage.
The locking mechanism comprises an upper connecting ring 10 sleeved at one end of the elbow 6, a lower connecting ring 9 on the outer side of the top of the funnel 8 at the position corresponding to the upper connecting ring 10, a plurality of locking pieces 7 are connected between the upper connecting ring 10 and the lower connecting ring 9 at equal intervals, a sealing groove 19 is annularly formed in the top end of the lower connecting ring 9, a sealing ring is inserted into the sealing groove 19, and the sealing ring is connected to the bottom end of the upper connecting ring 10; the funnel 8 and the elbow 6 can be fixedly connected by providing the upper and lower connection rings 10 and 9 and the plurality of locking members 7, and the sealing performance of the connection between the upper and lower connection rings 10 and 9 can be improved by providing the sealing groove 19 and the sealing ring.
A filter screen 14 is horizontally arranged at the bottom end inside the funnel 8; by providing the strainer 14, dirt in the water can be filtered.
The driving mechanism comprises a fixed support 11 fixedly arranged at the top end in the funnel 8, a bearing 18 is fixedly arranged at the middle position of the fixed support 11, a fixed shaft 16 is vertically clamped in the bearing 18, a rotating shaft 13 is vertically connected to the bottom end of the fixed shaft 16, a plurality of rotating blades 17 are equidistantly connected to the outer side of the fixed shaft 16 along the circumferential direction, and the rotating blades 17 are obliquely arranged; through setting up fixed bolster 11 to can improve rotating vane 17's stability, because the in-process of drainage has the impact force, thereby can promote rotating vane 17 and rotate, rotating vane 17 can drive fixed axle 16 and pivot 13 simultaneously and rotate, thereby drives sponge brush 15 and cleans 8 inner walls of funnel.
The utility model discloses: at first use sealing mechanism to carry out zonulae occludens with drain pipe 2 and return bend 6, avoid appearing the edge leakage phenomenon at the in-process of drainage, rethread locking mechanism carries out zonulae occludens with return bend 6 and funnel 8, is convenient for discharge the water of 1 inside of tower body, avoids leading to the fact ponding subaerial, simultaneously through actuating mechanism and cleaning mechanism at the in-process of drainage, can clean 8 inner walls of funnel automatically, avoid the dirt of aquatic to adhere on funnel 8.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an ozone tower drainage device, includes tower body (1), its characterized in that, the bottom level intercommunication of tower body (1) has drain pipe (2), install control valve (3) on drain pipe (2), the pot head of drain pipe (2) is equipped with return bend (6), be connected through sealing mechanism between drain pipe (2) and return bend (6), the one end that drain pipe (2) were kept away from in return bend (6) is equipped with funnel (8), be connected through locking mechanism between funnel (8) and drain pipe (2), just funnel (8) inside is equipped with cleans the mechanism, clean the mechanism and include vertical pivot (13) that set up in funnel (8) inside, the outside symmetric connection of pivot (13) has two brush boards (12), sponge brush (15) are all installed to one side that brush board (12) are close to funnel (8) inner wall, the sponge brush (15) is in contact with the inner wall of the funnel (8), and the top end of the rotating shaft (13) is connected with a driving mechanism.
2. The ozone tower drain device according to claim 1, wherein the sealing mechanism comprises a plurality of clamping flaps (4) connected to the end of the elbow pipe (6) at equal intervals, the clamping flaps (4) are clamped outside the drain pipe (2) together, the outer sides of the clamping flaps (4) are arranged in an inclined manner, and a fixing ring (5) is sleeved outside the clamping flaps (4) together through threads.
3. The ozone tower drain device as claimed in claim 1, wherein the outside of the drain pipe (2) is sleeved with a rubber sealing sleeve, and the inner wall of the elbow (6) is tightly attached to the rubber sealing sleeve.
4. The ozone tower drainage device of claim 1, wherein the locking mechanism comprises an upper connecting ring (10) sleeved at one end of the elbow (6), the upper connecting ring (10) corresponds to a lower connecting ring (9) on the outer side of the top of the funnel (8) at the position corresponding to the upper connecting ring (10), a plurality of locking pieces (7) are connected between the upper connecting ring (10) and the lower connecting ring (9) at equal intervals, a sealing groove (19) is annularly formed in the top end of the lower connecting ring (9), a sealing ring is inserted into the sealing groove (19), and the sealing ring is connected to the bottom end of the upper connecting ring (10).
5. An ozone tower drain as claimed in claim 1, characterized in that the internal bottom end of the funnel (8) is horizontally fitted with a sieve (14).
6. The ozone tower drain device according to claim 1, wherein the driving mechanism comprises a fixed support (11) fixedly installed at the top end inside the funnel (8), a bearing (18) is fixedly installed at the middle position of the fixed support (11), a fixed shaft (16) is vertically clamped inside the bearing (18), the rotating shaft (13) is vertically connected to the bottom end of the fixed shaft (16), a plurality of rotating blades (17) are equidistantly connected to the outer side of the fixed shaft (16) along the circumferential direction, and the rotating blades (17) are obliquely arranged.
CN201920819687.XU 2019-06-03 2019-06-03 Ozone tower drainage device Expired - Fee Related CN210457605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920819687.XU CN210457605U (en) 2019-06-03 2019-06-03 Ozone tower drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920819687.XU CN210457605U (en) 2019-06-03 2019-06-03 Ozone tower drainage device

Publications (1)

Publication Number Publication Date
CN210457605U true CN210457605U (en) 2020-05-05

Family

ID=70439338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920819687.XU Expired - Fee Related CN210457605U (en) 2019-06-03 2019-06-03 Ozone tower drainage device

Country Status (1)

Country Link
CN (1) CN210457605U (en)

Similar Documents

Publication Publication Date Title
CN201258519Y (en) Filter for secondary utilization of washbowl launching water
CN201603494U (en) Water-bath dust collection device
CN208701866U (en) A kind of anti-blockage type floor drain
CN210457605U (en) Ozone tower drainage device
CN106039824A (en) Two-stage filtration type water treatment system
CN206680324U (en) A kind of irrigating apparatus with filtering sterilization
CN205530609U (en) Totally enclosed floor drain
CN209040256U (en) A kind of multichannel draining manifold for interlayer and drop layer
CN209243881U (en) A kind of odor-proof floor drain
CN208718056U (en) A kind of no-spill floor drain in bathroom
CN206570057U (en) A kind of municipal water use face oil slick foam removing machine
CN205361135U (en) Can there be abluent mixer in dead angle
CN201632170U (en) Flange conical screen pipe bundle immersion high-efficiency wet-type dust collector
CN205435382U (en) Absorption tower of waste gas in mud
CN210964481U (en) Automatic wash drum-type dust remover
CN117502363B (en) Water pump convenient to filter impurity
CN208626888U (en) For the medicine dirt recyclable device in production process
CN211735627U (en) Detachable direct-discharging deodorant sewer pipe
CN207812633U (en) The horizontally-arranged floor drain of washing machine
CN212138914U (en) Nipple type water dispenser
CN108867826A (en) A kind of no-spill floor drain in bathroom
CN210752049U (en) Avoid spray column of jam
CN220328134U (en) Transverse pre-filter
CN219429744U (en) Spray tower for preventing filling material from being blocked in wastewater treatment
CN210699106U (en) City water circulating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200505

CF01 Termination of patent right due to non-payment of annual fee