CN210440673U - New energy automobile pipeline support - Google Patents

New energy automobile pipeline support Download PDF

Info

Publication number
CN210440673U
CN210440673U CN201921088468.5U CN201921088468U CN210440673U CN 210440673 U CN210440673 U CN 210440673U CN 201921088468 U CN201921088468 U CN 201921088468U CN 210440673 U CN210440673 U CN 210440673U
Authority
CN
China
Prior art keywords
groove
new energy
energy automobile
bracing piece
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921088468.5U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penglai Sanhe Casting Co Ltd
Original Assignee
Penglai Sanhe Casting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penglai Sanhe Casting Co Ltd filed Critical Penglai Sanhe Casting Co Ltd
Priority to CN201921088468.5U priority Critical patent/CN210440673U/en
Application granted granted Critical
Publication of CN210440673U publication Critical patent/CN210440673U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)

Abstract

The utility model discloses a new energy automobile pipeline bracket, which comprises a support rod, a vacuum chuck and a limiting mechanism, wherein the vacuum chuck is arranged under the support rod, the two limiting mechanisms are arranged above the support rod and are respectively arranged above two end parts of the support rod, the support rod is arranged in a rectangular plate shape, a first bearing is embedded and installed at the central position of the lower end surface of the support rod, the first bearing is rotationally connected with a first rotating shaft, one end of the first rotating shaft, which is far away from the support rod, is fixedly connected with the vacuum chuck, and the upper end surface of the support rod is vertically and fixedly connected with two second rotating shafts, the new energy automobile pipeline bracket has the characteristics of flexible and convenient use, the new energy automobile pipeline bracket adopts the vacuum chuck to be fixed with a new energy automobile body without bolts at bolt holes, is flexible to use and is simultaneously provided with a limiting mechanism with 360, the pipeline that can the adaptation new energy automobile body is different supports needs.

Description

New energy automobile pipeline support
Technical Field
The utility model relates to a pipeline bracket, in particular to new energy automobile pipeline bracket belongs to new energy automobile auxiliary fittings technical field.
Background
The new energy automobile engine hood contains numerous pipelines, and some of them pipeline are required not to contact each other when the installation, and the circuit is not twined, for this needs design a pipeline support.
Traditional pipeline support passes through bolt and new energy automobile body thread tightening, and is inconvenient during the use, can only fixed mounting in the screw hole department of specific setting, and especially important, traditional pipeline support can not effectually carry out the multi-angle and turn to, can not turn to in a flexible way according to new energy automobile inner space, and is nimble not used, need design a new energy automobile pipeline support to this.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a new energy automobile pipeline support to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a new energy automobile pipeline support, includes bracing piece, vacuum chuck and stop gear, be provided with a vacuum chuck under the bracing piece, the bracing piece top is provided with two stop gear, two stop gear sets up directly over the bracing piece both ends respectively.
Preferably, the bracing piece is rectangular platelike setting, terminal surface central point puts the embedding under the bracing piece and installs first bearing, the first bearing internal rotation is connected with first pivot, bracing piece one end and vacuum chuck fixed connection are kept away from to first pivot, two second pivots of the perpendicular fixedly connected with of bracing piece up end, two the unanimous and mutual division spool symmetric distribution about the longitudinal center of bracing piece up end of second pivot specification.
Preferably, two stop gear all includes limit bottom plate, two limit bottom plate specification is unanimous and the lower terminal surface central point puts all the embedding and installs the second bearing, two limit bottom plate all rotates the installation through second bearing and second pivot and bracing piece.
Preferably, two four U types have all been seted up to the limiting bottom plate up end and have been deposited the chase, and is same four U types that set up on the limiting bottom plate deposit the setting of impartial distance between the chase, the U type is deposited the length of chase and all is unanimous with limiting bottom plate length, two the threaded groove has all been seted up to limiting bottom plate up end central point and put, two the limiting bottom plate up end two relative edges have all been seted up the spacing groove.
Preferably, two all be provided with spacing roof, two directly over the spacing roof the rotation groove has all been seted up to spacing roof inside, two it all rotates to rotate the groove and is connected with the rotation piece, two it rotates groove looks adaptation design, two with two to rotate the rotation piece spacing roof up end central point puts and all is provided with the rotation head, two the lower terminal surface of rotation head all with the upper end plush copper fixed connection who rotates, two terminal surface central point puts all perpendicularly and is provided with the screw thread axle under the spacing roof, two the screw thread axle is close to the equal lower extreme plush copper fixed connection who rotates of spacing roof one end, two the equal perpendicular fixed connection of terminal surface has two spacing picture pegs under the spacing roof.
Preferably, two the screw thread axle respectively with two thread groove looks adaptations and the corresponding setting in position, four spacing picture peg respectively with four spacing groove looks adaptations and the corresponding setting in position, the groove depth that highly is greater than the spacing groove of spacing picture peg.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a new energy automobile pipeline support has the characteristics of using nimble convenience, in concrete use, and compared with traditional new energy automobile pipeline support, this new energy automobile pipeline support adopts vacuum chuck and new energy automobile body fixed, need not the bolt fastening in bolt hole department, uses in a flexible way, is provided with the stop gear that 360 degrees turned to simultaneously, can the different pipeline support needs of adaptation new energy automobile body.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is the schematic view of the mounting structure of the limiting mechanism of the present invention.
In the figure: 1. a support bar; 2. a vacuum chuck; 3. a limiting mechanism; 11. a first bearing; 12. a first rotating shaft; 13. a second bearing; 31. a limiting bottom plate; 32. a second bearing; 33. a U-shaped pipe storage groove; 34. a thread groove; 35. a limiting groove; 36. a limiting top plate; 37. a rotating groove; 38. rotating the head; 39. a rotating member; 310. a threaded shaft; 311. and a limiting inserting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a new energy automobile pipeline support, includes bracing piece 1, vacuum chuck 2 and stop gear 3, be provided with a vacuum chuck 2 under the bracing piece 1, 1 tops of bracing piece are provided with two stop gear 3, two stop gear 3 sets up directly over 1 both ends of bracing piece respectively.
Wherein, bracing piece 1 is rectangular platelike setting, the terminal surface central point puts the embedding and installs first bearing 11 under bracing piece 1, first bearing 11 internal rotation is connected with first pivot 12, 1 one end of bracing piece and 2 fixed connection of vacuum chuck are kept away from to first pivot 12, two perpendicular fixedly connected with of 1 up end of bracing piece second pivot 13, two the unanimous and mutual spool symmetric distribution of cutting apart about the vertical center of 1 up end of bracing piece of second pivot 13 specification.
The two limiting mechanisms 3 respectively comprise a limiting bottom plate 31, two limiting bottom plates 31 are consistent in specification, lower end faces of the limiting bottom plates are respectively embedded with a second bearing 32, and the limiting bottom plates 31 are respectively rotatably installed with the supporting rod 1 through the second bearings 32 and the second rotating shafts 13.
Wherein, two the tube seat 33 is deposited to four U types all seted up to limiting bottom plate 31 up end, it is same four U types that set up on limiting bottom plate 31 deposit the impartial distance setting between the tube seat 33, the length that the tube seat 33 was deposited to the U type all is unanimous with limiting bottom plate 31 length, two thread groove 34, two have all been seted up to limiting bottom plate 31 up end central point puts limiting bottom plate 31 up end two relative edges has all seted up limiting bottom plate 35.
Wherein, two all be provided with spacing roof 36 directly over spacing bottom plate 31, two rotation groove 37, two have all been seted up to spacing roof 36 inside rotation groove 37, two rotate groove 37 and all rotate and be connected with rotation piece 39, two rotate piece 39 and two and rotate 37 looks adaptation designs in groove, two 36 up end central point of spacing roof puts and all is provided with rotation head 38, two the lower terminal surface of rotation head 38 all with the upper end plush fixed connection who rotates piece 39, two 36 terminal surface central point puts down and all is provided with screw spindle 310 perpendicularly, two screw spindle 310 is close to 36 one end of spacing roof all with the lower extreme plush fixed connection who rotates piece 39, two 36 lower terminal surface is two spacing picture peg 311 of equal perpendicular fixed connection of terminal surface down.
The threaded shafts 310 are respectively matched with the two threaded grooves 34 and are correspondingly arranged in position, the limiting insertion plates 311 are respectively matched with the four limiting grooves 35 and are correspondingly arranged in position, and the height of each limiting insertion plate 311 is larger than the depth of each limiting groove 35.
Specifically, when the utility model is used, firstly, the bracket is fixedly absorbed in the new energy automobile body through the vacuum chuck 2, then two limiting mechanisms 3 are adjusted according to the actual pipeline trend, the trend of the U-shaped pipe storage grooves 33 of the two limiting mechanisms 3 is consistent with the trend of the pipeline, the pipeline is placed in the corresponding U-shaped pipe storage groove 33, meanwhile, two limiting insertion plates 311 are inserted into the corresponding limiting grooves 35, at the moment, the threaded shaft 310 is inserted into the threaded groove 34, then the rotating head 38 is rotated, the threaded shaft 310 is also driven to rotate, the rotating part 39 rotates in the rotating groove 37 in an auxiliary way, the limiting insertion plates 311 are continuously inserted into the limiting grooves 35, further, the relative distance between the limiting top plate 36 and the limiting bottom plate 31 is reduced, the moving space of the automobile body pipeline in the U-shaped pipe storage groove 33 is reduced, the automobile body pipeline has certain trend positioning capability due to the short installation distance, that is, large-amplitude offset is not easy to occur, and after the pipe is placed in the U-shaped pipe storage groove 33, the limiting mechanism 3 is not driven to rotate by a large angle.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a new energy automobile pipeline support, its characterized in that includes bracing piece (1), vacuum chuck (2) and stop gear (3), be provided with one vacuum chuck (2) under bracing piece (1), bracing piece (1) top is provided with two stop gear (3), two stop gear (3) set up directly over bracing piece (1) both ends respectively.
2. The new energy automobile pipeline bracket according to claim 1, characterized in that: bracing piece (1) is rectangular platelike setting, terminal surface central point puts the embedding and installs first bearing (11) under bracing piece (1), first bearing (11) internal rotation is connected with first pivot (12), bracing piece (1) one end and vacuum chuck (2) fixed connection are kept away from in first pivot (12), two second pivot (13), two to bracing piece (1) up end perpendicular fixed connection two second pivot (13) of specification unanimity and between each other cut apart spool symmetric distribution about the vertical center of bracing piece (1) up end.
3. The new energy automobile pipeline bracket according to claim 1, characterized in that: two stop gear (3) all include limit bottom plate (31), two limit bottom plate (31) specification is unanimous and lower terminal surface central point puts and all imbeds and installs second bearing (32), two limit bottom plate (31) all rotate the installation through second bearing (32) and second pivot (13) and bracing piece (1).
4. The new energy automobile pipeline bracket according to claim 3, characterized in that: two four U types have all been seted up to limit bottom plate (31) up end and have been deposited tub groove (33), it is same four U types that set up on limit bottom plate (31) are deposited the setting of impartial distance between tub groove (33), the length that tub groove (33) were deposited to the U type all is unanimous with limit bottom plate (31) length, two thread groove (34), two have all been seted up to limit bottom plate (31) up end central point position limit bottom plate (31) up end two relative edges has all seted up spacing groove (35).
5. The new energy automobile pipeline bracket according to claim 4, characterized in that: two all be provided with spacing roof (36), two directly over spacing bottom plate (31) rotation groove (37), two have all been seted up to spacing roof (36) inside rotation groove (37), two rotation groove (37) all rotates and is connected with rotation piece (39), two rotation piece (39) and two rotation groove (37) looks adaptation designs, two spacing roof (36) up end central point puts and all is provided with rotation head (38), two the lower terminal surface of rotation head (38) all with the upper end plush copper fixed connection who rotates piece (39), two terminal surface central point puts all perpendicularly and is provided with screw spindle (310), two under spacing roof (36) end plush copper fixed connection, two the equal perpendicular fixedly connected with of terminal surface two spacing picture pegs (311) under spacing roof (36).
6. The new energy automobile pipeline bracket according to claim 5, characterized in that: two threaded shaft (310) respectively with two thread groove (34) looks adaptation and the corresponding setting in position, four spacing picture peg (311) respectively with four spacing groove (35) looks adaptation and the corresponding setting in position, the groove depth that highly is greater than spacing groove (35) of spacing picture peg (311).
CN201921088468.5U 2019-07-12 2019-07-12 New energy automobile pipeline support Active CN210440673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921088468.5U CN210440673U (en) 2019-07-12 2019-07-12 New energy automobile pipeline support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921088468.5U CN210440673U (en) 2019-07-12 2019-07-12 New energy automobile pipeline support

Publications (1)

Publication Number Publication Date
CN210440673U true CN210440673U (en) 2020-05-01

Family

ID=70405795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921088468.5U Active CN210440673U (en) 2019-07-12 2019-07-12 New energy automobile pipeline support

Country Status (1)

Country Link
CN (1) CN210440673U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116174660A (en) * 2023-04-25 2023-05-30 蓬莱三和铸造有限公司 High-precision casting device for balance shaft of mine car

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116174660A (en) * 2023-04-25 2023-05-30 蓬莱三和铸造有限公司 High-precision casting device for balance shaft of mine car

Similar Documents

Publication Publication Date Title
CN210440673U (en) New energy automobile pipeline support
CN210343025U (en) Wind-proof door ground sucker
CN201783777U (en) Round cutting device for processing circular holes on tubular surface
CN217046073U (en) Capacitor clamping tool
CN214219641U (en) Concrete pipe pile extension device
CN213900360U (en) Gear pump convenient to installation is fixed
CN110388536B (en) Outdoor weather-resistant anti-corrosion pipeline
CN220122006U (en) Energy storage battery support structure
CN217875183U (en) Vehicle-mounted computer mounting bracket
CN218716818U (en) Tunnel segment reinforcing member
CN215585475U (en) Multidirectional feeding device of evaporating pot
CN217355863U (en) Auxiliary erection structure for mounting pipeline for gas engineering
CN213151973U (en) Automatic photovoltaic support
CN219513707U (en) Cable mounting bracket for power construction
CN210344018U (en) Angle adjusting and linking device for anti-seismic support
CN216201135U (en) Water pipe reinforcing and connecting structure
CN210431308U (en) Novel solar cell panel support
CN218598996U (en) Temporary supporting device for water supply and drainage pipe
CN218277379U (en) Multifunctional support for mounting electrical element
CN216126768U (en) Pipeline welding clamp
CN210265539U (en) Bearing seat capable of being positioned at multiple angles
CN218268054U (en) Monitoring device is used in wisdom garden to multi-angle observation
CN221304950U (en) Annotate liquid structure
CN219914130U (en) Surface evaporation type air cooler heat exchange tube supporting structure
CN221282775U (en) Slidable cable support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A New Energy Vehicle Pipeline Support

Effective date of registration: 20230425

Granted publication date: 20200501

Pledgee: Penglai Minsheng Rural Bank Co.,Ltd.

Pledgor: Penglai Sanhe Casting Co.,Ltd.

Registration number: Y2023980038983