CN210432526U - Fixing device for support leg of greening support rod - Google Patents

Fixing device for support leg of greening support rod Download PDF

Info

Publication number
CN210432526U
CN210432526U CN201921070091.0U CN201921070091U CN210432526U CN 210432526 U CN210432526 U CN 210432526U CN 201921070091 U CN201921070091 U CN 201921070091U CN 210432526 U CN210432526 U CN 210432526U
Authority
CN
China
Prior art keywords
bottom plate
fixing device
screw rod
steel nail
greening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921070091.0U
Other languages
Chinese (zh)
Inventor
冯子文
梅博知
康许峰
张明明
姚亚晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengshi Ecology Environment Co ltd
Original Assignee
Shengshi Ecology Environment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengshi Ecology Environment Co ltd filed Critical Shengshi Ecology Environment Co ltd
Priority to CN201921070091.0U priority Critical patent/CN210432526U/en
Application granted granted Critical
Publication of CN210432526U publication Critical patent/CN210432526U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a fixing device for a support leg of a greening support rod, which comprises a bottom plate, wherein the bottom plate is overlooked into a square, four corners of the bottom plate are provided with steel nail holes, reinforcing platforms are arranged around the steel nail holes, fixing nails are inserted into the steel nail holes and are driven into the ground, the bottom plate is fixed on the ground, two vertical plates are arranged at two sides in the middle of the bottom plate, a sleeve is arranged in the middle of each vertical plate, the lower part of the sleeve is a rotating part, a screw rod is penetrated in the middle of the rotating part and always penetrates through the vertical plates at two sides; the rotating piece and the sleeve can rotate around the middle screw rod, the rotating piece and the sleeve can only rotate along the direction limited by the two vertical plates, and compared with the existing strut brace fixing method, the strut brace fixing device does not need to be assembled, the strut angle can be adjusted randomly in a plane, the strut brace fixing device is made of alloy materials, is not rusty and corrosion-resistant, can be repeatedly used, and is simple to install, convenient to use, uniform in size, neat and attractive.

Description

Fixing device for support leg of greening support rod
Technical Field
The utility model belongs to the garden instrument field, concretely relates to afforestation vaulting pole spike fixing device.
Background
At present, along with the rapid development of the economy of China, the productivity is continuously improved, the requirements of people on living environment are higher and higher, the interior of each cell needs to be greened, two sides of a road need to be greened, a forest park is additionally arranged in a city, river-side green belts are arranged on two sides of a river channel, villages need to have farmhouse happiness, all landscape greening can not be separated from trees, the greening trees can give people a sense of hierarchy and a third dimension, the three-dimensional experience of a garden can be greatly increased, the trees are tall and need to be supported during planting, the support rod is fixed to be an important ring, whether the support rod can firmly fix the trees or not, whether the binding of the support rod and the trees is firm or not is mainly seen, whether the support rod feet of the support rod are fixed or not is firmly determined, continuous expansion and research on a binding method and a fixing method are needed, and the existing support rod foot fixing method mainly comprises the following steps: sharpening fir wood, fir wood piling and the like.
Disclosure of Invention
The utility model aims at providing a afforestation vaulting pole spike fixing device, when arbor or trees are under construction, can be fast, convenient, simple form firm fixed to vaulting pole and trees, and the vaulting pole spike is fixed firm, and fixed angle can be adjusted at will, and the intensive place of trees can also a plurality of vaulting poles sharing spike (establish two sleeves on a fixing device can).
In order to realize the above function, the utility model adopts the following technical scheme:
the utility model provides a afforestation vaulting pole spike fixing device, includes bottom plate 1, and 1 four corners position of bottom plate is provided with steel nail hole 3, and steel nail hole 3 is equipped with reinforcing platform 2 along the circumferencial direction, has inserted staple 9 in the steel nail hole 3, and ground is squeezed into to the lower part of staple 9, bottom plate 1 is fixed subaerial through staple 9, and 1 last fixed surface of bottom plate has two relative risers 4, is provided with between two risers and rotates piece 8, and rotates piece 8 and rotate 4 rotations of riser and be connected, the bottom that rotates piece 8 is hemispherical, and the top that rotates piece 8 is the column, and the top that rotates the piece is connected with sleeve 7.
Further, a screw rod 5 penetrates through the middle of the rotating part 8, the screw rod 5 is rotatably connected with the rotating part 8, the screw rod 5 is perpendicular to the vertical plates 4, and two ends of the screw rod 5 are respectively fixedly connected with the two vertical plates 4.
Further, the bottom plate 1 is square in plan view.
Further, the bottom plate 1 is made of an aluminum alloy material.
Compared with the prior art, the utility model discloses following beneficial effect has:
compared with the prior method for fixing the stay bar and the stay bar, the fixing device for the greening stay bar and the stay bar of the utility model adopts modular production, one or more trees adopt one fixing module, and the combined installation is not needed;
2 compared with the prior method for fixing the brace rod and the brace rod, the fixing device for the greening brace rod and the brace rod of the utility model can randomly adjust the angle of the brace rod in a plane;
compared with the prior method for fixing the brace rod and the brace rod, the fixing device for the greening brace rod and the brace rod of the utility model is made of alloy materials, is not rusty and corrosion resistant, and can be repeatedly used;
4 the fixing device for the greening support rod and the support foot of the utility model has simple installation, convenient use, consistent size, tidiness and beauty;
description of the drawings:
fig. 1 is a schematic plan view of the greening brace rod brace fixing device of the present invention;
fig. 2 is a drawing of the greening brace rod brace fixing device a of the utility model.
In the figure, 1, a bottom plate, 2 reinforcing platforms, 3, steel nail holes, 4, vertical plates, 5, a screw rod, 6, a nut, 7, a sleeve, 8, a rotating piece and 9, a fixing nail.
The specific implementation mode is as follows:
the technical solution of the present invention will be clearly and completely described below with reference to the examples.
As shown in fig. 1-2, a afforestation vaulting pole spike fixing device, including bottom plate 1, 1 four corners position of bottom plate is provided with steel nail hole 3, and steel nail hole 3 is equipped with reinforcing platform 2 along the circumferencial direction, has inserted staple 9 in the steel nail hole 3, and ground is squeezed into to the lower part of staple 9, bottom plate 1 is fixed subaerial through staple 9, and 1 last fixed surface of bottom plate has two relative risers 4, is provided with between two risers and rotates piece 8, and rotates piece 8 and rotate riser 4 and be connected, the bottom of rotating piece 8 is hemispherical, rotates 8 tops and is the column, and the top of rotating the piece is connected with sleeve 7. The middle of the rotating part 8 is penetrated with a screw rod 5, the screw rod 5 and the rotating part 8 are in rotating connection, the screw rod 5 is perpendicular to the vertical plates 4, and two ends of the screw rod 5 are respectively in fastening connection with the two vertical plates 4. The bottom plate 1 is square in plan view. The bottom plate 1 is made of an aluminum alloy material.
Taking the tree diameter of 20cm as an example of the stay bar part, the bottom plate is 120 multiplied by 20cm, the inner diameter of a steel nail hole 3 is 3.8cm, and the inner diameter of a sleeve 7 is 10cm, when the fixing device is used, the stay bar and the fixing device are selected according to the tree diameter, the nut 6 is loosened, the fixing position of the stay bar is determined, the fixing position is tamped, the fixing device is laid flat, the fixing nail 8 is inserted into the steel nail hole 3, the fixing nail 9 is driven into the ground by a hammer, the bottom plate 1 is fixed firmly, then the stay bar is inserted into the sleeve 7, and the top end of the stay bar is fixed, so that the fixing of.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (4)

1. The utility model provides a afforestation vaulting pole spike fixing device which characterized in that: including bottom plate (1), bottom plate (1) four corners position is provided with steel nail hole (3), and steel nail hole (3) are equipped with reinforcing platform (2) along the circumferencial direction, have inserted staple (9) in steel nail hole (3), and ground is squeezed into to the lower part of staple (9), bottom plate (1) is fixed subaerial through staple (9), and bottom plate (1) upper surface is fixed with two relative risers (4), is provided with between two risers and rotates piece (8), and rotates piece (8) and rotate with riser (4) and be connected, the bottom that rotates piece (8) is hemispherical, rotates piece (8) top and is the column, and the top that rotates the piece is connected with sleeve (7).
2. A greening brace fixing device as claimed in claim 1, characterized in that: the middle of the rotating piece (8) penetrates into the screw rod (5), the screw rod (5) and the rotating piece (8) are connected in a rotating mode, the screw rod (5) is perpendicular to the vertical plates (4), and two ends of the screw rod (5) are fixedly connected with the two vertical plates (4) respectively.
3. A greening brace fixing device as claimed in claim 1, characterized in that: the bottom plate (1) is square in plan view.
4. A greening brace fixing device as claimed in claim 1, characterized in that: the bottom plate (1) is made of an aluminum alloy material.
CN201921070091.0U 2019-07-10 2019-07-10 Fixing device for support leg of greening support rod Active CN210432526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921070091.0U CN210432526U (en) 2019-07-10 2019-07-10 Fixing device for support leg of greening support rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921070091.0U CN210432526U (en) 2019-07-10 2019-07-10 Fixing device for support leg of greening support rod

Publications (1)

Publication Number Publication Date
CN210432526U true CN210432526U (en) 2020-05-01

Family

ID=70405430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921070091.0U Active CN210432526U (en) 2019-07-10 2019-07-10 Fixing device for support leg of greening support rod

Country Status (1)

Country Link
CN (1) CN210432526U (en)

Similar Documents

Publication Publication Date Title
CN202100027U (en) Novel pavilion with steel structure outer-wrapped by wood plastic composite
CN205912600U (en) Novel ornamental trees and shrubs covers that press from both sides support more device
CN210432526U (en) Fixing device for support leg of greening support rod
CN2860066Y (en) Frame for fixing plants
CN100459845C (en) Invisible garden tree fixing method
CN204317181U (en) Garden landscape trees wind-resistant fixing bracket
CN217064850U (en) Tree transplanting device for garden construction
CN214339066U (en) Novel but afforestation telescopic nursery stock pillar is fixed device
CN215122678U (en) Tree fixing system of aerial ecological courtyard
CN205116427U (en) Mounting structure of pavilion pillar in gardens
CN209710926U (en) A kind of Kiwifruit Culture frame
CN211510040U (en) Novel afforestation plant fixed knot constructs
CN207686323U (en) Diamond shape installation part and diamond shape mounting operation platform
CN205611426U (en) Seedling shovel is played in simple and easy practical gardens
CN106760897B (en) A kind of cement or steel pipe electric pole means for correcting
CN204888220U (en) Ornamental trees and shrubs protective cradle installs base
CN206237968U (en) It is fixed on the trees fixing protector on external wall
CN216018172U (en) Afforestation tree planting auxiliary device
CN219298953U (en) Adjustable guardrail for building construction gardens
CN202773539U (en) Shed frame rod structure for planting
CN212589295U (en) Trees supporting device for garden construction
CN211210786U (en) Tree supporting device
CN220587046U (en) Ornamental trees and shrubs protection support
CN220776767U (en) Auxiliary support assembly for ornamental trees and shrubs
CN217064823U (en) Forestry afforestation ground seedling protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant