CN210395069U - Novel park access bridge - Google Patents

Novel park access bridge Download PDF

Info

Publication number
CN210395069U
CN210395069U CN201921202855.7U CN201921202855U CN210395069U CN 210395069 U CN210395069 U CN 210395069U CN 201921202855 U CN201921202855 U CN 201921202855U CN 210395069 U CN210395069 U CN 210395069U
Authority
CN
China
Prior art keywords
bridge
concrete pipe
novel park
floor
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921202855.7U
Other languages
Chinese (zh)
Inventor
王萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huaisheng Urban Construction And Development Co Ltd
Original Assignee
Beijing Huaisheng Urban Construction And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huaisheng Urban Construction And Development Co Ltd filed Critical Beijing Huaisheng Urban Construction And Development Co Ltd
Priority to CN201921202855.7U priority Critical patent/CN210395069U/en
Application granted granted Critical
Publication of CN210395069U publication Critical patent/CN210395069U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a novel park access bridge, which comprises a bridge floor, a bridge bottom and concrete pipes; the bridge bottom is a platform positioned at the water bottom; the concrete pipe is arranged on the bridge bottom, and the length direction of the concrete pipe is parallel to the water flow direction; the middle section of the bridge floor is erected on the concrete pipe, and two ends of the bridge floor are erected on two banks. The utility model has the characteristics of bearing performance is better.

Description

Novel park access bridge
Technical Field
The utility model relates to a bridge, in particular to novel park passageway bridge.
Background
A bridge is originally built for traffic and is a building that is erected on the water surface or in the air so as to allow pedestrians, vehicles, and the like to pass through. The main purpose of bridge construction is to solve the problem of cross-water or cross-valley traffic, so that vehicles or pedestrians can pass through the bridge without obstruction, which is the basic function of the bridge.
The garden landscaping often cannot be driven by water, and the garden bridge is started only when water is available. The bridge in the garden is a landscape bridge and is an important component of landscape. The bridge has various types, various postures and long history, and the bridge in garden design is one of important constructions in gardens with beautiful shape and rich style until today. With the development of building technology and design theory, the form, material, body type, style and other aspects of the bridge are constantly changing and abundant.
In the existing garden landscape, especially the traffic bridge in the park, the bridge deck is generally made of wood materials by considering the manufacturing cost and the matching with the surrounding landscape, two ends of the bridge deck are supported by bridge columns, but when the length of the bridge is slightly longer, the middle part of the bridge deck has poor bearing performance and is easy to generate concave deformation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel park is passed through bridge, it has the better characteristics of bearing capacity.
The above object of the present invention can be achieved by the following technical solutions: a novel park traffic bridge comprises a bridge floor and a supporting part, wherein the bridge floor is arranged on the supporting part, and the supporting part comprises a bridge bottom and a concrete pipe; the bridge bottom is a platform positioned at the water bottom; the concrete pipe is arranged on the bridge bottom, and the length direction of the concrete pipe is parallel to the water flow direction; the middle section of the bridge floor is erected on the concrete pipe, and two ends of the bridge floor are erected on two banks.
By adopting the technical scheme, the bridge floor can be used for pedestrians to pass through, and the concrete pipes under the bridge floor can also contain water flow to pass through; the concrete pipe is used as a support part of the middle section of the bridge floor, and the concrete pipe is of a tubular structure and has better support performance, so that the passing bridge is not easy to deform and has better bearing performance; and the concrete pipe is common building materials and has low price, so that the park traffic bridge is simply and quickly built.
The utility model discloses further set up to: the supporting part also comprises a supporting strip; the support bar sets up on the lateral wall top of concrete pipe, and the bridge floor is set up on the support bar.
Through adopting above-mentioned technical scheme, the support bar setting replaces bridge floor and concrete pipe contact between concrete pipe and bridge floor, has increased the area of contact of bridge floor and supporting part, has strengthened the stability of bridge floor.
The utility model discloses further set up to: the supporting part also comprises a low wall; the low wall has two sides which are respectively arranged below the two ends of the bridge deck; two ends of the bridge deck are erected on the short wall.
Through adopting above-mentioned technical scheme, short wall sets up in bridge floor both ends below, plays better supporting role to the bridge floor both ends, and short wall is difficult for losing because of river erodees, also is not perishable to make the bridge floor both ends more stable.
The utility model discloses further set up to: the upper surface of the bridge bottom is provided with a pipe placing groove along the length direction of the concrete pipe, and the concrete pipe is arranged on the pipe placing groove.
Through adopting above-mentioned technical scheme, put the setting of tub groove and make the concrete pipe more stable.
The utility model discloses further set up to: the bridge deck comprises transverse strips and connecting beams; the crossbands are arranged at intervals, and the connecting beam is fixedly connected with all the crossbands.
Through adopting above-mentioned technical scheme, there is the clearance between the horizontal bar, avoids the bridge floor ponding, has also avoided the bridge floor to have the problem of easy fracture when setting up to the integer.
The utility model discloses further set up to: the bridge deck also comprises a frame; the frame is of an annular structure, is sleeved on the outer sides of the transverse strips and the connecting beams, and is fixedly connected with the end parts of all the transverse strips and the connecting beams.
Through adopting above-mentioned technical scheme, the frame makes the bridge floor structure more stable with the tip fixed connection of all crossbands and connecting beam, and the tip is not fragile.
The utility model discloses further set up to: a guardrail is arranged on the bridge floor; the guardrail comprises a guardrail column and a guardrail rope; the fence columns are arranged in two rows and are respectively arranged on two sides of the bridge floor; two fence ropes are respectively connected with the two fence columns in series.
Through adopting above-mentioned technical scheme, set up the guardrail, make people can be blocked when being close to the bridge limit in dark or not paying attention to the underfoot condition to reach the effect of protection pedestrian.
The utility model discloses further set up to: the upper part of the fence post is provided with a through hole; the two fence ropes respectively and sequentially pass through the through holes of the two fence columns.
Through adopting above-mentioned technical scheme, the fence rope passes the through-hole and connects on the fence post, makes the fence rope be difficult for droing on the fence post.
The utility model discloses further set up to: each column is arranged at equal intervals.
Through adopting above-mentioned technical scheme, every column fence post equidistant setting makes the fence post interval even, can not the overlength.
To sum up, the utility model discloses following beneficial effect has:
1. the bridge floor can be used for pedestrians to pass through, and the concrete pipes under the bridge can also be used for water flow to pass through; the concrete pipe is used as a support part of the middle section of the bridge floor, and the concrete pipe is of a tubular structure and has better support performance, so that the passing bridge is not easy to deform and has better bearing performance; and the concrete pipe is common building materials and has low price, so that the park traffic bridge is simply and quickly built.
2. The supporting bars are arranged, so that the contact area between the bridge deck and the supporting part is increased, and the bridge deck is more stable; the short walls are arranged, so that the short walls are not easy to lose due to river water scouring and are not easy to corrode, and the two ends of the bridge deck are more stable; the arrangement of the pipe placing groove enables the concrete pipe to be more stably arranged on the bridge bottom.
Drawings
FIG. 1 is a schematic structural view of a novel park passage bridge;
figure 2 is a schematic view of a structure for showing the bottom of a bridge deck.
In the figure, 1, bridge bottom; 10. a pipe placing groove; 2. a concrete pipe; 3. a supporting strip; 4. a low wall; 5. a bridge deck; 50. a horizontal bar; 51. a connecting beam; 52. a frame; 6. a guardrail; 60. a railing post; 600. a through hole; 61. and (4) rope fencing.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Examples
Referring to fig. 1, a novel park road bridge comprises a bridge bottom 1, concrete pipes 2, support bars 3, a short wall 4 and a bridge floor 5; wherein the bridge bottom 1, the concrete pipe 2, the support bar 3 and the short wall 4 form a support part, and the bridge floor 5 is arranged on the support part; the bridge bottom 1 is positioned at the water bottom and is a concrete pouring platform, two ends of the bridge bottom are abutted against two banks of a river, and the upper surface of the bridge bottom is higher than the river bottom at the upper and lower reaches of the bridge bottom; the upper surface of the bridge bottom 1 is provided with a row of parallel pipe placing grooves 10 along the water flow direction; a plurality of concrete pipes 2 are respectively arranged on the pipe placing grooves 10, the length direction of the concrete pipes 2 is parallel to the length direction of the pipe placing grooves 10, and the bottoms of the concrete pipes are matched with the pipe placing grooves 10; the support bars 3 are made of barred rocks and are arranged on the tops of the outer side walls of the concrete pipes 2 respectively, and the length directions of the support bars 3 are parallel to the length direction of the pipe placing groove 10; the short wall 4 is provided with two surfaces which are respectively arranged above two ends of the bridge bottom 1, the lower part of the short wall 4 is connected with the bridge bottom 1, and the height of the upper surface of the short wall is the same as that of the upper surfaces of the supporting bars 3.
Referring to fig. 1, a bridge deck 5 is spanned on a low wall 4 and support bars 3; referring to fig. 2, the deck 5 includes crossbars 50, connecting beams 51 and frames 52; the crossbars 50 and the connecting beams 51 form the body of the deck 5; the crossbars 50 are arranged in parallel, and the connecting beams 51 are arranged in parallel, are perpendicular to the crossbars 50 and are fixedly connected with all the crossbars 50; the frame 52 is of an annular structure, is sleeved on the outer side of the main body of the bridge deck 5, and is fixedly connected with the end parts of all the cross bars 50 and the connecting beams 51.
When the park through bridge is constructed, firstly, a bridge bottom 1 and a short wall 4 are poured, and then a concrete pipe 2, a support bar 3 and a bridge floor 5 are sequentially built; when the bridge deck is used, the concrete pipes 2 and the support bars 3 have a good supporting effect on the middle section of the bridge deck 5, so that the bridge deck 5 is not easy to deform and has good bearing.
The cross section of the concrete pipe 2 is circular, the supporting performance is good due to the structural characteristics, and meanwhile, the water part of the concrete pipe is reflected to the inverted image on the water surface, so that the aesthetic feeling is shown, and the characteristics of practicability and artistry of the garden bridge are embodied; meanwhile, water flow can flow in the concrete pipe 2, so that the obstruction of the river water flow by the passing bridge is reduced; the concrete pipe 2 and the strip stone are common building materials and have low price, so that the park traffic bridge is simple, convenient and quick to construct and has low manufacturing cost.
The bridge deck 5 consists of the cross bars 50, the connecting beams 51 and the frames 52, so that the problem that the bridge deck 5 is easy to break when the bridge deck 5 is integrally arranged is solved; and gaps exist among the transverse strips 50, so that water accumulation on the bridge deck 5 is prevented.
Above-mentioned park passageway bridge is in the use, and people especially child is when passing through, and light is not good or sometimes do not pay attention to the underfoot condition at night, will have the danger that drops into water, consequently, sets up guardrail 6 on bridge floor 5.
Referring to fig. 1, the barrier 6 includes a fence post 60 and a fence rope 61; two rows of fence columns 60 are arranged on two sides of the bridge floor 5 vertically and at intervals; the lower end of the fence column 60 is fixedly connected with the bridge floor 5, and the upper end of the fence column is provided with a through hole 600 along the length direction of the bridge floor 5; two fence ropes 61 pass through the through holes 600 of the two rows of fence posts 60 respectively.
The guardrail 6 is arranged on the park traffic bridge, so that pedestrians walking to the bridge edge are stopped to a certain extent, and the effect of protecting the pedestrians is achieved.
The embodiment of this embodiment is the utility model discloses preferred embodiment is not according to this restriction the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. The utility model provides a novel park is passed through road bridge, includes bridge floor (5) and supporting part, and bridge floor (5) set up on the supporting part, its characterized in that: the supporting part comprises a bridge bottom (1) and a concrete pipe (2); the bridge bottom (1) is a platform positioned at the water bottom; the concrete pipe (2) is arranged on the bridge bottom (1), and the length direction of the concrete pipe (2) is parallel to the water flow direction; the middle section of the bridge deck (5) is erected on the concrete pipe (2), and two ends of the bridge deck (5) are erected on two banks.
2. A novel park access bridge according to claim 1, characterized in that: the supporting part also comprises a supporting strip (3); the support bars (3) are arranged on the top of the outer side wall of the concrete pipe (2), and the bridge floor (5) is erected on the support bars (3).
3. A novel park access bridge according to claim 1, characterized in that: the supporting part also comprises a low wall (4); the short wall (4) is provided with two sides which are respectively arranged below the two ends of the bridge floor (5); two ends of the bridge deck (5) are erected on the short wall (4).
4. A novel park access bridge according to claim 1, characterized in that: the upper surface of the bridge bottom (1) is provided with a pipe placing groove (10) along the length direction of the concrete pipe (2), and the concrete pipe (2) is arranged on the pipe placing groove (10).
5. A novel park access bridge according to claim 1, characterized in that: the bridge deck (5) comprises cross bars (50) and connecting beams (51); the transverse strips (50) are arranged at intervals; the connecting beam (51) is fixedly connected with all the cross bars (50).
6. A novel park access bridge according to claim 5, characterized in that: the bridge deck (5) also comprises a frame (52); the frame (52) is of an annular structure and is sleeved on the outer sides of the transverse strips (50) and the connecting beams (51), and the frame (52) is fixedly connected with the end parts of all the transverse strips (50) and the connecting beams (51).
7. A novel park access bridge according to claim 1, characterized in that: a guardrail (6) is arranged on the bridge floor (5); the guardrail (6) comprises a guardrail column (60) and a guardrail rope (61); the two rows of the fence columns (60) are respectively arranged on two sides of the bridge deck (5); two railing ropes (61) are respectively connected with the two rows of railing columns (60) in sequence.
8. The novel park access bridge of claim 7, wherein: the upper part of the fence post (60) is provided with a through hole (600); the two fence ropes (61) respectively pass through the through holes (600) of the two rows of fence columns (60) in sequence.
9. The novel park access bridge of claim 7, wherein: the column columns (60) of each row are arranged at equal intervals.
CN201921202855.7U 2019-07-27 2019-07-27 Novel park access bridge Active CN210395069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921202855.7U CN210395069U (en) 2019-07-27 2019-07-27 Novel park access bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921202855.7U CN210395069U (en) 2019-07-27 2019-07-27 Novel park access bridge

Publications (1)

Publication Number Publication Date
CN210395069U true CN210395069U (en) 2020-04-24

Family

ID=70356917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921202855.7U Active CN210395069U (en) 2019-07-27 2019-07-27 Novel park access bridge

Country Status (1)

Country Link
CN (1) CN210395069U (en)

Similar Documents

Publication Publication Date Title
EP0821122A1 (en) Junction members and their uses
US20120304571A1 (en) Connector for boardwalk system
SE501737C2 (en) Polygon-shaped housing
KR102373984B1 (en) Deck road and construction method thereof
CN210395069U (en) Novel park access bridge
CN214737331U (en) Batter post pier
GB2434383A (en) Wind - resistant timber lap fencing
KR102524688B1 (en) Multipurpose solar energy system and construction method thereof
CN211395496U (en) Highway isolated column with show wide reflective stripe
KR100507743B1 (en) Frame structure of venlo-type greenhouse
CN214194092U (en) Water bridge is striden in gardens
CN201152058Y (en) Two layer tent frame capable of conveniently connecting wall cloth
CN2222205Y (en) Metal net post type safety fence
CN219196927U (en) Railing and bridge body and building with same
CN211818290U (en) Novel corridor frame
CN211646150U (en) Multifunctional highway guardrail
KR102365828B1 (en) Design Type Fence
CN113668702B (en) Assembled light steel building
CN212078905U (en) Bamboo joint-imitating guardrail
CN218509119U (en) Multi-person swing gallery frame
CN211851057U (en) Landscape corridor frame
CN203755717U (en) Assembly type up and down pedestrian path for deep foundation pit
KR200167937Y1 (en) Connect type safety fence
KR102173162B1 (en) Assembling awning frame for outdoor table
KR102257655B1 (en) Girder structure with experience facility and method for constructing this same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant