CN210372310U - Pipeline fixing device is used in municipal works network management construction - Google Patents

Pipeline fixing device is used in municipal works network management construction Download PDF

Info

Publication number
CN210372310U
CN210372310U CN201920970474.7U CN201920970474U CN210372310U CN 210372310 U CN210372310 U CN 210372310U CN 201920970474 U CN201920970474 U CN 201920970474U CN 210372310 U CN210372310 U CN 210372310U
Authority
CN
China
Prior art keywords
fixing device
pipeline
ring
sideboard
network management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920970474.7U
Other languages
Chinese (zh)
Inventor
黄建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920970474.7U priority Critical patent/CN210372310U/en
Application granted granted Critical
Publication of CN210372310U publication Critical patent/CN210372310U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a pipeline fixing device is used in municipal works network management construction, including the clamping ring, the built-in soft ring that is equipped with of clamping ring, the both sides of clamping ring are equipped with the sideboard, are equipped with the jack on the sideboard below, and the awl of inserting has been installed to the one end of the sideboard of higher authority. Through nut locking external screw thread, make the nut upwards compress tightly the sideboard of downside, thereby make the clamping ring to closing and compress tightly the pipeline, arch through even setting, the cooperation resistance of multiplicable pipeline and soft ring, the restriction pipeline removes in the clamping ring, then continue to strike the sideboard of upside with the hammer one by one, can make the backup pad insert in the earth of embedded groove lower extreme completely, the backup pad that evenly sets up through the annular contacts with earth, increase and insert the awl and attach intensity to taking off of earth, therefore can make and insert in the awl more stable to earth, when having east and west to drive over from the embedded groove, whole fixing device is difficult for heeling, it is fixed effectual to the pipeline, the problem that fixed effect is not good has been solved.

Description

Pipeline fixing device is used in municipal works network management construction
Technical Field
The utility model relates to a pipeline fixing device is used in municipal works network management construction.
Background
The construction of various public infrastructures matched with urban life belongs to the municipal engineering category, for example, the construction of various common urban roads, bridges and subways, such as various pipelines closely related to life, rainwater, sewage, upper reclaimed water, electric power, telecommunication, heating power and gas, squares, urban greening and the like belongs to the municipal engineering category.
The mode that buries is adopted more to current municipal works network management lays for reduce area, and adopt fixing device to fix the pipeline, current fixing device, its downside is provided with places the board, places and sets up double cassette structure on the board, and the snap ring both sides are provided with the mounting hole, can insert the bolt in the mounting hole, inserts the pipeline in the snap ring, and the bolt through nut locking both sides can make whole snap ring stably clip the pipeline, and the weak point of existence has: the pipeline is settled to the mode that the board was settled in the embedding slot is placed in the adoption, and only relative pipeline directly places in the embedding slot stable some, after filling up soil in the embedding slot, in case when having things to drive from the embedding slot, makes whole fixing device to heel very easily, therefore causes whole pipeline to heel, and fixed effect is not good.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline fixing device is used in municipal works network management construction to propose the not good problem of fixed effect in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline fixing device is used in municipal works network management construction, includes the clamping ring, the built-in soft ring that is equipped with of clamping ring, the both sides of clamping ring are equipped with the sideboard, are equipped with the jack on the sideboard below, and the one end of the sideboard of higher authority has been installed and has been inserted the awl, it inserts the awl and inserts the jack, it is equipped with the external screw thread to insert to bore, external screw thread threaded connection has the nut.
Preferably, the pressing ring is of a semicircular plate-shaped structure.
Preferably, the soft ring has a semicircular plate-shaped structure and is made of chloroprene rubber.
Preferably, the soft ring is internally provided with an inner cavity and a semicircular cavity structure.
Preferably, the inner wall of the soft ring is provided with a bulge, and the bulge is of a hemispherical structure.
Preferably, the inserting cone is provided with a supporting plate, and the supporting plate is of a square plate structure.
Preferably, an inserting plate is arranged below the pressing ring, and one end of the inserting plate is provided with a sharp edge.
Compared with the prior art, the beneficial effects of the utility model are that: the external thread is locked by the nut, so that the nut upwards compresses the side plate at the lower side, the compression ring is closed to compress the pipeline, the matching resistance between the pipeline and the soft ring can be increased by the evenly arranged bulges, the pipeline is limited from moving in the compression ring, then the side plate at the upper side is continuously knocked one by the hammer, the supporting plate can be completely inserted into the soil at the lower end of the embedded groove, the inserting plate can be inserted into the soil at the lower end of the embedded groove, when the inserting cone is inserted into the soil at the lower end of the embedded groove, the integral fixing device can be stably arranged in the soil, when the inserting cone is inserted into the soil at the lower end of the embedded groove, the supporting plate can be inserted into the soil, the supporting plate is contacted with the soil through the evenly arranged annular supporting plate, the attaching strength of the inserting cone to the soil is increased, therefore, the inserting cone can be more stably inserted, the fixing effect on the pipeline is good, and the problem of poor fixing effect is solved.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a partially cut-away front view of the present invention;
FIG. 3 is a schematic view of the distribution of the protrusions of the present invention;
FIG. 4 is a schematic view of the distribution of the supporting plates of the present invention;
fig. 5 is a schematic cross-sectional view of the insert plate of the present invention.
In the figure: 1 pressing ring, 2 soft rings, 3 inner cavities, 4 bulges, 5 side plates, 6 jacks, 7 inserting cones, 8 external threads, 9 nuts, 10 supporting plates, 11 inserting plates and 12 sharp blades.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: a pipeline fixing device for municipal engineering network management construction comprises a compression ring 1, wherein the compression ring 1 is of a semicircular plate structure, the number of the compression rings 1 is two, the compression rings are arranged up and down, the inner ends of the two compression rings 1 are in sliding contact, a soft ring 2 is arranged in the compression ring 1, the inner wall of the compression ring 1 is connected with the outer wall of the soft ring 2 in a resin adhesive bonding mode, the soft ring 2 is of a semicircular plate structure, the material of the soft ring is chloroprene rubber, the soft ring 2 is soft, when the compression ring 1 is pressed against the pipeline inwards, the pipeline can be flexibly protected, the size of the compression ring 1 and the size of the soft ring 2 can be manufactured according to the actual pipeline design size, an inner cavity 3 and a semicircular cavity structure are arranged in the soft ring 2, the soft elasticity of the whole soft ring 2 can be increased through the inner cavity 3, the soft protection effect on the inner wall part of the pipeline compressed by the compression ring 1 is, when the soft ring 2 is pressed against the inner wall of the pipeline, the matching resistance between the pipeline and the soft ring 2 can be increased through the uniformly arranged bulges 4, the pipeline is limited to move in the compression ring 1, the bulges 4 are of a hemispherical structure, the two sides of the compression ring 1 are provided with the side plates 5, the side plates 5 are of a transversely arranged plate-shaped structure and are arranged on the two sides of the compression ring 1 and are integrated with the compression ring 1 by fusion casting, the lower side plate 5 is provided with the insertion hole 6, the insertion hole 6 is of a circular hole-shaped structure, the central position of the lower side plate 5 is provided with the insertion cone 7, one end of the upper side plate 5 is provided with the insertion cone 7, the insertion cone 7 is of a circular rod-shaped structure, the lower side of the insertion cone 7 is provided with a cone, when the insertion cone 7 is inserted into the soil at the lower end of the embedded groove, the integral fixing device can be stably arranged in the soil, the insertion, external screw thread 8 sets up at the upper portion outer wall of inserting awl 7, and 8 threaded connection of external screw thread have a nut 9, through nut 9 locking external screw thread 8 for nut 9 upwards compresses tightly sideboard 5 of downside, thereby makes clamping ring 1 involute.
Referring to fig. 1, 2, 4 and 5, the insert cone 7 is provided with a support plate 10, the support plate 10 is annularly and uniformly arranged on the insert cone 7, when the insert cone 7 is inserted into the soil at the lower end of the embedded groove, the support plate 10 is also inserted into the soil, the scraping strength of the insert cone 7 to the soil is increased by the contact of the support plate 10 annularly and uniformly arranged with the soil, so that the insert cone 7 can be inserted into the soil more stably, the support plate 10 is of a square plate structure, the lower surface of the compression ring 1 is provided with an insert plate 11, the front and the rear of the insert plate 11 are uniformly arranged at the lower side of the compression ring 1 at the lower side, the insert plate 11 and the compression ring 1 at the lower side are a fusion-casting integrated piece, the sharp edge 12 is of a double-sided edge structure and arranged at the lower end of the insert plate 11, the insert plate 11 can be more easily inserted into the soil at the lower end of the embedded groove, when, one end of the insert plate 11 is provided with a sharp edge 12.
The utility model discloses when concrete implementation: when the pipeline pressing device is installed, the nut 9 can be rotated downwards to enable the nut 9 to leave the side plate 5 on the lower side, then the whole device is placed in the pre-buried groove, the side plate 5 on the upper side is firstly knocked by a hammer to enable the lower side of the insertion cone 7 to be inserted into soil, according to the mode, the fixing device is evenly arranged in the pre-buried groove, then the pipeline penetrates into the position between the pressing rings 1, then butt joint operation is carried out on the pipeline, finally the nut 9 is screwed, the external thread 8 is locked through the nut 9, the nut 9 is enabled to upwards press the side plate 5 on the lower side, so that the pressing rings 1 are butted and pressed on the pipeline, when the pressing rings 1 are inwards abutted against the pipeline, the soft elasticity of the whole soft rings 2 can be increased through the inner cavity 3, the soft protection effect on the inner wall part of the pipeline pressed by the pressing rings 1 is better, the matching resistance of the pipeline and the soft rings, then continue to strike the sideboard 5 of upside one by one with the hammer, can make backup pad 10 insert in the earth of embedding slot lower extreme completely, and picture peg 11 also can insert in the earth of embedding slot lower extreme, in inserting the earth of awl 7 insertion embedding slot lower extreme, can make whole fixing device settle in earth stably, when inserting awl 7 insertion embedding slot lower extreme in the earth, backup pad 10 also can insert in the earth, through the contact of the backup pad 10 that the annular evenly set up with earth, increase the attached intensity of taking off of awl 7 to earth, therefore can make and insert awl 7 insertion in earth more stable, when picture peg 11 inserts in the earth of embedding slot lower extreme, increase the stability that the downside supports in the embedding slot lower extreme under clamping ring 1, after backfilling in the embedding slot, when follow-up have east and west to drive from the embedding slot, whole fixing device is difficult for heeling, it is effectual to pipeline fixed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a pipeline fixing device is used in municipal works network management construction, includes clamping ring (1), its characterized in that: the built-in soft ring (2) that is equipped with of clamping ring (1), the both sides of clamping ring (1) are equipped with sideboard (5), are equipped with jack (6) on sideboard (5) below, and the one end of the sideboard (5) of higher authority has been installed and has been inserted awl (7), insert awl (7) and insert jack (6), be equipped with external screw thread (8) on inserting awl (7), external screw thread (8) threaded connection has nut (9).
2. The pipeline fixing device for municipal engineering network management construction according to claim 1, wherein: the compression ring (1) is of a semicircular plate-shaped structure.
3. The pipeline fixing device for municipal engineering network management construction according to claim 1, wherein: the soft ring (2) is of a semicircular plate-shaped structure and is made of chloroprene rubber.
4. The pipeline fixing device for municipal engineering network management construction according to claim 3, wherein: an inner cavity (3) and a semicircular cavity structure are arranged in the soft ring (2).
5. The pipeline fixing device for municipal engineering network management construction according to claim 4, wherein: the inner wall of the soft ring (2) is provided with a bulge (4), and the bulge (4) is of a hemispherical structure.
6. The pipeline fixing device for municipal engineering network management construction according to claim 1, wherein: the inserting cone (7) is provided with a supporting plate (10), and the supporting plate (10) is of a square plate-shaped structure.
7. The pipeline fixing device for municipal engineering network management construction according to claim 2, wherein: an inserting plate (11) is arranged below the pressing ring (1), and a sharp blade (12) is arranged at one end of the inserting plate (11).
CN201920970474.7U 2019-06-26 2019-06-26 Pipeline fixing device is used in municipal works network management construction Expired - Fee Related CN210372310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920970474.7U CN210372310U (en) 2019-06-26 2019-06-26 Pipeline fixing device is used in municipal works network management construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920970474.7U CN210372310U (en) 2019-06-26 2019-06-26 Pipeline fixing device is used in municipal works network management construction

Publications (1)

Publication Number Publication Date
CN210372310U true CN210372310U (en) 2020-04-21

Family

ID=70267227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920970474.7U Expired - Fee Related CN210372310U (en) 2019-06-26 2019-06-26 Pipeline fixing device is used in municipal works network management construction

Country Status (1)

Country Link
CN (1) CN210372310U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112751305A (en) * 2020-12-22 2021-05-04 盐城荣平建设工程有限公司 Municipal works construction buries fixing device with cable
CN113389946A (en) * 2021-07-02 2021-09-14 中国十七冶集团有限公司 Rainwater and sewage pipeline fixing device and construction method thereof
CN114321504A (en) * 2021-12-06 2022-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112751305A (en) * 2020-12-22 2021-05-04 盐城荣平建设工程有限公司 Municipal works construction buries fixing device with cable
CN113389946A (en) * 2021-07-02 2021-09-14 中国十七冶集团有限公司 Rainwater and sewage pipeline fixing device and construction method thereof
CN114321504A (en) * 2021-12-06 2022-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe
CN114321504B (en) * 2021-12-06 2024-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe

Similar Documents

Publication Publication Date Title
CN210372310U (en) Pipeline fixing device is used in municipal works network management construction
CN210430759U (en) Cable fixing device for weak current engineering
CN204039871U (en) Pin-connected panel lawn supporting pad
CN210797223U (en) Fixing device is restoreed in road crack
MX2009011885A (en) Reinforced grommet for cured in place pipe.
CN104358256A (en) Quick connection type connecting pile
CN213805239U (en) Hydraulic engineering's ready-package ditch
CN214424094U (en) Assembled steel construction house reinforcing apparatus
CN211228577U (en) Cylinder embedded structure for wind power generation
CN204174613U (en) A kind of fast-connecting type connects stake
CN204704585U (en) Well lid electronic tag fixed structure
CN211775357U (en) A plastic-aluminum plate mounting structure for outrigger is decorated
CN206849867U (en) Impermeable LED support
CN201333675Y (en) Special wrench for cover of drain pipe inspection port
CN211649445U (en) PE water supply pipe quick-assembling joint
CN217816628U (en) Urban road illumination monitoring system
CN211597848U (en) Connecting and supporting device for aluminum template
CN210859517U (en) Rag bolt protector
CN213086927U (en) Water pipe assembly of water supply tank for building construction
CN214674979U (en) Photovoltaic support built-in fitting with leveling function
CN211603380U (en) Environment-friendly electric power collection equipment
CN211286010U (en) Novel assembled baling box top and bottom corner fitting and supporting corner post
CN210004333U (en) street lamp mounting structure
CN210662546U (en) Novel mounting structure of linear underground lamp of chucking
CN209942335U (en) Locking iron tower connection structure that moves

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421