CN210369953U - Electric lifting discharging platform for high-rise building construction - Google Patents
Electric lifting discharging platform for high-rise building construction Download PDFInfo
- Publication number
- CN210369953U CN210369953U CN201920383193.1U CN201920383193U CN210369953U CN 210369953 U CN210369953 U CN 210369953U CN 201920383193 U CN201920383193 U CN 201920383193U CN 210369953 U CN210369953 U CN 210369953U
- Authority
- CN
- China
- Prior art keywords
- discharging platform
- platform
- ejection
- load sensor
- rise building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model provides an electronic promotion ejection of compact platform for high-rise building construction, the on-line screen storage device comprises a base, a tertiary flexible stand is installed respectively to the upper portion both sides of base, the bottom both ends at an ejection of compact platform are all fixed at the top of tertiary flexible stand, a load sensor is installed at ejection of compact platform's bottom center, an overload alarm is installed to load sensor's bottom. Two ends of the bottom of the discharging platform are respectively connected with a small tool barrel through steel wire ropes. The design of the three-stage telescopic vertical column can ensure higher lifting height, and the smooth construction of high-rise buildings is ensured; by installing the load sensor at the lower part of the discharging platform, the overload condition can be found in real time, and equipment damage or production accidents caused by overload are prevented; through set up small-size instrument section of thick bamboo in ejection of compact platform both sides, can make things convenient for getting of small-size instrument to put.
Description
Technical Field
The utility model relates to a construction material feeding unit, especially a simple structure is reliable, and design benefit guarantees higher rise height, discovers the overload situation in real time, makes things convenient for the electric promotion ejection of compact platform that is used for the high-rise building construction of getting of small-size instrument.
Background
In the construction process of a high-rise building, various materials and tools need to be conveyed to a high-rise construction platform, the existing mode is that a tower crane for heavy materials is adopted, manual work is adopted for light materials and tools, and the working efficiency is very low.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a simple structure is reliable, and design benefit guarantees higher rise height, discovers the overload situation in real time, makes things convenient for the electric lifting discharging platform who gets the electric lifting discharging platform who is used for high-rise building construction of putting of small-size instrument for high-rise building construction's electric lifting discharging platform.
Realize the utility model discloses an electric lifting discharging platform for high-rise building construction, the on-line screen storage device comprises a base, a tertiary flexible stand is installed respectively to the upper portion both sides of base, the bottom both ends at a discharging platform are all fixed at the top of tertiary flexible stand, a load sensor is installed at discharging platform's bottom center, an overload alarm is installed to load sensor's bottom.
Two ends of the bottom of the discharging platform are respectively connected with a small tool barrel through steel wire ropes.
This patent an electric lifting discharging platform for high-rise building construction, the mode that rises in proper order through the second grade telescopic link and the tertiary telescopic link of tertiary flexible stand carries discharging platform to the appointed height of high-rise building construction, put or take off the material on discharging platform, put or take off the instrument in small-size tool cylinder, load sensor can real-time supervision discharging platform's load, when overloading, the overload alarm can send out the police dispatch newspaper, the workman only need remove partial material or instrument can.
The electric lifting discharging platform for high-rise building construction is simple and reliable in structure and ingenious in design, and higher lifting height can be guaranteed through the design of the three-stage telescopic vertical columns, so that the high-rise building construction can be smoothly carried out; by installing the load sensor at the lower part of the discharging platform, the overload condition can be found in real time, and equipment damage or production accidents caused by overload are prevented; through set up small-size instrument section of thick bamboo in ejection of compact platform both sides, can make things convenient for getting of small-size instrument to put.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
As shown in fig. 1, the utility model discloses an electronic promotion discharging platform for high-rise building construction, including base 1, a tertiary flexible stand 2 is installed respectively to base 1's upper portion both sides, the bottom both ends at a discharging platform 7 are all fixed at tertiary flexible stand 2's top, a load sensor 8 is installed at discharging platform 7's bottom center, an overload alarm 9 is installed to load sensor 8's bottom.
Two ends of the bottom of the discharging platform 7 are respectively connected with a small tool barrel 5 through a steel wire rope 6.
This patent an electric lifting discharging platform for high-rise building construction, the mode that rises in proper order through tertiary telescopic column 3 and tertiary telescopic link 4 carries discharging platform to the appointed height of high-rise building construction, put or take off the material on discharging platform, put or take off the instrument in small-size tool cylinder, load sensor can real-time supervision discharging platform's load, when overloading, overload alarm can send out the police dispatch newspaper, the workman only need remove partial material or instrument can.
The above-mentioned embodiments are only intended to describe the preferred embodiments of the present invention, but not to limit the scope of the present invention, and various modifications and improvements made by the technical solutions of the present invention by those skilled in the art should fall within the protection scope defined by the claims of the present invention without departing from the design spirit of the present invention.
Claims (1)
1. The electric lifting discharging platform for high-rise building construction is characterized by comprising a base, wherein three-stage telescopic stand columns are respectively installed on two sides of the upper portion of the base, the tops of the three-stage telescopic stand columns are fixed at two ends of the bottom of one discharging platform, a load sensor is installed at the center of the bottom of the discharging platform, an overload alarm is installed at the bottom of the load sensor, and two ends of the bottom of the discharging platform are respectively connected with a small tool barrel through steel wire ropes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920383193.1U CN210369953U (en) | 2019-03-25 | 2019-03-25 | Electric lifting discharging platform for high-rise building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920383193.1U CN210369953U (en) | 2019-03-25 | 2019-03-25 | Electric lifting discharging platform for high-rise building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210369953U true CN210369953U (en) | 2020-04-21 |
Family
ID=70245833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920383193.1U Active CN210369953U (en) | 2019-03-25 | 2019-03-25 | Electric lifting discharging platform for high-rise building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210369953U (en) |
-
2019
- 2019-03-25 CN CN201920383193.1U patent/CN210369953U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208352858U (en) | Control adjustable length high-altitude power equipment maintaining takes sundries | |
CN204112696U (en) | For the electric hoist elevator shaft platform of main building construction | |
CN209957260U (en) | Hoisting frame for mechanical equipment | |
CN205935600U (en) | Scaffold frame that building engineering used | |
CN103821356A (en) | Construction equipment and system of elevator shaft shear wall | |
CN210369953U (en) | Electric lifting discharging platform for high-rise building construction | |
CN207108405U (en) | Portable light-duty jacking apparatus | |
CN210823985U (en) | Novel electric lifting discharging platform capable of adjusting chain tightness | |
CN203394011U (en) | Aerial hanging platform for ball arm type roofs with grid structures | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN205183582U (en) | Plate shearing machine is with transition receiving device | |
CN208561042U (en) | A kind of steel silo powder and granule shape material library clearing machine | |
CN210885022U (en) | Building material lifting device | |
CN203846779U (en) | Construction equipment for shear wall of shaft body of elevator and system | |
CN203624932U (en) | Portable indoor material lifter | |
CN202467146U (en) | Sling type field operation platform | |
CN201459602U (en) | Equipment for bridge construction | |
CN207434933U (en) | Workshop weight part lifting device | |
CN202808252U (en) | Small-sized light hoisting equipment | |
CN206616460U (en) | A kind of adhesion type bridge maintenance nacelle device | |
CN112551457A (en) | Elevating platform is used in communication maintenance | |
CN205204691U (en) | Integrative safe tower crane of reputation | |
CN205000623U (en) | Integrated form intelligence lift protective screen | |
CN205275132U (en) | Forklift lifting tool | |
CN211078293U (en) | High-altitude hoisting prefabricated part symmetrical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |