CN210369288U - Novel dredging equipment for cured sewer cement paste - Google Patents

Novel dredging equipment for cured sewer cement paste Download PDF

Info

Publication number
CN210369288U
CN210369288U CN201920899709.8U CN201920899709U CN210369288U CN 210369288 U CN210369288 U CN 210369288U CN 201920899709 U CN201920899709 U CN 201920899709U CN 210369288 U CN210369288 U CN 210369288U
Authority
CN
China
Prior art keywords
support frame
drilling
rod
slide bar
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920899709.8U
Other languages
Chinese (zh)
Inventor
杨晓萌
袁帅
张世功
唐尧
李众谋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CONSTR ENG
Original Assignee
BEIJING CONSTR ENG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CONSTR ENG filed Critical BEIJING CONSTR ENG
Priority to CN201920899709.8U priority Critical patent/CN210369288U/en
Application granted granted Critical
Publication of CN210369288U publication Critical patent/CN210369288U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model relates to a novel mediation equipment of sewer grout cured substance, it includes support, slide bar, slide and drilling equipment. The support comprises a base and support frames arranged at two ends of the base, the support frames are fixedly connected to the base in a door shape, and each support frame comprises a first support frame and a second support frame; the drilling device comprises a drilling machine, a drill rod and a machine frame, wherein the machine frame is fixedly connected to the bottom surface of the sliding seat, the drilling machine and the drill rod are respectively arranged at two ends of the machine frame along a drilling direction, one end of the drill rod is fixedly connected with the drilling machine, and the other end of the drill rod horizontally penetrates through the first support frame and faces a cement paste condensate. The slide bar is erected on the top ends of the first support frame and the second support frame, one end of the slide bar is connected with the first support frame in a sliding mode, and the other end of the slide bar is hinged with the second support frame. The utility model discloses have through the regulation to the direction of slide bar, drive the regulation of drilling rod direction, be convenient for carry out multiple spot position multi-angle drilling to the grout curing substance of sewer and destroy, labour saving and time saving promotes work efficiency.

Description

Novel dredging equipment for cured sewer cement paste
Technical Field
The utility model belongs to the technical field of the technique of grout cured material mediation equipment and specifically relates to a novel mediation equipment of sewer grout cured material is related to.
Background
At present, cement slurry can flow into a sewer during engineering construction, and the cement slurry can be continuously deposited and solidified in the sewer along with the construction, so that the water passing size of the sewer is reduced, and even the sewer is blocked. Therefore, cleaning is required, and conventional mechanical chiseling work is difficult to perform because of limited space in the sewage.
Therefore, utility model patent No. CN201621274095.7 discloses a dredging device for cured sewer cement slurry. The drilling device comprises a drilling device and a support, wherein a guide rod is arranged on the support along the drilling direction, and the drilling device is matched with a gear and can slide and advance on the guide rod. During construction, a drill rod of the drilling device is over against the cured cement paste to drill and damage, and cleaning operation is carried out.
However, because the guide rod and the bracket are fixed in position in the device, in actual construction and use, multi-point and multi-angle drilling and cleaning can not be carried out on cured cement paste, and if multi-direction drilling is desired, the whole bracket needs to be rotated. But the rotating bracket is inconvenient to operate due to the space limitation of the sewer pipeline, thereby greatly reducing the working efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a novel mediation equipment of sewer grout cured substance, its advantage is convenient for drilling rod multiple spot multi-angle of being convenient for is dredged the drilling of sewer grout cured substance, convenient operation, and labour saving and time saving promotes work efficiency.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a novel dredging device for cured sewer cement paste comprises a bracket, a sliding rod, a sliding seat and a drilling device; the support comprises a base and support frames arranged at two ends of the base, the support frames are fixedly connected to the base in a door shape, and each support frame comprises a first support frame and a second support frame; the bottom surface of the sliding rod is provided with a tooth socket, two ends of the sliding rod are respectively erected at the top ends of the first support frame and the second support frame, one end of the sliding rod is connected with the first support frame in a sliding mode, and the other end of the sliding rod is hinged with the second support frame; the top end of the first support frame is provided with a sliding groove, and the front end of the sliding rod is provided with a pulley capable of rolling in the sliding groove; the drilling device comprises a drilling machine, a drill rod and a rack, wherein the rack is fixedly connected to the bottom surface of the sliding seat, a gear is arranged in the rack and is meshed with a tooth groove in the sliding seat through the sliding seat, and a rotating wheel is arranged outside the rack and is connected with the gear in the rack; the drilling machine and the drill rod are respectively arranged at two ends of the frame along the drilling direction, one end of the drill rod is connected with the drilling machine, and the other end of the drill rod horizontally penetrates through the first support frame and faces the cement paste cured object.
Through adopting above-mentioned technical scheme, through the angle of adjusting the slide bar, the drilling rod of being convenient for carries out the drilling mediation of the different angles of different positions to sewer grout curing material, convenient operation, labour saving and time saving promotes work efficiency.
The utility model discloses further set up to: a plurality of pin holes are formed in the sliding groove, and bolts for limiting the sliding rod to move are inserted into the pin holes.
Through adopting above-mentioned technical scheme, when the slide bar slided the assigned position, at the slide bar both sides with the vertical pinhole of inserting of bolt, fixed the slide bar, avoided the slide bar when drilling to appear sliding the skew.
The utility model discloses further set up to: and limiting plates are fixedly arranged at two ends of the sliding chute.
Through adopting above-mentioned technical scheme, the limiting plate is fixed the slide bar inside the spout, breaks away from the spout when avoiding the slide bar to slide on the spout.
The utility model discloses further set up to: the vertical pipe of support frame vertical concretion on the base all includes two sections tube coupling and the positive and negative screw sleeve of connecting two sections tube coupling.
Through adopting above-mentioned technical scheme, through the regulation to the support frame height, be convenient for carry out the drilling mediation to the grout curing substance of sewer co-altitude not, the clearance is clean thoroughly more.
The utility model discloses further set up to: and a hanging bracket for stabilizing the drill rod is fixedly arranged at the end of the bottom surface of the sliding rod close to the first support frame.
Through adopting above-mentioned technical scheme, the setting of gallows is used for carrying out certain support to the drilling rod, reduces or avoids the drilling rod to take place skew, deformation in drilling process, reduces the inhomogeneous possibility of being broken of drilling rod atress.
The utility model discloses further set up to: the hanger comprises a hanging rod fixedly arranged on the bottom surface of the sliding rod and a hanging ring fixedly arranged on the hanging rod, and the drill rod penetrates through the hanging ring.
Through adopting above-mentioned technical scheme, the gallows further supports the drilling rod, fixes the drilling rod in certain extent, reduces the drilling rod and takes place skew, warp at the drilling in-process.
The utility model discloses further set up to: and a reinforcing plate is arranged at the fixedly connected part of the suspender and the bottom surface of the sliding rod.
Through adopting above-mentioned technical scheme, strengthen fixedly with jib and slide bar bottom surface rigid coupling department, avoid appearing the fracture in the construction, deviation appears in the drilling, influences the efficiency of construction.
The utility model discloses further set up to: two transverse supporting rods are fixedly connected between the first supporting frame and the second supporting frame and are respectively positioned on two sides of the sliding rod.
Through adopting above-mentioned technical scheme, the stability of support frame has been promoted in the setting of horizontal stay bar, has reduced the condition that the support frame takes place deformation when drilling.
To sum up, the utility model discloses a beneficial technological effect does:
1. the angle of the sliding rod is adjusted, so that the drilling and dredging of the cured sewer cement slurry by the drilling rod are facilitated, the operation is convenient, the time and the labor are saved, and the working efficiency is improved;
2. by adjusting the height of the supporting frame, drilling and dredging can be conveniently carried out on cement paste condensate with different heights of a sewer, and the cleaning is cleaner and more thorough;
3. through the setting of bolt, it is fixed with the slide bar, has avoided appearing the slip skew when drilling, influences the efficiency of construction.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic structural view of the protruded rod and pin hole of the present invention;
FIG. 3 is a schematic structural view of the salient pulley and hanger of the present invention;
fig. 4 is a partially enlarged structural view of a portion a in fig. 3.
In the figure, 1, a bracket; 101. a base; 102. a support frame; 1021. A first support frame; 1022. a second support frame; 2. a slide bar; 201. a pulley; 3. a slide base; 4. a drilling device; 401. a drilling machine; 402. a drill stem; 403. a frame; 5. a chute; 6. hinging a shaft; 7. a pin hole; 8. a limiting plate; 9. a first pipe section; 10. a second pipe section; 11. a positive and negative threaded sleeve; 12. a hanger; 121. a boom; 122. a hoisting ring; 123. a reinforcing plate; 13. a transverse stay bar.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Refer to fig. 1, do the utility model discloses a novel mediation equipment of sewer grout cured substance, including support 1, slide bar 2, slide 3 and drilling equipment 4. The support 1 comprises a rectangular base 101 and rectangular support frames 102 arranged at two ends of the base 101, wherein the support frames 102 are fixedly connected to the base 101 in a door shape. The support frame 102 comprises a first support frame 1021 and a second support frame 1022, the slide bar 2 is erected at the top ends of the first support frame 1021 and the second support frame 1022, and the bottom surface of the slide bar 2 is provided with a tooth socket; one end of the slide bar 2 is slidably connected to the first support 1021, and the other end is hinged to the second support 1022. The top end of the first support 1021 is provided with a sliding groove 5, the top end of the second support 1022 is provided with a hinge hole, the front end of the sliding rod 2 is provided with a pulley 201 (as shown in fig. 3), the pulley 201 can roll in the sliding groove 5, and the width of the sliding groove 5 is greater than the thickness of the pulley 201. The rear end of the slide bar 2 is provided with a through hole matched with the hinge hole of the second support frame 1022, and the rear end of the slide bar 2 is hinged with the second support frame 1022 by using a hinge shaft 6 to sequentially penetrate through the through hole and the hinge hole. Two transverse supporting rods 13 are fixedly connected between the first supporting frame 1021 and the second supporting frame 1022, one end of each transverse supporting rod 13 is fixedly connected to the inner side of the first supporting frame 1021 relative to the second supporting frame 1022, and the other end of each transverse supporting rod 13 is fixedly connected to the inner side of the second supporting frame 1022 relative to the first supporting frame 1021.
The drilling device 4 comprises a drilling machine 401, a drill rod 402 and a frame 403, the frame 403 is fixedly connected to the bottom surface of the sliding seat 3, a gear is arranged inside the frame 403 and meshed with a tooth groove on the sliding seat 3 and the sliding rod 2, and a rotating wheel is arranged outside the frame 403 and connected with the gear inside the frame. The drilling machine 401 and the drill rod 402 are respectively arranged at two ends of the frame 403 along the drilling direction, one end of the drill rod 402 is connected with the drilling machine 401, and the other end horizontally penetrates through the first support frame 1021 and faces the cured cement paste.
When the drilling tool is used, the pulley 201 rolls, the front end of the sliding rod 2 is adjusted, the drill bit is aligned to a set drilling point of a cured cement paste, then the rotating wheel is rotated, the sliding seat 3 drives the drilling machine 401 and the drill rod 402 to move forwards, and drilling damage is carried out on the cured cement paste. The angle of the sliding rod 2 in the horizontal direction is adjustable, the drilling range is enlarged, and drilling dredging can be conveniently carried out on cement paste condensate in a multi-point and multi-angle mode.
As shown in fig. 2, when the slide bar 2 moves to a predetermined position on the slide groove 5, in order to prevent the slide bar 2 from sliding during drilling, a plurality of pin holes 7 are formed in the slide groove 5 to prevent the drilling position from being shifted. When the sliding rod 2 slides to a designated position, the inserted pins are vertically inserted into the pin holes 7 at two sides of the sliding rod 2, and the sliding rod 2 is limited and fixed. In order to avoid the slide bar 2 from separating from the chute 5 when sliding on the chute 5, limit plates 8 are fixedly arranged at two ends of the chute 5.
As shown in fig. 1 and 3, since the drill rod 402 is long and has a certain weight, it may be deviated or deformed or even broken during drilling. Therefore, a hanger 12 for stabilizing the drill pipe 402 is fixedly arranged on the sliding rod 2 at one side of the drill hole of the drill pipe 402, the hanger 12 comprises a suspension rod 121 fixedly arranged on the bottom surface of the sliding rod 2 and a hanging ring 122 fixedly arranged on the suspension rod 121, and the drill pipe 402 is arranged through the hanging ring 122.
As shown in fig. 4, in the construction process, the acting force of the drill rod 402 on the hanger 12 is large, in order to avoid the fracture of the fixed connection part between the suspension rod 121 and the bottom surface of the slide rod 2, a triangular reinforcing plate 123 is arranged at the fixed connection part between the suspension rod 121 and the bottom surface of the slide rod 2, a right-angle side of the triangular reinforcing plate 123 is fixedly connected with the suspension rod 121, and the other right-angle side is fixedly connected with the bottom surface of the slide rod 2, so that the fixed connection part between the suspension rod 121.
Referring back to fig. 1, during construction, in order to move the drill rod up and down, two vertical pipes vertically and fixedly connected to the base 101 by the support frame 102 are all arranged into two pipe joints, including the first pipe joint 9 and the second pipe joint 10, and the peripheral surfaces of the first pipe joint 9 and the second pipe joint 10 are provided with positive and negative threads, and are sleeved at the joint of the pipe joints by the sleeve 11 with the positive and negative threads. When the cement condensate at a lower position needs to be drilled and removed in the construction process, the forward and reverse threaded sleeve 11 is rotated, and the height of the drill rod 402 is adjusted to a specified position for drilling.
The implementation principle of the embodiment is as follows: during the construction, place support 1 in grout cured object the place ahead, the drill bit is towards grout cured object and advance the drilling, when needs different angle drilling, adjusts slide bar 2, when sliding the assigned position, fixes slide bar 2 with the bolt, continues to drill. When different heights of drilling are needed, the forward and reverse threaded sleeves 11 are adjusted to enable the drill rod to vertically move to a designated height for drilling. Through the angle to slide bar 2 and the regulation of support frame 102 height, be convenient for to each position of sewer the mediation grout condensate that solidifies in the sewer of driling, labour saving and time saving promotes work efficiency.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a novel mediation equipment of sewer grout cured substance which characterized in that: comprises a bracket (1), a slide bar (2), a slide seat (3) and a drilling device (4); the support (1) comprises a base (101) and support frames (102) arranged at two ends of the base (101), the support frames (102) are fixedly connected to the base (101) in a door shape, and each support frame (102) comprises a first support frame (1021) and a second support frame (1022); the bottom surface of the slide bar (2) is provided with a tooth socket, two ends of the slide bar are respectively erected at the top ends of the first support frame (1021) and the second support frame (1022), one end of the slide bar (2) is connected with the first support frame (1021) in a sliding manner, and the other end of the slide bar is hinged with the second support frame (1022); a sliding groove (5) is formed in the top end of the first support frame (1021), and a pulley (201) capable of rolling in the sliding groove (5) is mounted at the front end of the sliding rod (2); the drilling device (4) comprises a drilling machine (401), a drill rod (402) and a rack (403), wherein the rack (403) is fixedly connected to the bottom surface of the sliding seat (3), a gear is arranged inside the rack (403) and is meshed with a tooth groove in the sliding seat (3) and the sliding rod (2), and a rotating wheel is arranged outside the rack (403) and is connected with the gear inside the rack; the drilling machine (401) and the drill rod (402) are respectively arranged at two ends of the frame (403) along the drilling direction, one end of the drill rod (402) is connected with the drilling machine (401), and the other end horizontally penetrates through the first support frame (1021) and faces the cured cement paste.
2. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 1, wherein: a plurality of pin holes (7) are formed in the sliding groove (5), and a bolt for limiting the movement of the sliding rod (2) is inserted into each pin hole (7).
3. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 1, wherein: and limiting plates (8) are fixedly arranged at two ends of the sliding chute (5).
4. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 1, wherein: the vertical pipe of support frame (102) vertical concretion on base (101) all includes two sections tube coupling and positive and negative screw sleeve (11) of connecting two sections tube coupling.
5. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 1, wherein: and a hanging bracket (12) for stabilizing a drill rod (402) is fixedly arranged at the bottom surface of the sliding rod, which is close to the end head of the first supporting frame.
6. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 5, wherein: the hanger (12) comprises a hanging rod (121) fixedly arranged on the bottom surface of the sliding rod (2) and a hanging ring (122) fixedly arranged on the hanging rod (121), and the drill rod (402) penetrates through the hanging ring (122).
7. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 6, wherein: and a reinforcing plate (123) is arranged at the fixed connection part of the suspender (121) and the bottom surface of the sliding rod (2).
8. The dredging device for the cured substance of the novel sewer cement paste as claimed in claim 1, wherein: two transverse supporting rods (13) are fixedly connected between the first supporting frame (1021) and the second supporting frame (1022), and the two transverse supporting rods (13) are respectively positioned at two sides of the sliding rod (2).
CN201920899709.8U 2019-06-15 2019-06-15 Novel dredging equipment for cured sewer cement paste Expired - Fee Related CN210369288U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920899709.8U CN210369288U (en) 2019-06-15 2019-06-15 Novel dredging equipment for cured sewer cement paste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920899709.8U CN210369288U (en) 2019-06-15 2019-06-15 Novel dredging equipment for cured sewer cement paste

Publications (1)

Publication Number Publication Date
CN210369288U true CN210369288U (en) 2020-04-21

Family

ID=70264985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920899709.8U Expired - Fee Related CN210369288U (en) 2019-06-15 2019-06-15 Novel dredging equipment for cured sewer cement paste

Country Status (1)

Country Link
CN (1) CN210369288U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112354987A (en) * 2020-10-14 2021-02-12 国网山东省电力公司潍坊供电公司 Pipe well dredging device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112354987A (en) * 2020-10-14 2021-02-12 国网山东省电力公司潍坊供电公司 Pipe well dredging device

Similar Documents

Publication Publication Date Title
CN210369288U (en) Novel dredging equipment for cured sewer cement paste
CN206840332U (en) A kind of round log drilling equipment
CN211850870U (en) Novel building engineering formwork supports device
CN106425553B (en) A kind of screen scarifier excavation chain harrow plate processing and positioning device
KR20130085354A (en) Apparatus for piling screw pile
CN105291180B (en) Two-way porous jewel hole machine
CN214770099U (en) Pipeline welding platform
CN212251446U (en) Pipeline fixing device is used in hydraulic engineering construction
CN213046724U (en) Aerated concrete block mortar joint processing apparatus
CN211473450U (en) Ceiling board support frame
CN112538878A (en) Wall brushing device of integrated grooving machine
CN203248090U (en) Adjustable supporting frame used for top drilling
CN220789787U (en) Larson steel sheet pile supporting structure for sewage pipeline
CN217371157U (en) Welding tool for producing rotary spraying machine drill rod
CN215332647U (en) Power head connecting structure of rotary drilling machine
CN214219787U (en) Wall brushing device of integrated grooving machine
CN216446522U (en) Concrete placement feeding hopper assembly
CN213543369U (en) Blast hole cleaning device for open-air deep hole blasting
CN218597182U (en) Adjustable groove supporting device
CN213360014U (en) Auxiliary device for threaded drill
CN217231839U (en) Protection device for building foundation ditch construction
CN210919083U (en) Tunnel inner section steel support
CN220081342U (en) Tiltable drilling machine for shallow water environment drilling
CN219548337U (en) Engineering construction work frame with protection architecture
CN218716898U (en) Equipment in cavity slip casting stock accent that tunnel engineering used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421