CN210361245U - Novel engineering cost budgets instrument and deposits device - Google Patents

Novel engineering cost budgets instrument and deposits device Download PDF

Info

Publication number
CN210361245U
CN210361245U CN201921423497.2U CN201921423497U CN210361245U CN 210361245 U CN210361245 U CN 210361245U CN 201921423497 U CN201921423497 U CN 201921423497U CN 210361245 U CN210361245 U CN 210361245U
Authority
CN
China
Prior art keywords
box body
upper box
box
tool storage
lock catch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921423497.2U
Other languages
Chinese (zh)
Inventor
金熙
李晓军
王芳
崔智翔
张斌
李卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201921423497.2U priority Critical patent/CN210361245U/en
Application granted granted Critical
Publication of CN210361245U publication Critical patent/CN210361245U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel engineering cost budgets instrument strorage device, include: the box body, the inboard bottom fixed mounting of box has first sponge layer down, box in one, the inside of well box is kept apart by a plurality of baffles and is formed a plurality of instruments and deposit the chamber, goes up the box, it is provided with the elasticity strap to go up between the box inner wall, it is provided with the elasticity net to go up between the adjacent inner wall of box, the elasticity strap is connected with the elasticity net to keep apart the inner space of going up the box and form a data and deposit the chamber, two bisymmetry at last box top is equipped with the screw hole. This practicality is deposited the chamber through the instrument that the baffle was kept apart and can be deposited the instrument of difference and deposit the intracavity in the instrument of difference, deposits the instrument classification, and is more orderly, finds easily when using, because the outer wall of lower box both sides is provided with flexible baldric, the device both can be with portable, also can be with the shoulder back of the body, convenient to carry.

Description

Novel engineering cost budgets instrument and deposits device
Technical Field
The utility model relates to an instrument strorage device field relates to a novel engineering cost budgets instrument strorage device particularly.
Background
The direct meaning of the project cost budget is the construction price of the budget project and the project valuation as three elements: amount, price, fee. The construction cost is defined from the perspective of an owner (investor), the construction cost refers to the construction cost of a project, namely, the total fixed asset investment cost expected to be paid or actually paid for constructing a project, and the costs mainly include equipment and tool purchase cost, construction project and installation project cost, other costs of the construction project, preparation cost, construction period interest, and fixed asset investment direction adjustment tax (the cost is not collected at present), although the costs do not form new fixed asset value when the new asset value is calculated according to a new financial system and enterprise accounting criteria in the completion settlement of the construction project, the costs are necessary for completing the fixed asset construction, so in this sense, the construction cost is the fixed asset investment of the construction project, the construction cost is defined from the perspective of a delivery package, namely, a project is built, and the price of the building installation project and the total price of the construction project are formed by the trading modes of bid inviting and bidding and the like in the markets of land, equipment, technical labor, contract and the like, wherein the bid inviting and bidding can be a construction project, a single project, or a certain stage in the whole construction project, such as feasibility research of the construction project, design of the construction project, construction stage of the construction project and the like.
In the work of the engineering cost budgeting personnel, a large amount of technical data are required to be browsed to obtain data, the data are required to be obtained by on-site surveying and mapping, a device for storing the required tools is lacked, the existing engineering cost budgeting toolbox also has corresponding functions, but the requirements of the workers cannot be met, the shapes and the sizes of the tools are different, the tools can be damaged when being placed randomly, the tools are difficult to find when being used, and how to facilitate the carrying of the device used by the engineering cost budgeting personnel is expected to be well solved.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned problems in the prior art, an aspect of the present invention is to provide a novel storage device for engineering cost budgeting tools, which is used to solve the above-mentioned problems in the background.
In order to achieve the above object, the utility model provides a pair of novel engineering cost budgets instrument and deposits device, include:
the bottom of the inner side of the lower box body is fixedly provided with a first sponge layer, and the center of the outer wall of one side of the lower box body is fixedly provided with an upper box body lock catch and a lower box body lock catch;
the middle box body is internally isolated by a plurality of partition plates to form a plurality of tool storage cavities, elastic limiting belts are fixedly arranged between the inner walls of the two opposite sides of the tool storage cavities, a lock catch fixing part is fixedly arranged at the center of the outer wall of one side of the middle box body, and a second sponge layer is bonded at the bottom of the middle box body;
the upper box body is provided with an elastic cloth belt between the inner walls of the upper box body, an elastic net is arranged between the adjacent inner walls of the upper box body, the elastic cloth belt is connected with the elastic net and isolates the inner space of the upper box body to form a data storage cavity, an upper box body lock catch is fixedly mounted at the center of the outer wall of one side of the upper box body, and threaded holes are formed in the top of the upper box body in a pairwise symmetry mode.
Preferably, the upper box body lock catch, the lock catch fixing part and the lower box body lock catch are all located on the same side and are all located on the same horizontal line.
Preferably, the tool storage cavity on the rightmost side of the middle box body is internally provided with four cylindrical legs, the outer wall of one end of each cylindrical leg is provided with a thread, and the cylindrical legs are matched with the threaded holes through the threads.
Preferably, the outer walls of the two sides of the lower box body are provided with telescopic shoulder straps.
Preferably, the middle box body is hinged with the upper box body and the lower box body respectively.
Preferably, a box handle is fixedly arranged at the center of the top of the upper box body.
Preferably, the upper box body, the middle box body and the lower box body can adopt aluminum alloy plates.
Advantageous effects
Compared with the prior art, the utility model provides a pair of novel engineering cost budgets instrument and deposits device possesses following beneficial effect:
the utility model discloses a, the instrument that keeps apart through the baffle is deposited the chamber and can be deposited the intracavity with different instruments and leave in different instruments, deposits the instrument classification, and is more orderly, makes the instrument not fragile, and finds more easily when using.
Two, this utility model, can install the cylinder leg at the screw hole at last box top, with the case of turning over, can place computer or stool with the case as the desk and sit the rest, make engineering cost budget personnel more convenient at work.
Thirdly, this utility model, the top fixed mounting who goes up the box has the box handle, and the outer wall of lower box both sides is provided with flexible baldric, and the device both can be with portable, also can be with the shoulder back of the body, and it is more convenient to carry.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
This document provides an overview of various implementations or examples of the technology described in this disclosure, and is not a comprehensive disclosure of the full scope or all features of the disclosed technology.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the lower case of the present invention;
FIG. 3 is a cross-sectional view of the lower case of the present invention;
FIG. 4 is a schematic structural view of the middle box body of the present invention;
FIG. 5 is a cross-sectional view of the middle box body of the present invention;
fig. 6 is a schematic view of the upper box structure of the present invention.
The main reference numbers:
1. an upper box body; 2. a middle box body; 3. a lower box body; 4. a handle of the box body; 5. locking the upper box body; 6. a locking fastener; 7. locking the lower box body; 8. a first sponge layer; 9. a second sponge layer; 10. a partition plate; 11. An elastic limit band; 12. a tool storage chamber; 13. a cylindrical leg; 14. an elastic cloth belt; 15. an elastic net; 16. a data storage chamber; 17. a threaded hole; 18. a telescopic shoulder belt.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be described below clearly and completely with reference to the accompanying drawings of the embodiments of the present disclosure. It is to be understood that the described embodiments are only a few embodiments of the present disclosure, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the disclosure without any inventive step, are within the scope of protection of the disclosure.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The use of the word "comprising" or "comprises", and the like, in this disclosure is intended to mean that the elements or items listed before that word, include the elements or items listed after that word, and their equivalents, without excluding other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may also include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
To maintain the following description of the embodiments of the present disclosure clear and concise, a detailed description of known functions and known components have been omitted from the present disclosure.
Referring to fig. 1-6, a novel construction cost budgeting tool storage device comprises: the lower box body 3, the middle box body 2 and the upper box body 1, the tool storage cavities 12 separated by the partition plates 10 can store different tools in different tool storage cavities 12, and the tools are stored in different categories, so that the tools are more orderly, are not easy to damage and are easier to find when in use; because the top of the upper box body 1 is fixedly provided with the box body handle 4, and the outer walls of the two sides of the lower box body 3 are provided with the telescopic shoulder straps 18, the device can be carried by hands or shoulders, and is more convenient to carry; through installing cylinder leg 13 at the screw hole 17 at last 1 tops of box, turn over the case, can place the computer or the stool is sitting the rest as the desk with the case, make engineering cost budget personnel more convenient at work. Used for solving the technical problems existing in the background technology in the utility model: in the work of the personnel for cost budget, the personnel usually need to browse a large amount of technical data to obtain data and also need to survey and draw on the spot to obtain data, and the personnel lack a device for storing required tools and are inconvenient to carry, and the tools are damaged when being randomly placed, and are difficult to search when in use.
As a further technical solution provided by the present application, the following is specifically provided:
as shown in fig. 2 and 3, a first sponge layer 8 is fixedly arranged at the bottom of the inner side of a lower box body 3, and an upper box body lock catch 7 and a lower box body lock catch 7 are fixedly arranged at the center of the outer wall of one side of the lower box body 3;
wherein, the outer walls of both sides of the lower box body 3 are provided with telescopic shoulder straps 18, so that the box body can be carried on the shoulders.
As shown in fig. 4 and 5, a middle box body 2, wherein the inside of the middle box body 2 is separated by a plurality of partition boards 10 to form a plurality of tool storage cavities 12, elastic limiting belts 11 are fixedly installed between the inner walls of two opposite sides of the tool storage cavities 12, a lock catch fixing part 6 is fixedly installed at the center of the outer wall of one side of the middle box body 2, and a second sponge layer 9 is adhered to the bottom of the middle box body 2;
as shown in fig. 1 and 6, an upper box body 1 is provided with an elastic cloth belt 14 between inner walls of the upper box body 1, an elastic net 15 is provided between adjacent inner walls of the upper box body 1, the elastic cloth belt 14 is connected with the elastic net 15 and separates an inner space of the upper box body 1 to form a data storage cavity 16, an upper box body lock catch 5 is fixedly installed at the center of an outer wall of one side of the upper box body 1, and threaded holes 17 are symmetrically arranged at the top of the upper box body 1.
Wherein, a box handle 4 is fixedly arranged at the center of the top of the upper box body 1, so that the box body can be held by hands.
Wherein, go up box hasp 5, hasp mounting 6 and lower box hasp 7 and all lie in same one side to all lie in same water flat line, make the box pin.
Wherein, the instrument storage cavity 12 on the rightmost side of the middle box body 2 is internally provided with four cylindrical legs 13, the number of the cylindrical legs 13 is four, the outer wall of one end of each cylindrical leg 13 is provided with a thread, the cylindrical legs 13 are matched with the threaded holes 17 through the threads, the cylindrical legs 13 are matched with the threaded holes 17, and then the box is turned over, so that the box can be used as a desk for placing a computer or a stool for sitting and resting, and the engineering cost budget personnel can work more conveniently.
Wherein, the middle box body 2 is respectively hinged with the upper box body 1 and the lower box body 3.
Wherein, go up box 1, well box 2 and 3 can adopt aluminium alloy plate of lower box, be that the case is more light, more firm.
The working principle is as follows: through opening upper box hasp 5 and lower box hasp 7, can open the case, lower box 3 is used for depositing the notebook computer that engineering cost is used for calculating, later close lower box hasp 7, put into different instrument respectively and deposit the chamber 12 with required instrument, later put into required file data and manuscript paper data and deposit the chamber 16, close the case, detain upper box hasp 5, deposit promptly and finish, can remove and carry through box handle 4 and flexible baldric 18, in addition, can install cylinder leg 13 at the screw hole 17 at upper box 1 top, overturn the case, can place the computer or sit the rest as the desk with the case, make engineering budget personnel more convenient in work.
It will be appreciated by those skilled in the art that other similar connections may be used to implement the present invention. Such as welding, bonding, or screwing.
The above embodiments are merely exemplary embodiments of the present invention, which is not intended to limit the present invention, and the scope of the present invention is defined by the appended claims. Various modifications and equivalents may be made by those skilled in the art to the present invention without departing from the spirit and scope of the invention, and such modifications and equivalents should be considered to be within the scope of the invention.

Claims (7)

1. A novel engineering cost budgets instrument strorage device which characterized in that includes:
the box body structure comprises a lower box body (3), wherein a first sponge layer (8) is fixedly arranged at the bottom of the inner side of the lower box body (3), and an upper box body lock catch (7) and a lower box body lock catch (7) are fixedly arranged at the center of the outer wall of one side of the lower box body (3);
the tool storage box comprises a middle box body (2), wherein a plurality of tool storage cavities (12) are formed in the middle box body (2) in an isolated mode through a plurality of partition plates (10), elastic limiting belts (11) are fixedly installed between the inner walls of two opposite sides of each tool storage cavity (12), a lock catch fixing piece (6) is fixedly installed in the center of the outer wall of one side of the middle box body (2), and a second sponge layer (9) is bonded to the bottom of the middle box body (2);
the upper box body (1) is provided with an elastic cloth belt (14) between the inner walls of the upper box body (1), an elastic net (15) is arranged between the adjacent inner walls of the upper box body (1), the elastic cloth belt (14) is connected with the elastic net (15) and isolates the inner space of the upper box body (1) to form a data storage cavity (16), a box lock catch (5) is fixedly arranged at the center of the outer wall of one side of the upper box body (1), and threaded holes (17) are formed in the two-to-two symmetry of the top of the upper box body (1).
2. The storage device for the engineering cost budgeting tool according to claim 1, wherein the upper box body lock catch (5), the lock catch fixing piece (6) and the lower box body lock catch (7) are all located on the same side and on the same horizontal line.
3. The novel engineering cost budgeting tool storage device is characterized in that cylindrical legs (13) are arranged in a tool storage cavity (12) on the rightmost side of the middle box body (2), the number of the cylindrical legs (13) is four, threads are arranged on the outer wall of one end of each cylindrical leg (13), and the cylindrical legs (13) are matched with threaded holes (17) through the threads.
4. A new construction cost budgeting tool storage device according to claim 1, characterized in that the outer walls of both sides of the lower box (3) are provided with telescopic shoulder straps (18).
5. A new construction cost budgeting tool storage device according to claim 1, wherein the middle box (2) is hinged to the upper box (1) and the lower box (3), respectively.
6. The new project cost budgeting tool storage device according to claim 1, wherein a box handle (4) is fixedly installed at the center of the top of the upper box body (1).
7. A new construction cost budgeting tool storage device according to claim 1, wherein the upper box (1), the middle box (2) and the lower box (3) are made of aluminum alloy plate.
CN201921423497.2U 2019-08-29 2019-08-29 Novel engineering cost budgets instrument and deposits device Expired - Fee Related CN210361245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921423497.2U CN210361245U (en) 2019-08-29 2019-08-29 Novel engineering cost budgets instrument and deposits device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921423497.2U CN210361245U (en) 2019-08-29 2019-08-29 Novel engineering cost budgets instrument and deposits device

Publications (1)

Publication Number Publication Date
CN210361245U true CN210361245U (en) 2020-04-21

Family

ID=70253257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921423497.2U Expired - Fee Related CN210361245U (en) 2019-08-29 2019-08-29 Novel engineering cost budgets instrument and deposits device

Country Status (1)

Country Link
CN (1) CN210361245U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112086009A (en) * 2020-09-09 2020-12-15 王远志 Intelligent information equipment for engineering cost consultation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112086009A (en) * 2020-09-09 2020-12-15 王远志 Intelligent information equipment for engineering cost consultation

Similar Documents

Publication Publication Date Title
US8173893B2 (en) Electronic device case
CN210361245U (en) Novel engineering cost budgets instrument and deposits device
CN107097193A (en) A kind of portable power tool box
CN215186935U (en) Bracket is put to hand-held type scanner that electronic commerce used
CN209961227U (en) Portable mapping device
CN211608428U (en) Toolbox is used in reconnaissance of engineering cost budget
CN214432706U (en) Drawing tool storage device based on engineering cost budget
CN209737565U (en) Engineering project management uses multi-functional toolbox
CN207444536U (en) A kind of Work tool bag
CN207029864U (en) A kind of multilayer screwdriver bit receiver
CN218313460U (en) Equipment tool kit for measurement
CN212351963U (en) Emergency rescue toolbox
CN206482172U (en) A kind of Multifunctional cosmetics case
CN217695488U (en) Land house survey and drawing survey recording device convenient to use
CN211483298U (en) Portable english teaching tool package
CN210416062U (en) Portable drawing tool box
CN216464522U (en) Toolbox for construction engineering cost
CN210809630U (en) Toolbox is used in financial sales
CN214686476U (en) Portable ancient biogenetic fossil gathers toolbox
CN212385457U (en) Portable toolbox is used in computer maintenance
CN213324200U (en) Special bin for network maintenance tool
CN209425412U (en) A kind of portable cost tool box
CN213106755U (en) Visual transmission planar design is saddlebag for specialty
CN204908325U (en) Portable multi -functional open -air geological exploration specialized tool case
CN220094570U (en) Green toolbox for architectural design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421

Termination date: 20210829

CF01 Termination of patent right due to non-payment of annual fee