CN210336937U - Hot melting device is used in cell-phone equipment production - Google Patents

Hot melting device is used in cell-phone equipment production Download PDF

Info

Publication number
CN210336937U
CN210336937U CN201920869307.3U CN201920869307U CN210336937U CN 210336937 U CN210336937 U CN 210336937U CN 201920869307 U CN201920869307 U CN 201920869307U CN 210336937 U CN210336937 U CN 210336937U
Authority
CN
China
Prior art keywords
treatment box
melting furnace
wall
secondary treatment
melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920869307.3U
Other languages
Chinese (zh)
Inventor
彭胜甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920869307.3U priority Critical patent/CN210336937U/en
Application granted granted Critical
Publication of CN210336937U publication Critical patent/CN210336937U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Muffle Furnaces And Rotary Kilns (AREA)
  • Processing Of Solid Wastes (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model provides a hot melting device for mobile phone assembly production, which relates to the field of mobile phone assembly production, and comprises a melting furnace, a secondary treatment box and a primary treatment box, wherein the primary treatment box is arranged at the top of the secondary treatment box, the top of the secondary treatment box is arranged at the side wall of the primary treatment box, and an isolation box is arranged at the side wall of the secondary treatment box, the secondary treatment box is arranged at the top of the melting furnace, the bottom of the melting furnace is communicated with a spray melting head, the hot melting device for mobile phone assembly production is characterized in that raw materials pass through the primary treatment box, a rotary handle drives a crushing barrel to rotate to crush the raw materials, a motor drives the grinding table to rotate, the raw materials pass through a grinding block arranged on the inner wall of the grinding table and the secondary treatment box to be crushed again, the raw materials are crushed into individuals with a plurality of small volumes, and are crushed twice, the contact, easily conduct heat, the hot melt efficiency accelerates, and then improves the efficiency of hot melt work.

Description

Hot melting device is used in cell-phone equipment production
Technical Field
The utility model relates to a cell-phone equipment production technical field specifically is a cell-phone equipment production is with hot melt device.
Background
When the mobile phone is assembled, the mobile phone needs to be subjected to hot melting, for example, a hot melting device for mobile phone assembly production with application number CN201720985587.5 has low efficiency of raw material crushing, reduces the rate of hot melting, and the raw material is easy to adhere to the inner wall of the hot melting cavity to affect the utilization rate of the raw material.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a hot melting device is used in cell-phone equipment production has solved that the kibbling efficiency of raw materials is lower, has reduced the speed of hot melt, and the raw materials easily bonds the problem that influences the raw materials rate of utilization at the inner wall in hot melt chamber.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a hot melting device for mobile phone assembly production comprises a melting furnace, a secondary treatment box and a primary treatment box, wherein the primary treatment box is mounted at the top of the secondary treatment box, an isolation box is mounted at the top of the secondary treatment box and positioned on the side wall of the primary treatment box, the secondary treatment box is mounted at the top of the melting furnace, and a spray melting head is communicated with the bottom of the melting furnace;
the melting furnace comprises insulating layer, hot melt layer and heat-conducting layer, the inside of handling the case for the first time is provided with horizontally crushing barrel, the outer wall of crushing barrel encircles and is provided with the spiral section, crushing barrel through the inside of the connection bearing movable mounting that its both ends set up in handling the case for the first time, the lateral part of handling the case for the first time is provided with changes, and the tip of changing inserts the inside of handling the case for the first time and is connected with the lateral wall of crushing barrel, the top of handling the case for the first time and keep away from one side of shielded box and seted up the feed inlet, the bottom of handling the case for the first time and be close to one side of shielded box and seted up the discharge gate, and the discharge gate extends to the inside of handling the case again, the internally mounted of shielded box has the motor, the motor passes through wire and peripheral hardware control panel electric connection, the output shaft end welding of motor has the bull stick, the bottom of, grinding blocks are arranged on the side wall of the grinding table and the inner wall of the secondary treatment box, and a through hole communicated with the interior of the melting furnace is formed in the bottom of the secondary treatment box;
the internally mounted of melting furnace has the screen cloth, the top swing joint of fixing bearing and screen cloth is passed through to the bottom of bull stick, the stirring roller is installed to the lateral wall of bull stick, the end connection of stirring roller has scrapes the wall pole, and scrapes the lateral wall of wall pole and the inner wall contact of melting furnace, the top riveting of retreating the case has the fan, the fan passes through wire and the peripheral hardware control panel electric connection, the exit end intercommunication of fan has the trachea, tracheal other end extends to the lateral wall of melting furnace and the orientation and spouts the fusion head unanimously.
Preferably, a control valve is arranged inside the melt-spraying head.
Preferably, the heat insulation layer, the hot melt layer and the heat conduction layer are arranged in sequence from outside to inside.
Preferably, the grinding table is in a circular truncated cone shape, and the top of the grinding table is in an arc shape protruding upwards.
Preferably, the wall scraping rod is obliquely arranged, and the radian of the wall scraping rod is matched with that of the melting furnace.
(III) advantageous effects
The utility model provides a hot melting device is used in cell-phone equipment production. The method has the following beneficial effects:
1. this hot melting device is used in cell-phone equipment production, the leading-in first treatment incasement of raw materials, rotatory commentaries on classics is the rotation of driving crushing barrel, move gradually when the raw materials is kibbling and drop to the inside of once more crushing case, the motor drives the rotation of grinding platform, make the raw materials through the grinding platform with handle the abrasive brick mutual contact friction that the incasement wall set up once more with the raw materials smash once more, the raw materials is smashed to the individuality of a plurality of little volumes, through twice smashing, kibbling more thoroughly, area of contact has been increased, easily heat conduction, with higher speed hot melt efficiency, and then improve the efficiency of hot melt work.
2. This hot melting device is used in cell-phone equipment production, the motor passes through the rotation that the bull stick drove the stirring roller, with raw materials intensive mixing, thermal conduction accelerates, help improving hot melt efficiency, scrape the continuous inner wall contact with the melting furnace of wall pole simultaneously, help scraping the raw materials from the oven, and scrape the bottom to the melting furnace under continuous, avoid the raw materials to bond and be difficult to handle on the oven, influence the rate of utilization, produce decurrent application of force to the raw materials when scraping the continuous rotation of wall pole, discharge of raw materials accelerates.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion of A in FIG. 1;
FIG. 3 is a top view of the wall scraping rod and the rotating rod of the present invention;
fig. 4 is a side view of the wall scraping rod and the rotating rod of the present invention.
In the figure: 1 melting furnace, 101 heat-insulating layer, 102 hot melt layer, 103 heat-conducting layer, 2 retreatment box, 3 primary treatment box, 4 isolation box, 5 crushing cylinder, 6 grinding table, 7 rotating rod, 8 stirring roller, 9 wall scraping rod, 10 screen, 11 fan, 12 air pipe and 13 spray melting head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a hot melting device is used in cell-phone equipment production, as shown in fig. 1-4, including melting furnace 1, retreatment case 2 and first processing case 3, first processing case 3 is installed in retreatment case 2's top, retreatment case 2's top and be located the lateral wall of first processing case 3 and install shielded cell 4, retreatment case 2 is installed in melting furnace 1's top, melting furnace 1's bottom intercommunication is provided with spouts melting head 13, spouts melting head 13's inside and is provided with control flap, steerable raw materials are from spouting melting head 13 exhaust flow size.
The melting furnace 1 consists of a heat insulation layer 101, a hot melt layer 102 and a heat conduction layer 103, the heat insulation layer 101, the hot melt layer 102 and the heat conduction layer 103 are sequentially arranged from outside to inside, an electric heating tube or other heating components are arranged inside the hot melt layer 102 to provide a heat source, heat is conducted to the inside of the melting furnace 1 through the heat conduction layer 103, the arrangement of the heat insulation layer 101 avoids personnel damage caused by overhigh external temperature of the melting furnace 1, a horizontal crushing barrel 5 is arranged inside the primary treatment box 3, the outer wall of the crushing barrel 5 is provided with spiral slices in a surrounding manner, the crushing barrel 5 is movably arranged inside the primary treatment box 3 through connecting bearings arranged at two ends of the crushing barrel, a rotating handle is arranged at the side part of the primary treatment box 3, the end part of the rotating handle is inserted into the primary treatment box 3 and is connected with the side wall of the crushing barrel 5, a feed inlet is arranged at the top of the primary treatment box 3 and at one side far away from, and the discharge port extends to the interior of the secondary treatment box 2, a motor is arranged inside the isolation box 4, the model of the motor is Y90L-4-1.5, the power is 1.5KW, the rotating speed is 1480(rpm), the motor is electrically connected with an external control panel through a lead, a rotating rod 7 is welded at the end part of an output shaft of the motor, the bottom of the rotating rod 7 penetrates through the secondary treatment box 2 and the grinding table 6 and is inserted into the melting furnace 1, grinding blocks are arranged on the side wall of the grinding table 6 and the inner wall of the secondary treatment box 2, the grinding table 6 is in a circular table shape, the top of the grinding table 6 is in an upward protruding arc shape, a through hole communicated with the interior of the melting furnace 1 is arranged at the bottom of the secondary treatment box 2, raw materials are led into the primary treatment box 3, a rotary handle drives the grinding cylinder 5 to rotate, the raw materials are gradually moved and dropped into the interior of the secondary treatment box 2 while, make the raw materials through grinding platform 6 and the rubbing block mutual contact friction who handles 2 inner walls of case once more and smash the raw materials once more, the raw materials is smashed for the individuality of a plurality of little volumes, and kibbling more thoroughly has increased area of contact, easily conducts heat, and hot melt efficiency accelerates, and then improves the efficiency of hot melt work.
The internal installation of melting furnace 1 has screen cloth 10, the bottom of bull stick 7 is through the top swing joint of fixed bearing and screen cloth 10, screen cloth 10 avoids the raw materials of caking to block up spouts melting head 13, stirring roller 8 is installed to the lateral wall of bull stick 7, the end connection of stirring roller 8 has scrapes wall rod 9, scrape the slope setting of wall rod 9, and scrape the radian of wall rod 9 and melt 1 looks adaptation, and scrape the lateral wall of wall rod 9 and contact with the inner wall of melting furnace 1, the motor drives the rotation of stirring roller 8 through bull stick 7, fully stir the raw materials, the conduction of heat is accelerated, help improving hot melt efficiency, scrape wall rod 9 and contact with the inner wall of melting furnace 1 constantly simultaneously, help scraping the raw materials from the oven, and constantly scrape to the bottom of melting furnace 1, avoid the raw materials to bond and be difficult to handle on the oven, influence the rate of utilization, scrape and produce decurrent application of force to the raw materials when wall rod 9 constantly rotates, discharge of raw materials is quickened, the top riveting of retreating case 2 has fan 11, fan 11 passes through the wire and the peripheral hardware control panel electric connection, and fan 11's exit end intercommunication has trachea 12, and the other end of trachea 12 extends to the lateral wall of melting furnace 1 and the orientation is unanimous with spout melting head 13, and fan 11 work produces wind and blows the hot melt department to the cell-phone through trachea 12 direction, helps its cooling solidification.
The working principle is as follows: when the material crusher is used, raw materials are guided into the primary treatment box 3, the rotary rotating handle drives the grinding cylinder 5 to rotate, the raw materials are gradually moved and fall into the secondary treatment box 2 while being crushed, the motor drives the grinding table 6 to rotate, so that the raw materials are crushed again through mutual contact friction of the grinding table 6 and the grinding blocks arranged on the inner wall of the secondary treatment box 2, the crushing is more thorough, an electric heating pipe or other heating components are arranged inside the hot melting layer 102 to provide heat source, the heat is guided into the melting furnace 1 through the heat conduction layer 103 to carry out hot melting on the raw materials, the arrangement of the heat insulation layer 101 avoids personnel damage caused by overhigh external temperature of the melting furnace 1, the motor drives the stirring roller 8 to rotate through the rotating rod 7, the raw materials are fully stirred, the heat conduction is accelerated, the hot melting efficiency is improved, meanwhile, the wall scraping rod 9 is continuously contacted with the inner wall of the melting furnace 1, and the raw, and continuously scrape down to the bottom of melting furnace 1, avoid the raw materials to bond difficult processing on the oven, influence the rate of utilization, scrape and produce decurrent application of force to the raw materials when wall pole 9 is continuous rotatory, discharge of raw materials is accelerated, and fan 11 work produces wind and blows the hot melt department to the cell-phone through trachea 12 direction, helps its cooling solidification.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a cell-phone equipment production is with hot melting device, includes melting furnace (1), retreats case (2) and first processing case (3), its characterized in that: the primary treatment box (3) is arranged at the top of the secondary treatment box (2), the top of the secondary treatment box (2) and the side wall of the primary treatment box (3) are provided with isolation boxes (4), the secondary treatment box (2) is arranged at the top of the melting furnace (1), and the bottom of the melting furnace (1) is communicated with a melt-spraying head (13);
melting furnace (1) comprises insulating layer (101), hot melt layer (102) and heat-conducting layer (103), the inside of handling case (3) for the first time is provided with horizontally crushing barrel (5), the outer wall of crushing barrel (5) is encircleed and is provided with the spiral section of thick bamboo, connection bearing movable mounting in the inside of handling case (3) for the first time that crushing barrel (5) set up through its both ends, the lateral part of handling case (3) for the first time is provided with changes, and changes the tip of handle and insert the inside of handling case (3) for the first time and be connected with the lateral wall of crushing barrel (5), the feed inlet has been seted up to the top of handling case (3) for the first time and keep away from one side of shielded box (4), the discharge gate has been seted up to the bottom of handling case (3) for the first time and is close to one side of shielded box (4), and the discharge gate extends to the inside of handling case (2) again, the, the electric melting furnace is characterized in that the motor is electrically connected with an external control panel through a lead, a rotating rod (7) is welded at the end part of an output shaft of the motor, the bottom of the rotating rod (7) penetrates through the secondary treatment box (2) and the grinding table (6) and is inserted into the melting furnace (1), grinding blocks are mounted on the side wall of the grinding table (6) and the inner wall of the secondary treatment box (2), and a through hole communicated with the inside of the melting furnace (1) is formed in the bottom of the secondary treatment box (2);
the internally mounted of melting furnace (1) has screen cloth (10), the top swing joint of fixing bearing and screen cloth (10) is passed through to the bottom of bull stick (7), stirring roller (8) are installed to the lateral wall of bull stick (7), the end connection of stirring roller (8) scrapes wall pole (9), and scrapes the lateral wall of wall pole (9) and the inner wall contact of melting furnace (1), the top riveting of retreating case (2) has fan (11), fan (11) are through wire and peripheral hardware's control panel electric connection, the exit end intercommunication of fan (11) has trachea (12), the other end of trachea (12) extends to the lateral wall of melting furnace (1) and orientation and spouts melting head (13) unanimously.
2. The hot melting device for mobile phone assembly production according to claim 1, wherein: and a control valve is arranged in the spray melting head (13).
3. The hot melting device for mobile phone assembly production according to claim 1, wherein: the heat insulation layer (101), the hot melt layer (102) and the heat conduction layer (103) are sequentially arranged from outside to inside.
4. The hot melting device for mobile phone assembly production according to claim 1, wherein: the grinding table (6) is in a circular truncated cone shape, and the top of the grinding table (6) is in an arc shape protruding upwards.
5. The hot melting device for mobile phone assembly production according to claim 1, wherein: the wall scraping rod (9) is obliquely arranged, and the radian of the wall scraping rod (9) is matched with that of the melting furnace (1).
CN201920869307.3U 2019-06-11 2019-06-11 Hot melting device is used in cell-phone equipment production Expired - Fee Related CN210336937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920869307.3U CN210336937U (en) 2019-06-11 2019-06-11 Hot melting device is used in cell-phone equipment production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920869307.3U CN210336937U (en) 2019-06-11 2019-06-11 Hot melting device is used in cell-phone equipment production

Publications (1)

Publication Number Publication Date
CN210336937U true CN210336937U (en) 2020-04-17

Family

ID=70185231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920869307.3U Expired - Fee Related CN210336937U (en) 2019-06-11 2019-06-11 Hot melting device is used in cell-phone equipment production

Country Status (1)

Country Link
CN (1) CN210336937U (en)

Similar Documents

Publication Publication Date Title
CN112473834B (en) Melting device of copper waste
CN108007185A (en) A kind of application method of rotary microwave metallurgical furnace
CN212266329U (en) Full-automatic granulator for reclaimed plastic preparation
CN207724621U (en) A kind of efficient comminutor of plastics-production
CN210336937U (en) Hot melting device is used in cell-phone equipment production
CN206104048U (en) Sand mill that possesses ultrasonic cleaning function
CN212457832U (en) Vertical roller grinding system with bilateral air supply
CN211191989U (en) Device for producing sheet of smelting metal
CN107376395A (en) A kind of long-life chemical industry reflects crystallization kettle
CN111961889A (en) Equipment and method for adding powdery material in alloy smelting process
CN209365090U (en) Phenolaldehyde moulding compound preparation system
CN212320317U (en) Castable drying device
CN213454905U (en) Waste metal recycling remelting furnace capable of achieving uniform heating
CN205238343U (en) Multi -functional high -efficient powder mixer
CN211903666U (en) A spray drying device for research and development of fodder milk powder
CN209013739U (en) Compact vessel is used in a kind of processing of hardware
CN210242468U (en) Drawer kiln waste heat utilization equipment of high-voltage electric porcelain
CN2585151Y (en) Medium-frequency induction heating drying kiln for modified magnesium oxide powder
CN207231139U (en) A kind of drying equipment of crystallizer protecting residue
CN206718261U (en) A kind of useless PE bottles multi-blade stirring reducing mechanism
CN106582363A (en) Double-stirring device of thermal cracking reaction kettle
CN205825705U (en) A kind of follow-on smelting furnace
CN211160138U (en) Aluminum product crushed aggregates processingequipment
CN206052111U (en) Wet method scruff segregation apparatuss
CN218656076U (en) Smelting device for processing waste glass

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200417

Termination date: 20210611

CF01 Termination of patent right due to non-payment of annual fee