CN210336830U - Cooling equipment after rubber pipeline processing - Google Patents

Cooling equipment after rubber pipeline processing Download PDF

Info

Publication number
CN210336830U
CN210336830U CN201921224605.3U CN201921224605U CN210336830U CN 210336830 U CN210336830 U CN 210336830U CN 201921224605 U CN201921224605 U CN 201921224605U CN 210336830 U CN210336830 U CN 210336830U
Authority
CN
China
Prior art keywords
box body
upper cover
box
exhaust pipe
rubber pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921224605.3U
Other languages
Chinese (zh)
Inventor
陆秋林
施俊烨
洪良益
顾丹英
孙美玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang Jiecheng Rubber Line Co Ltd
Original Assignee
Taicang Jiecheng Rubber Line Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taicang Jiecheng Rubber Line Co Ltd filed Critical Taicang Jiecheng Rubber Line Co Ltd
Priority to CN201921224605.3U priority Critical patent/CN210336830U/en
Application granted granted Critical
Publication of CN210336830U publication Critical patent/CN210336830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

The utility model relates to the technical field of cooling after rubber pipeline processing, in particular to a cooling device after rubber pipeline processing, which comprises a box body, a box roller shaft group is rotatably installed between the inner walls of the upper part of the box body, an M-shaped refrigerating pipe is horizontally installed and fixed on one side of the inner wall of the middle part of the box body, an air pump is installed and fixed on the lower part of the outer side of the box body, an exhaust pipe is fixedly arranged on the output end cover of the air pump, the exhaust pipe is communicated with the inner part of the box body, air outlet holes are uniformly formed on the exhaust pipe, an upper cover is installed on the upper end of the box body through a hinge, an upper cover roller shaft group is rotatably installed on the upper cover, an inverted L-shaped support is welded on the lower part of one side of the box body, the inverted L-shaped support comprises a vertical part and a horizontal part, and a winding shaft is rotatably installed, and the productivity of the glue pipeline is better improved.

Description

Cooling equipment after rubber pipeline processing
Technical Field
The utility model relates to a cooling technical field behind the rubber pipeline processing especially relates to a cooling device behind rubber pipeline processing.
Background
The rubber pipeline mainly extrudes rubber materials into a pipe through an extruder at high temperature, the temperature of the rubber pipeline just produced from the extruder is high, the rubber pipeline needs to be rapidly cooled, otherwise, the rubber pipeline just produced can deform, the quality of a rubber pipeline product is affected, the existing cooling equipment is single in function, single cooling can be frequently carried out on the rubber pipeline, the rubber pipeline after cooling needs to be wound by an operator, and then the rubber pipeline is wound, so that the capacity of the rubber pipeline is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a rubber pipeline processing rear cooling device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a cooling device after processing of rubber pipeline, the power distribution box comprises a box body, it installs box roller group to rotate between the inner wall on box upper portion, one side horizontal installation of box middle part inner wall is fixed with M shape refrigeration pipe, the lower part installation in the box outside is fixed with the air pump, the output pot head of air pump is established and is fixed with the blast pipe, the inside intercommunication of blast pipe and box, and evenly seted up the venthole on the blast pipe, the upper cover is installed through the hinge in the upper end of box, and the upper cover roller group is installed to the upper cover internal rotation, the lower part welding of box one side has the shape of falling L support, the shape of falling L support includes vertical part and horizontal part, and the top of the shape of falling.
Preferably, the M-shaped refrigerating pipe is positioned between the exhaust pipe and the roller shaft group of the box body.
Preferably, two wire inlet holes are horizontally formed in one side of the upper cover, two wire outlet holes are horizontally formed in the other side of the upper cover, and each wire outlet hole corresponds to each wire inlet hole in position.
Preferably, two winches are fixedly mounted on the winding shaft, and a rotating handle is fixedly mounted on one side of each winch.
Preferably, each roller shaft of the upper cover roller shaft group is positioned between two roller shafts of the box roller shaft group.
The utility model has the advantages that: the utility model discloses in, through installation refrigeration pipe and setting up the venthole, can be better cool down the cooling to the surface of gluing the pipeline, simultaneously through set up two sets of entrance holes and wire holes on covering to two fixed capstan winches of installation, the rubber tube line after the cooling can carry out the rolling to two sets of capstan wires simultaneously through rotating the commentaries on classics on the capstan winch, has not only saved workman's operating time, still better improvement the productivity of gluing the pipeline.
Drawings
Fig. 1 is a schematic structural view of a front view of a cooling device after processing a rubber pipe line provided by the present invention;
fig. 2 is the utility model provides a structural schematic of the top view of cooling device after rubber pipeline processing.
In the figure: the device comprises a box body 1, a box body 2, a roller shaft group 3M, a cooling pipe 4, an air pump 4, an air outlet 5, an upper cover 6, an upper cover roller shaft group 7, an inverted L-shaped support 8 and a winding shaft 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a cooling device after processing a rubber pipeline, comprising a box body 1, wherein the upper end of the box body 1 is provided with an upper cover 6 through a hinge, one side of the upper cover 6 is horizontally provided with two wire inlet holes for allowing rubber pipelines needing cooling to enter the box body 1, the other side of the upper cover 6 is horizontally provided with two wire outlet holes for allowing the rubber pipeline after cooling to come out from the box body 1, each wire outlet hole corresponds to each wire inlet hole, an upper cover roller group 7 is rotatably arranged in the upper cover 6, each roller shaft of the upper cover roller group 7 is arranged between two roller shafts of the box body roller group 2 for allowing the rubber pipeline to be cooled and cooled in the box body 1, the box body roller group 2 is rotatably arranged between the inner walls of the upper part of the box body 1, one side of the inner wall of the middle part of the box body 1 is horizontally provided with an M-shaped cooling pipe 3, and the lower part of the outer side, the utility model discloses a rubber hose line winding device, including air pump 4, blast pipe and box 1, and the inside intercommunication of blast pipe and box 1, and air outlet 5 has evenly been seted up on the blast pipe, M shape cooling pipe 3 is located between blast pipe and the box roller group 2, the gas that blows off in air outlet 5 can pass through M shape cooling pipe 3, thereby make the gas that blows off can become colder, be convenient for cool down the rubber hose line, the lower part welding of box 1 one side has the shape of falling L support 8, the shape of falling L support 8 includes vertical part and horizontal part, and the top of the vertical part of the shape of falling L support 8 rotates installs rolling axle 9, the installation is fixed with two winches on the rolling axle 9, and one side installation of capstan winch is fixed with the turning handle, can carry out the rolling to two sets of twisting pipes simultaneously through the turning handle on the rotation winch, workman's operating time has not only been saved, still better improvement the productivity.
In this embodiment, when the cooling device is used after rubber hose line processing, the upper cover 6 is opened, the rubber hose line to be cooled is inserted through the wire inlet hole and the wire outlet hole, the rubber hose line is placed on the upper cover roller group 7, the other end of each rubber hose line is fixed on the winch respectively, the upper cover 6 is closed, the power supplies of the air pump 4 and the M-shaped cooling pipe 3 are opened, the temperature of the air blown out of the air outlet hole 5 is reduced after passing through the M-shaped cooling pipe 3, the rubber hose line can be better cooled, at this time, an operator rotates a rotating handle on the winch to roll the cooled rubber hose line, the working time of workers is saved, two groups of rubber hose lines can be cooled and cooled simultaneously, the productivity of the rubber hose line is better improved, and the power supplies of the air pump 4 and the M-shaped cooling pipe 3 are closed after the operation is finished.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A cooling device after processing a rubber pipeline comprises a box body (1) and is characterized in that, a box roller shaft group (2) is rotatably arranged between the inner walls of the upper part of the box body (1), an M-shaped refrigerating pipe (3) is horizontally arranged and fixed on one side of the inner wall of the middle part of the box body (1), an air pump (4) is arranged and fixed on the lower part of the outer side of the box body (1), an exhaust pipe is fixedly sleeved on the output end of the air pump (4) and communicated with the inside of the box body (1), air outlet holes (5) are uniformly formed on the exhaust pipe, an upper cover (6) is arranged at the upper end of the box body (1) through a hinge, an upper cover roller shaft group (7) is rotatably arranged in the upper cover (6), an inverted L-shaped bracket (8) is welded at the lower part of one side of the box body (1), the inverted L-shaped bracket (8) comprises a vertical part and a horizontal part, and a winding shaft (9) is rotatably arranged at the top of the vertical part of the inverted L-shaped bracket (8).
2. The glue line post-processing cooling equipment as claimed in claim 1, wherein the M-shaped cooling pipe (3) is located between the exhaust pipe and the box roller shaft group (2).
3. The rubber pipeline processed cooling device as claimed in claim 1, wherein one side of the upper cover (6) is horizontally provided with two wire inlet holes, the other side of the upper cover (6) is horizontally provided with two wire outlet holes, and each wire outlet hole corresponds to each wire inlet hole.
4. The glue line post-processing cooling device according to claim 1, wherein two winches are fixedly mounted on the winding shaft (9), and a rotating handle is fixedly mounted on one side of each winch.
5. The glue line post-processing cooling equipment according to claim 1, wherein each roller of the upper cover roller set (7) is located between two rollers of the box roller set (2).
CN201921224605.3U 2019-07-31 2019-07-31 Cooling equipment after rubber pipeline processing Active CN210336830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921224605.3U CN210336830U (en) 2019-07-31 2019-07-31 Cooling equipment after rubber pipeline processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921224605.3U CN210336830U (en) 2019-07-31 2019-07-31 Cooling equipment after rubber pipeline processing

Publications (1)

Publication Number Publication Date
CN210336830U true CN210336830U (en) 2020-04-17

Family

ID=70216712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921224605.3U Active CN210336830U (en) 2019-07-31 2019-07-31 Cooling equipment after rubber pipeline processing

Country Status (1)

Country Link
CN (1) CN210336830U (en)

Similar Documents

Publication Publication Date Title
CN205772393U (en) A kind of wrap-up of cable
CN210336830U (en) Cooling equipment after rubber pipeline processing
CN210207343U (en) Electric motor car wheel hub paint spraying apparatus
CN205110740U (en) Die casting fan cooler
CN102974626B (en) High-efficiency and high-strength air cooling method and device of high-speed wire rod
CN208616758U (en) A kind of PVC board conveyer
CN207425464U (en) A kind of cable cooling device
CN202984301U (en) High-efficiency and high-strength air cooling device for high-speed wire
CN206915268U (en) A kind of paper reels device efficiently changed
CN205221747U (en) Device for conveying glass tubes
CN211034685U (en) Avoid in disorder high coiler of circuit
CN210098545U (en) Copper alloy wire drawing machine
CN203486558U (en) Automatic device for producing air-conditioning heat exchanger cores
CN215047284U (en) Spout automatic winding mechanism of area machine
CN201692962U (en) Film surface dust-removing device
CN201246843Y (en) Air exhausting apparatus of limitation space operation
CN217226588U (en) Forming die is used in production of fire prevention adhesive tape
CN210610821U (en) Seed ultra-low temperature intervention processing apparatus before maize cultivation
CN218223892U (en) Pipe tail blowing device for production of anti-corrosion pipeline
CN102635384A (en) Air distribution controller for tunnel construction air duct
CN204177169U (en) Continuous annealing is turned blue the special wind-guiding drying device of continuous tunnel furnace oil-removing area
CN213671744U (en) Stable and efficient metal pipe forming machine
CN217989908U (en) Multi-wire plastic coating device
CN218711552U (en) Antibacterial waterproof composite fabric production device
CN214089004U (en) Flame-retardant fabric ammonia fumigation device capable of controlling internal water vapor balance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant