CN210316672U - Strutting arrangement is used in building engineering construction - Google Patents

Strutting arrangement is used in building engineering construction Download PDF

Info

Publication number
CN210316672U
CN210316672U CN201920258204.3U CN201920258204U CN210316672U CN 210316672 U CN210316672 U CN 210316672U CN 201920258204 U CN201920258204 U CN 201920258204U CN 210316672 U CN210316672 U CN 210316672U
Authority
CN
China
Prior art keywords
building engineering
plate
fixed mounting
strutting arrangement
fixing base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920258204.3U
Other languages
Chinese (zh)
Inventor
谢晓宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920258204.3U priority Critical patent/CN210316672U/en
Application granted granted Critical
Publication of CN210316672U publication Critical patent/CN210316672U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a building engineering technical field just discloses a strutting arrangement for building engineering construction, comprising a base plate, the top fixed mounting of bottom plate has the support column the spacing groove has been seted up at the top of support column, the inside slidable mounting of spacing groove has the lifter, the interior diapire fixed mounting of spacing groove has the crash pad, the tooth's socket has been seted up in the front of lifter. This strutting arrangement for building engineering construction has seted up the tooth's socket to the lifter through setting up, and installed the gear to the dwang, reached the effect of conveniently adjusting strutting arrangement height, installed ball bearing to the fixing base through the setting, reached the effect that reduces the frictional force of dwang and fixing base, installed spacing dish to the fixing base through setting up, and to connecting block threaded connection have extended to the inside kelly of constant head tank, reached strutting arrangement and conveniently adjusted the length and adapt to the not effect that the co-altitude carries out the support.

Description

Strutting arrangement is used in building engineering construction
Technical Field
The utility model relates to a building engineering technical field specifically is a strutting arrangement is used in building engineering construction.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the house buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities.
Along with the development of society, the requirement of building engineering is also higher and higher, and the strutting arrangement that present building engineering used mainly is the bamboo pole, bindes extension or cuts the weak point with the bamboo pole and adapts to not support of co-altitude, and length adjustment is comparatively inconvenient, and work efficiency is lower, therefore strutting arrangement adjusts whether length is convenient to have this certain influence to work efficiency, so provides a strutting arrangement for building engineering construction and solves the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a strutting arrangement for building engineering construction possesses the advantage of conveniently adjusting length and the not support of adaptation co-altitude, has solved present strutting arrangement length and has adjusted comparatively inconveniently, and the lower problem of work efficiency.
(II) technical scheme
For the purpose of realizing the advantage of the above-mentioned convenient length of adjusting and the support that adapts to different heights, the utility model provides a following technical scheme: a supporting device for construction engineering comprises a base plate, wherein a supporting column is fixedly arranged at the top of the base plate, a limiting groove is formed in the top of the supporting column, a lifting rod is slidably arranged in the limiting groove, an anti-collision pad is fixedly arranged on the inner bottom wall of the limiting groove, a tooth groove is formed in the front of the lifting rod, a fixing seat extending to the right side of the supporting column is fixedly arranged on the front of the supporting column, a rotating rod extending into the limiting groove is movably arranged in the fixing seat, a gear meshed with the tooth groove is fixedly arranged on the left side of the rotating rod, a ball bearing is fixedly arranged in the fixing seat and positioned outside the rotating rod, a limiting disc is fixedly arranged on the outside of the fixing seat, a positioning groove is formed in the right side of the limiting disc, a connecting block is fixedly arranged on, the inside threaded connection of connecting block has the kelly that extends to the constant head tank inside, the outside of dwang and the right side fixed mounting that is located the connecting block have the holding rod, the top fixed mounting of lifter has the touch panel, the spout has been seted up to the inside of touch panel, the inside movable mounting of spout has the sliding block, the top fixed mounting of sliding block has the activity cardboard that extends to the touch panel outside, the top of touch panel and the left side fixed mounting that is located the activity cardboard have the location cardboard.
Preferably, a through hole is formed in the bottom plate, the number of the through holes is not less than four, and a threaded nail extending to the outside of the bottom plate is connected to the inner thread of the through hole.
Preferably, the thickness of the anti-collision pad is not less than one centimeter, and a fixing block is fixedly mounted on the right side of the clamping rod.
Preferably, a protective sleeve is fixedly mounted on the outer portion of the holding rod, anti-slip grains are formed in the outer surface of the protective sleeve, and the protective sleeve is made of rubber.
Preferably, the top of the touch panel and the right side of the movable clamping plate are fixedly provided with a connecting plate, the inner thread of the connecting plate is connected with a push rod, and the left side of the push rod is fixedly provided with a push block.
Preferably, the anti-skid pads are fixedly mounted on the opposite sides of the movable clamping plate and the positioning clamping plate, and the lines are arranged on the opposite sides of the two anti-skid pads.
(III) advantageous effects
Compared with the prior art, the utility model provides a strutting arrangement is used in building engineering construction possesses following beneficial effect:
1. this strutting arrangement for building engineering construction, set up the through hole to the bottom plate through setting up, and to through hole threaded connection the screw nail, convenient fixed effect has been reached, through setting up the support column to the bottom plate installation, and to the support column seted up the spacing groove, reached and carried out spacing effect to the lifter, through setting up the conflict board to the lifter, the effect that the contact was supported has been reached, through setting up to the touch panel seted up the spout, and to the spout installed sliding block and activity cardboard and to connecting plate threaded connection the catch bar, the effect that the centre gripping supported has been reached.
2. This strutting arrangement for building engineering construction has seted up the tooth's socket to the lifter through setting up, and installed the gear to the dwang, reached the effect of conveniently adjusting strutting arrangement height, installed ball bearing to the fixing base through the setting, reached the effect that reduces the frictional force of dwang and fixing base, installed spacing dish to the fixing base through setting up, and to connecting block threaded connection have extended to the inside kelly of constant head tank, reached strutting arrangement and conveniently adjusted the length and adapt to the not effect that the co-altitude carries out the support.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is a schematic view of the limiting plate of the present invention.
In the figure: 1 bottom plate, 2 support columns, 3 spacing grooves, 4 lifter, 5 crash pads, 6 tooth grooves, 7 fixing seats, 8 rotating rods, 9 gears, 10 ball bearings, 11 spacing discs, 12 positioning grooves, 13 connecting blocks, 14 clamping rods, 15 holding rods, 16 touch panels, 17 sliding grooves, 18 sliding blocks, 19 movable clamping plates and 20 positioning clamping plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a supporting device for construction of building engineering comprises a bottom plate 1, wherein through holes are formed in the bottom plate 1, the number of the through holes is not less than four, the inner threads of the through holes are connected with screw nails extending to the outside of the bottom plate 1, a limiting groove 3 is formed in the top of a supporting column 2 fixedly installed on the top of the bottom plate 1, a lifting rod 4 is slidably installed in the limiting groove 3, an anti-collision pad 5 is fixedly installed on the inner bottom wall of the limiting groove 3, the thickness of the anti-collision pad 5 is not less than one centimeter, a fixing block is fixedly installed on the right side of a clamping rod 14, a tooth socket 6 is formed in the front of the lifting rod 4, a fixing seat 7 extending to the right side of the supporting column 2 is fixedly installed on the front of the supporting column 2, a rotating rod 8 extending to the inside of the limiting groove 3 is, a ball bearing 10 is fixedly arranged inside the fixed seat 7 and outside the rotating rod 8, a limiting disc 11 is fixedly arranged outside the fixed seat 7, a positioning groove 12 is arranged on the right side of the limiting disc 11, a connecting block 13 is fixedly arranged outside the rotating rod 8 and on the right side of the limiting disc 11, a clamping rod 14 extending into the positioning groove 12 is connected with the inner portion of the connecting block 13 through a thread, a holding rod 15 is fixedly arranged outside the rotating rod 8 and on the right side of the connecting block 13, a protective sleeve is fixedly arranged outside the holding rod 15, anti-skid lines are arranged on the outer surface of the protective sleeve, the protective sleeve is made of rubber, a touch panel 16 is fixedly arranged on the top of the lifting rod 4, a sliding groove 17 is arranged inside the touch panel 16, a sliding block 18 is movably arranged inside the sliding groove 17, a movable clamping plate 19 extending to the outside the touch panel 16 is fixedly arranged on the top of the touch panel 18, and on the right, the inside threaded connection of connecting plate has the catch bar, and the left side fixed mounting of catch bar has the promotion piece, and the top of touch panel 16 and the left side fixed mounting that is located movable cardboard 19 have location cardboard 20, and the equal fixed mounting in one side that movable cardboard 19 is relative with location cardboard 20 has the slipmat, and the line has all been seted up to two one side that the slipmat is relative.
To sum up, this strutting arrangement for building engineering construction has seted up the through hole to bottom plate 1 through setting up, and to the through hole threaded connection screw nail, convenient fixed effect has been reached, support column 2 has been installed to bottom plate 1 through setting up, and spacing groove 3 has been seted up to support column 2, the effect of carrying on spacingly to lifter 4 has been reached, conflict board 16 has been installed to lifter 4 through setting up, the effect that the contact was supported has been reached, spout 17 has been seted up to touch board 16 through setting up, and slide block 18 and activity cardboard 19 have been installed to spout 17 and the catch bar has been connected to connecting plate threaded connection, the effect that the centre gripping supported has been reached.
And, tooth's socket 6 has been seted up to lifter 4 through the setting, and to dwang 8 installed gear 9, reached the effect that makes things convenient for the regulation strutting arrangement height, through setting up ball bearing 10 has been installed to fixing base 7, the effect that reduces the frictional force of dwang 8 and fixing base 7 has been reached, spacing dish 11 has been installed to fixing base 7 through the setting, and to connecting block 13 threaded connection has extended to the inside kelly 14 of constant head tank 12, the convenient length of adjusting of strutting arrangement and the effect that the adaptation is not highly supported have been reached.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a strutting arrangement for building engineering construction, includes bottom plate (1), its characterized in that: the top fixed mounting of bottom plate (1) has support column (2) spacing groove (3) have been seted up at the top of support column (2), the inside slidable mounting of spacing groove (3) has lifter (4), the interior diapire fixed mounting of spacing groove (3) has crashproof pad (5), tooth's socket (6) have been seted up in the front of lifter (4), the front fixed mounting of support column (2) has fixing base (7) that extends to support column (2) right side, the inside movable mounting of fixing base (7) has dwang (8) that extends to the inside of spacing groove (3), the left side fixed mounting of dwang (8) has gear (9) with tooth's socket (6) meshing, the outside fixed mounting that just is located dwang (8) in the inside of fixing base (7) has ball bearing (10), the outside fixed mounting of fixing base (7) has spacing dish (11), a positioning groove (12) is arranged on the right side of the limiting disc (11), a connecting block (13) is fixedly arranged outside the rotating rod (8) and positioned on the right side of the limiting disc (11), the inner thread of the connecting block (13) is connected with a clamping rod (14) extending to the inner part of the positioning groove (12), a holding rod (15) is fixedly arranged outside the rotating rod (8) and positioned at the right side of the connecting block (13), the top of the lifting rod (4) is fixedly provided with a touch plate (16), the inside of the touch plate (16) is provided with a sliding groove (17), a sliding block (18) is movably arranged in the sliding groove (17), a movable clamping plate (19) extending to the outside of the contact plate (16) is fixedly arranged at the top of the sliding block (18), and a positioning clamping plate (20) is fixedly arranged at the top of the abutting plate (16) and on the left side of the movable clamping plate (19).
2. The supporting device for construction of building engineering according to claim 1, wherein: the novel bottom plate is characterized in that a through hole is formed in the bottom plate (1), the number of the through holes is not less than four, and a threaded nail extending to the outside of the bottom plate (1) is connected to the inner thread of the through hole in a threaded mode.
3. The supporting device for construction of building engineering according to claim 1, wherein: the thickness of the anti-collision pad (5) is not less than one centimeter, and a fixing block is fixedly mounted on the right side of the clamping rod (14).
4. The supporting device for construction of building engineering according to claim 1, wherein: the outer portion of the holding rod (15) is fixedly provided with a protective sleeve, anti-slip grains are arranged on the outer surface of the protective sleeve, and the protective sleeve is made of rubber.
5. The supporting device for construction of building engineering according to claim 1, wherein: the top of the touch panel (16) and the right side of the movable clamping plate (19) are fixedly provided with a connecting plate, the inner thread of the connecting plate is connected with a push rod, and the left side of the push rod is fixedly provided with a push block.
6. The supporting device for construction of building engineering according to claim 1, wherein: the anti-skid device is characterized in that anti-skid pads are fixedly mounted on one opposite sides of the movable clamping plate (19) and the positioning clamping plate (20), and grains are arranged on one opposite sides of the two anti-skid pads.
CN201920258204.3U 2019-03-01 2019-03-01 Strutting arrangement is used in building engineering construction Expired - Fee Related CN210316672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920258204.3U CN210316672U (en) 2019-03-01 2019-03-01 Strutting arrangement is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920258204.3U CN210316672U (en) 2019-03-01 2019-03-01 Strutting arrangement is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN210316672U true CN210316672U (en) 2020-04-14

Family

ID=70122367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920258204.3U Expired - Fee Related CN210316672U (en) 2019-03-01 2019-03-01 Strutting arrangement is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN210316672U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112634709A (en) * 2020-12-24 2021-04-09 曲靖师范学院 Analytic show shelf of intelligence mathematics and applied mathematics difficult problem

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112634709A (en) * 2020-12-24 2021-04-09 曲靖师范学院 Analytic show shelf of intelligence mathematics and applied mathematics difficult problem

Similar Documents

Publication Publication Date Title
CN210316672U (en) Strutting arrangement is used in building engineering construction
CN207092498U (en) A kind of ceramic tile height adjuster
CN203452397U (en) Safe protection rack
CN210077474U (en) Bathroom cabinet convenient to adjust plywood
CA2130923A1 (en) Spacer for supporting water catchment basins
CN206677069U (en) A kind of distribution line push type drainage thread bending press
CN213572810U (en) Overhead floor convenient to installation
CN214117126U (en) Connection structure of raised floor and glass partition
CN211424317U (en) Fixing base for lighting fixture
CN213391110U (en) Building brick device for building house
CN210947276U (en) Partition wall ground of assembled light gauge steel mounting structure of making level
CN210152145U (en) Decorate interior panel's of engineering mounting structure
CN215631392U (en) Positioning device for wall brick installation
CN210598057U (en) Supporting device is laid to wall brick
CN214696740U (en) Scaffold for building engineering
CN214881773U (en) A spacing tuningout device for galvanized sheet production
CN210858098U (en) Strutting arrangement for civil engineering
CN219396853U (en) Decorative flower stand for architectural design
CN212963173U (en) Flatness detection device for building engineering
CN212039586U (en) Environmental protection dust collecting equipment of building engineering construction
CN214402630U (en) Wall brick strutting arrangement
CN217622924U (en) Mounting structure convenient to change wooden structure and build sculpture
CN107380682A (en) A kind of storage device of Dali stone ceramic tile
CN217268520U (en) Smooth installation component of dado
CN213593004U (en) Decorate panel cutting device for engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200414

CF01 Termination of patent right due to non-payment of annual fee