CN210303009U - Dust that building site construction was used filters collection formula and administers device - Google Patents

Dust that building site construction was used filters collection formula and administers device Download PDF

Info

Publication number
CN210303009U
CN210303009U CN201921213585.XU CN201921213585U CN210303009U CN 210303009 U CN210303009 U CN 210303009U CN 201921213585 U CN201921213585 U CN 201921213585U CN 210303009 U CN210303009 U CN 210303009U
Authority
CN
China
Prior art keywords
box
partition plate
dust
air
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921213585.XU
Other languages
Chinese (zh)
Inventor
张淑慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921213585.XU priority Critical patent/CN210303009U/en
Application granted granted Critical
Publication of CN210303009U publication Critical patent/CN210303009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model relates to a dust collecting device technical field specifically is a device is administered to dust filtration collection formula of building site construction usefulness, including the box, the outside left and right sides of box is equipped with inlet air channel and air-out passageway respectively, and the inside left and right sides of box is equipped with first baffle and second baffle respectively, and the equal fixed mounting in inside of inlet air channel and air-out passageway ventilates fan and filter screen, and the filter screen is located the outside of ventilating the fan, and beneficial effect is: the utility model discloses be provided with first deashing storehouse, second deashing storehouse and third deashing storehouse in the inside of box, wherein utilize the first baffle of air striking in the first deashing storehouse, make the large granule dust drop, be provided with outer bushing and interior bushing in the second deashing storehouse, and it has the cobblestone to be used for filtering to fill between the two, the inside watering dish that is provided with in third deashing storehouse utilizes water smoke to make the dust subside, triple filtration, dust in the fully collectable air, the air quality of construction site is improved.

Description

Dust that building site construction was used filters collection formula and administers device
Technical Field
The utility model relates to a dust collecting equipment technical field specifically is a device is administered to dust filtration collection formula that building site construction used.
Background
At present, on the construction site of a construction site, a large amount of building material dust is often seen to be distributed in the air, the most common cement dust, lime dust and the like exist, the dust is distributed in the air and cannot be settled in a short time, the environment of the construction site is seriously influenced, troubles are brought to the work of constructors, and waste is caused to a certain degree. In the prior art, there is not a good method to collect these dusts, and the dust remover that can purchase on the market is or just power is too little, and the dust removal effect is not obvious, or just the purification inefficiency of dust, and the dust collection difficulty, in a word, is not fit for using on the building site, for this reason, the utility model provides a dust filtration collection formula of building site construction usefulness administers device is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is administered to dust filtration collection formula of building site construction usefulness to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a dust filtering and collecting type treatment device for construction of construction sites comprises a box body, wherein the left side and the right side of the outside of the box body are respectively provided with an air inlet channel and an air outlet channel, the left side and the right side of the inside of the box body are respectively provided with a first partition plate and a second partition plate, the insides of the air inlet channel and the air outlet channel are fixedly provided with a ventilating fan and a filter screen, the filter screen is positioned on the outer side of the ventilating fan, the first partition plate and the second partition plate are vertically arranged, the side edges of the first partition plate and the second partition plate are fixedly connected to the inner wall of the box body, the first partition plate is uniformly provided with a ventilating opening, a gap between the first partition plate and the left side wall of the box body is arranged to be a first dust removing bin, a gap between the first partition plate and the second partition plate is arranged to be a second dust removing bin, a gap between the second partition plate and the right side wall, the air intake has evenly been seted up to the bottom of gas collecting tank, evenly run through on the mounting panel and be provided with outer bushing, the equal bolted connection of outer bushing is on the mounting panel, and the quantity of outer bushing and the quantity of air intake equal, and the connection is equipped with the hose between the two tip, the inside top side in third deashing storehouse is equipped with the water tank, be equipped with the watering dish under the water tank, the top central authorities of watering dish are equipped with the inlet tube, and the top of watering dish is provided with the connecting rod outward along being provided with, and the bottom of watering dish evenly is provided with the nozzle, the vertical bottom that upwards runs through the water tank in top of inlet tube, the upper and lower both ends difference welded fastening of connecting rod is on the bottom of water tank.
Preferably, the bottom ends of the first ash removing bin, the second ash removing bin and the third ash removing bin are respectively provided with a first collecting box, a second collecting box and a third collecting box, and a filter layer is fixedly arranged in the third collecting box.
Preferably, the inside of outer weeping pipe all cup joints and is equipped with interior weeping pipe, evenly seted up the through-hole on the pipe wall of interior weeping pipe and outer weeping pipe, the outside of interior weeping pipe and the inboard of outer weeping pipe all laminate and are provided with the filter ring, all fill in the clearance of interior weeping pipe and outer weeping pipe and be equipped with the cobblestone.
Preferably, the top both sides of mounting panel all are equipped with the flexure strip, outside one side fixed mounting shock dynamo of mounting panel, the upper and lower both sides of flexure strip bolted connection is respectively on the bottom of gas collecting tank and mounting panel.
Preferably, one side of the gas collection box, which is close to the second partition plate, is provided with a communicating pipe in a penetrating manner, and one end, which is far away from the gas collection box, of the communicating pipe penetrates through the second partition plate and extends to the inside of the third ash removal bin.
Preferably, the outside one side of box is equipped with the suction pump, connect inlet tube and outlet pipe on the water inlet of suction pump and the delivery port respectively, the tip of inlet tube runs through the lateral wall of box and third collecting box and extends to the inside of third collecting box, the tip of outlet pipe runs through the lateral wall of box and water tank and extends to in the water tank.
Preferably, the inside in third deashing storehouse is equipped with the filter frame perpendicularly, the filter frame is rectangular frame structure, and three are no less than to its quantity, and the interval of two adjacent filter frames equals.
Preferably, the side edges of the front side and the rear side of the filter frame are fixedly connected to the inner wall of the box body, and filter cloth is fixedly mounted in the filter frame.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the first ash cleaning bin, the second ash cleaning bin and the third ash cleaning bin are arranged inside the box body, wherein the first ash cleaning bin is internally impacted with air to the first partition plate, so that large-particle dust falls off, the second ash cleaning bin is internally provided with the outer leakage pipe and the inner leakage pipe, cobblestones are filled between the outer leakage pipe and the inner leakage pipe for filtering, the third ash cleaning bin is internally provided with the water spraying disc, the dust is settled by using water mist, and the dust in the air can be fully collected under the triple filtering action, so that the air quality of a construction site is improved;
2. the utility model discloses all be provided with the collecting box structure in the inside bottom in first deashing storehouse, second deashing storehouse and third deashing storehouse, wherein the inside vibrating motor drive mounting panel that utilizes in second deashing storehouse shakes, utilize the vibrations effect to make the dust drop, the inside third collecting box that utilizes in third deashing storehouse is collected and is taken dust water smoke, then the dust in the water smoke is strained to the rethread filter layer, relatively speaking, the collecting process is simple, can realize the recovery and recycle to the dust, avoid the material extravagant.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the outer funnel structure of the present invention;
FIG. 3 is a sectional view of the outer funnel structure of the present invention;
fig. 4 is a schematic view of the structure of the sprinkler plate of the present invention.
In the figure: the air inlet and outlet device comprises a box body 1, an air inlet channel 2, an air outlet channel 3, a ventilating fan 4, a filter screen 5, a first partition plate 6, a second partition plate 7, a first collecting box 8, a second collecting box 9, a third collecting box 10, an air collecting box 11, a mounting plate 12, an outer leakage pipe 13, an air inlet 14, a hose 15, an elastic sheet 16, a communicating pipe 17, a vibration motor 18, a water tank 19, a sprinkling disc 20, a water inlet pipe 21, a water suction pump 22, a water outlet pipe 23, a filter frame 24, a filter layer 25, an inner leakage pipe 26, a filter ring 27 and cobblestones 28.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a device is administered to dust filtration collection formula of building site construction usefulness, the power distribution box comprises a box body 1, the outside left and right sides of box 1 is equipped with inlet air duct 2 and air-out passageway 3 respectively, the inside left and right sides of box 1 is equipped with first baffle 6 and second baffle 7 respectively, the equal fixed mounting in inside of inlet air duct 2 and air-out passageway 3 ventilates fan 4 and filter screen 5, and filter screen 5 is located the outside of ventilating fan 4, ventilating fan 4 has all been installed to inlet air duct 2 and air-out passageway 3's inside, wherein the inside ventilating fan 4 of inlet air duct 2 pumps the outside air to box 1 in, the inside ventilating fan 4 of air-out passageway 3 pumps the inside air of box 1 to the outside.
The first partition plate 6 and the second partition plate 7 are both vertically arranged, the side edges of the first partition plate 6 and the second partition plate 7 are both fixedly connected to the inner wall of the box body 1, the first partition plate 6 is uniformly provided with ventilation openings, the gap between the left side walls of the first partition plate 6 and the box body 1 is set as a first dust removing bin, the gap between the first partition plate 6 and the second partition plate 7 is set as a second dust removing bin, the gap between the right side walls of the second partition plate 7 and the box body 1 is set as a third dust removing bin, the top side of the inner part of the second dust removing bin is provided with a gas collecting box 11, a mounting plate 12 is arranged under the gas collecting box 11, the bottom end of the gas collecting box 11 is uniformly provided with air inlets 14, the mounting plate 12 is uniformly provided with outer leakage pipes 13 in a penetrating manner, the outer leakage pipes 13 are all bolted on the mounting plate 12, the number of the outer leakage pipes 13 is equal to the number of the air inlets 14, a hose, the upper end and the lower end of the air inlet pipe are respectively fixedly connected with the air inlet 14 and the end part of the outer leakage pipe 13, and the connection part is sealed, so that air leakage is avoided.
The inside top side in third deashing storehouse is equipped with water tank 19, is equipped with watering dish 20 under water tank 19, and the top central authorities of watering dish 20 are equipped with inlet tube 21, and the top of watering dish 20 is outer along being provided with the connecting rod, and the bottom of watering dish 20 evenly is provided with the nozzle, and the vertical bottom that upwards runs through water tank 19 in top of inlet tube 21, the upper and lower both ends difference welded fastening of connecting rod are on water tank 19's bottom and watering dish 20. The water spraying disc 20 is fixed below the bottom end of the water tank 19 in a welded mode through a connecting rod, the water spraying disc 20 is of a hollow structure, water can be stored inside the water spraying disc 20, nozzles are evenly arranged at the bottom end of the water spraying disc, and water inside the water spraying disc 20 can be sprayed out in a water mist mode.
The inside bottom in first deashing storehouse, second deashing storehouse and third deashing storehouse is provided with first collecting box 8, second collecting box 9 and third collecting box 10 respectively, and the inside fixed mounting filter layer 25 of third collecting box 10, and filter layer 25 is the small aperture filter screen, can collect the dust of aquatic.
The inside of outer leak tube 13 all cup joints and is equipped with interior leak tube 26, the through-hole has evenly been seted up on the pipe wall of interior leak tube 26 and outer leak tube 13, the outside of interior leak tube 26 and the inboard of outer leak tube 13 all laminate and are provided with filter ring 27, all fill in the clearance of interior leak tube 26 and outer leak tube 13 and be equipped with cobblestone 28, concrete structure shape is as shown in fig. 2 and 3, there is the back cover bottom of outer leak tube 13, the bottom laminating of interior leak tube 26 and outer leak tube 13, therefore, outside air can only pass outer leak tube 13 in proper order, filter ring 27 and cobblestone 28 and interior leak tube 26 just can enter the inside of interior leak tube 26.
The top both sides of mounting panel 12 all are equipped with flexure strip 16, and outside one side fixed mounting shock dynamo 18 of mounting panel 12, and bolted connection is on the bottom of gas collecting box 11 and mounting panel 12 respectively in the upper and lower both sides of flexure strip 16, and flexure strip 16 is made for elastic material, and its effect supports mounting panel 12 on one hand, provides the space that mounting panel 12 can vibrate on the other hand.
One side of the gas collection box 11 close to the second partition plate 7 is provided with a communicating pipe 17 in a penetrating manner, and one end of the communicating pipe 17 far away from the gas collection box 11 penetrates through the second partition plate 7 and extends to the inside of the third ash removal bin.
The outside one side of box 1 is equipped with suction pump 22, connects inlet tube and outlet pipe 23 on the water inlet of suction pump 22 and the delivery port respectively, and the tip of inlet tube runs through the lateral wall of box 1 and third collecting box 10 and extends to the inside of third collecting box 10, and the tip of outlet pipe 23 runs through the lateral wall of box 1 and water tank 19 and extends to in the water tank 19, and suction pump 22 can be with the water pumping of third collecting box 10 bottom to the water tank 19 in, wholly constitutes a water circulation system.
The inside of third deashing storehouse is equipped with filter frame 24 perpendicularly, and filter frame 24 is rectangular frame structure, and three are no less than to its quantity, and two adjacent filter frame 24's interval equals.
The equal fixed connection of side of both sides is on the inner wall of box 1 around filter frame 24, and the equal fixed mounting filter cloth in inside of filter frame 24, and the setting of filter cloth is for hindering the circulation of air, slows down circulation of air speed, and moist filter cloth also can adsorb the dust, improves the collection efficiency of dust.
The working principle is as follows: the utility model discloses during the use, open simultaneously 2 air inlet channel and 3 inside ventilation fan 4 of air-out passageway and the vibrating motor 18 on the mounting panel 12. Under the action of the ventilating fan 4, the outside air firstly enters the first dust removing bin at a certain speed, the dust-carrying air firstly impacts the first partition plate 6, and part of dust with large particle diameter directly falls into the first collecting box 8. The air passes through the ventilation opening on the first partition plate 6 into the second ash removing bin, then passes through the outer leakage pipe 13, the filter ring 27, the cobblestones 28 and the inner leakage pipe 26 in sequence, enters the inner leakage pipe 26, and then passes through the hose 15 into the gas collecting box 11. The cobblestones 28 are piled between the outer funnel 13 and the inner funnel 26, which can filter the dust to adhere to the cobblestones 28, and the dust is shaken off the cobblestones 28 by the vibration of the vibration motor 18 and finally falls into the second collection box 9. Air in the air collecting box 11 passes through the communicating pipe 17 and enters the third dust cleaning bin, a water tank 19 and a water spraying disc 20 are arranged in the third dust cleaning bin, water in the water tank 19 enters the water spraying disc 20 through a water inlet pipe 21, the water spraying disc 20 sprays the water in the form of water mist by using a nozzle, and the water mist can enable dust in the air to settle and finally fall into the third collecting box 10. The filter layer 25 is arranged inside the third collecting tank 10, the filter layer 25 can separate dust and water in water, the water suction pump 22 is arranged on one side of the outer portion of the tank body 1, and the water suction pump 22 can suck filtered water in the third collecting tank 10 into the water tank 19 again, so that a water flow circulating system is integrally formed. Meanwhile, a filter frame 24 is vertically arranged in the third dust removing bin, filter cloth is arranged inside the filter frame 24, the filter cloth has the functions of slowing down the air circulation rate, and wet filter cloth also has the function of adsorbing dust under the wetting of water mist, so that the dust collecting efficiency is further improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a device is administered to dust filtration collection formula that building site construction used, includes box (1), its characterized in that: the air inlet channel (2) and the air outlet channel (3) are respectively arranged on the left side and the right side of the outer portion of the box body (1), the first partition plate (6) and the second partition plate (7) are respectively arranged on the left side and the right side of the inner portion of the box body (1), the ventilating fan (4) and the filter screen (5) are fixedly installed inside the air inlet channel (2) and the air outlet channel (3), the filter screen (5) is located on the outer side of the ventilating fan (4), the first partition plate (6) and the second partition plate (7) are vertically arranged, the side edges of the first partition plate and the second partition plate are fixedly connected to the inner wall of the box body (1), the first partition plate (6) is uniformly provided with a ventilation opening, the left side wall gap of the first partition plate (6) and the left side wall of the box body (1) is set as a first ash cleaning bin, the gap of the first partition plate (6) and the second partition plate (7) is set as a second ash cleaning bin, and the, the gas collecting box (11) is arranged on the top side in the second ash cleaning bin, a mounting plate (12) is arranged under the gas collecting box (11), air inlets (14) are uniformly formed in the bottom end of the gas collecting box (11), outer leaking pipes (13) are uniformly arranged on the mounting plate (12) in a penetrating mode, the outer leaking pipes (13) are all connected to the mounting plate (12) through bolts, the number of the outer leaking pipes (13) is equal to that of the air inlets (14), a hose (15) is connected between the end portions of the outer leaking pipes and the air inlets, a water tank (19) is arranged on the top side in the third ash cleaning bin, a water spraying disc (20) is arranged under the water tank (19), a water inlet pipe (21) is arranged in the center of the top end of the water spraying disc (20), a connecting rod is arranged on the outer edge of the top end of the water spraying disc (20), nozzles are uniformly arranged at the bottom end of the water spraying disc (20), and, the upper end and the lower end of the connecting rod are respectively welded and fixed at the bottom end of the water tank (19) and the sprinkling disc (20).
2. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: the bottom ends of the inner parts of the first ash removing bin, the second ash removing bin and the third ash removing bin are respectively provided with a first collecting box (8), a second collecting box (9) and a third collecting box (10), and a filtering layer (25) is fixedly arranged in the inner part of the third collecting box (10).
3. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: the inside of outer weeping pipe (13) all cup joints and is equipped with interior weeping pipe (26), evenly seted up the through-hole on the pipe wall of interior weeping pipe (26) and outer weeping pipe (13), the outside of interior weeping pipe (26) and the inboard of outer weeping pipe (13) all laminate and are provided with filter ring (27), all fill in the clearance of interior weeping pipe (26) and outer weeping pipe (13) and be equipped with cobblestone (28).
4. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: the gas collecting box is characterized in that elastic pieces (16) are arranged on two sides of the top end of the mounting plate (12), a vibration motor (18) is fixedly mounted on one side of the outside of the mounting plate (12), and the upper side and the lower side of each elastic piece (16) are respectively connected to the bottom end of the gas collecting box (11) and the mounting plate (12) through bolts.
5. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: one side of the gas collection box (11) close to the second partition plate (7) is provided with a communicating pipe (17) in a penetrating mode, and one end, far away from the gas collection box (11), of the communicating pipe (17) penetrates through the second partition plate (7) and extends to the interior of the third ash removal bin.
6. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: the outside one side of box (1) is equipped with suction pump (22), connect inlet tube and outlet pipe (23) on the water inlet of suction pump (22) and the delivery port respectively, the tip of inlet tube runs through the lateral wall of box (1) and third collecting box (10) and extends to the inside of third collecting box (10), the tip of outlet pipe (23) runs through the lateral wall of box (1) and water tank (19) and extends to in water tank (19).
7. The dust filtering and collecting type treatment device for construction site according to claim 1, wherein: the inside in third deashing storehouse is equipped with filter frame (24) perpendicularly, filter frame (24) are rectangular frame structure, and three are no less than to its quantity, and the interval of two adjacent filter frames (24) equals.
8. The dust filtering and collecting type treatment device for construction site according to claim 7, wherein: the side edges of the front side and the rear side of the filter frame (24) are fixedly connected to the inner wall of the box body (1), and filter cloth is fixedly arranged in the filter frame (24).
CN201921213585.XU 2019-07-30 2019-07-30 Dust that building site construction was used filters collection formula and administers device Expired - Fee Related CN210303009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921213585.XU CN210303009U (en) 2019-07-30 2019-07-30 Dust that building site construction was used filters collection formula and administers device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921213585.XU CN210303009U (en) 2019-07-30 2019-07-30 Dust that building site construction was used filters collection formula and administers device

Publications (1)

Publication Number Publication Date
CN210303009U true CN210303009U (en) 2020-04-14

Family

ID=70127010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921213585.XU Expired - Fee Related CN210303009U (en) 2019-07-30 2019-07-30 Dust that building site construction was used filters collection formula and administers device

Country Status (1)

Country Link
CN (1) CN210303009U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110292826A (en) * 2019-07-30 2019-10-01 张淑慧 A kind of working dust-filtering collection type controlling device in construction site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110292826A (en) * 2019-07-30 2019-10-01 张淑慧 A kind of working dust-filtering collection type controlling device in construction site

Similar Documents

Publication Publication Date Title
CN212108885U (en) Indoor fan that humidification dust fall air-purifying for construction
CN210303009U (en) Dust that building site construction was used filters collection formula and administers device
CN208626908U (en) A kind of industrial air cleaning unit
CN208541951U (en) A kind of road construction dedusting cleaning device
CN206956639U (en) A kind of airborne dust filtration system of sweeper
CN107354896A (en) A kind of multi-functional formula garbage recovery device based on wet dedusting
CN207211036U (en) A kind of multi-functional formula garbage recovery device based on wet dedusting
CN206853369U (en) A kind of cleaner
CN215692884U (en) High-efficient dust pelletizing system
CN213761092U (en) Wet dust collector
CN213273077U (en) Air purification device for building environment
CN211989335U (en) Environment-friendly paint spray booth
CN210522146U (en) Environment-friendly dust remover
CN211079856U (en) Raised dust collecting device of pavement grooving machine
CN209952506U (en) Low-cost efficient dust collector
CN109999593B (en) Low-cost high-efficiency dust removing device
CN208482195U (en) A kind of interior decoration cleaner
CN208275187U (en) One kind building work engineering dedusting and purifying device
CN209735215U (en) Environment-friendly dust removal device with purification function and used for building construction
CN112023580A (en) Mine dust removal device and dust removal method thereof
CN208131358U (en) A kind of automobile coating equipment of novel dry coating cloud separation
CN107525140A (en) A kind of efficient haze air filter unit
CN219002489U (en) Wet type explosion-proof dust remover
CN218530317U (en) Dust fall equipment is used in construction
CN210561916U (en) Dry-wet dual-purpose road sweeper filtering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200414

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee