CN210293549U - Tuyere pressure test blind plate structure of Ou metallurgical furnace - Google Patents

Tuyere pressure test blind plate structure of Ou metallurgical furnace Download PDF

Info

Publication number
CN210293549U
CN210293549U CN201921312618.6U CN201921312618U CN210293549U CN 210293549 U CN210293549 U CN 210293549U CN 201921312618 U CN201921312618 U CN 201921312618U CN 210293549 U CN210293549 U CN 210293549U
Authority
CN
China
Prior art keywords
blind plate
gusset
flange
rib plate
pressure testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921312618.6U
Other languages
Chinese (zh)
Inventor
季书民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201921312618.6U priority Critical patent/CN210293549U/en
Application granted granted Critical
Publication of CN210293549U publication Critical patent/CN210293549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an air port pressure testing blind plate structure of ou ye stove, including the stove wall steel sheet and install the big set of big flange on the stove wall steel sheet, through bolted connection pressure testing blind plate flange on the big set of big flange, the outer terminal surface of pressure testing blind plate flange is gone up inside and outside full weld and is being connected a circular cone, and the outside end of circular cone is setting up blind plate lid, and the inside and outside full weld respectively on the surface of blind plate lid is setting up gusset one, gusset two, gusset three, gusset four, wherein gusset three, gusset four are the cross and arrange. The utility model discloses can solve the problem of frequent dismouting tuyere cover, practice thrift repair time, improve production efficiency.

Description

Tuyere pressure test blind plate structure of Ou metallurgical furnace
Technical Field
The utility model relates to a tuyere pressure testing blind plate structure of Ou smelt stove.
Background
After the intermediate maintenance or the overhaul of the Euro-metallurgical furnace or the blast furnace, an air tightness test needs to be carried out before the furnace is opened so as to detect the sealing strength of a gas pipeline and equipment and ensure that a gas system has no leakage after the furnace is opened and no serious accident of emergency stop is caused. The preparation work for opening the furnace is carried out according to the following sequence: baking furnace → cooling furnace → pressure test → sleeper filling → installing tuyere big sleeve. When the sleeper is filled, people need to frequently enter the furnace to pave the sleeper, before the sleeper is filled by pressure testing, the air port sleeve needs to be installed by pressure testing, the air port sleeve needs to be disassembled when the sleeper is filled, the maintenance time is prolonged by frequently disassembling and assembling the air port sleeve, and manpower and material resources are wasted. Particularly, after the cooling of the stove, the euler stove needs to perform a nitrogen-oxygen switching blowing-down experiment, so that a device and a technology which can conveniently and quickly replace a tuyere sleeve are adopted, the pressure test and sleeper safety are ensured without frequently dismounting the tuyere sleeve, and the purpose of saving maintenance time is achieved.
Disclosure of Invention
An object of the utility model is to provide an Ou smelt stove's wind gap pressure testing blind plate structure can solve the problem of frequent dismouting wind gap cover, practices thrift repair time, improves production efficiency.
The utility model aims at realizing like this, a tuyere pressure testing blind plate structure of ou smelt stove, including the stove wall steel sheet and install the big set of big flange on the stove wall steel sheet, through bolted connection pressure testing blind plate flange on the big set of big flange, a circular cone is being connected to inside and outside full weld on the outer terminal surface of pressure testing blind plate flange, and the outside end of circular cone is setting up blind plate lid, and the inside and outside full weld respectively on the surface of blind plate lid is setting up gusset one, gusset two, gusset three, gusset four, wherein gusset three, gusset four is the cross and arranges, gusset one, gusset two are inside and outside concentric ring shape and arrange.
The device is mainly characterized in that a flange depending on a tuyere large sleeve is manufactured, is matched with a tuyere large sleeve arranged on a furnace wall in the same specification and size, is connected through bolts and is tightly arranged on the upper part of the large flange of the tuyere large sleeve.
And the side surface of the pressure test blind flange is welded with a large-size section of a cone frustum, and the welding requirements are full welding and internal and external welding. The small-size end face of the cone frustum is welded with the blind plate cover, and the welding requirements are full welding and internal and external welding. In order to improve the strength of the inner surface and the outer surface of the blind plate cover, rib plates are welded on the inner surface and the outer surface of the blind plate cover, the rib plates are arranged on the basis of the center of the blind plate cover, welding is distributed in a cross manner, and the welding requirement is that two ends are fully welded. When needing the pressure testing, can not install the big cover earlier, will the utility model discloses pass through the supporting installation of bolted connection with big set of flange, compress tightly. The utility model discloses be pressure vessel head form design, have high pressure resistant function, take welding seam double-sided welding simultaneously, the blind plate lid adopts cross gusset to strengthen the atress, and appearance characteristic has can bear bigger pressure than ordinary blind plate, and fail safe nature is higher. Before the pressure test of the Ou metallurgical furnace or the blast furnace, the pressure test blind plate is connected through the bolts and installed on the flange of the large sleeve, and the air tightness test can be carried out after the bolts are fastened.
Use this device to carry out the gas tightness test after, can practice thrift the repair time, and this device simple manufacture, safe and reliable, if carry out airtight experiment dismouting at the ou metallurgical stove and once the big cover needs 16h, the dismouting needs 48h for 3 times, and this device of installation only needs 2h, can practice thrift repair time 30 hours, if ou metallurgical stove is carrying out the nitrogen oxygen and switches and baker, frequent dismouting wind gap, the repair time of saving can be longer.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic side view of the present invention.
Detailed Description
The utility model provides a wind gap pressure testing blind plate structure of ou smelt stove, as shown in figure 1, figure 2, including furnace wall steel sheet 1 and install the big set of large flange 2 on furnace wall steel sheet 1, pressure testing blind plate flange 3 is being connected through bolt 4 on the big set of large flange 2, a circular cone 5 is being connected to full welding inside and outside on the outer terminal surface of pressure testing blind plate flange 3, the outside end of circular cone 5 is setting up blind plate lid 6, full welding respectively is setting up gusset one 7 on the inside and outside surface of blind plate lid 6, gusset two 8, gusset three 9, gusset four 10, wherein gusset three 9, gusset four 10 are the cross and arrange, gusset one 7, gusset two 8 are inside and outside concentric ring shape and arrange.

Claims (1)

1. The utility model provides a wind gap pressure testing blind plate structure of ou ye stove, includes the brickwork steel sheet and installs the big flange of cover on the brickwork steel sheet, characterized by: the large-sleeve large flange is connected with a pressure test blind flange through a bolt, the outer end face of the pressure test blind flange is internally and externally connected with a cone frustum in a full welding mode, a blind plate cover is arranged at the outer end of the cone frustum, and a rib plate I, a rib plate II, a rib plate III and a rib plate IV are respectively arranged on the inner surface and the outer surface of the blind plate cover in a full welding mode, wherein the rib plate III and the rib plate IV are arranged in a cross mode, and the rib plate I and the rib plate II are arranged in an internal and external concentric circular mode.
CN201921312618.6U 2019-08-14 2019-08-14 Tuyere pressure test blind plate structure of Ou metallurgical furnace Active CN210293549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921312618.6U CN210293549U (en) 2019-08-14 2019-08-14 Tuyere pressure test blind plate structure of Ou metallurgical furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921312618.6U CN210293549U (en) 2019-08-14 2019-08-14 Tuyere pressure test blind plate structure of Ou metallurgical furnace

Publications (1)

Publication Number Publication Date
CN210293549U true CN210293549U (en) 2020-04-10

Family

ID=70060759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921312618.6U Active CN210293549U (en) 2019-08-14 2019-08-14 Tuyere pressure test blind plate structure of Ou metallurgical furnace

Country Status (1)

Country Link
CN (1) CN210293549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112484930A (en) * 2020-12-21 2021-03-12 山东钢铁集团日照有限公司 Method for testing air tightness before blow-in of blast furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112484930A (en) * 2020-12-21 2021-03-12 山东钢铁集团日照有限公司 Method for testing air tightness before blow-in of blast furnace

Similar Documents

Publication Publication Date Title
CN210293549U (en) Tuyere pressure test blind plate structure of Ou metallurgical furnace
CN206960076U (en) The experimental rig of the close property of closed in space and intensity
CN202992512U (en) Pipeline suppressing and plugging device
CN207608569U (en) A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve
CN215487695U (en) Novel energy-saving double-turning-plate air locking valve
CN108548426B (en) Scrap steel heating furnace
CN101463401B (en) Method for detecting hermeticity of blast furnace bucket rubber ring
CN102562558B (en) Large centrifugal compressor pressure testing shell and pressure testing method thereof
CN213176052U (en) Novel oil gas barrel structure without dismounting pipeline
CN206786094U (en) A kind of side valve cap valve
CN212107457U (en) Leakage stopping structure with pressure for leakage point of gas pipeline
CN209925837U (en) Combined SF6 inflator joint
CN205092558U (en) Cable joint who uses among humid environment
CN208845724U (en) A kind of RH refining rifle sealing device
CN215477301U (en) Concentrator central disk ore discharge square box
CN201778039U (en) Improved blast furnace ignition manhole
CN205092557U (en) Explosion -proof cable joint in dust workshop
CN103794334A (en) Transformer rectangular pipe opening blocking plate sealing structure and sealing method
CN201155635Y (en) Wind power nuclear power dedicated welding flange
CN217977703U (en) Maintenance-free sealing device for regulating door of power plant
CN219669029U (en) Manhole door that sign indicating number was hung is pressed to quick detach formula
CN202327152U (en) Blast furnace pressure equalizing and depressurizing valve easy to overhaul and maintain
CN206523189U (en) A kind of gas meter movement group sealing mechanism
CN210314345U (en) Multi-section type connected converter air brick tube
CN211081786U (en) Tube-sealing device for oil and gas development

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant