CN210288882U - C-shaped steel pipe bundle combined structure - Google Patents

C-shaped steel pipe bundle combined structure Download PDF

Info

Publication number
CN210288882U
CN210288882U CN201920781730.8U CN201920781730U CN210288882U CN 210288882 U CN210288882 U CN 210288882U CN 201920781730 U CN201920781730 U CN 201920781730U CN 210288882 U CN210288882 U CN 210288882U
Authority
CN
China
Prior art keywords
steel pipe
steel
pipe bundle
groove
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920781730.8U
Other languages
Chinese (zh)
Inventor
方梦旭
陈梦飞
李二凯
李鑫
田地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Minhe Hangxiao Steel Structure Co ltd
Original Assignee
Anhui Minhe Hangxiao Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Minhe Hangxiao Steel Structure Co ltd filed Critical Anhui Minhe Hangxiao Steel Structure Co ltd
Priority to CN201920781730.8U priority Critical patent/CN210288882U/en
Application granted granted Critical
Publication of CN210288882U publication Critical patent/CN210288882U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model belongs to steel-pipe bundle field, especially a C style of calligraphy steel-pipe bundle integrated configuration, to the concatenation of being not convenient for of current steel-pipe bundle component, connect unstablely between the steel-pipe bundle, lead to need to carry out interim fixing to the steel-pipe bundle when concreting, increased the pouring time of concrete, reduced work efficiency's problem, the following scheme is proposed now, and it includes first steel pipe and second steel pipe, the second recess has all been seted up to the both sides of first steel pipe, all is equipped with fixing device in two second recesses, and first recess has all been seted up to the both sides of second steel pipe, and equal slidable mounting has the picture peg in two first recesses, picture peg movable mounting is in the second recess that corresponds. The utility model discloses simple structure, convenient operation, this steel-pipe bundle component are convenient for make up the concatenation, and it is stable to connect between the steel-pipe bundle, no longer need carry out interim fixing to the steel-pipe bundle when concreting, has improved work efficiency.

Description

C-shaped steel pipe bundle combined structure
Technical Field
The utility model relates to a technical field is restrainted to the steel-pipe, especially relates to a C style of calligraphy steel-pipe bundle integrated configuration.
Background
The C-shaped steel pipe is a light pipe with the shape like C and an opening at one side, a plurality of standardized and modularized component steel pipes are connected together side by side to form a steel pipe bundle, concrete is poured inside the steel pipe bundle to form a steel pipe bundle combined structural member, and the steel pipe bundle combined structural member is used as a main bearing member and a side force resisting member;
however, the existing steel pipe bundle components are inconvenient to combine and splice, and the connection between the steel pipe bundles is unstable, so that the steel pipe bundles need to be temporarily fixed when concrete is poured, the pouring time of the concrete is prolonged, and the working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having the steel-pipe to restraint the concatenation of the not convenient combination of component among the prior art, connect unstablely between the steel-pipe bundle, lead to when concreting need restrainting the steel-pipe and go on interim fixedly, increased the pouring time of concrete, reduced work efficiency's shortcoming, and the C style of calligraphy steel-pipe bundle integrated configuration who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
c style of calligraphy steel-pipe bundle integrated configuration, including first steel pipe and second steel pipe, the second recess has all been seted up to the both sides of first steel pipe, all is equipped with fixing device in two second recesses, and first recess has all been seted up to the both sides of second steel pipe, and equal slidable mounting has the picture peg in two first recesses, picture peg movable mounting is in the second recess that corresponds, and fixing device and corresponding picture peg looks adaptation have been seted up same connecting hole on the one side inner wall that two first recesses are close to each other, are equipped with drive arrangement in the connecting hole, drive arrangement and picture peg looks adaptation.
Preferably, drive arrangement includes mount pad, dwang, two rotation wheels, two racks, two fixed plates and two first gears, and mount pad fixed mounting has been seted up on one side of mount pad on the inner wall of connecting hole and has been rotated the hole, and the dwang rotates to be installed in rotating the hole, and two equal fixed cover of rotation wheel are established on the dwang, and two first gears are fixed mounting respectively at the both ends of dwang.
Preferably, first racks are fixedly mounted on one sides of the two inserting plates and meshed with corresponding first gears, the two fixing plates are fixedly mounted on the first steel pipe, sliding holes are formed in the inner wall of one side of the connecting hole, the fixing plates are slidably mounted in the corresponding sliding holes, second racks are fixedly mounted on one sides of the two fixing plates and meshed with corresponding rotating wheels.
Preferably, fixing device includes the movable plate, removes seat, lead screw, two nuts, second gear and two grip blocks, has all seted up the mounting groove on the both sides inner wall of second recess, and grip block slidable mounting all contacts with the picture peg in the mounting groove that corresponds, two grip blocks, and the welding of one side of removing the seat has the third rack, has seted up the fixed slot on one side inner wall of second recess, removes seat slidable mounting in the fixed slot, and one side fixed mounting of removing the seat contacts with the picture peg on the movable plate.
Preferably, the spread groove has all been seted up on the both sides inner wall of fixed slot, and the lead screw rotates to be installed in the spread groove that corresponds, and nut screw thread installs on the lead screw that corresponds, and the second gear welding is on two lead screws, and second gear and third rack toothing have seted up same through-hole on the one side inner wall that spread groove and mounting groove are close to each other, and slidable mounting has the connecting rod in the through-hole, and the one end welding of connecting rod is on the grip block, and the other end welding of connecting rod is on the nut.
In the utility model, the C-shaped steel pipe bundle combined structure is provided with the driving device, when the first steel pipe is combined with the second steel pipe, the fixed plate is inserted into the slide hole and moves in the connecting hole, the fixed plate drives the rotating wheel to rotate, the rotating wheel drives the rotating rod to rotate, the rotating rod drives the two first gears to rotate, the two first gears drive the two corresponding inserting plates to move, and the two inserting plates are inserted into the two corresponding second grooves;
due to the fact that the fixing device is arranged, the plugboard presses the movable plate, the movable plate drives the movable seat to slide in the fixed groove, the movable seat drives the second gear to rotate, the second gear drives the screw rod to rotate, the screw rod drives the nut to move, the nut drives the connecting rod to move, the connecting rod drives the clamping blocks to move, the two clamping blocks enable the plugboard to be clamped and fixed in the second groove, and therefore the positions of the first steel pipe and the second steel pipe can be fixed;
the utility model discloses simple structure, convenient operation, this steel-pipe bundle component are convenient for make up the concatenation, and it is stable to connect between the steel-pipe bundle, no longer need carry out interim fixing to the steel-pipe bundle when concreting, has improved work efficiency.
Drawings
Fig. 1 is a schematic view of a C-shaped steel tube bundle combined structure according to the present invention;
fig. 2 is a schematic view of a top view structure of the C-shaped steel pipe bundle combination structure provided by the present invention;
fig. 3 is a schematic structural view of a part a of the C-shaped steel tube bundle combined structure provided by the present invention;
fig. 4 is a schematic diagram of a part B of the C-shaped steel tube bundle combined structure provided by the present invention.
In the figure: the device comprises a first steel pipe 1, a second steel pipe 2, a first groove 3, a 4 inserting plate, a second groove 5, a connecting hole 6, a rotating rod 7, a fixing plate 8, a first gear 9, a moving plate 10, a moving seat 11, a screw rod 12, a second gear 13, a clamping block 14, a fixed groove 15 and a connecting groove 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-4, the C-shaped steel pipe bundle composite structure comprises a first steel pipe 1 and a second steel pipe 2, second grooves 5 are formed in two sides of the first steel pipe 1, fixing devices are arranged in the two second grooves 5, first grooves 3 are formed in two sides of the second steel pipe 2, inserting plates 4 are slidably mounted in the two first grooves 3, the inserting plates 4 are movably mounted in the corresponding second grooves 5, the fixing devices are matched with the corresponding inserting plates 4, one connecting hole 6 is formed in the inner wall, close to each other, of one side of the two first grooves 3, a driving device is arranged in the connecting hole 6, and the driving device is matched with the inserting plates 4.
In this embodiment, drive arrangement includes mount pad, dwang 7, two rotation wheels, two racks, two fixed plates 8 and two first gears 9, and mount pad fixed mounting has been seted up on one side of mount pad on the inner wall of connecting hole 6 and has been rotated the hole, and dwang 7 rotates and installs in rotating the hole, and two are rotated the equal fixed cover of wheel and are established on dwang 7, and two first gears 9 are fixed mounting respectively at the both ends of dwang 7.
In this embodiment, the first racks are fixedly mounted on the two inserting plates 4, the first racks are engaged with the corresponding first gears 9, the two fixing plates 8 are fixedly mounted on the first steel pipe 1, the inner wall of one side of the connecting hole 6 is provided with a sliding hole, the fixing plates 8 are slidably mounted in the corresponding sliding holes, the second racks are fixedly mounted on the two fixing plates 8, and the second racks are engaged with the corresponding rotating wheels.
In this embodiment, fixing device includes movable plate 10, remove seat 11, lead screw 12, two nuts, second gear 13 and two grip blocks 14, the mounting groove has all been seted up on the both sides inner wall of second recess 5, grip block 14 slidable mounting is in the mounting groove that corresponds, two grip blocks 14 all contact with picture peg 4, one side welding of removing seat 11 has the third rack, fixed slot 15 has been seted up on one side inner wall of second recess 5, remove seat 11 slidable mounting in fixed slot 15, one side fixed mounting that removes seat 11 is on movable plate 10, movable plate 10 contacts with picture peg 4.
In this embodiment, connecting groove 16 has all been seted up on the both sides inner wall of fixed slot 15, lead screw 12 rotates and installs in the connecting groove 16 that corresponds, the nut screw thread is installed on the lead screw 12 that corresponds, second gear 13 welds on two lead screws 12, second gear 13 and third rack toothing, same through-hole has been seted up on the connecting groove 16 and the one side inner wall that the mounting groove is close to each other, slidable mounting has the connecting rod in the through-hole, the one end welding of connecting rod is on grip block 14, the other end welding of connecting rod is on the nut.
In the embodiment, due to the arrangement of the driving device, when the first steel pipe 1 and the second steel pipe 2 are combined, the fixed plate 8 is inserted into the sliding hole and moves in the connecting hole, the fixed plate 8 drives the rotating wheel to rotate, the rotating wheel drives the rotating rod 7 to rotate, the rotating rod 7 drives the two first gears 9 to rotate, the two first gears 9 drive the two corresponding inserting plates 4 to move, and the two inserting plates 4 are inserted into the two corresponding second grooves 5; due to the arrangement of the fixing device, the inserting plate 4 presses the moving plate 10, the moving plate 10 drives the moving seat 11 to slide in the fixing groove 15, the moving seat 11 drives the second gear 13 to rotate, the second gear 13 drives the screw rod 12 to rotate, the screw rod 12 drives the nut to move, the nut drives the connecting rod to move, and the connecting rod drives the clamping blocks 14 to move, so that the two clamping blocks 14 clamp and fix the inserting plate 4 in the second groove 5, and the positions of the first steel pipe 1 and the second steel pipe 2 can be fixed; the steel pipe bundle component is convenient to combine and splice, the steel pipe bundles are stably connected, the steel pipe bundles do not need to be temporarily fixed when concrete is poured, and the working efficiency is improved.
Example 2
Referring to fig. 1-4, a further improvement is made on the basis of example 1:
c style of calligraphy steel-pipe bundle integrated configuration, including first steel pipe 1 and second steel pipe 2, second recess 5 has all been seted up to the both sides of first steel pipe 1, all be equipped with fixing device in two second recesses 5, first recess 3 has all been seted up to the both sides of second steel pipe 2, equal slidable mounting has picture peg 4 in two first recesses 3, picture peg 4 movable mounting is in the second recess 5 that corresponds, fixing device and the 4 looks adaptations of picture peg that correspond, same connecting hole 6 has been seted up on the one side inner wall that two first recesses 3 are close to each other, be equipped with drive arrangement in the connecting hole 6, drive arrangement and 4 looks adaptations of picture peg.
In this embodiment, drive arrangement includes mount pad, dwang 7, two rotation wheels, two racks, two fixed plates 8 and two first gears 9, and the mount pad passes through bolt fixed mounting on the inner wall of connecting hole 6, and the rotation hole has been seted up to one side of mount pad, and dwang 7 rotates to be installed in the rotation hole, and two equal fixed cover of rotation wheel are established on dwang 7, and two first gears 9 are respectively through bolt fixed mounting at the both ends of dwang 7.
In this embodiment, a first rack is fixedly mounted on one side of each of the two inserting plates 4 through a bolt, the first rack is engaged with the corresponding first gear 9, the two fixing plates 8 are fixedly mounted on the first steel pipe 1 through bolts, a sliding hole is formed in the inner wall of one side of the connecting hole 6, the fixing plates 8 are slidably mounted in the corresponding sliding holes, a second rack is fixedly mounted on one side of each of the two fixing plates 8 through a bolt, and the second racks are engaged with the corresponding rotating wheels.
In this embodiment, fixing device includes movable plate 10, remove seat 11, lead screw 12, two nuts, second gear 13 and two grip blocks 14, the mounting groove has all been seted up on the both sides inner wall of second recess 5, grip block 14 slidable mounting is in the mounting groove that corresponds, two grip blocks 14 all contact with picture peg 4, one side welding of removing seat 11 has the third rack, fixed slot 15 has been seted up on one side inner wall of second recess 5, remove seat 11 slidable mounting in fixed slot 15, bolt fixed mounting is passed through on movable plate 10 in one side of removing seat 11, movable plate 10 contacts with picture peg 4.
In this embodiment, connecting groove 16 has all been seted up on the both sides inner wall of fixed slot 15, lead screw 12 rotates and installs in the connecting groove 16 that corresponds, the nut screw thread is installed on the lead screw 12 that corresponds, second gear 13 welds on two lead screws 12, second gear 13 and third rack toothing, same through-hole has been seted up on the connecting groove 16 and the one side inner wall that the mounting groove is close to each other, slidable mounting has the connecting rod in the through-hole, the one end welding of connecting rod is on grip block 14, the other end welding of connecting rod is on the nut.
In the embodiment, due to the arrangement of the driving device, when the first steel pipe 1 and the second steel pipe 2 are combined, the fixed plate 8 is inserted into the sliding hole and moves in the connecting hole, the fixed plate 8 drives the rotating wheel to rotate, the rotating wheel 8 drives the rotating rod 7 to rotate, the rotating rod 7 drives the two first gears 9 to rotate, the two first gears 9 drive the two corresponding inserting plates 4 to move, and the two inserting plates 4 are inserted into the two corresponding second grooves 5; due to the arrangement of the fixing device, the inserting plate 4 presses the moving plate 10, the moving plate 10 drives the moving seat 11 to slide in the fixing groove 15, the moving seat 11 drives the second gear 13 to rotate, the second gear 13 drives the screw rod 12 to rotate, the screw rod 12 drives the nut to move, the nut drives the connecting rod to move, and the connecting rod drives the clamping blocks 14 to move, so that the two clamping blocks 14 clamp and fix the inserting plate 4 in the second groove 5, and the positions of the first steel pipe 1 and the second steel pipe 2 can be fixed; the steel pipe bundle component is convenient to combine and splice, the steel pipe bundles are stably connected, the steel pipe bundles do not need to be temporarily fixed when concrete is poured, and the working efficiency is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

  1. The C-shaped steel pipe bundle combined structure comprises a first steel pipe (1) and a second steel pipe (2), and is characterized in that second grooves (5) are formed in two sides of the first steel pipe (1), fixing devices are arranged in the two second grooves (5), first grooves (3) are formed in two sides of the second steel pipe (2), inserting plates (4) are arranged in the two first grooves (3) in a sliding mode, the inserting plates (4) are movably mounted in the corresponding second grooves (5), the fixing devices are matched with the corresponding inserting plates (4), the two first grooves (3) are close to one inner wall of one side, the same connecting hole (6) is formed in the inner wall of one side, a driving device is arranged in the connecting hole (6), and the driving device is matched with the inserting plates (4).
  2. 2. The C-shaped steel pipe bundle combined structure according to claim 1, wherein the driving device comprises an installation seat, a rotating rod (7), two rotating wheels, two racks, two fixing plates (8) and two first gears (9), the installation seat is fixedly installed on the inner wall of the connecting hole (6), a rotating hole is formed in one side of the installation seat, the rotating rod (7) is rotatably installed in the rotating hole, the two rotating wheels are fixedly sleeved on the rotating rod (7), and the two first gears (9) are respectively and fixedly installed at two ends of the rotating rod (7).
  3. 3. The C-shaped steel pipe bundle combined structure according to claim 1, wherein a first rack is fixedly mounted on one side of each of the two insertion plates (4), the first rack is meshed with the corresponding first gear (9), two fixing plates (8) are fixedly mounted on the first steel pipe (1), a sliding hole is formed in the inner wall of one side of each connecting hole (6), the fixing plates (8) are slidably mounted in the corresponding sliding holes, a second rack is fixedly mounted on one side of each of the two fixing plates (8), and the second racks are meshed with the corresponding rotating wheels.
  4. 4. The C-shaped steel pipe bundle combined structure according to claim 1, wherein the fixing device comprises a moving plate (10), a moving seat (11), a screw rod (12), two nuts, a second gear (13) and two clamping blocks (14), mounting grooves are formed in the inner walls of two sides of the second groove (5), the clamping blocks (14) are slidably mounted in the corresponding mounting grooves, the two clamping blocks (14) are both in contact with the inserting plate (4), a third rack is welded on one side of the moving seat (11), a fixing groove (15) is formed in the inner wall of one side of the second groove (5), the moving seat (11) is slidably mounted in the fixing groove (15), one side of the moving seat (11) is fixedly mounted on the moving plate (10), and the moving plate (10) is in contact with the inserting plate (4).
  5. 5. The C-shaped steel pipe bundle combined structure according to claim 4, wherein the inner walls of the two sides of the fixed groove (15) are respectively provided with a connecting groove (16), the screw rods (12) are rotatably installed in the corresponding connecting grooves (16), the nut is installed on the corresponding screw rods (12) in a threaded manner, the second gear (13) is welded on the two screw rods (12), the second gear (13) is meshed with the third rack, the inner wall of one side, close to the connecting groove (16) and the installation groove, of the connecting groove is provided with the same through hole, the connecting rod is slidably installed in the through hole, one end of the connecting rod is welded on the clamping block (14), and the other end of the connecting rod is welded on the nut.
CN201920781730.8U 2019-05-28 2019-05-28 C-shaped steel pipe bundle combined structure Expired - Fee Related CN210288882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920781730.8U CN210288882U (en) 2019-05-28 2019-05-28 C-shaped steel pipe bundle combined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920781730.8U CN210288882U (en) 2019-05-28 2019-05-28 C-shaped steel pipe bundle combined structure

Publications (1)

Publication Number Publication Date
CN210288882U true CN210288882U (en) 2020-04-10

Family

ID=70071415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920781730.8U Expired - Fee Related CN210288882U (en) 2019-05-28 2019-05-28 C-shaped steel pipe bundle combined structure

Country Status (1)

Country Link
CN (1) CN210288882U (en)

Similar Documents

Publication Publication Date Title
CN111633227B (en) Jack catch self-locking device is used in processing of rail vehicle spare part
CN102581641A (en) Boring automatic centering clamp of drive axle housing
CN212043360U (en) Pipeline strutting arrangement is used in pipeline welding
CN211266293U (en) Electric power safety construction is with anticreep protective apparatus of end of a thread
CN111779258A (en) Connecting mechanism with automatic locking structure for assembling steel structure scaffold
CN211361922U (en) Bench clamp clamping device
CN112720000A (en) Clamping device and clamping method for machining rod-like metal workpiece
CN210288882U (en) C-shaped steel pipe bundle combined structure
CN211680735U (en) Switchable combined clamping device
CN218168563U (en) Bailey is reinforcing bar cutting device for bridge
CN203086047U (en) Rotating shaft fixing device for universal type breaker drawer seat
CN111922582B (en) Accurate welding clamp for lead of pressure sensor
CN212984602U (en) Building engineering external scaffolding is wall spare even
CN210147541U (en) Four-axis frock clamp convenient to installation
CN210336005U (en) Transplanting clamping device for assembling new energy battery
CN211104067U (en) Robot paw for feeding and discharging in worm gear carrying
CN210334984U (en) Alignment jig
CN104550835A (en) Overturn unloading device
CN212762197U (en) A equipment for diversified processing of four-axis
CN219823046U (en) Combined steel structure platform
CN210194567U (en) Multistage hydraulic hoist
CN210839253U (en) Motor stator and rotor assembly tool
CN218225633U (en) Workpiece clamp structure for machining of mechanical equipment
CN210797911U (en) Prestressed concrete panel structure
CN217341517U (en) Jaw plate combined structure for jaw crusher

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200410