CN210264751U - Lock foot anchor pipe positioner - Google Patents

Lock foot anchor pipe positioner Download PDF

Info

Publication number
CN210264751U
CN210264751U CN201920722763.5U CN201920722763U CN210264751U CN 210264751 U CN210264751 U CN 210264751U CN 201920722763 U CN201920722763 U CN 201920722763U CN 210264751 U CN210264751 U CN 210264751U
Authority
CN
China
Prior art keywords
positioning
steel
pipe
plate
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920722763.5U
Other languages
Chinese (zh)
Inventor
朱大河
马新民
张宜鑫
常帅斌
李建军
陈明
史凌杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yinxi Railway Co ltd
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Yinxi Railway Co ltd
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yinxi Railway Co ltd, China Railway 12th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Yinxi Railway Co ltd
Priority to CN201920722763.5U priority Critical patent/CN210264751U/en
Application granted granted Critical
Publication of CN210264751U publication Critical patent/CN210264751U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A locking leg anchor pipe positioning device comprises a positioning steel plate and a guide steel pipe. The positioning steel plate is provided with two directional holes, a 45-degree oblique rectangular hole matched with the cross section of the positioning steel plate in size is processed in the profile steel web plate, the positioning plate is firmly welded with the profile steel web plate after penetrating through the rectangular hole, the guiding steel pipe is installed, and the guiding pipe penetrates through the directional holes in the positioning steel plate and is firmly welded with the positioning steel plate. When the lock pin anchor pipe is manufactured, positioning, drilling and welding are carried out through the guide steel pipe. The device is convenient to machine, simple to operate and low in cost, can accurately control the construction angle of the lock pin anchor pipe, improves the connection firmness of the lock pin anchor pipe and the preliminary bracing steel frame, avoids the defect that the L-shaped connecting rib is not firmly welded, and can be widely applied to preliminary bracing construction of the tunnel adopting the profile steel frame.

Description

Lock foot anchor pipe positioner
Technical Field
The utility model relates to a tunnel adopts the preliminary bracing construction technical field of shaped steel steelframe, concretely relates to lock foot anchor pipe positioner.
Background
The construction of the lock leg anchor pipe is an important process of primary support operation of the tunnel, the driving angle of the lock leg anchor pipe has direct influence on the settlement and convergence of the primary support structure which is not closed into a ring, and the accuracy of the driving direction of the lock leg anchor pipe and the welding quality of the steel arch directly relate to the deformation and the stability of the primary support of the tunnel. In the construction process, the driving angles of the lock pin anchor pipes are difficult to ensure uniformity due to factors of all aspects, the stress of the primary support steel frame is uneven due to the deviation of the driving angles every time, and the effects of settlement control and stress control of the lock pin anchor pipes are greatly weakened.
Disclosure of Invention
In order to overcome the not enough of above-mentioned prior art, the utility model aims at providing a lock foot anchor pipe positioner has solved prior art lock foot anchor pipe and has squeezed into the difficult control of angle, lock foot anchor pipe and the poor problem of shaped steel bow member welding quality. The method has the characteristics of convenience and quickness in processing, simplicity in operation, high working efficiency, low cost, high precision and the like.
In order to achieve the above purpose, the technical solution of the present invention is as follows:
a rectangular hole with the 45-degree oblique angle and the cross section size matched with that of a positioning steel plate are machined in a section steel web plate, and the positioning steel plate penetrates through the 45-degree oblique rectangular hole of the section steel web plate and is welded with the section steel web plate.
The positioning steel plate is provided with two phi 53 directional holes, the guide steel pipe is processed by a phi 51mm multiplied by 3mm seamless steel pipe with the length of 20cm, and the guide steel pipe penetrates through the directional holes on the positioning steel plate and is welded with the steel plate.
And the finished lock pin anchor pipe is firmly welded at the lower opening and the end part of the guide steel pipe respectively.
The utility model has the advantages that:
compared with the prior art, the utility model, have characteristics such as processing is convenient, easy operation, work efficiency height, with low costs, precision height, safety.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
FIG. 2 is a side view of the steel arch.
Fig. 3 is a schematic view of the positioning steel plate.
Wherein, 1 is a steel frame; 2, a guide steel pipe; 3, a positioning steel plate; 4, a rectangular hole with a 45-degree oblique section steel web plate; and 5, positioning holes in the positioning steel plate.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
As shown in figure 1, the locking leg anchor pipe positioning device comprises a positioning steel plate (2) and a guide steel pipe (3).
As shown in figures 1 and 2, a rectangular hole (4) with an inclined angle of 45 degrees and adapted to the section size of a positioning steel plate is machined in the steel section web plate (1).
The positioning steel plate (2) penetrates through a rectangular hole (4) which is inclined by 45 degrees on the section steel web plate (1) and is welded with the section steel web plate (1).
As shown in figure 3, two phi 53mm oriented holes are processed on the positioning steel plate (2), a phi 51mm multiplied by 3mm seamless steel pipe is used for processing the guide steel pipe (3), and the guide steel pipe (3) penetrates through the oriented holes (5) on the positioning steel plate (2) to be welded with the positioning steel plate (3).
And the guide steel pipe (3) is welded with the exposed part of the lock pin anchor pipe after construction.
The utility model discloses a theory of operation:
through the angle of processing the 45 rectangular hole control location steel sheets of slant on shaped steel web, the angle of further control direction steel pipe, through direction steel pipe to drilling and beat establish lock foot anchor pipe and carry out direction control, effectual control drilling in-process drilling rod swing causes defects such as inclined to one side hole, guaranteed drilling and beat the angle of establishing lock foot anchor pipe, lock foot anchor pipe exposes the part and welds with the direction steel pipe, avoided adopting "L" type splice bar welding not firm shortcoming.

Claims (3)

1. A locking leg anchor pipe positioning device comprises a positioning steel plate (2) and a guide steel pipe (3), and is characterized in that the positioning steel plate (2) is welded with a section steel web (1), and the guide steel pipe (3) is welded with the positioning steel plate (2); an oblique 45-degree rectangular hole (4) which is adaptive to the section size of the positioning steel plate (2) is machined in the section steel web plate (1), and the positioning steel plate (2) is welded with the oblique 45-degree rectangular hole (4) of the section steel web plate; the positioning steel plate (2) is provided with two phi 53 positioning holes (5).
2. The device for positioning a lock pin anchor pipe according to claim 1, wherein the guide steel pipe (3) with a length of 20cm is manufactured by a seamless steel pipe with a diameter of 51mm x 3mm, and passes through and is welded with the positioning hole (5) on the positioning steel plate (2).
3. The device for positioning an anchor tube for a lock pin according to claim 1, wherein the guide steel tube (3) is welded to an exposed portion of the anchor tube for the lock pin after the operation.
CN201920722763.5U 2019-05-20 2019-05-20 Lock foot anchor pipe positioner Active CN210264751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920722763.5U CN210264751U (en) 2019-05-20 2019-05-20 Lock foot anchor pipe positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920722763.5U CN210264751U (en) 2019-05-20 2019-05-20 Lock foot anchor pipe positioner

Publications (1)

Publication Number Publication Date
CN210264751U true CN210264751U (en) 2020-04-07

Family

ID=70025546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920722763.5U Active CN210264751U (en) 2019-05-20 2019-05-20 Lock foot anchor pipe positioner

Country Status (1)

Country Link
CN (1) CN210264751U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814715A (en) * 2021-01-07 2021-05-18 中铁十六局集团第三工程有限公司 Novel locking anchor pipe construction fixing device and construction method thereof
CN114991824A (en) * 2022-08-08 2022-09-02 中铁九局集团第七工程有限公司 Fixing device for controlling angle of advanced small guide pipe in tunnel and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814715A (en) * 2021-01-07 2021-05-18 中铁十六局集团第三工程有限公司 Novel locking anchor pipe construction fixing device and construction method thereof
CN114991824A (en) * 2022-08-08 2022-09-02 中铁九局集团第七工程有限公司 Fixing device for controlling angle of advanced small guide pipe in tunnel and construction method

Similar Documents

Publication Publication Date Title
CN210264751U (en) Lock foot anchor pipe positioner
CN105414907A (en) Building technology for pile leg of self-elevating wind power vessel
CN216305958U (en) Tunnel bow member lock foot anchor pipe angle controller
JP5997100B2 (en) Steel pipe pile manufacturing method
CN114589385A (en) Take centering and autogiration's long oil pipe welding set
CN211143495U (en) Connecting and fixing device for concrete filled steel tube column
CN205778937U (en) A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate
CN206839689U (en) Online bushing quick press mounting device is processed in two-sided boring
CN208473120U (en) Cross-shaped steel strengthening concrete column tie-bar wears web structure
CN209998668U (en) pipe group correction connecting tool
CN111001976A (en) Opening aligning device for large-diameter thin-wall pipeline and using method thereof
CN212251446U (en) Pipeline fixing device is used in hydraulic engineering construction
CN109235271B (en) Vertical rib positioning tool, positioning clamping seat and working method of combined bridge tower steel shell section
CN209780773U (en) A drilling auxiliary device for rock-wall beam blasting construction
CN110145074B (en) Reinforcing steel bar connecting sleeve and reinforcing steel bar connecting method
CN212734843U (en) Fixture for correcting size of welding opening of circular tube
CN103726493B (en) During hammering method prestressing pipe pile construction to stake positioner and using method thereof
CN203245622U (en) Anti-rotating hole clamp of drilling marine oil conduit joint
CN212286255U (en) Seam welder rib guiding device
CN219012648U (en) Tunnel primary support foot locking anchor pipe and arch frame connection reinforcing device
CN214868375U (en) Tunnel is first, and welding set is assisted to a steel bow member I-steel and steel backing plate
CN219235437U (en) Pipeline punching auxiliary device
CN209924445U (en) Secondary adjusting device for assembling concrete steel templates
CN218843357U (en) Horizontal positioning installation device for installation of overhanging I-shaped steel
CN220679877U (en) Be used for pipeline or square steel welded fixed frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant