CN210252049U - Fitment is with lime water preparation device - Google Patents

Fitment is with lime water preparation device Download PDF

Info

Publication number
CN210252049U
CN210252049U CN201920914717.5U CN201920914717U CN210252049U CN 210252049 U CN210252049 U CN 210252049U CN 201920914717 U CN201920914717 U CN 201920914717U CN 210252049 U CN210252049 U CN 210252049U
Authority
CN
China
Prior art keywords
mounting
pivot
mounting panel
cavity
inlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920914717.5U
Other languages
Chinese (zh)
Inventor
杨向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jinying Electric Power Communication Engineering Group Co ltd
Original Assignee
Shenyang Jinying Electric Power Communication Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jinying Electric Power Communication Engineering Group Co ltd filed Critical Shenyang Jinying Electric Power Communication Engineering Group Co ltd
Priority to CN201920914717.5U priority Critical patent/CN210252049U/en
Application granted granted Critical
Publication of CN210252049U publication Critical patent/CN210252049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

The utility model discloses a device is prepared to lime water for finishing work, package are including preparing the case, the top fixed mounting who prepares incasement portion has the mounting panel, the inside of preparing the case passes through the mounting panel is provided with the installation cavity and prepares the cavity, the installation cavity is located the top of mounting panel, it is located to prepare the cavity the bottom of mounting panel, the intermediate position department fixed mounting who prepares the roof portion has driving motor, the inside of mounting panel is provided with three bearing, it is three on the mounting panel through bearing movable mounting has three pivot, and three the equal perpendicular to of pivot the mounting panel, it is three be located in the middle of in the pivot the top of pivot is passed through the bearing with driving motor fixed connection, it is three the surface of pivot all is provided with spiral stirring vane. The utility model discloses a set up a series of structures and make this device have the efficient and effectual characteristics of configuration.

Description

Fitment is with lime water preparation device
Technical Field
The utility model relates to a technical field is prepared to lime thick liquid, specifically is a device is prepared to lime thick liquid for finishing work.
Background
The decoration engineering is a general name for indoor and outdoor decoration and decoration of buildings by using building materials and products thereof or using decorative artworks such as sculptures, paintings and the like, and comprises three major parts of indoor and outdoor plastering engineering, decorative surface installation engineering and glass, paint, painting and pasting engineering.
Fitment need use a large amount of lime thick liquids in the work progress, but present processing stirring mixing preparation's in-process to lime thick liquids, it is low to prepare speed, rabbling mechanism is "feng" style of calligraphy structure usually during current stirring to the resistance is big when stirring, and stirring uniformity is poor, be difficult to prepare lime thick liquids fast, and when reinforced, lead to the jam of inlet pipe easily, consequently, we have proposed a fitting up with lime thick liquid preparation device problem for the fitment in order to solve this a series of problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is prepared to lime water for finishing work to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a device is prepared to lime water for finishing work, includes the preparation case, the inside top fixed mounting of preparation case has the mounting panel, the inside of preparation case is passed through the mounting panel is provided with the installation cavity and prepares the cavity, the installation cavity is located the top of mounting panel, it is located the bottom of mounting panel to prepare the cavity, the intermediate position department fixed mounting of preparing the roof portion has driving motor, the inside of mounting panel is provided with three bearing, through three on the mounting panel bearing movable mounting have three pivot, and three the pivot all is perpendicular to the mounting panel, three in the pivot be located in the middle the top of pivot pass through the bearing with driving motor fixed connection, three the surface of pivot all is provided with spiral stirring vane, just spiral stirring vane is located the inside of preparing the cavity, the top of the rotating shaft is fixedly provided with gears, the gears are located in the installation cavity, a rack is arranged between the gears, the gears are movably connected with the rack, and the gears are meshed with the rack.
Preferably, four ends of the bottom of the preparation box are provided with mounting blocks, and four ends of the bottom of the preparation box are respectively provided with movable wheels through four mounting blocks.
Preferably, fixed mounting has the inlet pipe on the lateral wall of preparation case one side, just the one end of inlet pipe with it communicates each other to prepare the cavity, just the intermediate position department fixed mounting at inlet pipe top has the filling tube, the filling tube with the inlet pipe communicates each other.
Preferably, the top end of the feeding pipe is fixedly provided with an expanded feeding head.
Preferably, the one end of inlet pipe is provided with the installation cover, the one end of inlet pipe is passed through installation cover movable mounting has the push rod, the one end fixed mounting of push rod has the handle that pushes away, the other end fixed mounting of push rod has the push pedal, the push pedal is located the inside of inlet pipe, just around being equipped with the spring on the push rod, the spring is located the inlet pipe with push away between the handle.
Preferably, the bottom fixed mounting of preparing case one side lateral wall has the discharging pipe, the inside movable mounting of discharging pipe has the material valve of ending.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of scientific and reasonable structure, convenient and safe use, through the inside preparation cavity that is provided with in the preparation case, the inside of preparation cavity is equipped with three pivots, the surface of three pivots all is provided with helical stirring blade, make this device through control driving motor, thereby make three pivots rotate simultaneously, mix the preparation through three helical stirring blade to lime thick liquid, because the helical structure of helical stirring blade, make the raw materials can be stirred from top to bottom in the preparation cavity, and the resistance is little, thereby make the speed of preparation fast, the effect of preparation is good, when feeding, add the raw materials to the filling tube through the wide-type feeding head, when appearing blockking up, promote the push rod through the push handle, the push rod promotes the push plate, push the raw materials to the inside of preparation cavity, around being equipped with the spring on the push rod, the spring is located between inlet pipe and the push handle, make the push plate after the propelling movement automatically reset, thereby facilitating the next operation.
Drawings
Fig. 1 is a schematic structural view of the whole of the present invention;
FIG. 2 is an enlarged view of the present invention at A in FIG. 1;
fig. 3 is an enlarged view of the present invention at B in fig. 1.
In the figure: 1. a moving wheel; 2. mounting blocks; 3. a discharge pipe; 4. a material stopping valve; 5. preparing a cavity; 6. a rotating shaft; 7. preparing a box; 8. a helical mixing blade; 9. mounting a plate; 10. installing a cavity; 11. a bearing; 12. a drive motor; 13. a feed tube; 14. a wide-range feeding head; 15. a feed pipe; 16. installing a sleeve; 17. pushing the plate; 18. a spring; 19. a push handle; 20. a push rod; 21. a rack; 22. a gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a technical scheme of a lime slurry preparation device for decoration engineering comprises a preparation box 7, wherein a mounting plate 9 is fixedly mounted at the top end inside the preparation box 7, an installation cavity 10 and a preparation cavity 5 are arranged inside the preparation box 7 through the mounting plate 9, the installation cavity 10 is positioned at the top of the mounting plate 9, the preparation cavity 5 is positioned at the bottom of the mounting plate 9, a driving motor 12 is fixedly mounted at the middle position of the top of the preparation box 7, three bearings 11 are arranged inside the mounting plate 9, three rotating shafts 6 are movably mounted on the mounting plate 9 through the three bearings 11, the three rotating shafts 6 are all vertical to the mounting plate 9, the top end of the rotating shaft 6 positioned in the middle of the three rotating shafts 6 is fixedly connected with the driving motor 12 through the bearings 11, helical stirring blades 8 are arranged on the surfaces of the three rotating shafts 6, the helical stirring blades 8 are positioned inside the preparation cavity 5, gears 22 are fixedly mounted at, three gears 22 are all located installation cavity 10, and are provided with rack 21 between three gears 22, and three gears 22 pass through rack 21 swing joint, and gear 22 and rack 21 intermeshing for this device can directly make three pivot 6 rotate through a driving motor 12 through three gear 22 and rack 21.
Preferably, four ends of preparing 7 bottoms portions of case all are provided with installation piece 2, and four ends of preparing 7 bottoms portions of case have respectively through four 2 movable mounting of installation pieces that remove wheel 1 for this device is convenient for remove.
Preferably, a feeding pipe 15 is fixedly installed on the side wall of one side of the preparation box 7, one end of the feeding pipe 15 is communicated with the preparation cavity 5, a feeding pipe 13 is fixedly installed at the middle position of the top of the feeding pipe 15, and the feeding pipe 13 is communicated with the feeding pipe 15.
Preferably, an expanded feeding head 14 is fixedly mounted at the top end of the feeding pipe 13, so that feeding is facilitated.
Preferably, the one end of inlet pipe 15 is provided with the installation cover 16, the one end of inlet pipe 15 has push rod 20 through 16 movable mounting of installation cover, the one end fixed mounting of push rod 20 has push handle 19, the other end fixed mounting of push rod 20 has push pedal 17, push pedal 17 is located the inside of inlet pipe 15, promote push rod 20 through push handle 19, push rod 20 promotes push pedal 17, with the inside of raw materials propelling movement to preparing cavity 5, and around being equipped with spring 18 on the push rod 20, spring 18 is located between inlet pipe 15 and the push handle 19, make push pedal 17 after the propelling movement automatically re-settable, thereby be convenient for carry out next operation.
Preferably, the bottom fixed mounting who prepares 7 one side lateral walls of case has discharging pipe 3, and the inside movable mounting of discharging pipe 3 has only material valve 4, is convenient for control discharging pipe 3's opening and shutting through only material valve 4.
The working principle is as follows: the utility model discloses a through being provided with in the inside of preparing the case 7 and preparing the cavity 5, the internally mounted of preparing the cavity 5 has three pivot 6, the surface of three pivot 6 all is provided with helical mixing blade 8, make this device through control driving motor 12, thereby make three pivot 6 rotate simultaneously, mix through three helical mixing blade 8 lime thick liquid and prepare, because helical mixing blade 8's helical structure, make the raw materials can turn from top to bottom in the inside of preparing the cavity 5, and the resistance is little, thereby make the speed of preparing fast, the effect of preparing is good, when reinforced, add raw materials to the filling tube 13 through wide-type material adding head 14, when appearing blockking up, promote push rod 20 through push handle 19, push rod 20 promotes push pedal 17, with the inside of raw materials propelling movement to preparing the cavity 5, around being equipped with spring 18 on push rod 20, spring 18 is located between inlet pipe 15 and the push handle 19, the push plate 17 after being pushed can be automatically reset, so that the next operation is convenient.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A lime slurry preparing device for decoration engineering comprises a preparing box (7), and is characterized in that: the top fixed mounting who prepares case (7) inside has mounting panel (9), the inside of preparing case (7) is passed through mounting panel (9) is provided with installation cavity (10) and prepares cavity (5), installation cavity (10) are located the top of mounting panel (9), it is located to prepare cavity (5) the bottom of mounting panel (9), the intermediate position department fixed mounting who prepares case (7) top has driving motor (12), the inside of mounting panel (9) is provided with three bearing (11), on mounting panel (9) through three bearing (11) movable mounting has three pivot (6), and three pivot (6) all perpendicular to mounting panel (9), three lie in the middle in pivot (6) the top of pivot (6) is passed through bearing (11) with driving motor (12) fixed connection, it is three the surface of pivot (6) all is provided with spiral stirring vane (8), just spiral stirring vane (8) are located the inside of preparing cavity (5), it is three the equal fixed mounting in top of pivot (6) has gear (22), and is three gear (22) all are located installation cavity (10), and three be provided with rack (21) between gear (22), it is three gear (22) pass through rack (21) swing joint, just gear (22) with rack (21) intermeshing.
2. The lime slurry dispensing apparatus for finishing work according to claim 1, wherein: four ends of preparing case (7) bottom all are provided with installation piece (2), four ends of preparing case (7) bottom are respectively through four installation piece (2) movable mounting has removal wheel (1).
3. The lime slurry dispensing apparatus for finishing work according to claim 1, wherein: prepare on the lateral wall of case (7) one side fixed mounting have inlet pipe (15), just the one end of inlet pipe (15) with prepare cavity (5) and communicate with each other, just the intermediate position department fixed mounting at inlet pipe (15) top has filling tube (13), filling tube (13) with inlet pipe (15) communicate with each other.
4. The lime slurry dispensing apparatus for finishing work according to claim 3, wherein: the top end of the feeding pipe (13) is fixedly provided with a wide feeding head (14).
5. The lime slurry dispensing apparatus for finishing work according to claim 3, wherein: the one end of inlet pipe (15) is provided with installation cover (16), the one end of inlet pipe (15) is passed through installation cover (16) movable mounting has push rod (20), the one end fixed mounting of push rod (20) has and pushes away handle (19), the other end fixed mounting of push rod (20) has push pedal (17), push pedal (17) are located the inside of inlet pipe (15), just around being equipped with spring (18) on push rod (20), spring (18) are located inlet pipe (15) with push away between handle (19).
6. The lime slurry dispensing apparatus for finishing work according to claim 1, wherein: the bottom fixed mounting who prepares case (7) one side lateral wall has discharging pipe (3), the inside movable mounting of discharging pipe (3) has only material valve (4).
CN201920914717.5U 2019-06-18 2019-06-18 Fitment is with lime water preparation device Active CN210252049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920914717.5U CN210252049U (en) 2019-06-18 2019-06-18 Fitment is with lime water preparation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920914717.5U CN210252049U (en) 2019-06-18 2019-06-18 Fitment is with lime water preparation device

Publications (1)

Publication Number Publication Date
CN210252049U true CN210252049U (en) 2020-04-07

Family

ID=70043219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920914717.5U Active CN210252049U (en) 2019-06-18 2019-06-18 Fitment is with lime water preparation device

Country Status (1)

Country Link
CN (1) CN210252049U (en)

Similar Documents

Publication Publication Date Title
CN106968422A (en) It is a kind of can be with the efficient metope spraying equipment of multi-faceted construction
CN209277490U (en) A kind of anticlogging Mortar spraying machine
CN210252049U (en) Fitment is with lime water preparation device
CN211447874U (en) Wall crack repairing device for building construction
CN212053791U (en) Automatic watering device of construction concrete
CN217175550U (en) Automatic wall putty trowelling machine
CN206587631U (en) A kind of true mineral varnish agitator tank
CN215948821U (en) Automatic laying device of ceramic tile for architectural decoration
CN211164661U (en) Simple concrete stirring device
CN115672091A (en) Putty powder preparation mixing apparatus is used to house building fitment
CN211159941U (en) Raw material grinding equipment in field of food processing machinery
CN212942677U (en) Hot melt vacuum compounding device is used in heat insulating strip production
CN205185086U (en) Multilayer multipurpose mixer
CN210256748U (en) Prevent discharging device for concrete production of jam
CN210252025U (en) A draw-out device for slice of rock lacquer
CN211114862U (en) Building construction concrete placement device
CN218314832U (en) Foaming board production line batching compounding device
CN214915711U (en) Material stirring device for decoration
CN219171280U (en) Gypsum mortar apparatus for producing
CN110905142A (en) Putty spraying construction method for paint construction base
CN216006499U (en) Asphalt preparation device for road and bridge construction
CN214915712U (en) Decorate fitment with scribbling storage bucket
CN220737239U (en) Architectural coating agitated vessel
CN213106362U (en) Sand blasting unit is used in architectural decoration fitment construction
CN213352859U (en) Drying environment-friendly glaze spraying machine for ceramic tile processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant