CN210244164U - Anchor rod construction angle controller - Google Patents

Anchor rod construction angle controller Download PDF

Info

Publication number
CN210244164U
CN210244164U CN201921265102.0U CN201921265102U CN210244164U CN 210244164 U CN210244164 U CN 210244164U CN 201921265102 U CN201921265102 U CN 201921265102U CN 210244164 U CN210244164 U CN 210244164U
Authority
CN
China
Prior art keywords
anchor rod
flitch
protractor
construction
angle controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921265102.0U
Other languages
Chinese (zh)
Inventor
Chuisheng Wei
魏垂胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongcheng Coal and Electricity Holding Group Co Ltd
Original Assignee
Yongcheng Coal and Electricity Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongcheng Coal and Electricity Holding Group Co Ltd filed Critical Yongcheng Coal and Electricity Holding Group Co Ltd
Priority to CN201921265102.0U priority Critical patent/CN210244164U/en
Application granted granted Critical
Publication of CN210244164U publication Critical patent/CN210244164U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

The utility model relates to an anchor rod construction angle controller, including the protractor, its characteristics are that the straight line limit of protractor is connected perpendicularly with the middle part of a rectangle flitch upper surface, and a diameter slightly is greater than the round hole of stock diameter is opened at the middle part one side on the straight line limit of protractor to the flitch, and a couple, protractor and flitch overall construction are respectively established at the both ends of the lower surface of flitch. Has the advantages that: the anchor rod supporting device is low in cost and simple to operate, accuracy of anchor rod construction angles is improved, and anchor rod supporting quality is improved.

Description

Anchor rod construction angle controller
Technical Field
The utility model relates to a coal mine tunnel construction field, more specifically the stock construction angle controller that says so.
Background
The anchor rod is usually beaten in the construction of colliery underworkings and is strutted, and nevertheless anchor rod construction angle control is crucial to the anchor rod support effect, requires the perpendicular tunnel contour line tangent line of anchor rod among the national standard, and in actual anchor rod work progress, anchor rod angle control is comparatively difficult, and the unqualified phenomenon of ubiquitous anchor rod construction angle has seriously influenced the tunnel support effect.
Disclosure of Invention
The utility model aims at overcoming prior art's weak point and providing an anchor rod construction angle controller who improves the anchor rod construction angle degree of accuracy, reinforcing tunnel support effect.
The purpose of the utility model can be realized by the following method: the anchor rod construction angle controller comprises an angle gauge and is characterized in that the linear edge of the angle gauge is vertically connected with the middle of the upper surface of a rectangular flitch, one side of the flitch in the middle of the linear edge of the angle gauge is provided with a round hole with the diameter slightly larger than that of an anchor rod, two ends of the lower surface of the flitch are respectively provided with a hook, and the angle gauge and the flitch are integrally constructed.
Compared with the prior art, the utility model following advantage has: the anchor rod supporting device is low in cost and simple to operate, accuracy of anchor rod construction angles is improved, and anchor rod supporting quality is improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. a protractor; 2. pasting a board; 3. a circular hole; 4. and (4) hanging hooks.
Detailed Description
With reference to the accompanying drawings as follows: the anchor rod construction angle controller comprises an angle gauge 1 and is characterized in that a straight line edge of the angle gauge 1 is vertically connected with the middle of the upper surface of a rectangular flitch 2, one side of the flitch 2 in the middle of the straight line edge of the angle gauge 1 is provided with a round hole 3 with the diameter slightly larger than that of an anchor rod, two ends of the lower surface of the flitch are respectively provided with a hook 4, and the angle gauge 1 and the flitch 2 are integrally constructed.
When the colliery underworkings construction stock, earlier the utility model discloses 2 lower surface couples 4 of flitch hang on tunnel roof screen, and make flitch 2 go up round hole 3 and the coincidence of anchor rod position of being under construction in advance through adjusting 4 positions of couple, then pass round hole 3 with the drilling rod of the anchor rod of being under construction, through adjusting the rig position and through observing 1 drilling rods that make the construction stock of protractor and 2 perpendicular with flitch, the drilling rod of the anchor rod of being under construction this moment is perpendicular to tunnel contour line tangent line, then start the rig and drive drilling rod construction stock, at this moment the anchor rod construction angle accords with the national standard requirement, the utility model discloses play the effect of control anchor rod construction angle, improved the tunnel and strutted the effect, and the utility model discloses low cost, easy operation, easily manufacturing.

Claims (1)

1. Anchor rod construction angle controller, including protractor (1), its characterized in that: the straight line limit of protractor (1) is connected with the middle part of a rectangle flitch (2) upper surface is perpendicular, and flitch (2) open a diameter slightly is greater than round hole (3) of stock diameter in the middle part one side of protractor (1) straight line limit, and the both ends of the lower surface of flitch respectively establish a couple (4), protractor (1) and flitch (2) overall construction.
CN201921265102.0U 2019-07-30 2019-07-30 Anchor rod construction angle controller Expired - Fee Related CN210244164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921265102.0U CN210244164U (en) 2019-07-30 2019-07-30 Anchor rod construction angle controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921265102.0U CN210244164U (en) 2019-07-30 2019-07-30 Anchor rod construction angle controller

Publications (1)

Publication Number Publication Date
CN210244164U true CN210244164U (en) 2020-04-03

Family

ID=69963079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921265102.0U Expired - Fee Related CN210244164U (en) 2019-07-30 2019-07-30 Anchor rod construction angle controller

Country Status (1)

Country Link
CN (1) CN210244164U (en)

Similar Documents

Publication Publication Date Title
CN205421254U (en) Civil engineering is with going up and down from flagging pile driver
CN210244164U (en) Anchor rod construction angle controller
CN107246995A (en) A kind of multi-functional clamp determined for concrete splitting tensile strength
CN207180683U (en) A kind of building construction formwork verticality measuring tool
CN216477305U (en) Be applied to quick auxiliary device of drill site contained angle reinspection
CN204348439U (en) The wire-clamping device of lopping coating all-in-one
CN208455622U (en) A kind of quick pile driving equipment of architectural engineering
CN203778687U (en) Wooden mold with stripping device and stripping device
CN206369009U (en) A kind of natural gas line supporting construction
CN214359787U (en) Steel construction hoist device for construction
CN201317992Y (en) Hoisting and positioning structure for open type mineral wool decorative acoustic board
CN207649590U (en) A kind of twist measuring device in discontinuous hole
CN209877983U (en) Assembled shear force wallboard straightness measuring device that hangs down
CN208007268U (en) Aircraft
CN200969504Y (en) Laying conductor point for downhole measurement of coal mine
CN202586164U (en) Head clamp of concrete-pole cross arm
CN203855346U (en) Novel guide wheel
CN203795854U (en) Preformed hole formwork fixing device for bare concrete floor
CN213014749U (en) Wall heat-insulating layer bracket
CN205244169U (en) Universal joint
CN220525585U (en) Concrete penetration resistance instrument
CN214993123U (en) Steel pipe jib assistance-localization real-time structure
CN220856069U (en) Stainless steel conical flagpole capable of preventing rope from falling off
CN208981936U (en) For positioning the device of the auxiliary frame of window hole
CN219620680U (en) Reinforced concrete pipe hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403