CN210241090U - Supporting device of engineering measurement equipment in building construction - Google Patents
Supporting device of engineering measurement equipment in building construction Download PDFInfo
- Publication number
- CN210241090U CN210241090U CN201921335889.3U CN201921335889U CN210241090U CN 210241090 U CN210241090 U CN 210241090U CN 201921335889 U CN201921335889 U CN 201921335889U CN 210241090 U CN210241090 U CN 210241090U
- Authority
- CN
- China
- Prior art keywords
- movable rod
- fixedly connected
- supporting device
- engineering
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
The utility model discloses an engineering measuring equipment's strutting arrangement in construction, including rotating the sleeve and putting the ware platform, rotate telescopic top and the bottom rotation of putting the ware platform and be connected, the inside sliding connection who rotates the sleeve has the movable rod, the circular slot has been seted up to the bottom on movable rod surface, the inside rotation of circular slot is connected with the roll-over stand, the fixed slot has been seted up to the inside of movable rod, and equal sliding connection has the fly leaf between the both sides of fixed slot inner wall top and bottom, the utility model relates to an engineering measurement technical field. This strutting arrangement of engineering measurement equipment among construction can realize carrying out convenient the removal to this strutting arrangement when carrying out next place measurement use, need not the transport, can stably place subaerial at the in-process that uses simultaneously, has guaranteed the normal clear of follow-up work, has practiced thrift the time, has reduced the manpower consumption, facilitates for subsequent measurement and construction work.
Description
Technical Field
The utility model relates to an engineering survey technical field specifically is an engineering measuring equipment's strutting arrangement in construction.
Background
The construction is a production activity in the construction implementation stage, is a construction process of various buildings, and can also be said to be a process of changing various lines on a design drawing into a real object at a designated place, and engineering measurement is not separated before the construction begins, wherein the engineering measurement comprises various measurement works performed in the surveying, designing, constructing and managing stages of the construction, and is directly served for a series of engineering procedures of surveying, designing, constructing, installing, completing, monitoring, operation managing and the like of various construction projects.
The existing engineering measurement equipment needs to be supported by a supporting device in the actual application process, the engineering measurement equipment needs to have a plurality of angles when measuring large-scale engineering, the measurement is carried out in a plurality of places, after one place is measured, the measurement equipment and the supporting device need to be carried to the next place in the process, the equipment is heavy, time and labor are wasted, the next measurement work is influenced, even the subsequent engineering progress can be delayed, and unnecessary time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides an engineering measuring equipment's strutting arrangement in construction has solved engineering measuring equipment and has measured after a certain department, needs the transport to move to next department again and installs the very inconvenient and extravagant labour's of measurement problem.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a supporting device of engineering measuring equipment in building construction comprises a rotating sleeve and a device placing table, wherein the top end of the rotating sleeve is rotatably connected with the bottom of the device placing table, a movable rod is slidably connected inside the rotating sleeve, a circular groove is formed in the bottom of the surface of the movable rod, a turnover frame is rotatably connected inside the circular groove, a fixed groove is formed in the movable rod, movable plates are slidably connected between the top and the bottom of the inner wall of the fixed groove, clamping blocks are fixedly connected to the opposite sides of the two movable plates, one side of each clamping block sequentially penetrates through the fixed groove, the movable rod and the turnover frame and extends into the turnover frame, clamping grooves matched with the clamping blocks are formed in the two sides of the inner wall of the turnover frame, springs are fixedly connected between the top and the bottom of the opposite sides of the two movable plates, and poking plates are fixedly connected to the front sides of the two movable plates, one side of the two poking plates, which is far away from the movable plate, sequentially penetrates through the fixed groove and the movable rod and extends to the front of the movable rod.
Preferably, the bottom of the roll-over stand is fixedly connected with a universal wheel, and the bottom of the front side of the movable rod is provided with a sliding groove matched with the shifting plate.
Preferably, one side on the surface of the movable rod and the top of the roll-over stand are fixedly connected with a first bandage, and the back of the first bandage is fixedly connected with a hook-and-loop fastener.
Preferably, the other side of the surface of the movable rod is fixedly connected with a second binding belt, and the front surface of the second binding belt is fixedly connected with a magic tape suede.
Preferably, the bottom end of the movable rod is fixedly connected with a toe nail, and the bottoms of the two sides of the surface of the rotating sleeve are rotatably connected with adjusting blocks.
Preferably, the inside of the movable rod and the two sides of the fixed groove are both provided with through holes matched with the clamping blocks.
Advantageous effects
The utility model provides an engineering measuring equipment's strutting arrangement in construction. Compared with the prior art, the method has the following beneficial effects:
(1) the supporting device of the engineering measuring equipment in building construction is rotationally connected with the bottom of the placing platform through the top end of the rotating sleeve, the inside of the rotating sleeve is slidably connected with a movable rod, the bottom of the surface of the movable rod is provided with a circular groove, the inside of the circular groove is rotationally connected with a roll-over stand, the inside of the movable rod is provided with a fixed groove, movable plates are slidably connected between the top and the two sides of the inner wall of the fixed groove, one sides of the two movable plates, which are far away from each other, are fixedly connected with a clamping block, one sides of the clamping blocks sequentially penetrate through the fixed groove, the movable rod and the roll-over stand and extend to the inside of the roll-over stand, the two sides of the inner wall of the roll-over stand are respectively provided with a clamping groove matched with the clamping block, springs are fixedly connected between the top and the bottom of the opposite sides of the two movable plates, poking, the bottom fixedly connected with universal wheel of roll-over stand, the spout with striking plate looks adaptation is seted up to the positive bottom of movable rod, can realize conveniently removing this strutting arrangement when carrying out next place measurement use, need not the transport, can stably place subaerial at the in-process that uses simultaneously, has guaranteed the normal clear of follow-up work, has practiced thrift the time, has reduced the manpower consumption, facilitates for subsequent measurement and construction work.
(2) This support arrangement for engineering measuring equipment among construction, one side through the movable rod surface just is located the first bandage of the top fixedly connected with of roll-over stand, and the hook face is pasted to the back fixedly connected with magic of first bandage, state the opposite side fixedly connected with second bandage on movable rod surface, and the positive fixedly connected with magic of second bandage pastes the matte, the bottom fixedly connected with toe nail of movable rod, the bottom of rotating sleeve surface both sides all rotates and is connected with the regulating block, the inside of movable rod just is located the both sides of fixed slot and all sets up the through-hole with fixture block looks adaptation, adjustable movable rod extends to outside length, the instrument is located suitable height when guaranteeing to measure, effectively improve measurement accuracy and efficiency.
Drawings
Fig. 1 is a front view of the structure of the present invention;
FIG. 2 is a sectional view of the movable rod structure of the present invention;
FIG. 3 is an enlarged view of the point A of FIG. 1 according to the present invention;
fig. 4 is a rear view of the first strap structure of the present invention.
In the figure: 1-rotating sleeve, 2-placing device table, 3-movable rod, 4-circular groove, 5-turning frame, 6-fixed groove, 7-movable plate, 8-fixture block, 9-fixture groove, 10-spring, 11-poking plate, 12-universal wheel, 13-sliding groove, 14-first bandage, 15-magic tape hook surface, 16-second bandage, 17-magic tape suede, 18-toe nail, 19-adjusting block and 20-through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a supporting device of engineering measuring equipment in building construction comprises a rotating sleeve 1 and a placing device platform 2, wherein the placing device platform 2 is a supporting structure for placing a measuring instrument, a device for fixing the instrument is usually arranged on the supporting structure, unnecessary loss caused by shaking and falling of the instrument is prevented, the top end of the rotating sleeve 1 is rotatably connected with the bottom of the placing device platform 2, a movable rod 3 is slidably connected inside the rotating sleeve 1, through holes 20 matched with clamping blocks are formed in the movable rod 3 and positioned on two sides of a fixed groove 6, a toe pin 18 is fixedly connected with the bottom end of the movable rod 3, a foot rest can be stably placed on the ground by the toe pin 18 during measurement, the purpose is to ensure that engineering measurement is orderly and stably carried out, the supporting device has the characteristics of wear resistance and stability, adjusting blocks 19 are rotatably connected to the bottoms of two sides of the surface of the rotating sleeve 1, and the effect of the adjusting blocks 19 is to control the length of the movable rod 3 extending out of the, the height of the foot rest is adjusted during measurement, so that the measurement procedure is reasonably performed, the second bandage 16 is fixedly connected to the other side of the surface of the movable rod 3, the magic tape suede 17 is fixedly connected to the front side of the second bandage 16, the first bandage 14 is fixedly connected to one side of the surface of the movable rod 3 and is positioned at the top of the turnover frame 5, the hook surface 15 is fixedly connected to the back side of the first bandage 14, the circular groove 4 is formed in the bottom of the surface of the movable rod 3, the turnover frame 5 is rotatably connected to the inside of the circular groove 4, the universal wheel 12 is fixedly connected to the bottom of the turnover frame 5, the sliding groove matched with the poking plate 11 is formed in the bottom of the front side of the movable rod 3, the fixing groove 6 is formed in the inside of the movable rod 3, the movable plate 7 is slidably connected between the top of the inner wall of the fixing groove 6 and the two sides of the bottom, the, The movable rod 3 and the roll-over stand 5 and extend to the inside of roll-over stand 5, the draw-in groove 9 with 8 looks adaptations of fixture block is all seted up to the both sides of the inner wall of roll-over stand 5, equal fixedly connected with spring 10 between the top and the bottom of the relative one side of two fly leafs 7, and the equal fixedly connected with in front of two fly leafs 7 dials movable plate 11, and one side that movable plate 7 was kept away from to two dials movable plate 11 runs through fixed slot 6 and movable rod 3 in proper order and extends to the front of movable rod 3.
When the universal wheel device is used, the two poking plates 11 move relatively, the universal wheel 12 is put down, the poking plates 11 are loosened at the same time, the clamping block 8 on the movable plate 7 is just clamped in the clamping groove 9 on the turnover frame 5, the universal wheel 12 is fixed under the toe nail 18 and just contacts with the ground, the turnover frame 5 cannot shake in the moving process, the whole body is pushed to the next measuring point, when the universal wheel is moved to the next measuring point, the two poking plates 11 move relatively, the clamping block 8 is separated from the clamping groove 9, the universal wheel 12 is turned upwards through the turnover frame 5, the magic tape hook surface 15 on the first tape 14 and the magic tape suede surface 17 on the second tape 16 are bonded together, the universal wheel 12 is bound on the movable rod 3, and the whole work is finished.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an engineering survey equipment's strutting arrangement in construction, includes and rotates sleeve (1) and puts ware platform (2), the top of rotating sleeve (1) is connected its characterized in that with the bottom rotation of putting ware platform (2): the inner part of the rotating sleeve (1) is connected with a movable rod (3) in a sliding manner, the bottom of the surface of the movable rod (3) is provided with a circular groove (4), the inner part of the circular groove (4) is connected with a turning frame (5) in a rotating manner, a fixed groove (6) is formed in the movable rod (3), movable plates (7) are connected between the top and the bottom of the inner wall of the fixed groove (6) in a sliding manner, clamping blocks (8) are fixedly connected to the two sides of the opposite sides of the movable plates (7), one side of each clamping block (8) sequentially penetrates through the fixed groove (6), the movable rod (3) and the turning frame (5) and extends to the inner part of the turning frame (5), clamping grooves (9) matched with the clamping blocks (8) are formed in the two sides of the inner wall of the turning frame (5), and springs (10) are fixedly connected between the top and the bottom, the front surfaces of the two movable plates (7) are fixedly connected with toggle plates (11), and one side, away from the movable plates (7), of each toggle plate (11) penetrates through the fixed groove (6) and the movable rod (3) in sequence and extends to the front surface of the movable rod (3).
2. The supporting device of the engineering surveying equipment in building construction according to claim 1, characterized in that: the bottom of the roll-over stand (5) is fixedly connected with a universal wheel (12), and the bottom of the front surface of the movable rod (3) is provided with a sliding chute (13) matched with the poking plate (11).
3. The supporting device of the engineering surveying equipment in building construction according to claim 1, characterized in that: one side on movable rod (3) surface just is located the first bandage of top fixedly connected with (14) of roll-over stand (5), and the back fixedly connected with magic subsides hook face (15) of first bandage (14).
4. The supporting device of the engineering surveying equipment in building construction according to claim 1, characterized in that: the other side of the surface of the movable rod (3) is fixedly connected with a second bandage (16), and the front side of the second bandage (16) is fixedly connected with a magic tape suede (17).
5. The supporting device of the engineering surveying equipment in building construction according to claim 1, characterized in that: the bottom fixedly connected with toe nail (18) of movable rod (3), the bottom of rotating sleeve (1) surface both sides all rotates and is connected with regulating block (19).
6. The supporting device of the engineering surveying equipment in building construction according to claim 1, characterized in that: and through holes (20) matched with the clamping blocks are formed in the movable rod (3) and positioned on two sides of the fixing groove (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921335889.3U CN210241090U (en) | 2019-08-17 | 2019-08-17 | Supporting device of engineering measurement equipment in building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921335889.3U CN210241090U (en) | 2019-08-17 | 2019-08-17 | Supporting device of engineering measurement equipment in building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210241090U true CN210241090U (en) | 2020-04-03 |
Family
ID=69963989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921335889.3U Active CN210241090U (en) | 2019-08-17 | 2019-08-17 | Supporting device of engineering measurement equipment in building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210241090U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112984333A (en) * | 2021-02-19 | 2021-06-18 | 于少康 | Geographic information collection system is used in territory space planning |
-
2019
- 2019-08-17 CN CN201921335889.3U patent/CN210241090U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112984333A (en) * | 2021-02-19 | 2021-06-18 | 于少康 | Geographic information collection system is used in territory space planning |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210241090U (en) | Supporting device of engineering measurement equipment in building construction | |
DK144981C (en) | REMOVABLE, COMPRESSED AIR-EFFECTED EQUIPMENT FOR GROWTH IN THE EARTH | |
CN214276814U (en) | Laser test concrete resistance to compression test piece size device | |
CN109532184A (en) | Lining cloth paving machine before a kind of leather and lining cloth bonding are processed | |
CN106525537B (en) | Concrete core sample end face filling-in device and its application method | |
CN208122483U (en) | A kind of fixed architectural engineering fence | |
CN210998644U (en) | Rack for textile processing | |
CN209039618U (en) | A kind of clamp for electric plating | |
CN207335590U (en) | One kind building monitoring thickness of wall body real-time monitoring device | |
CN210979205U (en) | Civil engineering is auxiliary stand for measurement | |
CN203836514U (en) | Rotation test support | |
CN209883401U (en) | Indoor decoration is with supplementary drawing device | |
CN210567116U (en) | A equipment support frame for hydraulic and hydroelectric engineering surveys | |
CN213579034U (en) | Surveying and mapping device for indoor design | |
CN220840366U (en) | Board cutting device for green decoration engineering | |
CN207884888U (en) | A kind of fabric sticking device | |
CN206336057U (en) | A kind of portable drawing boards of Environment Design | |
CN210431517U (en) | Portable mobile phone support frame | |
CN220255984U (en) | Supporting structure for valuation equipment | |
CN209638650U (en) | A kind of construction Machines mounting base that stability is good | |
CN218261621U (en) | Novel crane supporting leg structure | |
CN218028799U (en) | Auxiliary device for paving and hanging construction of assembled wall | |
CN213721123U (en) | Template display device for building engineering construction | |
CN211473249U (en) | Soft porcelain facing installation device for fabricated building | |
CN216340835U (en) | Scaffold board fixing device of attached lifting scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |