CN210216338U - Portable water flow partition gate for river regulation - Google Patents

Portable water flow partition gate for river regulation Download PDF

Info

Publication number
CN210216338U
CN210216338U CN201920865724.0U CN201920865724U CN210216338U CN 210216338 U CN210216338 U CN 210216338U CN 201920865724 U CN201920865724 U CN 201920865724U CN 210216338 U CN210216338 U CN 210216338U
Authority
CN
China
Prior art keywords
gate
threaded rod
motor
water flow
portable water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920865724.0U
Other languages
Chinese (zh)
Inventor
Zhenjie Gong
龚珍杰
Liuxin Kang
康刘新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Laitai Garden Ltd By Share Ltd
Original Assignee
Henan Laitai Garden Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Laitai Garden Ltd By Share Ltd filed Critical Henan Laitai Garden Ltd By Share Ltd
Priority to CN201920865724.0U priority Critical patent/CN210216338U/en
Application granted granted Critical
Publication of CN210216338U publication Critical patent/CN210216338U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a river course is administered and is cut off gate with portable rivers, including the framework, the controller is installed to one side of framework, and the connection base is installed to the bottom of framework, and screw and trapezoidal slide rail are installed at the top of base, and trapezoidal slide rail and base welding, and spacing bolt is installed at the top of trapezoidal slide rail, and the motor is installed at the top of framework, and the threaded rod is installed to one side of motor, and the internally mounted of framework has the gear, and the flashboard is installed to the bottom of threaded rod. The utility model discloses a set up threaded rod, motor, controller, sleeve pipe, spacing bolt, trapezoidal slide rail, gear, solved traditional gate and mostly had fixed both sides of installing in the river course, be not convenient for install and dismantle, and gate itself designs for fixed structure, portable not, and when the gate used, need the manual work to operate, aggravate the problem of staff's work burden.

Description

Portable water flow partition gate for river regulation
Technical Field
The utility model relates to a river course is administered technical field, specifically is a river course is administered and is cut off gate with portable rivers.
Background
The partition gate is a device used for river regulation, and the river regulation is also called 'riverbed arrangement'. The engineering measures for controlling and reforming the river channel often cause scouring and silting phenomena in natural rivers, water damage easily occurs, water conservancy development is hindered, in order to meet the requirements of removing troubles and benefiting, proper measures are needed to be taken to rectify the river channel, the projects comprise dredging, treating and shore protection, and the like, when the river channel is treated, the upstream and the downstream of the river channel need to be separated, and a separation gate needs to be used.
However, the prior art has the following defects:
1. the traditional gate is mainly fixedly arranged on two sides of a river channel and is inconvenient to install and disassemble, the gate is designed in a fixed structure and is inconvenient to carry, and when the gate is used, manual operation is needed, so that the workload of workers is increased;
2. the flashboard of gate is makeed for appointed size, only can be effective to the river course of appointed degree of depth, and when the river course water level was too high, the gate just can not use, and application range is little.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a river course is administered and is cut off gate with portable rivers has solved traditional gate and has mostly fixed both sides of installing in the river course, is not convenient for install and dismantle, and gate itself designs for fixed structure, portable not, and when the gate used, needs the manual work to operate, aggravates the problem of staff work burden.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a portable water flow partition gate for river regulation comprises a frame body, a controller is arranged on one side of the frame body, a connecting base is arranged at the bottom of the frame body, a screw and a trapezoidal slide rail are arranged at the top of the base, the trapezoidal slide rail is welded with the base, the top of the trapezoidal slide rail is provided with a limiting bolt, the top of the frame body is provided with a motor, one side of the motor is provided with a threaded rod, the inside of the frame body is provided with a gear, the bottom of the threaded rod is provided with a flashboard, the bottom of the flashboard is provided with a sealing rubber pad, the bottom of the sealing rubber pad is provided with a pressure sensor, the top of the flashboard is provided with a top plate, one side and the other side of the flashboard, and the edge position of the elastic waterproof membrane is respectively bonded with the flashboard and the top plate, an electric push rod is arranged inside the top plate, an extension plate is arranged at the bottom of the electric push rod, and the electric push rod, the motor and the pressure sensor are all electrically connected with the controller.
Preferably, the number of the bases is two, the bases are distributed in a central symmetry mode, the screws are connected with the bases through threads, and the frame body is connected with the bases through the trapezoidal sliding rails.
Preferably, the limit bolt is embedded in the trapezoidal sliding rail, and a pull ring is welded at the top end of the limit bolt.
Preferably, the top welding of threaded rod has the stopper, and the threaded rod passes through threaded connection with the inner wall of framework.
Preferably, the gear is connected with the motor through a rotating shaft arranged at the bottom of the motor, and the gear is meshed with the threaded rod.
Preferably, the number of pressure sensor sets up is two to be central symmetry distribution, the pressure sensor embedding sets up in sealed cushion, and sealed cushion and flashboard bonding.
Preferably, the top welding of roof has the sleeve pipe, and the sleeve pipe intussuseption sets up the bottom at the threaded rod to with the outer wall clearance fit of threaded rod.
Preferably, the number of the electric push rods is two, the electric push rods are distributed in a central symmetry manner, and the electric push rods are connected with the extension plate through the telescopic rods arranged at the bottom of the electric push rods.
(III) advantageous effects
The utility model provides a river course is administered and is cut off gate with portable rivers possesses following beneficial effect:
(1) the utility model solves the problems that the traditional gate is mostly fixedly arranged at two sides of a river channel and is inconvenient to install and disassemble, and the gate is designed in a fixed structure and is inconvenient to carry, and the gate needs to be operated manually when in use, thus increasing the workload of workers, two bases are fixedly arranged at two sides of the river channel through screws, then the bottom of a frame body is assembled with the bases through the trapezoidal slide rail, the limiting bolt is inserted into the trapezoidal slide rail by a handheld pull ring to limit the frame body, after the assembly is finished, the motor drives the gear to rotate through a rotating shaft, as the gear is meshed with the threaded rod, the threaded rod is screwed into the inner wall of the frame body under the driving of the gear, the flashboard is driven to move downwards, the limiting block is used for limiting the threaded rod, when two pressure sensors at the bottom of the sealing rubber mat are pressed simultaneously, send the signal of telecommunication to the controller, controller control motor stop work, the flashboard cuts off the river course this moment, and when the gate did not use, the handheld pull ring of staff takes out spacing bolt, can slide the framework from the base and take off, then pass through screw thread rotation separation with sleeve pipe and roof, can carry the gate, the gate is convenient for install and dismantle, and itself can dismantle, conveniently carries, and the gate can be worked by controller automatic control, has to play and alleviates staff's work burden.
(2) The utility model discloses a set up the roof, electric putter and extension board, the flashboard of having solved the gate is makeed for the specified size, only can just effective fruit in the river course to the specified degree of depth, when river course water level is too high, the gate just can not use, the problem that application range is little, observe the inside water level in river course, when the water level is high, can use controller control electric putter work, electric putter passes through the telescopic link and drives the extension board and move down, thereby increase the whole height of flashboard, the elasticity water proof membrane expandes through self toughness, do water repellent for electric putter, the flashboard height of gate can be adjusted, application range is wide.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a partial longitudinal cross-sectional view of the frame of the present invention;
fig. 3 is a longitudinal sectional view of the shutter according to the present invention.
The reference numbers in the figures are: 1. a limiting block; 2. a threaded rod; 3. a motor; 4. a controller; 5. a frame body; 6. a sleeve; 7. a top plate; 8. a pull ring; 9. a limiting bolt; 10. a shutter plate; 11. sealing the rubber gasket; 12. an elastic waterproof film; 13. a pressure sensor; 14. a trapezoidal slide rail; 15. a screw; 16. a base; 17. a rotating shaft; 18. a gear; 19. an electric push rod; 20. a telescopic rod; 21. an extension plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: a portable water flow partition gate for river regulation comprises a frame body 5, a controller 4 is installed on one side of the frame body 5, a connecting base 16 is installed at the bottom of the frame body 5, the number of the bases 16 is two and is in central symmetrical distribution, screws 15 are in threaded connection with the bases 16, the frame body 5 is connected with the bases 16 through trapezoidal slide rails 14, the screws 15 and the trapezoidal slide rails 14 are installed at the top of the bases 16, the trapezoidal slide rails 14 are welded with the bases 16, limiting bolts 9 are installed at the top of the trapezoidal slide rails 14, the limiting bolts 9 are embedded in the trapezoidal slide rails 14, pull rings 8 are welded at the top ends of the limiting bolts 9, a motor 3 is installed at the top of the frame body 5, a threaded rod 2 is installed on one side of the motor 3, a limiting block 1 is welded at the top end of the threaded rod 2, the threaded rod 2 is in threaded connection with the, the gear 18 is connected with the motor 3 through a rotating shaft 17 arranged at the bottom of the motor 3, the gear 18 is meshed with the threaded rod 2, the gate plate 10 is arranged at the bottom of the threaded rod 2, the sealing rubber pad 11 is arranged at the bottom of the gate plate 10, the pressure sensors 13 are arranged at the bottom of the sealing rubber pad 11, the pressure sensors 13 are symmetrically distributed in the center, the pressure sensors 13 are embedded in the sealing rubber pad 11, the sealing rubber pad 11 is bonded with the gate plate 10, the top of the gate plate 10 is provided with the top plate 7, the top end of the top plate 7 is welded with the sleeve 6, the sleeve 6 is embedded at the bottom end of the threaded rod 2 and is in clearance fit with the outer wall of the threaded rod 2, the elastic waterproof films 12 are arranged at one side and the other side of the gate plate 10, the edge positions of the elastic waterproof films 12 are respectively bonded with the gate plate 10 and the top plate 7, the water level inside a river channel is, the electric push rod 19 drives the extension plate 21 to move downwards through the telescopic rod 20, so that the overall height of the gate plate 10 is increased, the elastic waterproof membrane 12 is unfolded through self toughness to perform waterproof treatment on the electric push rod 19, the height of the gate plate 10 of the gate can be adjusted, the application range is wide, the electric push rods 19 are arranged in the top plate 7, the number of the electric push rods 19 is two, and be central symmetric distribution, and electric putter 19 is connected through setting up the telescopic link 20 in electric putter 19 bottom with extension board 21, and extension board 21 is installed to electric putter 19's bottom, and electric putter 19, motor 3 and pressure sensor 13 all with 4 electric connection of controller, the utility model discloses controller 4, electric putter 19, motor 3 and pressure sensor 13's model is MAM-330 controller, PXTL electric putter, Y355 motor and CYYZ11 pressure sensor respectively, belongs to prior art.
The working principle is as follows: two bases 16 are fixedly arranged at two sides of a river channel through screws 15, then the bottom of a frame body 5 is assembled with the bases 16 through a trapezoid slide rail 14, a limiting bolt 9 is inserted into the trapezoid slide rail 14 by holding a pull ring 8 by a hand to limit the frame body 5, after the assembly is finished, a power supply is connected to a controller 4 to cut off a gate for use, when the device is used, the controller 4 controls a motor 3 to work, the motor 3 drives a gear 18 to rotate through a rotating shaft 17, as the gear 18 is meshed with a threaded rod 2, the threaded rod 2 is screwed into the inner wall of the frame body 5 under the driving of the gear 18 to drive a gate plate 10 to move downwards, a limiting block 1 is used for limiting the threaded rod 2, when two pressure sensors 13 at the bottom of a sealing rubber pad 11 are simultaneously pressed, an electric signal is sent to the controller 4, the controller 4 controls the motor 3 to stop working, at the moment, can use controller 4 control electric putter 19 work, electric putter 19 moves down through telescopic link 20 drive extension board 21 to increase the whole height of flashboard 10, elasticity water proof membrane 12 expandes through self toughness, do water repellent for electric putter 19, when the gate does not use, the handheld pull ring 8 of staff takes out spacing bolt 9, can slide frame 5 from base 16 and take off, then pass through the rotatory separation of screw thread with sleeve 6 and roof 7, can carry the gate.
To sum up can, the utility model discloses a set up threaded rod 2, motor 3, controller 4, sleeve pipe 6, spacing bolt 9, trapezoidal slide rail 14, gear 18, solved traditional gate and mostly had fixed both sides of installing in the river course, be not convenient for install and dismantle, and gate itself designs for fixed structure, portable not, and when the gate used, need the manual work to operate, aggravate staff's work burden's problem.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a river course is administered and is cut off gate with portable rivers, includes framework (5), its characterized in that: the controller (4) is installed on one side of the frame body (5), the connecting base (16) is installed at the bottom of the frame body (5), screws (15) and trapezoidal slide rails (14) are installed at the top of the base (16), the trapezoidal slide rails (14) are welded with the base (16), limiting bolts (9) are installed at the top of the trapezoidal slide rails (14), a motor (3) is installed at the top of the frame body (5), a threaded rod (2) is installed on one side of the motor (3), a gear (18) is installed inside the frame body (5), a flashboard (10) is installed at the bottom of the threaded rod (2), a sealing rubber pad (11) is installed at the bottom of the flashboard (10), a pressure sensor (13) is installed at the bottom of the sealing rubber pad (11), a top plate (7) is installed at the top of the flashboard (10), elastic waterproof films (12) are arranged on one side and the other side of the flashboard (10), and edge positions of the, the inside mounting of roof (7) has electric putter (19), and extension board (21) are installed to the bottom of electric putter (19), and electric putter (19), motor (3) and pressure sensor (13) all with controller (4) electric connection.
2. The portable water flow partition gate for river regulation according to claim 1, wherein: the number of the bases (16) is two, the bases are distributed in a central symmetry mode, the screws (15) are connected with the bases (16) through threads, and the frame body (5) is connected with the bases (16) through the trapezoidal sliding rails (14).
3. The portable water flow partition gate for river regulation according to claim 1, wherein: the limiting bolt (9) is embedded in the trapezoidal sliding rail (14), and the top end of the limiting bolt (9) is welded with the pull ring (8).
4. The portable water flow partition gate for river regulation according to claim 1, wherein: the top welding of threaded rod (2) has stopper (1), and threaded rod (2) passes through threaded connection with the inner wall of framework (5).
5. The portable water flow partition gate for river regulation according to claim 1, wherein: the gear (18) is connected with the motor (3) through a rotating shaft (17) arranged at the bottom of the motor (3), and the gear (18) is meshed with the threaded rod (2).
6. The portable water flow partition gate for river regulation according to claim 1, wherein: the number of the pressure sensors (13) is two, the pressure sensors are distributed in a central symmetry manner, the pressure sensors (13) are embedded in the sealing rubber mat (11), and the sealing rubber mat (11) is bonded with the flashboard (10).
7. The portable water flow partition gate for river regulation according to claim 1, wherein: the top welding of roof (7) has sleeve pipe (6), and sleeve pipe (6) inlay set is in the bottom of threaded rod (2) to with the outer wall clearance fit of threaded rod (2).
8. The portable water flow partition gate for river regulation according to claim 1, wherein: the number of the electric push rods (19) is two, the electric push rods are distributed in a central symmetry manner, and the electric push rods (19) are connected with the extension plate (21) through the telescopic rods (20) arranged at the bottom of the electric push rods (19).
CN201920865724.0U 2019-06-11 2019-06-11 Portable water flow partition gate for river regulation Expired - Fee Related CN210216338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920865724.0U CN210216338U (en) 2019-06-11 2019-06-11 Portable water flow partition gate for river regulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920865724.0U CN210216338U (en) 2019-06-11 2019-06-11 Portable water flow partition gate for river regulation

Publications (1)

Publication Number Publication Date
CN210216338U true CN210216338U (en) 2020-03-31

Family

ID=69930919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920865724.0U Expired - Fee Related CN210216338U (en) 2019-06-11 2019-06-11 Portable water flow partition gate for river regulation

Country Status (1)

Country Link
CN (1) CN210216338U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450178A (en) * 2022-10-14 2022-12-09 永嘉瑞杰阀门制造有限公司 Hoisting type gate valve
CN115466011A (en) * 2022-09-13 2022-12-13 湖北亚运景建设科技有限公司 Industrial wastewater purification device and purification method for purification engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115466011A (en) * 2022-09-13 2022-12-13 湖北亚运景建设科技有限公司 Industrial wastewater purification device and purification method for purification engineering
CN115450178A (en) * 2022-10-14 2022-12-09 永嘉瑞杰阀门制造有限公司 Hoisting type gate valve
CN115450178B (en) * 2022-10-14 2024-03-29 永嘉瑞杰阀门制造有限公司 Winding type gate valve

Similar Documents

Publication Publication Date Title
CN210216338U (en) Portable water flow partition gate for river regulation
CN211368620U (en) Water sluicegate that small-size reservoir was used
CN214579165U (en) Hydraulic control valve convenient to maintain
CN214551413U (en) Energy-saving peripheral transmission mud scraping equipment
CN211367192U (en) Foam eliminating device for industrial wastewater treatment
CN214130515U (en) Sewage treatment device utilizing biological deodorization
CN214061515U (en) Canal lining board protection film laying device
CN213239603U (en) Large-scale culture water quality sampler
CN209782006U (en) Novel cement pipe sealing cover plate
CN220736585U (en) Sewage treatment calandria for shield tunnel
CN211340689U (en) Diversion gate for water conservancy construction
CN207845223U (en) A kind of reverse osmosis water purification units of detectable water quality
CN213114539U (en) Water sluicegate latch device
CN220868315U (en) River mud salvaging equipment for ecological environment treatment
CN215105079U (en) Domatic prosthetic devices for hydraulic engineering
CN213836972U (en) Waste residue treatment device of regulation pond
CN219828715U (en) Hydraulic and hydroelectric engineering construction equipment
CN219638891U (en) Drainage device for subway construction
CN208088240U (en) A kind of provisional sluice of installation easy to disassemble
CN212159668U (en) Dam crack monitoring devices
CN212582772U (en) Silt clearing device is used in river course renovation
CN220957248U (en) Pipeline connecting piece for hydraulic engineering
CN214832481U (en) Water conservancy tunnel groundwater accuse row device
CN112096066B (en) Device and method for controlling depth of pipeline pressing groove on structural plate
CN219471057U (en) Channel dredging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331