CN210216120U - Temporary locking device for bridge deck and steel beam - Google Patents

Temporary locking device for bridge deck and steel beam Download PDF

Info

Publication number
CN210216120U
CN210216120U CN201920708320.0U CN201920708320U CN210216120U CN 210216120 U CN210216120 U CN 210216120U CN 201920708320 U CN201920708320 U CN 201920708320U CN 210216120 U CN210216120 U CN 210216120U
Authority
CN
China
Prior art keywords
locking
bridge deck
screw rod
locking device
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920708320.0U
Other languages
Chinese (zh)
Inventor
Ke Hu
胡可
Fagen Chen
陈发根
Xiaoguang Yang
杨晓光
Guanglun Cao
曹光伦
Runqing Li
李润清
Xuefei Shi
石雪飞
Chunjiang Yao
姚春江
Haipeng Duan
段海澎
Weiping Chen
陈维平
Jun Song
宋军
Changhai Liang
梁长海
Renhua Ruan
阮仁华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transportation Holding Group Co Ltd
Original Assignee
Anhui Transportation Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transportation Holding Group Co Ltd filed Critical Anhui Transportation Holding Group Co Ltd
Priority to CN201920708320.0U priority Critical patent/CN210216120U/en
Application granted granted Critical
Publication of CN210216120U publication Critical patent/CN210216120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a temporary locking device of decking and girder steel, including arranging locking roof beam (1) at decking (6) upper surface, fixing at locking nut (5) at girder steel (7) top and screw rod (2) that locking nut (5) and locking roof beam (1) are connected respectively at both ends, screw rod (2) upper end is provided with adjusting nut (3) with screw rod (2) and locking roof beam (1) locking. Compared with the prior art, the utility model discloses can firmly retrain prefabricated decking tip and prevent to lift up, and have easy operation, the convenient advantage of dismouting.

Description

Temporary locking device for bridge deck and steel beam
Technical Field
The utility model belongs to the technical field of the bridge building and specifically relates to a temporary locking device of decking and girder steel is related to.
Background
The prefabricated bridge deck can ensure the structural quality of concrete, and can realize the standardization and the rapidity of construction, but when the combined beam bridge is constructed, because the prestressed reinforcement is generally arranged above the section core, the end part of the prefabricated bridge deck can be lifted up during tensioning. There is a need for a device that can temporarily restrain a prefabricated bridge deck.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a temporary locking device of decking and girder steel in order to overcome the defect that above-mentioned prior art exists.
The purpose of the utility model can be realized through the following technical scheme:
the utility model provides a temporary locking device of decking and girder steel, is including arranging the locking roof beam at the decking upper surface, fixing at the locking nut at the girder steel top and pass the screw rod of locking roof beam, screw rod one end and locking nut threaded connection, the other end passes the locking roof beam, the screw rod upper end is provided with the adjusting nut with screw rod and locking roof beam locking.
Further, the locking nut is welded to the top of the steel beam.
Furthermore, the screw rod overcoat is equipped with the plastic sleeve, prevents that the screw rod from contacting with cast-in-place concrete, and the screw rod can be pulled out fast when demolising.
Further, a transverse handle is arranged at the top of the screw rod.
Furthermore, a notch is formed in the bridge deck, and the temporary locking device is arranged in the notch.
Further, the length of the locking beam is greater than the width of the slot.
The adjusting nut is used for adjusting the locking state between the locking beam and the prefabricated bridge deck slab, and when the screw and the locking nut are screwed, the locking beam and the prefabricated bridge deck slab can be pressed tightly by screwing the adjusting nut, so that the displacement of the prefabricated bridge deck slab and the steel beam is restrained; the screw can be unscrewed by a transverse handle at the top when the locking is released.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the end part of the prefabricated bridge deck can be firmly restrained, and the requirement that the end part of the prefabricated bridge deck is prevented from being lifted when the prestressed reinforcement is tensioned on the combined beam bridge is met;
2. the system is simple in composition, stable and reliable, simple to operate and convenient to disassemble and assemble.
Drawings
Fig. 1 is a schematic cross-sectional view of the present invention;
fig. 2 is a schematic layout of the present invention;
the reference numbers in the figures indicate:
1. locking roof beam, 2, screw rod, 3, adjusting nut, 4, plastic sleeve, 5, locking nut, 6, decking, 7, girder steel, 8, notch.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Examples
A temporary locking device for a bridge deck and a steel beam comprises a locking beam 1 arranged on the upper surface of a bridge deck 6, a locking nut 5 fixed at the top of the steel beam 7 and a screw rod 2 penetrating through the locking beam 1, wherein one end of the screw rod 2 is in threaded connection with the locking nut 5, the other end of the screw rod 2 penetrates through the locking beam 1, and an adjusting nut 3 for locking the screw rod 2 and the locking beam 1 is arranged at the upper end of the screw rod 2. The locking nut 5 is welded on top of the steel beam 7. The screw rod 2 is sleeved with the plastic sleeve 4, so that the screw rod 2 is prevented from contacting cast-in-place concrete, and the screw rod 2 can be quickly pulled out during dismantling. The top of the screw rod 2 is provided with a transverse handle. The bridge deck 6 is provided with a notch 8, and the temporary locking device is arranged in the notch 8. The length of the locking beam 1 is greater than the width of the slot 8.
The adjusting nut 3 is used for adjusting the locking state between the locking beam 1 and the prefabricated bridge deck 6, and after the screw rod 2 and the locking nut 5 are screwed, the locking beam 1 and the prefabricated bridge deck 6 can be tightly pressed by screwing the adjusting nut 3, so that the displacement of the prefabricated bridge deck 6 and the steel beam 7 is restrained; the screw 2 can be unscrewed by a lateral handle at the top when the locking is released.
The embodiments described above are intended to facilitate the understanding and use of the invention by those skilled in the art. It will be readily apparent to those skilled in the art that various modifications to these embodiments may be made, and the generic principles described herein may be applied to other embodiments without the use of the inventive faculty. Therefore, the present invention is not limited to the above embodiments, and those skilled in the art should make improvements and modifications within the scope of the present invention according to the disclosure of the present invention.

Claims (6)

1. The utility model provides a temporary locking device of decking and girder steel, its characterized in that, including arranging locking roof beam (1) at decking (6) upper surface, fixing at locking nut (5) at girder steel (7) top and screw rod (2) of passing locking roof beam (1), screw rod (2) one end and locking nut (5) threaded connection, the other end passes locking roof beam (1), screw rod (2) upper end is provided with adjusting nut (3) with screw rod (2) and locking roof beam (1) locking.
2. Temporary locking device of bridge deck and steel beam according to claim 1, characterized in that said locking nut (5) is welded on top of the steel beam (7).
3. Temporary locking device of bridge deck and steel beam according to claim 1, characterized in that the screw (2) is externally sleeved with a plastic sleeve (4).
4. Temporary locking device of bridge deck and steel beam according to claim 1, characterized in that the top of said screw (2) is provided with a transversal handle.
5. A temporary locking device of a bridge deck and a steel beam as claimed in claim 1, wherein the bridge deck (6) is provided with a notch (8), and the temporary locking device is arranged in the notch (8).
6. A temporary locking arrangement of a bridge deck and steel beam according to claim 5, wherein the length of the locking beam (1) is greater than the width of the slot (8).
CN201920708320.0U 2019-05-17 2019-05-17 Temporary locking device for bridge deck and steel beam Active CN210216120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920708320.0U CN210216120U (en) 2019-05-17 2019-05-17 Temporary locking device for bridge deck and steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920708320.0U CN210216120U (en) 2019-05-17 2019-05-17 Temporary locking device for bridge deck and steel beam

Publications (1)

Publication Number Publication Date
CN210216120U true CN210216120U (en) 2020-03-31

Family

ID=69926889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920708320.0U Active CN210216120U (en) 2019-05-17 2019-05-17 Temporary locking device for bridge deck and steel beam

Country Status (1)

Country Link
CN (1) CN210216120U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114657887A (en) * 2022-04-18 2022-06-24 杭州市交通规划设计研究院有限公司 Construction method of precast slab anti-cracking structure in hogging moment area of combined beam bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114657887A (en) * 2022-04-18 2022-06-24 杭州市交通规划设计研究院有限公司 Construction method of precast slab anti-cracking structure in hogging moment area of combined beam bridge
CN114657887B (en) * 2022-04-18 2024-04-02 杭州市交通规划设计研究院有限公司 Construction method of prefabricated slab crack-resistant structure in hogging moment area of composite beam bridge

Similar Documents

Publication Publication Date Title
CN205387770U (en) Be applied to precast floor plank connecting piece of prefabricated assembled steel construction building
CN205205646U (en) Structure of reinforcing prefabricated segment formula concrete bridge intersegmental connection of festival
CN202090290U (en) Tool for tensioning prestressing steel bar
CN210216120U (en) Temporary locking device for bridge deck and steel beam
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN203583884U (en) Outer climbing frame follow-up type discharging platform
CN104831640B (en) Construction method for reinforcing device of reinforced concrete bridge and bridge deck slab
CN204571092U (en) Prefabricated composite girder segment syndeton and the compound beam containing syndeton
CN201526006U (en) Prestressed concrete continuous box girder
CN114837417B (en) Construction method of basement buttress column stirrups and steel plate water stops
CN201695706U (en) Tensioning device of prestress fiber cloth for reinforcing reinforced concrete column
CN207537863U (en) A kind of combination beam prestress application connection structure
CN206987144U (en) A kind of dismountable steel bar truss floor support plate of bed die
CN203257121U (en) Novel reinforcing device of reinforced concrete beam and floor plate
CN211172720U (en) Mechanical connection structure of steel bars for prefabricated concrete structure
CN215714652U (en) Wet seam template fixing device
CN203320428U (en) Novel reinforcing device of reinforced concrete bridge and bridge deck
CN208294071U (en) A kind of concrete construction formwork
CN109972857B (en) Embedded steel type underpinning node
CN204826676U (en) Tension structure that has bonding prestressing tendons
CN208869929U (en) A kind of concrete box girder direction across bridge prestressed structure
CN107268460B (en) Bridge reinforcing apparatus
CN213015531U (en) Large-span bearing capacity reinforced structure of hollow slab
CN105986545A (en) Prefabricated composite beam segment connecting structure and application thereof
CN103015415A (en) Post-tensioned circular foundation pit support pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant