CN210196789U - Wear-resisting protector of long-distance tailing pipe elbow - Google Patents

Wear-resisting protector of long-distance tailing pipe elbow Download PDF

Info

Publication number
CN210196789U
CN210196789U CN201920718666.9U CN201920718666U CN210196789U CN 210196789 U CN210196789 U CN 210196789U CN 201920718666 U CN201920718666 U CN 201920718666U CN 210196789 U CN210196789 U CN 210196789U
Authority
CN
China
Prior art keywords
wear
fixture
connecting portion
long
elbow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920718666.9U
Other languages
Chinese (zh)
Inventor
Zhigang Long
龙志刚
Jiudong Wang
王久东
Yanjie Wang
王艳杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kangtai Tangshan City Industry & Trade Co Ltd
Original Assignee
Kangtai Tangshan City Industry & Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kangtai Tangshan City Industry & Trade Co Ltd filed Critical Kangtai Tangshan City Industry & Trade Co Ltd
Priority to CN201920718666.9U priority Critical patent/CN210196789U/en
Application granted granted Critical
Publication of CN210196789U publication Critical patent/CN210196789U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

A long-distance tailing pipe elbow wear-resistant protection device relates to the technical field of protection devices. The utility model provides a long defeated tailing pipe elbow wear-resisting protector it contains fixture, wear-resisting inoxidizing coating, first connecting portion, second connecting portion, injecting glue hole, and fixture inside sets up wear-resisting inoxidizing coating, and fixture one end sets up first connecting portion, and the second connecting portion set up at the fixture other end, and the fixture surface sets up the injecting glue hole. After the technical scheme is adopted, the beneficial effects of the utility model are that: in general, the device has reasonable design, does not need production halt construction, has the advantages of long service life, high cost performance and the like, and is favorable for popularization and use.

Description

Wear-resisting protector of long-distance tailing pipe elbow
Technical Field
The utility model relates to a protector technical field, concretely relates to wear-resisting protector of long-distance tailing pipe elbow.
Background
The elbow part of the tailing slag conveying pipeline with the pressure of 3MPa is easy to wear, and once the pipeline is leaked, the loss is very serious. Need the shut down production to carry out the repair welding when taking place wearing and tearing to tailing sediment pipeline elbow in the market at present, and the phenomenon of leaking repeatedly appears easily in the pipeline elbow after the repair welding, and the operation is once insisted on for a month, and when pipeline elbow thoroughly can't the repair welding, need the shut down production to change, the degree of difficulty is big, and the cycle length is unfavorable for using widely.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a long-distance tailing pipe elbow wear-resistant protection device aiming at the defects of the prior art, 1, the production stop construction is not needed, and the normal operation is ensured; 2. the service life is long, and the service life of the elbow can be prolonged by more than 3 years after one-time operation; 3. the cost performance is high. In general, the device has reasonable design, does not need production halt construction, has the advantages of long service life, high cost performance and the like, and is favorable for popularization and use.
In order to achieve the above purpose, the utility model adopts the following technical scheme: it contains fixture 1, wear-resisting inoxidizing coating 11, first connecting portion 12, second connecting portion 13, the glue injection hole 14, pipeline elbow 2, pipe wall portion of reducing 21, fixture 1 is inside to be set up wear-resisting inoxidizing coating 11, fixture 1 one end sets up first connecting portion 12, second connecting portion 13 sets up at the fixture 1 other end, fixture 1 surface sets up glue injection hole 14, 1 inside registrates of fixture sets up pipeline elbow 2, 2 surfaces of pipeline elbow are equipped with pipe wall portion of reducing 21.
The first connecting portion 12 and the second connecting portion 13 are provided with holes 131.
The interior of the pipe head elbow 2 is a cavity 22.
The utility model discloses a theory of operation: and (3) prefabricating the clamp according to the size of the pipeline elbow at the position easy to leak, and injecting a V-228 high-pressure stamping wear-resistant protective agent into the cavity of the wear-resistant protective layer through the glue injection hole.
After the technical scheme is adopted, the utility model discloses beneficial effect does: 1. the production stop construction is not needed, and the normal operation is ensured; 2. the service life is long, and the service life of the elbow can be prolonged by more than 3 years after one-time operation; 3. the cost performance is high. In general, the device has reasonable design, does not need production halt construction, has the advantages of long service life, high cost performance and the like, and is favorable for popularization and use.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a sectional view a-a corresponding to fig. 1.
Description of reference numerals: the pipe wall comprises a fixture 1, a wear-resistant protective layer 11, a first connecting portion 12, a second connecting portion 13, a hole 131, a glue injection hole 14, a pipe elbow 2, a pipe wall thinning portion 21 and a cavity 22.
Detailed Description
Referring to fig. 1 to 2, the technical solution adopted by the present embodiment is: it is by fixture 1, wear-resisting inoxidizing coating 11, first connecting portion 12, second connecting portion 13, the glue injection hole 14, pipeline elbow 2, the pipe wall subtracts thin portion 21 to constitute, fixture 1 is inside to be provided with wear-resisting inoxidizing coating 11, fixture 1's first connecting portion 12 of one end fixed connection, fixture 1 other end is whole decides to connect second connecting portion 13, there are a plurality of glue injection holes 14 on fixture 1, glue injection hole 14 and fixture 1 integrated into one piece set up, fixture 1 is inside to registrate connecting pipe elbow 2, there is pipe wall to subtract thin portion 21 on 2 outside surfaces of pipeline elbow. According to the size prefabrication fixture 1 of the pipeline elbow at the position easy to leak, V-228 high-pressure stamping wear-resistant protective agent is injected into the cavity of the wear-resistant protective layer 11 through the glue injection hole 14, so that the pipeline elbow is protected without construction stop, the service life of the elbow can be prolonged by more than 3 years after one operation, and the cost performance is extremely high.
The first connecting portion 12 and the second connecting portion 13 are respectively provided with six holes 131, and the holes 131 are respectively formed integrally with the first connecting portion 12 and the second connecting portion 13.
The method is as follows.
The inner part of the pipe elbow 2 is a cavity 22, and the cavity 22 and the pipe elbow 2 are integrally formed.
The utility model discloses a theory of operation: and (3) prefabricating the clamp according to the size of the pipeline elbow at the position easy to leak, and injecting a V-228 high-pressure stamping wear-resistant protective agent into the cavity of the wear-resistant protective layer through the glue injection hole.
After the technical scheme is adopted, the utility model discloses beneficial effect does: 1. the production stop construction is not needed, and the normal operation is ensured; 2. the service life is long, and the service life of the elbow can be prolonged by more than 3 years after one-time operation; 3. the cost performance is high. In general, the device has reasonable design, does not need production halt construction, has the advantages of long service life, high cost performance and the like, and is favorable for popularization and use.
The above description is only for the purpose of illustrating the technical solutions of the present invention and not for the purpose of limiting the same, and other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solutions of the present invention should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.

Claims (3)

1. The utility model provides a wear-resisting protector of long defeated tailing pipe elbow which characterized in that: it contains fixture (1), wear-resisting inoxidizing coating (11), first connecting portion (12), second connecting portion (13), injecting glue hole (14), fixture (1) is inside to set up wear-resisting inoxidizing coating (11), fixture (1) one end sets up first connecting portion (12), second connecting portion (13) set up at fixture (1) other end, fixture (1) surface sets up injecting glue hole (14), fixture (1) inside registrates and sets up pipeline elbow (2), pipeline elbow (2) surface is equipped with the pipe wall and subtracts thin portion (21).
2. The wear-resistant protection device for the long-distance tailing pipe elbow according to claim 1, characterized in that: holes (131) are arranged on the first connecting part (12) and the second connecting part (13).
3. The wear-resistant protection device for the long-distance tailing pipe elbow according to claim 1, characterized in that: the interior of the pipe elbow (2) is a cavity (22).
CN201920718666.9U 2019-05-17 2019-05-17 Wear-resisting protector of long-distance tailing pipe elbow Active CN210196789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920718666.9U CN210196789U (en) 2019-05-17 2019-05-17 Wear-resisting protector of long-distance tailing pipe elbow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920718666.9U CN210196789U (en) 2019-05-17 2019-05-17 Wear-resisting protector of long-distance tailing pipe elbow

Publications (1)

Publication Number Publication Date
CN210196789U true CN210196789U (en) 2020-03-27

Family

ID=69874558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920718666.9U Active CN210196789U (en) 2019-05-17 2019-05-17 Wear-resisting protector of long-distance tailing pipe elbow

Country Status (1)

Country Link
CN (1) CN210196789U (en)

Similar Documents

Publication Publication Date Title
CN210196789U (en) Wear-resisting protector of long-distance tailing pipe elbow
CN212429287U (en) Sealing structure of peripheral pump
CN103009644A (en) Automobile tire repair glue bottle
CN210034770U (en) Small-diameter non-concentric pipeline leaking stoppage fixture
CN213961138U (en) Water-saving irrigation pipeline
CN210770776U (en) Grouting plugging device
CN204922281U (en) Gas seal for pipe joints structure
CN208074359U (en) A kind of hydraulic flexible pipe joint
CN102878381A (en) Maintenance-free external-pressing direct buried expansion joint
CN208997536U (en) Capillary return connector
CN211598889U (en) Double-layer protection type high-pressure oil pipe
CN206656049U (en) With leakage failure automatic detection formula joint
CN210179168U (en) Leak point treatment device for steam tracing pipeline
CN207830801U (en) A kind of irrigation conduit coupling
CN209762549U (en) leak-stopping device for oil pipeline detection leak point
CN205325327U (en) Flexible high -speed cutting pressure boost cooling jet
CN210196779U (en) Local belt pressure sealing clamp for large-diameter corrugated pipe compensator
CN210890573U (en) Double-layer protective high-pressure oil pipe without oil return
CN216896169U (en) Multichannel water pipe for hydraulic engineering
CN204996606U (en) Spray tube subassembly
CN102861829A (en) Conduit closing-in clamp and closing-in method
CN210637175U (en) High-pressure oil pipe connecting structure capable of realizing internal and external sealing
CN209458510U (en) A kind of high tenacity Pressuretight sylphon bellows
CN220488537U (en) Pipeline connection structure of high-pressure oil feed pump
CN214500342U (en) Pipeline connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant