CN210195316U - Mounting structure is decorated to steel construction post assembled - Google Patents
Mounting structure is decorated to steel construction post assembled Download PDFInfo
- Publication number
- CN210195316U CN210195316U CN201920023775.9U CN201920023775U CN210195316U CN 210195316 U CN210195316 U CN 210195316U CN 201920023775 U CN201920023775 U CN 201920023775U CN 210195316 U CN210195316 U CN 210195316U
- Authority
- CN
- China
- Prior art keywords
- steel
- frame
- screw
- screw hole
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a mounting structure is decorated to steel construction post assembled, including steel frame and fixed screw, the steel construction stand is installed to the lower extreme of steel frame, and the top of steel construction stand is connected with steel construction top screw, the right-hand member of steel construction top screw is fixed with spool storage box, and the outer wall connection of spool storage box has the support, the right side of support is provided with the screw hole, and the screw hole openly settles and have the cylinder hoop, the cylinder hoop hole is installed to the outer wall of cylinder hoop, and the lower extreme in cylinder hoop hole is provided with the cardboard, the A-frame is installed to the lower extreme of cardboard, and the left end of steel frame is fixed with the side screw, the right side of steel frame is connected with the reinforcing bar frame, and the front of reinforcing bar frame installs the support frame, the surface of support frame is provided with the screw hole. This steel construction column assembled decorates mounting structure is provided with the tie point, can be utilizing the screw to fix the positional relationship between the two, has improved the availability factor greatly.
Description
Technical Field
The utility model relates to a steel construction field specifically is a mounting structure is decorated to steel construction post assembled.
Background
The upright columns of most steel structures are made of I-shaped steel, the finished steel columns are heavy, the upper strength is not enough, the working difficulty is high during construction, the working efficiency of workers is seriously influenced, the traditional steel structure upright columns are weaker than hinges in reinforcement measures, the defects of large welding deformation and the like easily occur in welded welding kerchief, the operability is poor, the stability and the strength are poor, the supporting mechanism is not firm, the quality and the landscape of products are seriously influenced, and a new technical scheme is specially provided for solving the problems.
Stability and intensity are also relatively poor in the steel structure column mounting structure in the market use, have brought the discomfort for the user, and supporting mechanism is insecure, has seriously influenced the quality of product.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mounting structure is decorated to steel construction post assembled to solve the simple problem of mounting structure is decorated to the steel construction post assembled that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure column assembly type decoration installation structure comprises a steel frame and fixing screws, wherein a steel structure supporting frame is installed at the lower end of the steel frame, a steel structure top screw is connected to the top end of the steel structure supporting frame, a spool storage box is fixed to the right end of the steel structure top screw, a support is connected to the outer wall of the spool storage box, a first screw hole is formed in the right side of the support, a cylindrical iron ring is arranged on the front side of the first screw hole, a cylindrical iron ring hole is installed in the outer wall of the cylindrical iron ring, a clamping plate is arranged at the lower end of the cylindrical iron ring hole, a triangular support is installed at the lower end of the clamping plate, a side screw is fixed to the left end of the steel frame, a steel bar frame is connected to the right side of the steel frame, a support frame is installed on the front side of the steel bar frame, a second screw hole is formed in the surface of, and the left end and the right end of the pipeline screw hole are provided with pipeline iron ring holes, and the lower end of each pipeline iron ring hole is provided with a fixing screw.
Preferably, the bracket and the first screw hole are of a fixed structure, and the bracket is of an L-shaped structure.
Preferably, the cylinder hoop is the equidistance with regard to the vertical direction of iron and steel frame and distributes, and the cylinder hoop is provided with 3.
Preferably, the clamping plate is connected with the triangular supports in an adhering mode, and the triangular supports are of funnel-shaped structures.
Preferably, a fixed connection structure is arranged between the support frame and the second screw hole, and the second screw hole is of a honeycomb-shaped structure.
Preferably, be swing joint between pipeline screw hole and the pipeline iron ring hole, and pipeline screw hole and pipeline iron ring hole set up 3.
Compared with the prior art, the beneficial effects of the utility model are that: this mounting structure is decorated to steel construction post assembled sets up simply, and is reasonable, uses the cylinder hoop to be connected fixedly with first screw hole, and the steel construction post assembled that used before decorates mounting structure and mostly uses welded structure, and this scheme has improved the steel construction stand and has been consolidating the measure, and the operability is good, and stability and intensity are also more stable, and supporting mechanism has played the reinforcing effect, has seriously influenced the quality prospect of product, for solving above-mentioned problem, provides a new technical scheme specially. The long easy corruption of live time or mopping time length, this scheme is simple, and is reasonable, and it is high to solve the resource availability factor, and is more durable wear-resisting simultaneously.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic view of the rear view structure of the present invention.
In the figure: 1. a steel frame; 2. a steel structure support frame; 3. a steel structure top screw; 4. a spool storage box; 5. a support; 6. a first screw hole; 7. a cylindrical iron ring; 8. a cylindrical iron ring hole; 9. clamping a plate; 10. A triangular bracket; 11. a side screw; 12. a reinforcing steel bar frame; 13. a support frame; 14. a second screw hole; 15. A pipeline screw hole; 16. a pipeline iron ring hole; 17. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a steel structure column assembly type decoration installation structure comprises a steel frame 1, a steel structure support frame 2, a steel structure top screw 3, a spool storage box 4, a support frame 5, a first screw hole 6, a cylindrical iron ring 7, a cylindrical iron ring hole 8, a clamping plate 9, a triangular support frame 10, a side screw 11, a steel bar frame 12, a support frame 13, a second screw hole 14, a pipeline screw hole 15, a pipeline iron ring hole 16 and a fixing screw 17, the steel structure support frame 2 is installed at the lower end of the steel frame 1, the top end of the steel structure support frame 2 is connected with the steel structure top screw 3, the spool storage box 4 is fixed at the right end of the steel structure top screw 3, the support frame 5 is connected with the outer wall of the spool storage box 4, the first screw hole 6 is arranged at the right side of the support frame 5, the cylindrical iron ring 7 is arranged on the front side of the first screw hole 6, the cylindrical iron ring hole 8 is installed on the outer wall of the cylindrical iron ring 7, and the, a triangular support 10 is installed at the lower end of a clamping plate 9, a side screw 11 is fixed at the left end of an iron and steel frame 1, a reinforcing steel frame 12 is connected to the right side of the iron and steel frame 1, a supporting frame 13 is installed on the front face of the reinforcing steel frame 12, a second screw hole 14 is formed in the surface of the supporting frame 13, a pipeline screw hole 15 is formed in the inner side of a cylindrical iron ring 7, pipeline iron ring holes 16 are formed in the left end and the right end of the pipeline screw hole 15, a fixing screw 17 is arranged at the lower end of the pipeline iron ring hole 16, a fixing structure is arranged between the supporting frame 5 and a first screw hole 6, the supporting frame 5 is of an L-shaped structure, the supporting function is effectively played, the cylindrical iron rings 7 are distributed at equal intervals in the vertical direction of the iron and steel frame 1, 3 cylindrical iron rings 7 are arranged, the cylindrical iron rings 7 correspond to a fixer, the clamping plate 9 is connected with the triangular, a triangular support 10 is the most stable fixer, a support frame 13 is fixedly connected with a second screw hole 14, the second screw hole 14 is of a honeycomb-shaped structure, materials are saved, the distance is effectively controlled, the pipeline screw hole 15 is movably connected with a pipeline iron ring hole 16, and 3 pipeline screw holes 15 and 3 pipeline iron ring holes 16 are arranged, so that better fixation is facilitated.
The working principle is as follows: to the steel structure post assembled decoration mounting structure of this type, there is a A-frame 10 as fixed use at the middle part that comes cylindrical hoop 7 and first screw hole 6 to be connected at first through side screw 11 on the iron and steel frame 1, cylindrical hoop 7 is fixed with cylindrical hoop hole 8 with the screw, makes the object more stable, with three cylindrical hoop 7, all with the screw fixation, reinforcing bar frame 12 between cylindrical hoop hole 8 and the iron and steel frame 1 has first screw hole 6 to be connected with the cylindrical hoop and uses with the integrative front of support frame.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a mounting structure is decorated to steel construction column assembled, includes iron and steel frame (1) and set screw (17), its characterized in that: the steel structure supporting frame (2) is installed at the lower end of the steel frame (1), a steel structure top screw (3) is connected to the top end of the steel structure supporting frame (2), a spool storage box (4) is fixed to the right end of the steel structure top screw (3), a support (5) is connected to the outer wall of the spool storage box (4), a first screw hole (6) is formed in the right side of the support (5), a cylindrical iron ring (7) is arranged on the front side of the first screw hole (6), a cylindrical iron ring hole (8) is installed on the outer wall of the cylindrical iron ring (7), a clamping plate (9) is arranged at the lower end of the cylindrical iron ring hole (8), a triangular support (10) is installed at the lower end of the clamping plate (9), a side screw (11) is fixed to the left end of the steel frame (1), a reinforcing steel frame (12) is connected to the right side of the steel frame (1), and a support frame (13) is installed on, the surface of support frame (13) is provided with second screw hole (14), pipeline screw hole (15) have been seted up to the inboard of cylinder hoop (7), pipeline iron ring hole (16) are provided with at both ends about pipeline screw hole (15), and the lower extreme of pipeline iron ring hole (16) settles and have set screw (17).
2. The assembled decorative installation structure of steel structural column of claim 1, wherein: a fixing structure is arranged between the support (5) and the first screw hole (6), and the support (5) is of an L-shaped structure.
3. The assembled decorative installation structure of steel structural column of claim 1, wherein: the cylinder hoop (7) are equidistantly distributed in the vertical direction of the steel frame (1), and 3 cylinder hoops (7) are arranged.
4. The assembled decorative installation structure of steel structural column of claim 1, wherein: the clamping plate (9) is connected with the triangular supports (10) in an adhering mode, and the triangular supports (10) are of funnel-shaped structures.
5. The assembled decorative installation structure of steel structural column of claim 1, wherein: the support frame (13) is fixedly connected with the second screw hole (14), and the second screw hole (14) is of a honeycomb-shaped structure.
6. The assembled decorative installation structure of steel structural column of claim 1, wherein: be swing joint between pipeline screw hole (15) and pipeline iron ring hole (16), and pipeline screw hole (15) all are provided with 3 with pipeline iron ring hole (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023775.9U CN210195316U (en) | 2019-01-08 | 2019-01-08 | Mounting structure is decorated to steel construction post assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023775.9U CN210195316U (en) | 2019-01-08 | 2019-01-08 | Mounting structure is decorated to steel construction post assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210195316U true CN210195316U (en) | 2020-03-27 |
Family
ID=69880482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920023775.9U Active CN210195316U (en) | 2019-01-08 | 2019-01-08 | Mounting structure is decorated to steel construction post assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210195316U (en) |
-
2019
- 2019-01-08 CN CN201920023775.9U patent/CN210195316U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979300B (en) | Section-adjustable rectangular column framework assembly | |
CN209817088U (en) | Prefabricated balcony of assembled | |
CN210195316U (en) | Mounting structure is decorated to steel construction post assembled | |
CN209397515U (en) | Deck form support device and cantilever bridge floor auxiliary device | |
CN201152024Y (en) | Oblique wall ledger beam strutting piece | |
CN202644973U (en) | Building template | |
CN215168695U (en) | Protective fence | |
CN110258770B (en) | Full-assembly house structure system | |
CN111945884B (en) | Steel structure upright post assembly capable of improving connection strength | |
CN213390850U (en) | Novel supporting component for preventing deformation of steel structure | |
CN213358652U (en) | Novel reinforcement is assembled to foundation prefabricated brick fetal membrane | |
CN211548291U (en) | Stable reinforcing mechanism of energy-saving curtain wall | |
CN206346319U (en) | A kind of tubular truss intersecting welding overlength replaces node | |
CN212866994U (en) | Steel structure frame for building construction | |
CN210086480U (en) | Environment-friendly steel structure | |
CN213420320U (en) | Precision laminating machine frame | |
CN211598034U (en) | Interim enclosure is built with consolidating stand | |
CN213062584U (en) | Roof support with reinforced structure | |
CN214070873U (en) | Monomer warmhouse booth convenient to dismouting | |
CN211081005U (en) | Aluminum template supporting structure | |
CN204979710U (en) | Frame is put in wallboard exhibition | |
CN209742235U (en) | Constructional engineering reinforcing bar split heads | |
CN219280460U (en) | Steel pipe stand column reinforced structure with supporting legs | |
CN218292783U (en) | Civil engineering construction support | |
CN215558562U (en) | Tower machine standard festival dismouting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |