CN210195271U - Concrete placement equipment for construction - Google Patents

Concrete placement equipment for construction Download PDF

Info

Publication number
CN210195271U
CN210195271U CN201920636779.4U CN201920636779U CN210195271U CN 210195271 U CN210195271 U CN 210195271U CN 201920636779 U CN201920636779 U CN 201920636779U CN 210195271 U CN210195271 U CN 210195271U
Authority
CN
China
Prior art keywords
wall
concrete
rigid coupling
horizontal pole
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920636779.4U
Other languages
Chinese (zh)
Inventor
Kaozhong Wu
吴考忠
Wenjun Ma
马文军
Qunyi Sun
孙群怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jinkai Construction Co Ltd
Original Assignee
Qingdao Jinkai Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jinkai Construction Co Ltd filed Critical Qingdao Jinkai Construction Co Ltd
Priority to CN201920636779.4U priority Critical patent/CN210195271U/en
Application granted granted Critical
Publication of CN210195271U publication Critical patent/CN210195271U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete placement equipment for construction, including the horizontal pole, the bottom rigid coupling of horizontal pole has the mount, eight perpendicular grooves have been seted up at the top of horizontal pole, two in the middle of being located the equal clearance fit in inside of erecting the groove has the iron round pin the clamping has the rubber pad between adjusting device and the horizontal pole, adjusting device's top is equipped with the elevating platform, the hose has been cup jointed on the right side of elevating platform. This concrete placement equipment for construction has realized carrying out regular removal with concrete conveying pipeline, has reduced the work load of flat compound concrete, relies on the workman to feel the operation in for the prior art, this concrete placement equipment for construction's pouring position is more accurate, the free height of concrete is more easily controlled to long-time operation leads to the problem that the operation personnel arm is sore among the traditional art has been solved, so this concrete placement equipment for construction can satisfy people's operation needs completely.

Description

Concrete placement equipment for construction
Technical Field
The utility model relates to a construction technical field specifically is a concrete placement equipment for construction.
Background
The concrete pouring refers to a process from pouring concrete into a mold until the concrete is plasticized, materials such as concrete and the like are poured into the mold to form a preset shape in civil and architectural engineering, when the concrete is poured, the free height of the concrete is not more than 2m, when the free height of the concrete is more than 3m, corresponding measures are taken, in the prior art, when the concrete is poured, a concrete conveying pipeline is generally and manually controlled to finish the pouring, the free height and the position of the concrete are manually controlled, further, in the pouring process of the same area, the free height of the concrete is not easy to control, workers feel the operation and are not fine enough, after the pouring, a large amount of concrete flattening operation is required, because the concrete pipeline is heavy, and the concrete is shaken during the conveying of a large amount of concrete, and the long-time operation can cause arm ache, the labor intensity is high, so the prior art can not meet the use requirements of people.
Disclosure of Invention
An object of the utility model is to provide a concrete placement equipment for construction, in order to solve the prior art that proposes in the above-mentioned background art, when carrying out concrete placement, generally manual control concrete conveying pipeline is in order to accomplish simultaneously and pour, the free height of concrete is by manual control, and then at the regional in-process of pouring of same slice, the free height of concrete should not be controlled, rely on the workman completely to feel the operation, it is not fine enough, and because concrete pipeline is more heavy, and in-process at a large amount of concrete conveying, can produce and rock, long-time operation can lead to the sour pain of operation personnel arm, the labor intensity is big, so prior art can't satisfy people's use needs problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete placement equipment for construction, includes the horizontal pole, the bottom rigid coupling of horizontal pole has the mount, eight perpendicular grooves have been seted up at the top of horizontal pole, are located two in the middle the equal clearance fit in inside of erecting the groove has the iron round pin, two the top of iron round pin is passed through adjusting device rigid coupling together, the clamp has the rubber pad between adjusting device and the horizontal pole, adjusting device's top is equipped with the elevating platform, the hose has been cup jointed on the right side of elevating platform.
Preferably, the vertical slots are arranged at equal intervals in pairs.
Preferably, the mount includes square pole, support and bolt, the top of square pole is in the same place with the bottom rigid coupling of horizontal pole, the outer wall below sliding clamping of square pole has first slider, the front threaded connection of first slider has the bolt, the end of bolt offsets tightly with the front of square pole, the gasket has been cup jointed to the outer wall of bolt, the back of gasket is laminated with the front of first slider mutually, the bottom rigid coupling of first slider has the support.
Preferably, adjusting device includes bottom plate, first bearing and round bar, the bottom of bottom plate is in the same place with the top rigid coupling of iron round pin, the bottom of bottom plate is laminated with the top of rubber pad mutually, first spout has been seted up at the top of bottom plate, the inner wall and the round bar clearance fit of first spout, the outer wall of round bar is in the same place with the inner wall rigid coupling of first bearing, the top rigid coupling of first bearing has the base, the top rigid coupling of base has the plectane.
Preferably, the elevating platform includes threaded rod, a screw thread section of thick bamboo and second bearing, the inner wall of second bearing and the outer wall bottom interference fit of threaded rod, the outer wall and the plectane interference fit of second bearing, the outer wall top of threaded rod links to each other with the inner wall screw thread of a screw thread section of thick bamboo, the outer wall right side rigid coupling of a screw thread section of thick bamboo has the semicircle ring, the inner wall of semicircle ring and the outer wall interference fit of hose, the outer wall left side rigid coupling of a screw thread section of thick bamboo has the second slider, the left side of second slider has the montant through second spout slip joint, the bottom of montant is in the same place with the top left side rigid coupling of plectane, the top rigid coupling of threaded rod has the disc, the.
Preferably, the second sliding block and the vertical rod form a sliding mechanism.
Compared with the prior art, the beneficial effects of the utility model are that: this concrete placement equipment for construction, through the bottom plate, the round bar, first bearing, cooperation between horizontal pole and the iron round pin, realized carrying out regular removal with concrete conveying pipeline, and then guaranteed the average of pouring, the work load of flat compound concrete has been reduced, and through the screw thread section of thick bamboo, the cooperation between threaded rod and the semicircle ring, the height that has guaranteed the hose remains unchanged, can guarantee the free height of concrete, for relying on workman to feel the operation in the conventional art, this concrete placement equipment for construction's pouring position is more accurate, the free height of concrete is more easily controlled, and long-time operation leads to the problem of the sour pain of operation personnel arm in the conventional art has been solved, very big reduction intensity of labour, so this concrete placement equipment for construction can satisfy people's operation needs completely.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a connection structure of the square bar, the first slide block and the bracket in FIG. 1;
FIG. 3 is a schematic view of the connection structure of the bottom plate, the circular rod and the circular plate in FIG. 1;
fig. 4 is a schematic view of the connection relationship between the disc, the vertical rod and the threaded cylinder in fig. 1.
In the figure: 1. the device comprises a fixed frame, 101, a square rod, 102, a first sliding block, 103, a support, 104, a bolt, 105, a gasket, 2, an adjusting device, 201, a bottom plate, 202, a first sliding groove, 203, a round rod, 204, a first bearing, 205, a base, 206, a round plate, 3, a lifting platform, 301, a threaded rod, 302, a second bearing, 303, a round plate, 304, a handle, 305, a vertical rod, 306, a threaded barrel, 307, a semicircular ring, 308, a second sliding block, 309, a second sliding groove, 4, a transverse rod, 5, a vertical groove, 6, an iron pin, 7, a rubber pad, 8 and a hose.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a concrete pouring device for building construction comprises a cross rod 4, wherein a fixed frame 1 is fixedly connected to the bottom of the cross rod 4, eight vertical grooves 5 are formed in the top of the cross rod 4, the vertical grooves 5 are matched with iron pins 6 to fix a bottom plate 201 and the cross rod 4 conveniently, the iron pins 6 are arranged in the two middle vertical grooves 5 in a clearance fit mode, the tops of the two iron pins 6 are fixedly connected together through an adjusting device 2, a rubber pad 7 is clamped between the adjusting device 2 and the cross rod 4, a lifting table 3 is arranged above the adjusting device 2, a hose 8 is sleeved on the right side of the lifting table 3, the vertical grooves 5 are arranged at equal intervals in pairs, the fixed frame 1 comprises a square rod 101, a support 103 and a bolt 104, the top of the square rod 101 is fixedly connected with the bottom of the cross rod 4, a first sliding block 102 is clamped below the outer wall of the square rod 101, and the first block 102 are matched with each other to conveniently adjust the position of the support 103, the front surface of the first sliding block 102 is in threaded connection with a bolt 104, the first sliding block 102 and the square rod 101 are fixed conveniently through the bolt 104, the tail end of the bolt 104 abuts against the front surface of the square rod 101, a gasket 105 is sleeved on the outer wall of the bolt 104, the back surface of the gasket 105 is attached to the front surface of the first sliding block 102, a support 103 is fixedly connected to the bottom of the first sliding block 102, a groove is formed in the bottom of the support 103 to clamp the outer wall of a steel bar, the adjusting device 2 comprises a bottom plate 201, a first bearing 204 and a round rod 203, the bottom of the bottom plate 201 is fixedly connected to the top of the iron pin 6, the bottom of the bottom plate 201 is attached to the top of the rubber gasket 7, a first sliding groove 202 is formed in the top of the bottom plate 201, the round rod 203 can be limited through the first sliding groove 202, and under the action of the first bearing 24, the round plate 206 is pushed to enable the round rod, the inner wall of the first chute 202 is in clearance fit with the round rod 203, the outer wall of the round rod 203 is fixedly connected with the inner wall of the first bearing 204, the top of the first bearing 204 is fixedly connected with the base 205, the base 205 plays a role in connection between the first bearing 204 and the round plate 206, the top of the base 205 is fixedly connected with the round plate 206, the lifting platform 3 comprises a threaded rod 301, a threaded cylinder 306 and a second bearing 302, the inner wall of the second bearing 302 is in interference fit with the bottom of the outer wall of the threaded rod 301, the second bearing 302 plays a role in connection between the threaded rod 301 and the round plate 206, the outer wall of the second bearing 302 is in interference fit with the round plate 206, the upper part of the outer wall of the threaded rod 301 is in threaded connection with the inner wall of the threaded cylinder 306, the right side of the outer wall of the threaded cylinder 306 is fixedly connected with a semicircular ring 307, the hose 8 is conveniently fixed through the semicircular ring 307, the, the outer wall left side rigid coupling of screw thread section of thick bamboo 306 has second slider 308, the left side of second slider 308 slides the joint through second spout 309 and has montant 305, montant 305 can the cooperation of second slider 308, play spacing effect to screw thread section of thick bamboo 306, the bottom of montant 305 is in the same place with the top left side rigid coupling of plectane 206, the top rigid coupling of threaded rod 301 has disc 303, the top left side rigid coupling of disc 303 has handle 304, it rotates threaded rod 301 to be convenient for the user through handle 304, sliding mechanism is constituteed with montant 305 to second slider 308.
In this embodiment, when the concrete pouring apparatus for building construction is used, first, the groove at the bottom of the bracket 103 is clamped on the steel bar frame to be poured with concrete, then the bolt 104 is adjusted, so that the end of the bolt 104 is tightly abutted against the square bar 101, thereby fixing the first slider 102 and the square bar 101, then the two iron pins 6 are in clearance fit with the two leftmost vertical slots 5, thereby fixing the bottom plate 201, then the handle 304 is pushed, the handle 304 drives the disc 303 to rotate, the disc 303 drives the threaded rod 301 fixedly connected to the bottom of the disc 303 to rotate, it is ensured that the threaded rod 301 drives the threaded cylinder 306 to move upwards or downwards by rotating, at this time, the second slider 308 slides along the inside of the second chute 309, thereby changing the height of the semicircular ring 307 to adjust the height of the hose 8, and then the circular plate 206 is pushed, so that the circular plate 206 drives the circular rod 203 to move along the inner wall of the first chute 202, make hose 8 be located the top of waiting to water the position, can carry out the pouring operation this moment, along with pouring going on, can continue to promote plectane 206, and then realize pouring in different regions for it is a straight line to pour the position, later with iron round pin 6 in proper order with the cooperation of different perpendicular grooves 5, guarantees that the motion trail of hose 8 under the plectane 206 drives is parallel with the position of pouring before, and then realizes pouring in whole region.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a concrete placement equipment for construction, includes horizontal pole (4), its characterized in that: the bottom rigid coupling of horizontal pole (4) has mount (1), eight perpendicular grooves (5) have been seted up at the top of horizontal pole (4), are located two in the middle of erecting the equal clearance fit in inside in groove (5) and having iron round pin (6), two the top of iron round pin (6) is passed through adjusting device (2) rigid coupling together, clamping has rubber pad (7) between adjusting device (2) and horizontal pole (4), the top of adjusting device (2) is equipped with elevating platform (3), hose (8) have been cup jointed on the right side of elevating platform (3).
2. The concrete pouring equipment for construction work according to claim 1, wherein: the vertical slots (5) are arranged at equal intervals.
3. The concrete pouring equipment for construction work according to claim 1, wherein: the utility model discloses a fixing frame, including mount (1) and bolt (104), the top of square bar (101) is in the same place with the bottom rigid coupling of horizontal pole (4), the outer wall below slip joint of square bar (101) has first slider (102), the front threaded connection of first slider (102) has bolt (104), the end of bolt (104) offsets tightly with the front of square bar (101), gasket (105) have been cup jointed to the outer wall of bolt (104), the back of gasket (105) is laminated with the front of first slider (102) mutually, the bottom rigid coupling of first slider (102) has support (103).
4. The concrete pouring equipment for construction work according to claim 1, wherein: adjusting device (2) are including bottom plate (201), first bearing (204) and round bar (203), the bottom of bottom plate (201) is in the same place with the top rigid coupling of iron round pin (6), the bottom of bottom plate (201) is laminated with the top of rubber pad (7) mutually, first spout (202) have been seted up at the top of bottom plate (201), the inner wall and round bar (203) clearance fit of first spout (202), the outer wall of round bar (203) is in the same place with the inner wall rigid coupling of first bearing (204), the top rigid coupling of first bearing (204) has base (205), the top rigid coupling of base (205) has circular plate (206).
5. The concrete pouring equipment for construction work according to claim 1, wherein: the elevating platform (3) comprises a threaded rod (301), a threaded cylinder (306) and a second bearing (302), the inner wall of the second bearing (302) is in interference fit with the outer wall bottom of the threaded rod (301), the outer wall of the second bearing (302) is in interference fit with a circular plate (206), the outer wall top of the threaded rod (301) is in threaded connection with the inner wall of the threaded cylinder (306), the outer wall right side of the threaded cylinder (306) is fixedly connected with a semicircular ring (307), the inner wall of the semicircular ring (307) is in interference fit with the outer wall of a hose (8), the outer wall left side of the threaded cylinder (306) is fixedly connected with a second sliding block (308), the left side of the second sliding block (308) is connected with a vertical rod (305) in a sliding manner through a second sliding chute (309), the bottom of the vertical rod (305) is fixedly connected with the top left side of the circular plate (206), and the top of the threaded rod (301, a handle (304) is fixedly connected to the left side of the top of the disc (303).
6. The concrete pouring equipment for construction work according to claim 5, wherein: the second sliding block (308) and the vertical rod (305) form a sliding mechanism.
CN201920636779.4U 2019-05-06 2019-05-06 Concrete placement equipment for construction Expired - Fee Related CN210195271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920636779.4U CN210195271U (en) 2019-05-06 2019-05-06 Concrete placement equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920636779.4U CN210195271U (en) 2019-05-06 2019-05-06 Concrete placement equipment for construction

Publications (1)

Publication Number Publication Date
CN210195271U true CN210195271U (en) 2020-03-27

Family

ID=69882457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920636779.4U Expired - Fee Related CN210195271U (en) 2019-05-06 2019-05-06 Concrete placement equipment for construction

Country Status (1)

Country Link
CN (1) CN210195271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111438814A (en) * 2020-04-06 2020-07-24 三一筑工科技有限公司 Production process of prefabricated wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111438814A (en) * 2020-04-06 2020-07-24 三一筑工科技有限公司 Production process of prefabricated wall

Similar Documents

Publication Publication Date Title
CN210738099U (en) Pour with scalable rotatory cloth chute device of slide rail formula
CN210195271U (en) Concrete placement equipment for construction
CN211492312U (en) Ceramic tile cutting device is used to fitment
CN211313404U (en) Concrete pouring support
CN209380461U (en) A kind of support device applied to glassware
CN112757464A (en) Prefabricated plate concrete placement setting device for assembly type structure
CN113547650B (en) Decorate and use ceramic tile cutting positioner
CN211334091U (en) Ceramic tile building materials processingequipment
CN209903112U (en) Dismounting device is used in speed reducer maintenance
CN213951388U (en) Automatic electrogalvanizing equipment for steel surface
CN211007566U (en) Portable construction frame
CN215166900U (en) Stone curtain wall with adjustable curtain wall gap
CN220408452U (en) Fixing device is used in hot rolling pulley processing
CN113466070B (en) Concrete quality control device for concrete wall column and use method
CN209868300U (en) Novel multifunctional grinding mold clamp
CN211054146U (en) Ceramic tile cutting device for building engineering
CN110821016A (en) Novel green building curtain
CN217478920U (en) Slate installation is with hoist and mount dolly
CN218117301U (en) Novel quick cloth ash ware
CN220482157U (en) Manual formula ceramic tile cutting device is used in fitment construction
CN216766630U (en) Adjustable flat wall surface keel fixing structure
CN213210160U (en) Cement concrete material early shrinkage factor measuring device
CN214418078U (en) Multifunctional welding equipment
CN213888882U (en) Be used for galvanized sheet welded assistance-localization real-time fixing device
CN217143683U (en) Quick positioning device is used in cavity glass production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200327

Termination date: 20210506

CF01 Termination of patent right due to non-payment of annual fee