CN210194993U - Assembled building curtain - Google Patents

Assembled building curtain Download PDF

Info

Publication number
CN210194993U
CN210194993U CN201920928146.0U CN201920928146U CN210194993U CN 210194993 U CN210194993 U CN 210194993U CN 201920928146 U CN201920928146 U CN 201920928146U CN 210194993 U CN210194993 U CN 210194993U
Authority
CN
China
Prior art keywords
piece
groove
install
pendant
building curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920928146.0U
Other languages
Chinese (zh)
Inventor
Guanyi Pang
庞观艺
Cong Fang
方聪
Jin Yan
严谨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guoyan Construction Technology Co Ltd
Original Assignee
Shenzhen Guoyan Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guoyan Construction Technology Co Ltd filed Critical Shenzhen Guoyan Construction Technology Co Ltd
Priority to CN201920928146.0U priority Critical patent/CN210194993U/en
Application granted granted Critical
Publication of CN210194993U publication Critical patent/CN210194993U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to an assembly type building curtain belongs to building curtain technical field, its technical scheme main points, include: install the pendant on keel frame to and install the back of the body at the stone material board and tie the piece, the constant head tank has been seted up on the pendant, back of the body tie and install on the piece with constant head tank assorted locating piece, the spacing groove has still been seted up on the pendant, back of the body tie the piece install with the stopper of spacing groove looks joint, the both sides that the pendant is close to the constant head tank are seted up to the spacing groove, install the inconsistent joint subassembly of drive stopper and spacing groove on the stopper, still install the locking subassembly that locks back of the body tie on the pendant. The utility model discloses when using, can reduce the installation work load of curtain stone material board to improve work efficiency.

Description

Assembled building curtain
Technical Field
The utility model relates to a building curtain technical field especially relates to an assembly type building curtain.
Background
The stone curtain wall belongs to one of building curtain walls, adopts stone as surface decoration of the curtain wall, and can be fixed by a dry hanging method due to factors such as earthquake resistance and the like.
The dry hanging method generally adopts back bolt type connection, namely, a back bolt is arranged on a stone plate and is connected with a hanging piece arranged on a keel frame, and the back bolt and the hanging piece are fixed by adopting a bolt method in the installation process.
However, since the back bolt is arranged on the back of the stone plate, the bolts need to be fixed one by one in the installation process, so that the installation process becomes complicated, the installation workload is large, and the work efficiency of the stone plate installation is reduced.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide an assembly type building curtain can reduce the installation work load of curtain stone material board to improve work efficiency.
The above object of the present invention can be achieved by the following technical solutions:
an assembled building curtain wall comprising: install the pendant on keel frame to and install the back of the body at the stone material board and tie the piece, the constant head tank has been seted up on the pendant, back of the body tie and install on the piece with constant head tank assorted locating piece, the spacing groove has still been seted up on the pendant, back of the body tie the piece install with the stopper of spacing groove looks joint, the both sides that the pendant is close to the constant head tank are seted up to the spacing groove, install the inconsistent joint subassembly of drive stopper and spacing groove on the stopper, still install the locking subassembly that locks back of the body tie on the pendant.
Adopt above-mentioned technical scheme, the setting of constant head tank and locating piece on the one hand can play the purpose of supporting the stone material board, and on the other hand can reach the purpose to the quick location of stone material board to can make the location that the stone material board can be quick in the installation. Through the clamping assembly, clamping can be carried out between the limiting groove and the limiting block, and therefore working efficiency in installation of the stone plate is improved. And, through the setting of locking Assembly, can fix back of the body bolt spare for the pendant, further improvement the stone material board steadiness on keel frame.
The utility model discloses further set up the joint subassembly including install keep away from the one end of back of the body bolt spare at the stopper and have elastic fixture block to and set up at spacing inslot and fixture block assorted draw-in groove, two inner wall slopes of stopper set up, the stopper is for having elastic metal shrapnel.
Adopt above-mentioned technical scheme, the elasticity of stopper is the metal shrapnel setting for the stopper can closely contradict with the spacing groove when the spacing groove that sets up through the inner wall slope, through the fixture block that sets up, can be with the gomphosis that the draw-in groove is firm mutually in the elasticity influence of limited block. When the stone plate is installed, the clamping between the back bolt piece and the hanging piece can be completed by pushing the stone plate, so that the installation process is simplified, and the installation work efficiency is improved.
The utility model discloses further set up the joint subassembly is including seting up the recess on the stopper side, install the spring on the recess diapire to and the dog that just activity holding is in the recess that is connected with the spring, the spacing inslot is seted up with dog assorted square groove.
Adopt above-mentioned technical scheme, the setting of joint subassembly adoption spring and dog, elasticity through the spring for when pushing the stopper spacing groove, make the spring compression, thereby make the dog pushed the recess in, when the stopper is pushed the diapire of spacing groove, make the dog order about to square groove by the elasticity of spring, thereby realized the joint, then reached the purpose of automatic joint.
The utility model is further provided with that the locking component comprises a baffle arranged on one side of the back bolt piece close to the pendant and a rotating block hinged on the top of the pendant and matched with the baffle.
Adopt above-mentioned technical scheme, the setting of locking subassembly adoption rotatory piece and baffle, when rotatory piece rotated to the position of baffle on through ordering about, can be so that fixing that back of the body bolt spare can stabilize on the pendant, through this setting, can improve the steadiness of stone material board, reduce because of the condition that the joint part drops and make the stone material board drop.
The utility model is further provided with an arc surface at one side of the baffle block away from the groove.
By adopting the technical scheme, the arc-shaped surface of the stop block can enable the stop block to be more smoothly pushed into the limit groove, so that the clamping efficiency of the back bolt piece is improved.
The utility model is further provided with an L-shaped block arranged on one side of the hanging piece away from the back bolt piece, and the L-shaped block is fixed with the keel frame.
By adopting the technical scheme, the stress area of the hanging piece in the vertical direction can be improved by arranging the L-shaped block, so that the stability of the stone plate is improved.
The utility model discloses further set up the L-shaped piece includes: the first side plate is vertically installed on the keel frame, the second side plate is fixed with the bottom of the pendant, and the second side plate is further used for supporting a back bolt piece.
Adopt above-mentioned technical scheme, L-shaped piece not only is used for supporting the pendant, can also support back of the body bolt spare, in the installation, can fix a position the stone material board, can improve the ascending steadiness of the vertical side of stone material board after installing.
The utility model is further provided with rubber strips which are respectively stuck on the bottom wall of the positioning groove and the side surface of the positioning block.
Adopt above-mentioned technical scheme, through setting up the rubber strip, can improve the conflict face of locating piece in the constant head tank to improve the steadiness of locating piece in the constant head tank, and still play the absorbing effect of buffering to the stone material board, thereby improved the life of stone material board.
To sum up, the utility model discloses following beneficial effect has:
1. through the spacing groove and the limiting block that set up, can lock the stone material board automatically to still need screw up the process of bolt when having reduced the installation, and the setting of locating piece and constant head tank, can be quick fix a position the stone material board, then improved work efficiency.
2. Through the locking subassembly that sets up, can further improve the steadiness of stone material board on keel frame to the life of stone material board after the installation has been improved.
Drawings
Fig. 1 is a schematic view of the overall structure of embodiment 1 of the present invention;
fig. 2 is a schematic structural view of a clamping assembly according to embodiment 1 of the present invention;
fig. 3 is a schematic structural view of a clamping assembly according to embodiment 2 of the present invention;
reference numerals: 1. a keel frame; 11. hanging parts; 111. rotating the block; 2. a stone plate; 21. a back latch member; 211. a baffle plate; 3. positioning a groove; 31. positioning blocks; 4. a limiting groove; 41. a limiting block; 5. a clamping block; 51. a card slot; 6. a groove; 61. a spring; 62. a stopper; 63. a square groove; 7. an L-shaped block; 71. a first side plate; 72. a second side plate; 8. a rubber strip.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1: an assembled building curtain wall, as shown in fig. 1 and 2, comprises: a hanging piece 11 arranged on the keel frame 1 and a back bolt piece 21 arranged on the stone plate 2. The hanging piece 11 is fixed on the keel frame 1 and used for bearing the stone plate 2, and the back bolt piece 21 on the stone plate 2 is used for being connected with the hanging piece 11, so that the assembled installation of the building curtain wall is achieved.
In this embodiment, a positioning groove 3 is formed in the middle of the hanging member 11, and a positioning block 31 matching with the positioning groove 3 is correspondingly mounted on the back bolt member 21. The two sides of the hanging part 11 close to the positioning groove 3 are provided with limiting grooves 4, and correspondingly, the back bolt part 21 is provided with a limiting block 41 matched with the limiting grooves 4. A clamping component for driving the limiting block 41 to be clamped with the limiting groove 4 is arranged on the limiting block 41, and a locking component for locking the back bolt piece 21 is also arranged on the hanging piece 11.
Through setting up constant head tank 3 and locating piece 31, can play the effect of support stone material board 2 on the one hand, on the other hand can play the effect of location, in the installation, can be so that stone material board 2 can fix a position fast to it is preliminary fixed. And the joint subassembly can be with stopper 41 and spacing groove 4 looks joint to reach the back of the body and tie 21 and the fixed between pendant 11, then realize the locking between stone material board 2 and the keel frame 1. The locking assembly can further lock the stone plate 2, so that the purpose of stability is achieved, the situation that the stone plate 2 is cracked due to vibration of a wall body is reduced, and the service life of the stone plate 2 is prolonged.
In this embodiment, the clamping assembly includes: a clamping block 5 arranged at one end of the limiting block 41 far away from the back bolt piece 21, and a clamping groove 51 arranged on the inner wall of the limiting groove 4 and matched with the clamping block 5. The fixture block 5 is made of rubber, and the fixture block 5 has elasticity. The stopper 41 is a metal elastic sheet having elasticity. The inner walls of the two limit grooves 4 incline to one side close to the positioning groove 3, the initial position of the limit block 41 is parallel to the positioning block 31, when the limit block 41 stretches into the limit groove 4, one side of the limit block 41 far away from the positioning block 31 and one side of the limit groove 4 far away from the positioning groove 3 can be tightly abutted, the clamping block 5 on the limit block 41 is clamped with the clamping groove 51 on the inner wall of the limit groove 4 after being contacted, and therefore the purpose of clamping the back bolt piece 21 and the hanging piece 11 is achieved.
In this embodiment, the locking assembly includes: the baffle 211 at back bolt 21 top is vertically installed to and articulate at 11 tops of pendant and baffle 211 assorted rotatory piece 111, rotatory piece 111 articulates the edge at 11 tops of pendant, through rotating rotatory piece 111, can be so that rotatory piece 111 is inconsistent with one side that baffle 211 is close to stone material board 2, thereby make back bolt 21 fixed mutually with pendant 11, then further locking back bolt 21, improve the steadiness of stone material board 2 in the horizontal direction.
An L-shaped block 7 is also arranged on the keel frame 1, and the L-shaped block 7 is used for bearing a fixed hanging piece 11. The L-shaped block 7 includes a first side plate 71 and a second side plate 72, the first side plate 71 and the second side plate 72 are perpendicular to each other, the first side plate 71 is fixed to the keel frame 1, the second side plate 72 is fixed to the hanging member 11, and the second side plate 72 can be used for receiving the back bolt member 21. Through the arrangement, the purpose of supporting the hanging piece 11 and the back bolt piece 21 can be achieved, and the stability of the stone plate 2 on the keel frame 1 is further improved.
In this embodiment, all paste on the locating piece 31 is close to one side of constant head tank 3 and the inner wall of constant head tank 3 and be equipped with rubber strip 8, compactness when contact between locating piece 31 and the constant head tank 3 inner wall can be improved through this setting to can reach the absorbing effect of buffering, thereby improve the life of stone material board 2.
Example 2: as shown in fig. 3, the difference from embodiment 1 lies in the difference of the clamping assembly, in this embodiment, the clamping assembly includes grooves 6 formed on both sides of the limiting block 41, and a stopper 62 movably received in the groove 6. A spring 61 is arranged on the bottom wall of the groove 6, one end of the spring 61 is connected with the bottom wall of the groove 6, and the other end is connected with the stop block 62. And a square groove 63 matched with the stop block 62 is arranged on the inner wall of the limit groove 4. Through the arrangement, the spring 61 can drive the stop block 62 to be abutted against the square groove 63, so that the purpose of locking the limiting block 41 is achieved.
In this embodiment, one side of the stopper 62 away from the side of the stopper 41 is set as an arc-shaped surface, and the stopper 41 can be pushed into the limit groove 4 more smoothly through the arc-shaped surface, so as to achieve the purpose of convenient locking.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment as required without making a contribution, but all the embodiments are protected by the patent law within the scope of the claims of the present invention.

Claims (8)

1. An assembled building curtain wall comprising: install pendant (11) on keel frame (1) to and install and tie piece (21) at the back of the body of stone material board (2), its characterized in that, constant head tank (3) have been seted up on pendant (11), install on the back of the body and tie piece (21) with constant head tank (3) assorted locating piece (31), spacing groove (4) have still been seted up on pendant (11), back of the body ties piece (21) and installs stopper (41) with spacing groove (4) looks joint, the both sides that are close to constant head tank (3) at pendant (11) are seted up in spacing groove (4), install the joint subassembly that drives stopper (41) and spacing groove (4) inconsistent on stopper (41), still install the locking subassembly that locks back of tying piece (21) on pendant (11).
2. The fabricated building curtain wall of claim 1 wherein the clamping assembly comprises: install and keep away from back of body bolt spare (21) one end and have elastic fixture block (5) at stopper (41) to and set up in spacing groove (4) with fixture block (5) assorted draw-in groove (51), two inner walls slopes of spacing groove (4) set up, stopper (41) are for having elastic metal shrapnel.
3. The fabricated building curtain wall of claim 1 wherein the clamping assembly comprises: the spring limiting device comprises a groove (6) formed in the side face of a limiting block (41), a spring (61) installed on the bottom wall of the groove (6), and a stop block (62) which is connected with the spring (61) and movably contained in the groove (6), wherein a square groove (63) matched with the stop block (62) is formed in the limiting groove (4).
4. The fabricated building curtain wall of claim 1 wherein the locking assembly comprises: a baffle plate (211) arranged on one side of the back bolt piece (21) close to the hanging piece (11), and a rotating block (111) hinged on the top of the hanging piece (11) and matched with the baffle plate (211).
5. An assembled building curtain wall as claimed in claim 3 in which the side of the stop (62) remote from the recess (6) is provided with an arcuate surface.
6. The fabricated building curtain wall as claimed in claim 1, wherein an L-shaped block (7) is mounted on one side of the hanging member (11) away from the back bolt member (21), and the L-shaped block (7) is fixed with the keel frame (1).
7. A fabricated building curtain wall according to claim 6, characterised in that the L-shaped blocks (7) comprise: the hanging piece comprises a first side plate (71) and a second side plate (72) perpendicular to the first side plate (71), wherein the first side plate (71) is vertically installed on the keel frame (1), the second side plate (72) is fixed with the bottom of the hanging piece (11), and the second side plate (72) is further used for supporting a back bolt piece (21).
8. The assembled building curtain wall as claimed in claim 1, wherein the rubber strips (8) are adhered to the bottom wall of the positioning groove (3) and the side surfaces of the positioning block (31).
CN201920928146.0U 2019-06-18 2019-06-18 Assembled building curtain Active CN210194993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920928146.0U CN210194993U (en) 2019-06-18 2019-06-18 Assembled building curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920928146.0U CN210194993U (en) 2019-06-18 2019-06-18 Assembled building curtain

Publications (1)

Publication Number Publication Date
CN210194993U true CN210194993U (en) 2020-03-27

Family

ID=69871954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920928146.0U Active CN210194993U (en) 2019-06-18 2019-06-18 Assembled building curtain

Country Status (1)

Country Link
CN (1) CN210194993U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561089A (en) * 2020-05-24 2020-08-21 段锐东 But utensil rapid Assembly assembled aluminum alloy curtain
CN112681588A (en) * 2020-11-30 2021-04-20 深圳景源达建设集团有限公司 Aluminum veneer curtain wall convenient to installation
CN114033083A (en) * 2022-01-06 2022-02-11 北京中瑞祥合建筑工程有限公司 Curtain wall system
CN114086731A (en) * 2021-11-08 2022-02-25 浙江万川装饰设计工程有限公司 Fixing structure of assembled decorative cover

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561089A (en) * 2020-05-24 2020-08-21 段锐东 But utensil rapid Assembly assembled aluminum alloy curtain
CN111561089B (en) * 2020-05-24 2021-08-31 广东兴发铝业(江西)有限公司 Can rapid Assembly assembled aluminum alloy curtain
CN112681588A (en) * 2020-11-30 2021-04-20 深圳景源达建设集团有限公司 Aluminum veneer curtain wall convenient to installation
CN114086731A (en) * 2021-11-08 2022-02-25 浙江万川装饰设计工程有限公司 Fixing structure of assembled decorative cover
CN114033083A (en) * 2022-01-06 2022-02-11 北京中瑞祥合建筑工程有限公司 Curtain wall system

Similar Documents

Publication Publication Date Title
CN210194993U (en) Assembled building curtain
JP6470673B2 (en) Support bracket for solar panel
CN111749377A (en) Glass curtain wall with rapid pressing and buckling structure
CN212271342U (en) Glass curtain wall with rapid pressing and buckling structure
CN212361227U (en) Pipe clamp with rubber buffer structure for fixing automobile pipeline
CN210577613U (en) Novel power cable is with solidus device
CN210562662U (en) Mounting structure of curtain built-in fitting
CN209760641U (en) Guardrail fixing device
CN210659758U (en) Energy-saving glass gasket for door and window
CN209891996U (en) Fixing mechanism for glass installation
CN215889113U (en) Wall mounting part, wallboard and wallboard mounting structure
CN219499044U (en) Install energy storage case of optic fibre box
CN218518524U (en) Door and window frame and steel auxiliary frame installation positioning device
CN210342336U (en) Glass partition
CN214885069U (en) Connection structure of stone material and wood veneer
CN219060491U (en) Building energy-saving curtain wall capable of being spliced
CN213575309U (en) Fan slide rail connection structure
CN220707764U (en) Trough type solar concentrator supporting sheet
CN217824053U (en) Cable testing bridge of easily dismantling
CN219255315U (en) Photovoltaic module frame presss from both sides and gets mechanism
CN213773974U (en) Assembled bathroom wallboard system
CN211606449U (en) Solar panel fixing system
CN217299371U (en) Fast-assembling wallboard of more convenient to assembly
CN220117588U (en) Horizontal component plate
CN218934210U (en) Connecting sleeve and door and window system with same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant