CN210194989U - Stone curtain wall closing-in structure - Google Patents

Stone curtain wall closing-in structure Download PDF

Info

Publication number
CN210194989U
CN210194989U CN201920660294.9U CN201920660294U CN210194989U CN 210194989 U CN210194989 U CN 210194989U CN 201920660294 U CN201920660294 U CN 201920660294U CN 210194989 U CN210194989 U CN 210194989U
Authority
CN
China
Prior art keywords
fossil fragments
stone
keel
stone material
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920660294.9U
Other languages
Chinese (zh)
Inventor
Xu Fan
范旭
Zhen Guo
郭振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Decai Tech New Material Co ltd
Original Assignee
Decai Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decai Decoration Co Ltd filed Critical Decai Decoration Co Ltd
Priority to CN201920660294.9U priority Critical patent/CN210194989U/en
Application granted granted Critical
Publication of CN210194989U publication Critical patent/CN210194989U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a stone material curtain binding off structure, including first fossil fragments, the second fossil fragments, seal and repair the stone material, big face stone material and with civil engineering body fixed connection's perpendicular fossil fragments, first fossil fragments perpendicular to perpendicular fossil fragments set up and be connected with perpendicular fossil fragments, second fossil fragments slope welding is on first fossil fragments, big face stone material and first fossil fragments fixed connection, the second fossil fragments include welding end and free end, seal and repair the stone material and articulate the second fossil fragments through the pendant on, it is fixed with big face stone material to seal and repair the stone material, distance between the horizontal plane at free end and welding end place is h, h = pb2(3L-b)/(6EI), wherein, p is the weight of the seal repair stone; b, the horizontal distance from the welding end to the hanging point of the sealing and repairing stone, and L is the length of the second keel; e, the elastic modulus of the second keel; i to the secondThe second keel section inertia moment. Through the utility model provides a current stone material curtain need adopt bracing or the problem that difficult construction, construction cost are high that vertical keel leads to.

Description

Stone curtain wall closing-in structure
Technical Field
The utility model belongs to the technical field of the architectural decoration fitment, concretely relates to improvement of stone material curtain binding off structure.
Background
Present stone material curtain wall construction all needs to seal and repaiies the stone material and close up the processing, and its specific implementation mainly sets up the bracing in order to strengthen the sealing of binding off and repaiies stone material support rigidity through increasing vertical keel or sealing the cross keel lower part of repairing the stone material at the binding off, and this kind of embodiment is difficult for the construction, and is inefficient and owing to need additionally increase vertical keel or bracing, and then has increased construction cost.
SUMMERY OF THE UTILITY MODEL
The utility model discloses need adopt the bracing or increase the vertical joist and seal the difficult construction of repairing stone material support rigidity and leading to in order to strengthen closing up to current stone material curtain binding off structure, the efficiency of construction is lower, the problem that construction cost is high.
In order to realize the purpose of the utility model, the utility model adopts the following technical scheme to realize:
the utility model provides a stone material curtain binding off structure, including first fossil fragments, second fossil fragments, seal and repair stone material, big face stone material and with civil engineering body fixed connection's perpendicular fossil fragments, first fossil fragments perpendicular to perpendicular fossil fragments set up and are connected with perpendicular fossil fragments, second fossil fragments slope welding is in on the first fossil fragments, big face stone material with first fossil fragments fixed connection, second fossil fragments are including welding end and free end, seal and repair the stone material and articulate through the pendant on the second fossil fragments, seal and repair the stone material with big face stone material is sealed fixed, the free end with distance between the horizontal plane at welding end place is h, h = pb2(3L-b)/(6EI), wherein, p is the weight of the seal repair stone; b, the horizontal distance from the welding end to the hanging point of the sealing and repairing stone, and L is the length of the second keel; e, the elastic modulus of the second keel; i-second keel section moment of inertia.
Furthermore, the large-surface stone is perpendicular to the sealing and repairing stone, and the foam rods are filled in gaps at the joint of the large-surface stone and the sealing and repairing stone.
Furthermore, the vertical keel is fixedly connected with the embedded part through the L-shaped hanging part, and the embedded part is fixedly connected with the civil engineering body.
Further, the pendant is T type pendant, is equipped with the mounting groove in sealing the stone material of repairing, T type pendant one end assembly is fixed through sealed glue and the stone material of repairing in the mounting groove, and the other end articulates on the second fossil fragments through the bolt.
Furthermore, the T-shaped hanging pieces are arranged and hung in the middle of the second keel.
Furthermore, the large stone is attached to the first keel, and the first keel is arranged and fixedly connected with the first keel through a connecting hanging piece.
Compared with the prior art, the utility model discloses an advantage is with positive effect:
the utility model provides a stone material curtain binding off structure, including first fossil fragments, the second fossil fragments, seal and repair the stone material, the big face stone material and with civil engineering body fixed connection's perpendicular fossil fragments, first fossil fragments perpendicular to perpendicular fossil fragments set up, second fossil fragments slope welding is on first fossil fragments, big face stone material and first fossil fragments fixed connection, the second fossil fragments are including welding end and free end, seal and repair the stone material and articulate the second fossil fragments through the pendant, seal and repair the stone material and seal fixedly with big face stone material, the distance between the horizontal plane at free end and welding end place is h, h = pb2(3L-b)/(6EI), wherein, p is the weight of the seal repair stone; b, the horizontal distance from the welding end to the hanging point of the sealing and repairing stone, and L is the length of the second keel; e, the elastic modulus of the second keel; i-second keel section moment of inertia. The utility model discloses make the second fossil fragments and the slope setting that are used for articulating and seal the maintenance stone material during the setting to make it exceed the welding end take the altitude, like this when the installation seal the maintenance stone material, the deflection that produces after its own atress of accessible makes it just be in horizontal position after sealing the maintenance stone material articulates the completion, then need not to set up alone like this and supports or erect fossil fragments, the construction is simple and convenient more and reduced construction cost.
Other features and advantages of the present invention will become more apparent from the following detailed description of the invention when read in conjunction with the accompanying drawings.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a first schematic structural view of a closing structure of the stone curtain wall of the present invention;
fig. 2 is the structural schematic diagram of the closing structure of the stone curtain wall of the utility model II.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings and embodiments.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are merely for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The utility model provides an embodiment of stone material curtain binding off structure, it is shown with reference to fig. 1-2, including first fossil fragments 100, second fossil fragments 200, seal and repair stone material 300, large face stone material 400 and with civil engineering body 500 fixed connection's perpendicular fossil fragments 600, it is specific, perpendicular fossil fragments 600 pass through L type pendant 610 and built-in fitting 620 fixed connection, built-in fitting 620 and civil engineering body 500 fixed connection. First fossil fragments 100 perpendicular to the riser 600 sets up and is connected fixedly with riser 600, the slope welding of second fossil fragments 200 is in on the first fossil fragments 100, large face stone material 400 with first fossil fragments 100 fixed connection, it is preferred, first fossil fragments 100 be 50 angle steel 5, large face stone material 400 laminating first fossil fragments 100 along 100 length direction settings of first fossil fragments and through connecting the pendant with first fossil fragments 100 fixed connection. Second fossil fragments 200 is also 50 x 5 angle steel, including welding end 210 and free end 220, seal and repair stone material 300 and articulate through pendant 700 on the second fossil fragments 200, pendant 700 is T type pendant, is equipped with mounting groove 310 in sealing and repairing stone material 300, T type pendant one end assembly is fixed through sealed glue and seal and repair stone material 300 in mounting groove 310, and is preferred, and sealed glue is epoxy glue, and the other end articulates on second fossil fragments 200 through the bolt. Specifically, ¢ 9 holes are formed in the second keel 200, and M8 x 30 stainless steel bolts are adopted and screwed into the T-shaped hanging piece and the second keel 200 to fixedly connect the T-shaped hanging piece with the second keel 200.
The sealing and repairing stone 300 and the large-surface stone 400 are fixed in a sealing mode, the distance between the free end 220 and the horizontal plane where the welding end 210 is located is h, and h = pb2(3L-b)/(6EI), wherein, p is the weight of the seal repair stone; b, the horizontal distance from the welding end to the hanging point of the sealing and repairing stone, and L is the length of the second keel; e, the elastic modulus of the second keel; and I, calculating the deformation of the second keel 200 connected with the sealing and repairing stone 300, namely h, the same as the deflection value of the second keel 200 in advance according to different sealing and repairing stone grid widths. Can apply effort to second fossil fragments 200 when sealing and repairing stone material 300 and hang to second fossil fragments 200 like this, make second fossil fragments 200 pressurized deformation, this embodiment makes the high h value that its flexibility value that warp just exceeds the welding end with second fossil fragments 200 welding is the same, after the pressurized like this, its deflection just is h, make second fossil fragments 200 still be in the horizontality after hanging and sealing and repairing stone material 300, the levelness after having guaranteed to seal and repair stone material 300 and assembled, and whole seal structure need not to set up the support alone, make whole construction process more simple and convenient, construction cost is reduced.
Specifically, the concrete installation process of the stone curtain wall in the embodiment is as follows: the vertical keels 600 are first connected and fixed to the embedded parts 620 on the civil engineering body 500 through the connecting parts. According to the vertical grid division of the stone, a section of the first keel 100 is horizontally welded, and then the second keel 200 is welded. Before welding the second keel 200, the deformation of the second keel 200 is calculated according to the cell width of different sealing and repairing stones, and the second keel is upwards inclined by an angle during welding according to the deformation, so that the free end 220 is higher than the welding end 210 by a height h. The T-shaped hanging piece is inserted into the mounting groove 310 of the repair stone 300 and is firmly bonded by epoxy resin glue. The sealing and repairing stone 300 and the second keel 200 are connected by stainless steel bolt T-shaped hanging pieces. After the installation is finished, filling the foam rods 800 in the adjacent gaps between the repair stone 300 and the large stone 400, and finally, sealing by using stone sealant.
The closing-in structure of the stone curtain wall in the embodiment can ensure the horizontal effect of the closed-in repaired stone after installation under the condition of not increasing inclined struts or vertical keels, simplifies the field installation process, saves materials, reduces the engineering construction cost, greatly improves the construction efficiency, is safe and reliable in connection, and ensures the installation quality and effect of the closed-in repaired position of the stone curtain wall.
Preferably, the large stone 400 is perpendicular to the repair stone 300, and the foam rod 800 is filled in the gap between the large stone 400 and the repair stone 300.
Preferably, one T-shaped hanging piece is hung at the middle position of the second keel 200.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or that equivalents may be substituted for elements thereof; such modifications and substitutions do not depart from the spirit and scope of the present invention, which is claimed.

Claims (6)

1. A stone curtain binding off structure, including first fossil fragments, second fossil fragments, seal and repair stone material, big face stone material and with civil engineering body fixed connection's perpendicular fossil fragments, first fossil fragments perpendicular to perpendicular fossil fragments set up and with perpendicular fossil fragments are connected, second fossil fragments slope welding is in on the first fossil fragments, big face stone material with first fossil fragments fixed connection, second fossil fragments are including welded end and free end, seal and repair the stone material and articulate the second fossil fragments through the pendant on, seal and repair stone material and big face stone material sealed fixed, distance between the horizontal plane at free end and welded end place is h, h = pb2(3L-b)/(6EI), wherein p-blockRepairing the weight of the stone; b, the horizontal distance from the welding end to the hanging point of the sealing and repairing stone, and L is the length of the second keel; e, the elastic modulus of the second keel; i-second keel section moment of inertia.
2. The closing-in structure of stone curtain wall as claimed in claim 1, wherein the large face stone is perpendicular to the seal-repaired stone, and the foam rod is filled in the gap at the joint of the large face stone and the seal-repaired stone.
3. The stone curtain wall binding off structure of claim 1, wherein the vertical keel is fixedly connected with the embedded part through an L-shaped hanging piece, and the embedded part is fixedly connected with the civil engineering body.
4. The closing-in structure of stone curtain wall as claimed in claim 1, wherein the hanging member is a T-shaped hanging member, a mounting groove is provided in the sealing and repairing stone, one end of the T-shaped hanging member is assembled in the mounting groove and fixed to the sealing and repairing stone through a sealant, and the other end is hung on the second keel through a bolt.
5. The closing-in structure of the stone curtain wall as claimed in claim 4, wherein one T-shaped hanging member is hung at the middle position of the second keel.
6. The close-up structure of the stone curtain wall as claimed in claim 1, wherein the large stone is attached to the first keel and is fixedly connected with the first keel through a connecting hanging member.
CN201920660294.9U 2019-05-09 2019-05-09 Stone curtain wall closing-in structure Active CN210194989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920660294.9U CN210194989U (en) 2019-05-09 2019-05-09 Stone curtain wall closing-in structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920660294.9U CN210194989U (en) 2019-05-09 2019-05-09 Stone curtain wall closing-in structure

Publications (1)

Publication Number Publication Date
CN210194989U true CN210194989U (en) 2020-03-27

Family

ID=69881540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920660294.9U Active CN210194989U (en) 2019-05-09 2019-05-09 Stone curtain wall closing-in structure

Country Status (1)

Country Link
CN (1) CN210194989U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113019829A (en) * 2021-03-10 2021-06-25 德才装饰股份有限公司 Guiding and supporting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113019829A (en) * 2021-03-10 2021-06-25 德才装饰股份有限公司 Guiding and supporting device

Similar Documents

Publication Publication Date Title
CN106760053B (en) Resettable rigid connection assembly type steel frame infilled wall system and construction method thereof
CN102979319B (en) A kind of method of stiffening frame node
CN108797847A (en) A kind of assembled steel frame wall filled with masonry structural system and its construction method
CN110318487B (en) Method for dry hanging and close splicing of metal curtain wall
CN208934190U (en) A kind of assembled steel frame wall filled with masonry structural system
CN210194989U (en) Stone curtain wall closing-in structure
CN113756486B (en) Wind tower spiral curved surface curtain wall system and construction method thereof
CN212477399U (en) Lifting type adjustable slurry storage tank for slurry sitting on assembled bent cap
CN211571246U (en) Road expansion joint structure
CN107587635A (en) The vertical bolt-type construction technique of exterior wall ceramic plate
CN108824651B (en) Assembly type steel structure building main body connecting structure and mounting method thereof
CN202299053U (en) Truss structure for stone decorative rib of glass curtain wall
CN213741663U (en) Sealing and waterproof device for assembly type building
CN210316136U (en) Double-limb short-slot type dry-hanging connecting piece
CN112282345B (en) Prestressed cable-stayed hanging basket installation method and installation structure
CN213741807U (en) Heavy stone curtain wall structure installed in pulling and hanging combination manner
CN211286205U (en) Glass curtain wall building structure
CN211257354U (en) Waterproof subsiding crack device that low-rise building used
CN209538483U (en) The mounting structure of energy-saving curtain wall
CN203905039U (en) Foot binding structure of column foot of outdoor steel pipe
CN208329654U (en) A kind of connection structure hung, pacify integrated detachable steel framed building wall
CN206956974U (en) A kind of Side fascia and steel column attachment structure
CN206859464U (en) The attachment means of fabricated shear wall horizontal joint
CN209760541U (en) Keel switching device
CN216990608U (en) Glass water slide support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210615

Address after: 266300 Industrial Park Area 3, Ligezhuang Town, Jiaozhou City, Qingdao City, Shandong Province

Patentee after: Qingdao Decai tech new material Co.,Ltd.

Address before: 266000 Hongkong Middle Road 169, Shinan District, Qingdao City, Shandong Province

Patentee before: DECAI DECORATION Co.,Ltd.

TR01 Transfer of patent right