CN210194986U - Combined curtain wall for building - Google Patents

Combined curtain wall for building Download PDF

Info

Publication number
CN210194986U
CN210194986U CN201921039970.7U CN201921039970U CN210194986U CN 210194986 U CN210194986 U CN 210194986U CN 201921039970 U CN201921039970 U CN 201921039970U CN 210194986 U CN210194986 U CN 210194986U
Authority
CN
China
Prior art keywords
wallboard
curtain wall
installing support
guide rail
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921039970.7U
Other languages
Chinese (zh)
Inventor
Haoran Ji
冀浩然
Jingjing Han
韩晶晶
Yan Zhang
张岩
Pengyuan Suo
索鹏媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921039970.7U priority Critical patent/CN210194986U/en
Application granted granted Critical
Publication of CN210194986U publication Critical patent/CN210194986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model relates to a building curtain technical field, specifically speaking relates to a modular curtain for building, it includes two guide rails, the slidable installing support that is equipped with the setting of a plurality of level between two guide rails, the tip of installing support be equipped with guide rail complex slider, the medial surface of installing support is equipped with two wallboard standing grooves, two wallboard standing grooves are formed by installing support up end undercut and lower terminal surface upwards sunken respectively, the joint has a plurality of to set up side by side and the wallboard of tip setting up in the wallboard standing groove along installing support length direction between the two adjacent installing supports. The utility model discloses it is comparatively convenient when the installation to can be applicable to the installation of the wallboard of co-altitude not, thereby promoted the utility model discloses an applicability.

Description

Combined curtain wall for building
Technical Field
The utility model relates to a building curtain technical field, specifically speaking relates to a combination formula curtain for building.
Background
The curtain wall is the outer wall enclosure of the building, does not bear the weight, hangs like a curtain, so is also called as a curtain wall, and is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings. The building outer protective structure or decorative structure consists of a panel and a support structure system, can have certain displacement capacity or certain deformation capacity relative to the main structure, and does not bear the function of the main structure.
Patent document with the application number of CN201820178486.1 discloses a combined curtain wall for buildings, which comprises a building main body, a curtain wall plate structure, an anti-falling rod structure, a ventilation structure, a fixing bolt, a hydraulic rod, fixed square steel, a hydraulic pipe, a fixed keel and an adjusting bolt, wherein the curtain wall plate structure is glued at the right end of the anti-falling rod structure; the anti-falling rod structure is connected to the right end of the fixed keel through a bolt; the ventilation structure is connected to the outer side of the building main body through bolts; the fixed bolts are respectively in threaded connection with the upper part and the lower part of the right side of the fixed square steel; the hydraulic rod is inserted at the upper end of the hydraulic pipe. Although the utility model discloses a realization that can the preferred is to the fixed of curtain board to prevent that the curtain board from falling and accidentally injuring the pedestrian. But in actual use, realize through refuting the claw and will cause this combination formula curtain wall time to take great intensity of labour to the installation of curtain wall board, be difficult to realize the quick installation of curtain wall.
SUMMERY OF THE UTILITY MODEL
The inconvenient defect of ordinary combination formula curtain installation to existence among the prior art, the utility model provides a combination formula curtain for building. It can realize the function of easy to assemble.
In order to solve the technical problem, the utility model discloses a following technical scheme can solve:
the utility model provides a modular curtain for building, it includes two guide rails, the slidable is equipped with the installing support that a plurality of level set up between two guide rails, the tip of installing support be equipped with guide rail complex slider, the medial surface of installing support is equipped with two wallboard standing grooves, two wallboard standing grooves are formed by installing support up end undercut and lower extreme face upwards sunken respectively, the joint has a plurality of to set up side by side and the wallboard that the tip set up in the wallboard standing groove along installing support length direction between two adjacent installing supports.
Through the utility model discloses a setting of guide rail, installing support can be when carrying out this installation that is used for the modular curtain of building, fixes the both ends at the wall body opening part with the guide rail earlier, then installs the installing support between two guide rails, according to the distance between two installing supports of the height adjustment of wallboard, then in pushing the wallboard into the wallboard standing groove of two adjacent installing supports, installs the dog at last at the tip of slider. Compared with a combined curtain wall for a building for files, the utility model does not need to fix the wall plate in a bolt manner, thereby being more convenient to install; the adjustable setting of distance between the installation support makes the utility model discloses can be applicable to the installation of the wallboard of co-altitude not, thereby promoted the utility model discloses an applicability. When damage appears in the wallboard, can take off the dog that damages wallboard department from the slider, then take off the wallboard from between two installing supports, later change new wallboard and install the dog and can accomplish the change to the wallboard to daily maintenance has been made things convenient for.
Preferably, the end part of the sliding block is connected with a stop block used for limiting the wallboard at the end part of the wallboard placing groove.
The utility model discloses in, through the setting of dog, prevented that the wallboard of wallboard standing groove edge from falling down, thereby promoted the utility model discloses a stability.
Preferably, the guide rail is provided with a plurality of first screw holes arranged at intervals along the length direction of the guide rail, the slider is provided with a limiting mechanism used for limiting the slider, the limiting mechanism comprises a limiting plate fixed on the slider, and the limiting plate is provided with a through hole and a first bolt which penetrates through the through hole and is matched with the first screw holes.
The utility model discloses in, through the setting of limiting plate, first screw and first bolt, the realization that can the preferred is to the regulation and the fixing of installing support.
Preferably, the slider and the mounting bracket are of an integral structure.
The utility model discloses in, set up to integral structure through slider and installing support, can enough promote the joint strength of slider and installing support, made things convenient for daily manufacturing again.
Preferably, a plurality of groups of roller mechanisms are arranged in the mounting support along the length direction of the mounting support, each roller mechanism comprises a roller mounting groove arranged in the mounting support between the two wallboard containing grooves, the two ends of each roller mounting groove are respectively communicated with the wallboard containing grooves at the upper end and the lower end of the mounting support, rollers are rotatably arranged in the roller mounting grooves, and the end parts of the rollers stretch into the wallboard containing grooves.
The utility model discloses in, through the setting of gyro wheel, can reduce the friction between wallboard and the wallboard standing groove when pushing the wallboard standing groove to made things convenient for and pushed the wallboard in the wallboard standing groove with the wallboard.
Preferably, the guide rail is provided with a plurality of counter bores arranged along the length direction of the guide rail.
The utility model discloses in, through the setting of counter bore, can be when carrying out the installation of guide rail, the accessible passes mountings such as the screw of counter bore and fixes the guide rail on the wall body to the installation to the guide rail has been made things convenient for.
Preferably, the end part of the sliding block is provided with a second screw hole, the axis direction of the second screw hole is parallel to the length direction of the mounting bracket, and the stop block is provided with a second bolt which penetrates through the stop block and is matched with the second screw hole.
The utility model discloses in, through the setting of second screw and second bolt, can fix the dog at the tip of slider comparatively conveniently to the installation to the dog has been made things convenient for.
Drawings
Fig. 1 is a schematic structural view of a sectional curtain wall for construction in embodiment 1;
FIG. 2 is an enlarged view of part A in example 1;
FIG. 3 is a schematic structural view of a mounting bracket in embodiment 1;
fig. 4 is a sectional view of the sectional curtain wall for construction in embodiment 1;
fig. 5 is an enlarged view of part B in example 1.
The names of the parts indicated by the numerical references in the drawings are as follows:
110. a guide rail; 111. a first screw hole; 112. a counter bore; 120. mounting a bracket; 121. a wallboard placing groove; 130. a wallboard; 140. a stopper; 150. a second bolt; 210. a slider; 220. a limiting plate; 230. a first bolt; 310. a through hole; 510. mounting grooves for rollers; 520. a roller; 530, a second screw hole.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples. It is to be understood that the examples are illustrative of the invention only and are not limiting.
Example 1
As shown in fig. 1 to 5, the present embodiment provides a combined curtain wall for building, which includes two guide rails 110, a plurality of horizontally disposed mounting brackets 120 are slidably disposed between the two guide rails 110, a slider 210 engaged with the guide rail 110 is disposed at an end of each mounting bracket 120, two wall panel placing grooves 121 are disposed on an inner side of each mounting bracket 120, each two wall panel placing grooves 121 are respectively formed by downward recessing an upper end surface of each mounting bracket 120 and upward recessing a lower end surface of each mounting bracket 120, and a plurality of wall panels 130 are fastened between two adjacent mounting brackets 120 and are disposed side by side along a length direction of each mounting bracket 120, and end portions of the wall panels 130 are disposed in the wall panel placing grooves 121.
Through the arrangement of the guide rails 110 and the mounting brackets 120 in this embodiment, when the combined curtain wall for a building is installed, the guide rails 110 are fixed at two ends of the opening of the wall body, the mounting brackets 120 are installed between the two guide rails 110, the distance between the two mounting brackets 120 is adjusted according to the height of the wall panel 130, the wall panel 130 is pushed into the wall panel placing grooves 121 of the two adjacent mounting brackets 120, and finally the stoppers 140 are installed at the ends of the sliders 210. Compared with the combined curtain wall for the building of the document, the combined curtain wall for the building in the embodiment does not need to fix the wall plate 130 in a bolt mode, so that the combined curtain wall for the building is more convenient to install; the adjustable distance between the mounting brackets 120 enables the modular curtain wall for building in the embodiment to be suitable for mounting wall panels 130 with different heights, thereby improving the applicability of the modular curtain wall for building. When wallboard 130 is damaged, relevant stop block 140 can be taken down from slider 210, then wallboard 130 is taken down from between two mounting brackets 120, and then the replacement of wallboard 130 can be completed by replacing new wallboard 130 and installing stop block 140, thereby facilitating daily maintenance. It should be noted that the mounting bracket 120 and the wall panel placement groove 121 in the present embodiment may be linear or arc-shaped, so that the modular curtain wall for building may be suitable for mounting wall panels 130 with different shapes.
In this embodiment, the end of the sliding block 210 is connected with a stop block 140 for limiting the wall board 130 at the end of the wall board placing groove 121.
Through the arrangement of the sliding blocks 210 in the embodiment, the wall boards 130 at the ends of the wall board placing grooves 121 can be prevented from falling down from the wall board placing grooves 121, so that the combined curtain wall for buildings has better stability.
Referring to fig. 2, in this embodiment, the guide rail 110 is provided with a plurality of first screw holes 111 arranged at intervals along the length direction of the guide rail, the slider 210 is provided with a limiting mechanism for limiting the slider 210, the limiting mechanism includes a limiting plate 220 fixed on the slider 210, and the limiting plate 220 is provided with a through hole 310 and a first bolt 230 penetrating through the through hole 310 and matching with the first screw hole 111.
The installation of the limiting plate 220, the first screw hole 111 and the first bolt 230 in this embodiment can better realize the adjustment and fixation of the mounting bracket 120.
In this embodiment, the slider 210 and the mounting bracket 120 are integrated.
By arranging the slider 210 and the mounting bracket 120 in the embodiment as an integrated structure, the connection strength between the slider 210 and the mounting bracket 120 can be improved, and the daily production and manufacturing are facilitated.
In this embodiment, a plurality of sets of roller mechanisms are arranged in the mounting bracket 120 along the length direction of the mounting bracket 120, each roller mechanism includes a roller mounting groove 510 arranged between two wall board placing grooves 121 in the mounting bracket 120, two ends of each roller mounting groove 510 are respectively communicated with the wall board placing grooves 121 on the upper end and the lower end of the mounting bracket 120, a roller 520 is rotatably arranged in each roller mounting groove 510, and the end of each roller 520 extends into the wall board placing groove 121.
Through the setting of the gyro wheel 520 in this embodiment, can reduce the friction between wallboard 130 and the wallboard standing groove 121 when pushing wallboard 130 into wallboard standing groove 121 to make things convenient for and push wallboard 130 into in wallboard standing groove 121.
In this embodiment, the guide rail 110 is provided with a plurality of counter bores 112 arranged along the length direction of the guide rail 110.
Through the arrangement of the counter bores 112 in the embodiment, when the guide rail 110 is installed, the guide rail 110 can be fixed on a wall body through fixing pieces such as screws penetrating through the counter bores 112, so that the guide rail 110 is convenient to install.
In this embodiment, the end of the sliding block 210 is provided with a second screw hole 530, the axis direction of which is parallel to the length direction of the mounting bracket 120, and the stopper 140 is provided with a second bolt 150 which passes through the stopper 140 and is matched with the second screw hole 530.
Through the arrangement of the second screw hole 530 and the second bolt 150 in this embodiment, the stopper 140 can be conveniently fixed at the end of the slider 210, thereby facilitating the installation of the stopper.
In short, the above description is only a preferred embodiment of the present invention, and all the equivalent changes and modifications made in accordance with the claims of the present invention should be covered by the scope of the present invention.

Claims (7)

1. A modular curtain wall for building which characterized in that: including two guide rails (110), slidable is equipped with installing support (120) that a plurality of level set up between two guide rails (110), the tip of installing support (120) be equipped with guide rail (110) complex slider (210), the medial surface of installing support (120) is equipped with two wallboard standing grooves (121), two wallboard standing grooves (121) are respectively by installing support (120) up end undercut and the up sunken formation of lower extreme face, the joint has wallboard (130) that a plurality of set up and the tip sets up in wallboard standing groove (121) side by side along installing support (120) length direction between two adjacent installing support (120).
2. A modular curtain wall for construction as claimed in claim 1, wherein: the end part of the sliding block (210) is connected with a stop block (140) used for limiting the wallboard (130) at the end part of the wallboard placing groove (121).
3. A modular curtain wall for construction as claimed in claim 2, wherein: be equipped with first screw (111) that a plurality of set up along guide rail length direction interval on guide rail (110), be equipped with on slider (210) and be used for carrying out spacing stop gear to slider (210), stop gear is equipped with through-hole (310) and passes through-hole (310) and first screw (111) matched with first bolt (230) including being fixed in limiting plate (220) on slider (210) on limiting plate (220).
4. A modular curtain wall for construction as claimed in claim 3, wherein: the sliding block (210) and the mounting bracket (120) are of an integrated structure.
5. A modular curtain wall for construction as claimed in claim 4, wherein: the roller mechanism is characterized in that a plurality of groups of roller mechanisms are arranged in the mounting support (120) along the length direction of the mounting support (120), each roller mechanism comprises a roller mounting groove (510) arranged between two wall board placing grooves (121) in the mounting support (120), the two ends of each roller mounting groove (510) are respectively communicated with the wall board placing grooves (121) on the upper end and the lower end of the mounting support (120), rollers (520) are rotatably arranged in the roller mounting grooves (510), and the end parts of the rollers (520) extend into the wall board placing grooves (121).
6. A modular curtain wall for construction as claimed in claim 5, wherein: the guide rail (110) is provided with a plurality of counter bores (112) arranged along the length direction of the guide rail (110).
7. A modular curtain wall for construction as claimed in claim 6, wherein: the end part of the sliding block (210) is provided with a second screw hole (530) with the axis direction parallel to the length direction of the mounting bracket (120), and the stop block (140) is provided with a second bolt (150) which penetrates through the stop block (140) and is matched with the second screw hole (530).
CN201921039970.7U 2019-07-05 2019-07-05 Combined curtain wall for building Active CN210194986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921039970.7U CN210194986U (en) 2019-07-05 2019-07-05 Combined curtain wall for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921039970.7U CN210194986U (en) 2019-07-05 2019-07-05 Combined curtain wall for building

Publications (1)

Publication Number Publication Date
CN210194986U true CN210194986U (en) 2020-03-27

Family

ID=69869031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921039970.7U Active CN210194986U (en) 2019-07-05 2019-07-05 Combined curtain wall for building

Country Status (1)

Country Link
CN (1) CN210194986U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706393A (en) * 2020-05-19 2020-09-25 中国路桥工程有限责任公司 Permanent tunnel wallboard mounting system
CN111910810A (en) * 2020-08-18 2020-11-10 田志刚 Steel construction building arc curtain wall construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706393A (en) * 2020-05-19 2020-09-25 中国路桥工程有限责任公司 Permanent tunnel wallboard mounting system
CN111706393B (en) * 2020-05-19 2021-08-03 中国路桥工程有限责任公司 Permanent tunnel wallboard mounting system
CN111910810A (en) * 2020-08-18 2020-11-10 田志刚 Steel construction building arc curtain wall construction
CN111910810B (en) * 2020-08-18 2021-11-09 山东莱茵艾佳电梯有限公司 Steel construction building arc curtain wall construction

Similar Documents

Publication Publication Date Title
CN210194986U (en) Combined curtain wall for building
CN212802174U (en) Curtain wall keel convenient to stably install
CN205477179U (en) Novel guide Assembly
CN112177229A (en) Decorative ceiling mounting structure
CN208416315U (en) A kind of Fast Installation hangs sliding door
AU2003227052B2 (en) Supporting and guiding device for holding movable, hanging door or wall elements
CN113969639B (en) Corridor decorative ceiling structure and construction method
CN215563695U (en) Building concrete heat preservation curtain wall construction
CN112031225A (en) Unit type curtain wall connecting mechanism
CN204778225U (en) Inorganic tenant ladder guide rail hauler mounting structure
CN219060847U (en) Wall-attached support with multiple attachment forms for climbing frame
CN216810463U (en) Energy-conserving curtain of waterproof stripe easy to assemble
CN211484245U (en) Novel assembled bracket
CN219386749U (en) Light steel keel wall structure of assembled building
CN211548690U (en) Gypsum board furred ceiling auxiliary device
CN215888907U (en) Assembled aluminium honeycomb panel furred ceiling from taking piece keel structure
CN216196518U (en) Inserted lifting scaffold pre-buried bolt hole positioning device
CN220492576U (en) Groove type cable bridge with telescopic function
CN220747329U (en) Wall cabinet integrated movable partition wall
CN212613509U (en) Assembled wall leveling keel
CN213509164U (en) Aluminum grid plate for suspended ceiling
CN219655984U (en) Hoisting flat lamp
CN214785993U (en) Supporting structure with adjustable door and window entrance to a cave is whole
CN215343770U (en) Cable bridge convenient to maintenance is changed
CN217458363U (en) Elevator guide rail bracket with adjustable spacing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant