CN210165000U - A quick pre-buried device of pipeline for hydraulic engineering - Google Patents
A quick pre-buried device of pipeline for hydraulic engineering Download PDFInfo
- Publication number
- CN210165000U CN210165000U CN201920878792.0U CN201920878792U CN210165000U CN 210165000 U CN210165000 U CN 210165000U CN 201920878792 U CN201920878792 U CN 201920878792U CN 210165000 U CN210165000 U CN 210165000U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- plate
- installation cavity
- fixed mounting
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a quick pre-buried device of pipeline for hydraulic engineering, including mounting plate and installation cavity, there is the fixed plate at mounting plate's top through three buffer spring fixed mounting of group, the central position department fixed mounting at fixed plate top has the installation cavity, and the top fixed mounting of installation cavity has sealed apron, the equal fixed mounting in both sides of installation cavity has the interface, fixed mounting has the installation support body on the fixed plate of installation cavity both sides, the inside top of installation support body all has arc clamp plate through threaded rod fixed mounting with the bottom. The utility model discloses be provided with buffer spring and avoid or reduce the pipeline and receive the pressure of soil when pre-buried and lead to the device to be absorbed in the condition in the soil, the installation cavity of setting can effectually protect the butt joint department of pipeline through sealed apron, and the arc clamp plate of setting is convenient for the staff quick when the installation operation through the arc clamp plate and carries out spacing fixed to the pipeline, is worth using widely.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a quick pre-buried device of pipeline for hydraulic engineering.
Background
Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotment nature, reach the earth's surface water and the groundwater of harmfulness and benefit purpose and the engineering of building, also known as water engineering, and the pipeline is then the necessary equipment among the hydraulic engineering, in order to guarantee that the pipeline can better installation operation, then need carry out the auxiliary operation through corresponding pre-buried device, the quick pre-buried device of pipeline of current hydraulic engineering has reached basic operation performance, but whole operation performance is comparatively single, the fixity is relatively poor, lead to the pipeline to press too greatly to lead to its skew pre-buried position after the installation easily, the practicality of device has been reduced, can't be better simultaneously protect the butt joint department of pipeline, the life of pipeline has been shortened, consequently, it is necessary to improve current technique, in order to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick pre-buried device of pipeline for hydraulic engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a quick pre-buried device of pipeline for hydraulic engineering, includes mounting plate and installation cavity, mounting plate's top has the fixed plate through three buffer spring fixed mounting of group, the central point department fixed mounting at fixed plate top has the installation cavity, and the top fixed mounting of installation cavity has sealed apron, the equal fixed mounting in both sides of installation cavity has the interface, fixed mounting has the installation support body on the fixed plate of installation cavity both sides, the inside top of installation support body all has arc clamp plate through threaded rod fixed mounting with the bottom.
Preferably, four corners of the installation bottom plate are fixedly provided with fixing pins which are matched with each other for use.
Preferably, a moisture absorption sponge cushion is placed at the bottom end of the interior of the mounting cavity, and a rubber sleeve is adhered to the inner wall of the butt joint.
Preferably, a thread adjusting sleeve matched with the threaded rod is fixedly installed on the threaded rod.
Preferably, the bottom of the arc-shaped pressing plate is fixedly provided with a rubber pad, and anti-skid protrusions are uniformly distributed at the bottom of the rubber pad.
Preferably, the front and back surfaces and the top of the mounting cavity are fixedly provided with a pressing base plate extending to the inside through a thread adjusting knob.
Compared with the prior art, the beneficial effects of the utility model are that: compared with the traditional embedded device, the rapid pipeline embedding device for the hydraulic engineering is provided with the buffer spring to ensure that the whole device has good buffer performance, the situation that the device is sunk into the soil due to the pressure of the soil when the pipeline is embedded is avoided or reduced, the device is more convenient for workers to overhaul the device, the practicability of the device is improved, the arranged installation cavity can effectively protect the butt joint of the pipeline through the sealing cover plate, the situation that the butt joint of the pipeline is corroded due to the fact that the butt joint of the pipeline is exposed for a long time is avoided or reduced, the service life of the pipeline is effectively prolonged, the arranged arc-shaped pressing plate is convenient for the workers to rapidly limit and fix the pipeline when the pipeline is installed, the situation that the pipeline deviates when embedded is effectively avoided or reduced, the stability of the pipeline when embedded is ensured, and the application range is enlarged, is worthy of popularization and application.
Drawings
Fig. 1 is a schematic front internal structure diagram of the present invention;
FIG. 2 is a schematic view of the internal structure of the mounting frame body of the present invention;
fig. 3 is a schematic top view of the present invention.
In the figure: 1. mounting a bottom plate; 101. a fixing pin; 2. installing a frame body; 201. a threaded rod; 202. an arc-shaped pressing plate; 203. a thread adjusting sleeve; 204. a rubber pad; 3. a butt joint port; 301. a rubber sleeve; 4. installing a cavity; 401. sealing the cover plate; 402. a threaded adjustment knob; 403. pressing the base plate; 5. a fixing plate; 6. a moisture-absorbing sponge cushion; 7. a buffer spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a quick pre-buried device of pipeline for hydraulic engineering, including mounting plate 1 and installation cavity 4, both sides of installation cavity 4 are all fixed with interface 3 through the bolt, install the mounting frame body 2 on the fixed plate 5 of installation cavity 4 both sides through the bolt fastening, the top and bottom inside the mounting frame body 2 are all fixed with arc clamp plate 202 through threaded rod 201, arc clamp plate 202 is convenient for the staff to carry on the spacing fixing to the pipeline fast when the installation operation through arc clamp plate 202, the effective condition that avoids or reduces the pipeline and takes place the skew when pre-buried, the stability when the pipeline is pre-buried is guaranteed, the top of mounting plate 1 is fixed with fixed plate 5 through three groups of buffer springs 7, buffer spring 7 makes the whole of the device have good cushion performance, avoid or reduce the pipeline and receive the pressure of soil and lead to the situation that the device sinks into the soil when pre-buried, make the device be convenient for the staff more to overhaul the operation to it, improved the practicality of device, the central position department at 5 tops of fixed plate has installation cavity 4 through bolt fixed mounting, and installs sealed apron 401 at the top of installation cavity 4 through the bolt, installation cavity 4 can effectually protect the butt joint department of pipeline through sealed apron 401, avoids or reduces the pipeline butt joint department and exposes the condition that leads to its quilt to corrode for a long time, the effectual life who prolongs the pipeline.
Furthermore, the four corners of the installation bottom plate 1 are all fixedly installed with the fixing pins 101 used in cooperation. In the embodiment, the mounting base plate 1 can limit and fix the device through the fixing pin 101, so that the stability and firmness of the device after mounting are ensured.
Further, the bottom end of the inside of the installation cavity 4 is provided with a moisture absorption sponge cushion 6, and the inner wall of the interface 3 is adhered with a rubber sleeve 301. In the embodiment, the moisture absorption foam-rubber cushion 6 can be installed in the cavity 4 to absorb moisture, thereby avoiding or reducing the serious corrosion of the pipeline after long-time operation, and the rubber sleeve 301 can wrap the pipeline in the butt joint port 3, thereby improving the sealing performance of the rubber sleeve to the butt joint port 3.
Further, a thread adjusting sleeve 203 matched with the threaded rod 201 is fixedly installed on the threaded rod. In the embodiment, the thread adjusting sleeve 203 has a good receiving effect, so that the worker can conveniently carry out the thread adjusting sleeve 203 through a thread structure, and the threaded rod 201 can limit and fix the pipeline.
Further, the bottom of the arc-shaped pressing plate 202 is fixedly provided with a rubber pad 204, and anti-skid protrusions are uniformly distributed on the bottom of the rubber pad 204. In the embodiment, the rubber pad 204 improves the friction between the arc-shaped pressing plate 202 and the pipeline through the anti-slip protrusions, so that the stability of the arc-shaped pressing plate 202 after fixation is ensured, and the practicability of the device is improved.
Further, a pressing pad plate 403 extending to the inside is fixedly installed on the front and back sides and the top of the installation cavity 4 by a screw adjusting knob 402. In the embodiment, the staff can fix the pipeline in the installation cavity 4 by adjusting the screw thread adjusting knob 402 and the chamber pressure pad 403, so that the stability of the pipeline in pre-embedding is ensured, and the dislocation is avoided or reduced.
The working principle is as follows: during the use, install the device through fixed pin 101 on the mounting base plate 1 fixedly, run through the butt joint with pipeline through installation support body 2 and installation cavity 4 again, carry out the centre gripping through arc clamp plate 202 fixed to the pipeline, during the butt joint, dock the pipeline through opening sealed apron 401, then, seal through sealed apron 401 again to through adjusting thread adjust knob 402, make and compress tightly backing plate 403 and carry out the secondary and fix.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a quick pre-buried device of pipeline for hydraulic engineering, includes mounting plate (1) and installation cavity (4), its characterized in that: the top of mounting plate (1) has fixed plate (5) through three buffer spring (7) fixed mounting of group, the central authorities position department fixed mounting at fixed plate (5) top has installation cavity (4), and the top fixed mounting of installation cavity (4) has sealed apron (401), the both sides of installation cavity (4) all fixed mounting have interface (3), fixed mounting has installation support body (2) on fixed plate (5) of installation cavity (4) both sides, the inside top of installation support body (2) all has arc clamp plate (202) through threaded rod (201) fixed mounting with the bottom.
2. The quick pre-buried device of pipeline for hydraulic engineering of claim 1, characterized in that: four angles of the installation bottom plate (1) are all fixedly provided with fixing pins (101) which are matched for use.
3. The quick pre-buried device of pipeline for hydraulic engineering of claim 1, characterized in that: the bottom in the installation cavity (4) is provided with a moisture absorption sponge cushion (6), and the inner wall of the butt joint port (3) is adhered with a rubber sleeve (301).
4. The quick pre-buried device of pipeline for hydraulic engineering of claim 1, characterized in that: and a thread adjusting sleeve (203) matched with the threaded rod (201) is fixedly installed on the threaded rod.
5. The quick pre-buried device of pipeline for hydraulic engineering of claim 1, characterized in that: the bottom of the arc-shaped pressing plate (202) is fixedly provided with a rubber pad (204), and anti-skid protrusions are uniformly distributed at the bottom of the rubber pad (204).
6. The quick pre-buried device of pipeline for hydraulic engineering of claim 1, characterized in that: the front and back surfaces and the top of the mounting cavity (4) are fixedly provided with a pressing base plate (403) extending to the inside through a thread adjusting knob (402).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920878792.0U CN210165000U (en) | 2019-06-12 | 2019-06-12 | A quick pre-buried device of pipeline for hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920878792.0U CN210165000U (en) | 2019-06-12 | 2019-06-12 | A quick pre-buried device of pipeline for hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210165000U true CN210165000U (en) | 2020-03-20 |
Family
ID=70170570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920878792.0U Expired - Fee Related CN210165000U (en) | 2019-06-12 | 2019-06-12 | A quick pre-buried device of pipeline for hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210165000U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112879710A (en) * | 2020-12-28 | 2021-06-01 | 奉节县三峡风天然气有限责任公司 | Staple bolt is used in natural gas repair that has an outer diameter adjusting function suitable for under water |
-
2019
- 2019-06-12 CN CN201920878792.0U patent/CN210165000U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112879710A (en) * | 2020-12-28 | 2021-06-01 | 奉节县三峡风天然气有限责任公司 | Staple bolt is used in natural gas repair that has an outer diameter adjusting function suitable for under water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210165000U (en) | A quick pre-buried device of pipeline for hydraulic engineering | |
CN209816693U (en) | Bridge road acoustic celotex board fixing device | |
CN213598571U (en) | Gasket with good sealing performance | |
CN214044978U (en) | Universal lightning arrester support easy to install | |
CN214424094U (en) | Assembled steel construction house reinforcing apparatus | |
CN210372303U (en) | Hydraulic engineering pipeline buries protection seat underground | |
CN211427985U (en) | Dry-type transformer convenient to installation | |
CN213319776U (en) | Photovoltaic board is with installation fixing device | |
CN211258240U (en) | Subway platform door stand structure | |
CN217927485U (en) | Municipal pipeline laying device | |
CN217655856U (en) | Light-emitting diode support with good waterproof performance | |
CN214560494U (en) | Automatic leveling structure is assembled at 45 degrees angles of aluminum alloy door and window | |
CN215906694U (en) | Protector of hydraulic and hydroelectric engineering side slope | |
CN205089562U (en) | Vacuum pump base | |
CN212753026U (en) | Radiator fixing device | |
CN213342545U (en) | Fixing device for Bluetooth base station | |
CN212462673U (en) | Trough type straight-through bridge convenient to disassemble | |
CN219610600U (en) | Waterproof mounting structure of lithium battery | |
CN217736500U (en) | Pipeline fastening device for building water supply and drainage | |
CN214884952U (en) | Fixing device is laid to building engineering technology waterproof design coiled material | |
CN214585726U (en) | Inverter fault detection device | |
CN213296230U (en) | Slope protection supporting device for hydraulic engineering | |
CN213598428U (en) | Automobile bearing rubber protective cover | |
CN215487617U (en) | Pad structure | |
CN216949105U (en) | Prestressed anchorage end waterproof protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200320 Termination date: 20200612 |
|
CF01 | Termination of patent right due to non-payment of annual fee |