CN210163893U - Piling equipment for building - Google Patents

Piling equipment for building Download PDF

Info

Publication number
CN210163893U
CN210163893U CN201920908059.9U CN201920908059U CN210163893U CN 210163893 U CN210163893 U CN 210163893U CN 201920908059 U CN201920908059 U CN 201920908059U CN 210163893 U CN210163893 U CN 210163893U
Authority
CN
China
Prior art keywords
wall
sides
fixed
guide
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920908059.9U
Other languages
Chinese (zh)
Inventor
张昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zouping Jiashuo Environmental Protection Equipment Co Ltd
Original Assignee
Zouping Jiashuo Environmental Protection Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zouping Jiashuo Environmental Protection Equipment Co Ltd filed Critical Zouping Jiashuo Environmental Protection Equipment Co Ltd
Priority to CN201920908059.9U priority Critical patent/CN210163893U/en
Application granted granted Critical
Publication of CN210163893U publication Critical patent/CN210163893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pile equipment for building, including removing the base, the top outer wall welding of removing the base has the portal frame, and the both sides inner wall of portal frame has all opened the carriage release ring spout, two the equal sliding connection of inner wall of carriage release ring spout has same carriage release ring, and the inner wall of carriage release ring is provided with guiding mechanism, driven shaft mounting hole and driving shaft mounting hole have been opened respectively to the top outer wall both sides of removing the base, and the inner wall of driven shaft mounting hole and driving shaft mounting hole is connected with driven shaft and driving shaft through the bearing respectively. The utility model discloses help reducing pile hammer swing range, can improve wire rope's stability, help reducing wire rope and rock the possibility that influences pile hammer, help reducing the possibility of stake slope, help improving the stability of the whole device of pile in-process, be convenient for adjust the position of four guide rings according to the diameter of stake, widened the device's application scope.

Description

Piling equipment for building
Technical Field
The utility model relates to a construction machinery technical field especially relates to a pile equipment for building.
Background
If the building is to be built on the ground, the ground is to bear great pressure, the ground must be ensured to have enough strength to resist the pressure, which is often difficult to achieve, most of the weight of the building is transmitted to a deep position below the ground through the piles by piling the piles on the ground, the pressure borne by the ground can be reduced, and the stability of the building is effectively improved.
The existing building pile driving equipment generally comprises a driving device, a pile driving hammer and a support frame, wherein the driving device drives the pile driving hammer to move up and down, the pile driving hammer is driven to hit a pile column by utilizing the gravity and the inertia of the pile driving hammer, the inertia of the pile driving hammer is enough, a steel wire rope is generally adopted to drive the pile driving hammer to move, the pile driving hammer is close to the free falling body to move when falling, but the pile driving hammer fixed by the steel wire rope is easy to shake in the falling process, so that the pile column is uneven in stress, and the pile column.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing the piling equipment for the building.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pile equipment for building, is including removing the base, the top outer wall welding of removing the base has the portal frame, and the both sides inner wall of portal frame has all opened the shift ring spout, two the equal sliding connection of inner wall of shift ring spout has same shift ring, and the inner wall of shift ring is provided with guiding mechanism, driven shaft mounting hole and driving shaft mounting hole have been opened respectively to the top outer wall both sides of removing the base, and the inner wall of driven shaft mounting hole and the inner wall of driving shaft mounting hole are connected with driven shaft and driving shaft through the bearing respectively, the outer wall both sides of driven shaft have rope sheave and driven gear through the key-type connection respectively, and the outer wall both sides of rope sheave all have wire rope, two through the fix with screw wire rope's one end outer wall all has same pile.
Preferably, the top outer wall both sides of portal frame all opened lead screw mounting hole, and the inner wall of two lead screw mounting holes all is connected with the lead screw through the bearing, and the top outer wall both sides of portal frame all are fixed with adjusting motor through the fix with screw, and two adjusting motor's output shaft is fixed in the one end outer wall of lead screw through the shaft coupling respectively.
Preferably, one side outer wall of driving shaft has the driving gear through the key-type connection, and driving gear and driven gear intermeshing, and one side outer wall of removal base has driving motor through the fix with screw, and the driving motor output shaft is fixed in the one end outer wall of driving shaft through the shaft coupling.
Preferably, the guide mechanism comprises four sliding rods and four guide rings, the four guide rings are fixed on the outer walls of one ends of the four sliding rods through screws respectively, the four sliding rods are connected with the inner walls of four sides of the moving ring respectively in a sliding manner, threaded holes are formed in two sides of the outer wall of the moving ring, and the two threaded holes are connected to the outer wall of one side of the two lead screws respectively through threads.
Preferably, the top outer wall both sides of shift ring all are fixed with electric telescopic handle through the fix with screw, and two electric telescopic handle's one end outer wall all is fixed with solid fixed ring through the fix with screw, and four sides of solid fixed ring's bottom outer wall and one side outer wall top of four guide rings all have the connecting rod through hinged joint.
Preferably, the inner wall of one side of the guide ring is welded with a support, the outer wall of one side of the support is connected with a rotating roller through a hinge, and the outer wall of the bottom of the guide ring is welded with a positioning nail.
Preferably, the fixed pulleys are welded on two sides of the outer wall of the top of the portal frame, the mounting grooves are formed in two sides of the outer wall of the top of the portal frame, the inner walls of the two mounting grooves are provided with guide pulley blocks, each guide pulley block comprises three guide pulleys, the three guide pulleys are fixed on the inner walls of two sides of the mounting grooves in a staggered mode through screws, and the steel wire rope is sleeved on the outer wall of one side of the fixed pulleys and the outer wall of one side of the guide pulley blocks.
Compared with the prior art, the utility model provides a pile equipment for building possesses following beneficial effect:
1. this pile equipment for building, through four guide rings and the location nail that sets up, the stake is wrapped up in to four guide rings, at the moving direction of pile in-process restriction stake, helps reducing the possibility of stake slope, and during the location nail inserted soil, further improved the stability of removing base and guide ring, help improving the stability of the whole device of pile in-process.
2. This pile equipment for building, through electric telescopic handle, solid fixed ring and the connecting rod that sets up, electric telescopic handle drives solid fixed ring and reciprocates, and four guide rings of connecting rod pulling expand or shrink, are convenient for adjust the position of four guide rings according to the diameter of stake, are applicable to the stake of different diameters, have widened the device's application scope.
3. This pile equipment for building, through the guide pulley group and two wire rope that set up, two wire rope fix the pile hammer simultaneously, make pile hammer both sides atress even, help reducing pile hammer swing range, the guide pulley group that three guide pulley of crisscross distribution formed can improve wire rope's stability, helps reducing wire rope and rocks the possibility that influences pile hammer.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses help reducing pile hammer swing range, help improving the stability of pile in-process whole device.
Drawings
Fig. 1 is a schematic cross-sectional structural view of a piling device for building according to embodiment 1 of the present invention;
fig. 2 is a schematic side view of the piling equipment for building according to the present invention;
fig. 3 is a schematic top view of a guide ring of the pile driving device for building according to the present invention;
fig. 4 is a schematic cross-sectional structural view of a piling device for building according to embodiment 2 of the present invention;
fig. 5 is a schematic structural view of a guide pulley block of the piling equipment for building.
In the figure: 1-a movable base, 2-a portal frame, 3-a lead screw, 4-a steel wire rope, 5-an adjusting motor, 6-a pile hammer, 7-a fixed ring, 8-an electric telescopic rod, 9-a connecting rod, 10-a guide ring, 11-a positioning nail, 12-a slide rod, 13-a movable ring, 14-a driven gear, 15-a fixed pulley, 16-a rope pulley, 17-a driving motor, 18-a driving gear, 19-a rotating roller and 20-a guide pulley block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-3, a pile driving equipment for building, including moving base 1, the welding of moving base 1's top outer wall has portal frame 2, and the both sides inner wall of portal frame 2 all opens the shift ring spout, the equal sliding connection of inner wall of two shift ring spouts has same shift ring 13, and the inner wall of shift ring 13 is provided with guiding mechanism, driven shaft mounting hole and driving shaft mounting hole have been opened respectively to moving base 1's top outer wall both sides, and the inner wall of driven shaft mounting hole and the inner wall of driving shaft mounting hole are connected with driven shaft and driving shaft through the bearing respectively, the outer wall both sides of driven shaft have rope sheave 16 and driven gear 14 through the key-type connection respectively, and the outer wall both sides of rope sheave 16 all have wire rope 4 through the fix with screw, the one end outer wall of two wire rope 4 all has same.
The utility model discloses in, the lead screw mounting hole has all been opened to portal frame 2's top outer wall both sides, and the inner wall of two lead screw mounting holes all is connected with lead screw 3 through the bearing, and portal frame 2's top outer wall both sides all have adjusting motor 5 through the fix with screw, and two adjusting motor 5's output shaft are fixed in lead screw 3's one end outer wall through the shaft coupling respectively.
The utility model discloses in, one side outer wall of driving shaft has driving gear 18 through the key connection, and driving gear 18 and driven gear 14 intermeshing, and one side outer wall of removing base 1 has driving motor 17 through the fix with screw, and driving motor 17 output shaft is fixed in the one end outer wall of driving shaft through the shaft coupling.
The utility model discloses in, guiding mechanism includes four litter 12 and four guide rings 10, and four guide rings 10 are respectively through the one end outer wall of fix with screw in four litter 12, and four litter 12 are sliding connection respectively has four side inner walls of shift ring 13, and the screw hole has all been opened to shift ring 13's outer wall both sides, and two screw holes are respectively through threaded connection in one side outer wall of two lead screws 3.
The utility model discloses in, the top outer wall both sides of shift ring 13 all have electric telescopic handle 8 through the fix with screw, and the one end outer wall of two electric telescopic handle 8 all has solid fixed ring 7 through the fix with screw, and four sides of the bottom outer wall of solid fixed ring 7 and one side outer wall top of four guide rings 10 all have connecting rod 9 through hinged joint.
The utility model discloses in, the welding of one side inner wall of guide ring 10 has the support, and one side outer wall of support has live-rollers 19 through hinged joint, and the welding of the bottom outer wall of guide ring 10 has location nail 11, and during location nail 11 inserted soil, improved the stability of removing base 1 and guide ring 10, live-rollers 19 can reduce the resistance that receives when the stake moves down.
Example 2
Referring to fig. 4-5, in the piling equipment for the building, the fixed pulleys 15 are welded on two sides of the outer wall of the top of the portal frame 2, mounting grooves are formed on two sides of the outer wall of the top of the portal frame 2, guide pulley blocks 20 are arranged on the inner walls of the two mounting grooves, each guide pulley block 20 comprises three guide pulleys, the three guide pulleys are fixed on the inner walls of the two mounting grooves in a staggered mode through screws, and the steel wire rope 4 is sleeved on the outer wall of one side of the fixed pulley 15 and the outer wall of one side of the guide pulley.
The working principle is as follows: the device is moved to a piling position through the movable base 1, the adjusting motor 5 is started to drive the movable ring 13 to move downwards, the guide ring 10 is sleeved on the outer wall of a pile column, the electric telescopic rod 8 is started to pull the fixing ring 7 to move downwards, the connecting rod 9 rotates to push the guide ring 10 to move, the rotating roller 19 is attached to the outer wall of the pile column, the positioning nail 11 is inserted into soil, the guide ring 10 is fixed, the driving motor 17 is started, transmission is achieved through the driving gear 18 and the driven gear 14, the rope sheave 16 pulls the steel wire rope 4 to drive the piling hammer 6 to move upwards, the driving motor 17 is powered off, the piling hammer 6 falls under the action of gravity to knock the pile column, the guide pulley block 20 limits the descending direction of the steel wire rope.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The piling equipment for the building comprises a movable base (1) and is characterized in that a portal frame (2) is welded on the outer wall of the top of the movable base (1), and the inner walls of the two sides of the portal frame (2) are both provided with moving ring chutes, the inner walls of the two moving ring chutes are both connected with the same moving ring (13) in a sliding way, and the inner wall of the movable ring (13) is provided with a guide mechanism, two sides of the outer wall of the top of the movable base (1) are respectively provided with a driven shaft mounting hole and a driving shaft mounting hole, the inner wall of the driven shaft mounting hole and the inner wall of the driving shaft mounting hole are respectively connected with a driven shaft and a driving shaft through bearings, two sides of the outer wall of the driven shaft are respectively connected with a rope pulley (16) and a driven gear (14) through keys, and the two sides of the outer wall of the rope pulley (16) are both fixed with steel wire ropes (4) through screws, and the outer wall of one end of each of the two steel wire ropes (4) is fixed with the same pile hammer (6) through screws.
2. The piling equipment for the building is characterized in that screw rod mounting holes are formed in two sides of the outer wall of the top of the portal frame (2), screw rods (3) are connected to the inner walls of the two screw rod mounting holes through bearings, adjusting motors (5) are fixed to two sides of the outer wall of the top of the portal frame (2) through screws, and output shafts of the two adjusting motors (5) are fixed to the outer wall of one end of each screw rod (3) through couplers respectively.
3. The piling device for building as recited in claim 2, wherein the driving gear (18) is connected to one side of the outer wall of the driving shaft through a key, the driving gear (18) is meshed with the driven gear (14), the driving motor (17) is fixed to one side of the outer wall of the movable base (1) through a screw, and the output shaft of the driving motor (17) is fixed to one end of the outer wall of the driving shaft through a coupling.
4. The piling device for building as claimed in claim 3, wherein the guiding mechanism comprises four slide rods (12) and four guiding rings (10), the four guiding rings (10) are respectively fixed on the outer walls of one ends of the four slide rods (12) through screws, the four slide rods (12) are respectively connected with the inner walls of four sides of the moving ring (13) in a sliding manner, threaded holes are respectively formed in two sides of the outer wall of the moving ring (13), and the two threaded holes are respectively connected with the outer wall of one side of the two lead screws (3) through threads.
5. Piling equipment for building according to claim 4, characterized in that the two sides of the top outer wall of the moving ring (13) are both fixed with electric telescopic rods (8) by screws, and the outer walls of one ends of the two electric telescopic rods (8) are both fixed with fixing rings (7) by screws, and the four sides of the bottom outer wall of the fixing rings (7) and the top of one side outer wall of the four guide rings (10) are both connected with connecting rods (9) by hinges.
6. Piling equipment for construction according to claim 5, characterized in that the guide ring (10) is welded on one side of its inner wall with a bracket, and the bracket is connected on one side of its outer wall with a rotating roller (19) by means of a hinge, and the guide ring (10) is welded on its bottom outer wall with a positioning nail (11).
7. The piling device for building as recited in claim 6, wherein the fixed pulleys (15) are welded on both sides of the top outer wall of the portal frame (2), the installation grooves are formed on both sides of the top outer wall of the portal frame (2), the guide pulley blocks (20) are arranged on the inner walls of the two installation grooves, the guide pulley blocks (20) comprise three guide pulleys, the three guide pulleys are fixed on the inner walls of the two installation grooves in a staggered manner through screws, and the steel wire rope (4) is sleeved on one side outer wall of the fixed pulleys (15) and one side outer wall of the guide pulley blocks (20).
CN201920908059.9U 2019-06-17 2019-06-17 Piling equipment for building Active CN210163893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920908059.9U CN210163893U (en) 2019-06-17 2019-06-17 Piling equipment for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920908059.9U CN210163893U (en) 2019-06-17 2019-06-17 Piling equipment for building

Publications (1)

Publication Number Publication Date
CN210163893U true CN210163893U (en) 2020-03-20

Family

ID=70170856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920908059.9U Active CN210163893U (en) 2019-06-17 2019-06-17 Piling equipment for building

Country Status (1)

Country Link
CN (1) CN210163893U (en)

Similar Documents

Publication Publication Date Title
CN107178083B (en) Pile driver for civil engineering
CN201786244U (en) Rotary drilling rig
CN206804438U (en) Realize moment of torsion and the pull-out test device for anchor cable of axle power decoupling
JP6099955B2 (en) Nakabori excavator
CN210163893U (en) Piling equipment for building
CN215252846U (en) Pile hammer is used in communication engineering construction
KR101546414B1 (en) The concrete pipe pile cutting device for a constructing foundation work
CN108679371A (en) A kind of heavy duty equipment clamping device
CN111058885A (en) Safety protection frame used in mine hole
CN208136913U (en) A kind of bridge construction piling equipment
JP2010031523A (en) Vertical shaft excavator
JP2008031756A (en) Inner excavation jacking device for hollow member
JP4187908B2 (en) Foundation pile rotary press-fitting machine
CN102296594A (en) Multifunctional remote control pile driver of motor-driven caterpillar band
CN112194038A (en) Material lifting machine main equipment for building construction
CN111877984A (en) Pile machine
CN112921955A (en) Square pile forming equipment for municipal civil engineering
CN218991484U (en) Power head of compaction type deep drilling CFG pile machine
CN111564708B (en) Electric power grounding post for electric power engineering
CN219299214U (en) Drilling tool of compaction type deep drilling CFG pile machine
CN213358574U (en) Rammer for civil engineering
CN104988909B (en) Triangle agitation driller
CN113373924B (en) Municipal works pile device
CN217974386U (en) Pile foundation pouring device for photovoltaic construction
CN216836767U (en) Tower crane lifting hook protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant