CN210154366U - Central air conditioning of frequency conversion is with cooling tower - Google Patents
Central air conditioning of frequency conversion is with cooling tower Download PDFInfo
- Publication number
- CN210154366U CN210154366U CN201920955520.6U CN201920955520U CN210154366U CN 210154366 U CN210154366 U CN 210154366U CN 201920955520 U CN201920955520 U CN 201920955520U CN 210154366 U CN210154366 U CN 210154366U
- Authority
- CN
- China
- Prior art keywords
- cooling tower
- water
- baffle
- tower body
- central air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Landscapes
- Separation Of Particles Using Liquids (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及中央空调技术领域,尤其涉及一种变频的中央空调用冷却塔。The utility model relates to the technical field of central air conditioners, in particular to a frequency-converting cooling tower for central air conditioners.
背景技术Background technique
中央空调冷却塔是利用水作为循环冷却剂,从一系统中吸收热量排放至大气中,以降低水温的装置,其冷却是借着水蒸发过程来完成,并使冷却水可以继续的循环使用,从经济效益上来说,无形中减少了成本的浪费。The central air-conditioning cooling tower is a device that uses water as a circulating coolant to absorb heat from a system and discharge it into the atmosphere to reduce the water temperature. In terms of economic benefits, the waste of costs is virtually reduced.
中央空调冷却水系统由于是开式系统,顶部的出风口向上,会使设备内的部件直接暴露在外,下雨时雨水会从出风口漏入设备内部,容易腐蚀设备,导致设备的快速老化,而且飞尘、落叶等杂质也常通过顶部的出风口进入设备内,造成水质变差,因此再继续循环使用不仅会对设备造成损伤,而且影响中央空调的使用效果。Because the central air-conditioning cooling water system is an open system, the air outlet on the top is upward, which will directly expose the components in the equipment. When it rains, rainwater will leak into the equipment from the air outlet, which is easy to corrode the equipment and cause the equipment to rapidly age. In addition, impurities such as flying dust and fallen leaves often enter the equipment through the air outlet at the top, resulting in poor water quality. Therefore, continued recycling will not only cause damage to the equipment, but also affect the use effect of the central air conditioner.
发明内容SUMMARY OF THE INVENTION
本实用新型的目的是为了解决现有技术中的问题,而提出的一种变频的中央空调用冷却塔。The purpose of the utility model is to solve the problems in the prior art, and proposes a frequency conversion cooling tower for central air-conditioning.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
一种变频的中央空调用冷却塔,包括冷却塔本体和风筒,所述冷却塔本体内部连接有布水管,所述布水管与进水口相连通,所述内部还连接有填料,所述风筒内部连接有风机,所述冷却塔本体底部依次设置有净化腔和储水腔,所述净化腔内部连接有第三过滤网和第一挡板,所述第一挡板底壁上连接有第二步进电机,所述第二步进电机输出端连接有第二转动轴,所述第二转动轴远离第二步进电机的一端穿过第一挡板并连接有搅拌叶,所述冷却塔本体外壁上连接有储药箱,所述储药箱和净化腔相连通。A frequency conversion cooling tower for central air-conditioning, comprising a cooling tower body and an air duct, the cooling tower body is internally connected with a water distribution pipe, the water distribution pipe is communicated with a water inlet, and the interior is also connected with filler, the air duct A fan is connected inside, a purification cavity and a water storage cavity are sequentially arranged at the bottom of the cooling tower body, a third filter screen and a first baffle are connected inside the purification cavity, and a second baffle is connected to the bottom wall of the first baffle. Two stepping motors, the output end of the second stepping motor is connected with a second rotating shaft, the end of the second rotating shaft away from the second stepping motor passes through the first baffle and is connected with a stirring blade, the cooling A medicine storage box is connected to the outer wall of the tower body, and the medicine storage box is communicated with the purification chamber.
优选的,所述第二步进电机底部连接有第二挡板,所述第一挡板和第二挡板之间连接有第一连接管道,所述净化腔和储水腔通过第一连接管道相连通。Preferably, a second baffle is connected to the bottom of the second stepper motor, a first connecting pipe is connected between the first baffle and the second baffle, and the purification chamber and the water storage chamber are connected through the first connection The pipes are connected.
优选的,所述布水管上连接有喷头,所述风筒内部连接有电机架,所述电机架外壁上连接有第一步进电机,所述第一步进电机输出端通过第一转动轴与风机相连。Preferably, a spray head is connected to the water distribution pipe, a motor frame is connected inside the air duct, a first step motor is connected to the outer wall of the motor frame, and the output end of the first step motor passes through a first rotating shaft connected to the fan.
优选的,所述冷却塔本体外壁上连接有弧形挡板,弧形挡板底部连接有第二连接管道。Preferably, an arc-shaped baffle is connected to the outer wall of the cooling tower body, and a second connecting pipe is connected to the bottom of the arc-shaped baffle.
优选的,所述冷却塔本体侧壁设置有进风口,所述进风口外壁上设置有第一过滤网,所述风筒顶壁上设置有第二过滤网。Preferably, the side wall of the cooling tower body is provided with an air inlet, the outer wall of the air inlet is provided with a first filter screen, and the top wall of the air cylinder is provided with a second filter screen.
与现有技术相比,本实用新型提供了一种变频的中央空调用冷却塔,具备以下有益效果:Compared with the prior art, the utility model provides a cooling tower for central air conditioning with frequency conversion, which has the following beneficial effects:
1、该变频的中央空调用冷却塔,通过水泵将需要冷却处理的热水通过进水口注入布水管中,通过设置的喷头,从而可以将布水管内部的热水进行一定的雾化,从而增加热水与空气的接触面积,进而加快热水的冷却与蒸发的速度,同时启动第一步进电机,从而带动其输出端的第一转动轴转动,进而带动风机转动,从而促进热水冷却与蒸发,然后雾化后的热水在重力的作用下进入到填料中,通过填料的设置,从而可以减缓雾化后的热水下落的速度,从而使得热水冷却与蒸发的效果更好,然后冷却后的热水进入到净化腔内部,通过净化腔内部设置的第三过滤网,从而可以对水中的大块杂质进行过滤,然后通过设置的储药箱向净化腔内部投入净化剂,同时启动第二步进电机,从而带动其输出端相连的第二转动轴转动,进而带动搅拌叶转动,从而使得净化剂与进入到净化腔内部的水进行充分混合,从而使得净化腔内部水中的飞尘微生物等进行有效的过滤处理,进而提高冷却后的水的水质,避免水质变差,影响人们使用空调的舒适感,甚至对中央空调本体造成损害,通过设置的第一连接管道,且第一连接管道上设置有电磁阀,从而便于将净化腔内部净化后的水输送到储水腔内部,方便对其进行储存并供给中央空调用作循环冷却剂,且第一连接管道进水口处设置有第四过滤网,可以避免净化腔内部的过滤的杂质进入到储水腔内部,且净化腔侧壁上开凿有排污口,便于将净化腔内部的杂质污染物排出。1. The frequency conversion cooling tower for central air-conditioning uses the water pump to inject the hot water that needs to be cooled into the water distribution pipe through the water inlet. The contact area between the hot water and the air, thereby speeding up the cooling and evaporation of the hot water, and at the same time starting the first stepping motor, which drives the first rotating shaft at the output end to rotate, which in turn drives the fan to rotate, thereby promoting the cooling and evaporation of the hot water. , and then the atomized hot water enters the filler under the action of gravity. Through the setting of the filler, the falling speed of the atomized hot water can be slowed down, so that the effect of hot water cooling and evaporation is better, and then cooling After the hot water enters the purification chamber, it can filter the large impurities in the water through the third filter screen set in the purification chamber, and then put the purification agent into the purification chamber through the set medicine storage box, and simultaneously start the first filter. Two stepper motors, thereby driving the second rotating shaft connected to the output end to rotate, and then driving the stirring blade to rotate, so that the purifying agent and the water entering the purification chamber are fully mixed, so that the flying dust microorganisms in the water in the purification chamber are fully mixed. Effective filtration treatment is carried out, so as to improve the water quality of the cooled water, avoid the deterioration of the water quality, affect the comfort of people using the air conditioner, and even cause damage to the central air conditioner body. There is a solenoid valve on it, so that it is convenient to transport the purified water in the purification chamber to the water storage chamber, which is convenient for storage and supply to the central air conditioner as a circulating coolant, and a fourth water inlet is provided at the water inlet of the first connecting pipe. The filter screen can prevent the filtered impurities in the purification chamber from entering the water storage chamber, and a sewage outlet is drilled on the side wall of the purification chamber to facilitate the discharge of impurities and pollutants in the purification chamber.
2、该变频的中央空调用冷却塔,通过弧形挡板和第二连接管道的设置,从而可以对溅出冷却塔本体的水进行收集,并通过第二连接管道排向较远处,从而避免其淋洒到冷却塔本体上,从而导致加快冷却塔本体的腐蚀生锈,通过第一过滤网和第二过滤网的设置,从而可以有效避免落叶等块状较大的杂质进入到冷却塔本体中,从而影响水质。2. The frequency conversion cooling tower for central air-conditioning can collect the water splashing out of the cooling tower body through the setting of the arc baffle and the second connecting pipe, and discharge it to a distance through the second connecting pipe, so as to Avoid it being sprinkled on the cooling tower body, which will accelerate the corrosion and rust of the cooling tower body. Through the setting of the first filter screen and the second filter screen, it can effectively prevent large impurities such as fallen leaves from entering the cooling tower. ontology, thereby affecting water quality.
附图说明Description of drawings
图1为本实用新型提出的一种变频的中央空调用冷却塔的结构示意图;Fig. 1 is the structural representation of a kind of frequency conversion central air-conditioning cooling tower proposed by the utility model;
图2为本实用新型提出的一种变频的中央空调用冷却塔的内部结构示意图一;2 is a schematic diagram 1 of the internal structure of a cooling tower for a variable frequency central air conditioner proposed by the utility model;
图3为本实用新型提出的一种变频的中央空调用冷却塔主视的剖视图;Fig. 3 is the front sectional view of a kind of frequency conversion cooling tower for central air-conditioning proposed by the utility model;
图4为本实用新型提出的一种变频的中央空调用冷却塔的内部结构示意图二。FIG. 4 is a second schematic diagram of the internal structure of a cooling tower for a variable frequency central air conditioner proposed by the present invention.
图中:1、冷却塔本体;101、布水管;102、喷头;103、填料;104、进风口;105、第一过滤网;2、风筒;201、电机架;202、第一步进电机;203、风机;204、第二过滤网;3、净化腔;301、储药箱;302、第三过滤网;303、第一挡板;304、第二步进电机;305、第二转动轴;306、搅拌叶;307、第二挡板;308、第一连接管道;4、储水腔;5、弧形挡板;501、第二连接管道。In the figure: 1, cooling tower body; 101, water distribution pipe; 102, nozzle; 103, filler; 104, air inlet; 105, first filter screen; 2, air duct; 201, motor frame; 202, first step Motor; 203, fan; 204, second filter; 3, purification chamber; 301, medicine storage box; 302, third filter; 303, first baffle; 304, second stepper motor; 305, second Rotating shaft; 306, stirring blade; 307, second baffle; 308, first connecting pipe; 4, water storage cavity; 5, arc baffle; 501, second connecting pipe.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.
参照图1-4,一种变频的中央空调用冷却塔,包括冷却塔本体1和风筒2,冷却塔本体1内部连接有布水管101,布水管101与进水口相连通,内部还连接有填料103,风筒2内部连接有风机203,冷却塔本体1底部依次设置有净化腔3和储水腔4,净化腔3内部连接有第三过滤网302和第一挡板303,第一挡板303底壁上连接有第二步进电机304,第二步进电机304输出端连接有第二转动轴305,第二转动轴305远离第二步进电机304的一端穿过第一挡板303并连接有搅拌叶306,冷却塔本体1外壁上连接有储药箱301,储药箱301和净化腔3相连通。1-4, a frequency conversion cooling tower for central air conditioning includes a
参照图2-4,第二步进电机304底部连接有第二挡板307,第一挡板303和第二挡板307之间连接有第一连接管道308,净化腔3和储水腔4通过第一连接管道308相连通。2-4 , a
参照图3,布水管101上连接有喷头102,风筒2内部连接有电机架201,电机架201外壁上连接有第一步进电机202,第一步进电机202输出端通过第一转动轴与风机203相连。3, the
通过水泵将需要冷却处理的热水通过进水口注入布水管101中,通过设置的喷头102,从而可以将布水管101内部的热水进行一定的雾化,从而增加热水与空气的接触面积,进而加快热水的冷却与蒸发的速度,同时启动第一步进电机202,从而带动其输出端的第一转动轴转动,进而带动风机203转动,从而促进热水冷却与蒸发,然后雾化后的热水在重力的作用下进入到填料103中,通过填料103的设置,从而可以减缓雾化后的热水下落的速度,从而使得热水冷却与蒸发的效果更好,然后冷却后的热水进入到净化腔3内部,通过净化腔3内部设置的第三过滤网302,从而可以对水中的大块杂质进行过滤,然后通过设置的储药箱301向净化腔3内部投入净化剂,同时启动第二步进电机304,从而带动其输出端相连的第二转动轴305转动,进而带动搅拌叶306转动,从而使得净化剂与进入到净化腔3内部的水进行充分混合,从而使得净化腔3内部水中的飞尘微生物等进行有效的净化处理,进而提高冷却后的水的水质,避免水质变差,影响人们使用空调的舒适感,甚至对中央空调本体造成损害,通过设置的第一连接管道308,且第一连接管道308上设置有电磁阀,从而便于将净化腔3内部净化后的水输送到储水腔4内部,方便对其进行储存并供给中央空调用作循环冷却剂,且第一连接管道308进水口处设置有第四过滤网,避免净化腔3内部的过滤的杂质进入到储水腔4内部,且净化腔3侧壁上开凿有排污口,便于将净化腔3内部的杂质污染物排出。The hot water that needs to be cooled is injected into the
参照图3-4,冷却塔本体1外壁上连接有弧形挡板5,弧形挡板5底部连接有第二连接管道501。3-4 , an
参照图1,冷却塔本体1侧壁设置有进风口104,进风口104外壁上设置有第一过滤网105,风筒2顶壁上设置有第二过滤网204。1 , the side wall of the
通过弧形挡板5和第二连接管道501的设置,从而可以对溅出冷却塔本体1的水进行收集,并通过第二连接管道501排向较远处,从而避免其淋洒到冷却塔本体1上,从而导致加快冷却塔本体1的腐蚀生锈,通过第一过滤网105和第二过滤网204的设置,从而可以有效避免落叶等块状较大的杂质进入到冷却塔本体1中,从而影响水质。Through the arrangement of the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920955520.6U CN210154366U (en) | 2019-06-24 | 2019-06-24 | Central air conditioning of frequency conversion is with cooling tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920955520.6U CN210154366U (en) | 2019-06-24 | 2019-06-24 | Central air conditioning of frequency conversion is with cooling tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210154366U true CN210154366U (en) | 2020-03-17 |
Family
ID=69763977
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920955520.6U Expired - Fee Related CN210154366U (en) | 2019-06-24 | 2019-06-24 | Central air conditioning of frequency conversion is with cooling tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210154366U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111637763A (en) * | 2020-05-19 | 2020-09-08 | 涡阳县沪涡多孔矸石砖有限公司 | A cooling tower water inlet anti-clogging and easy-to-clean mechanism |
| CN113251820A (en) * | 2021-05-11 | 2021-08-13 | 江西方舟流体科技有限公司 | Wet cooling tower water flow recovery device |
-
2019
- 2019-06-24 CN CN201920955520.6U patent/CN210154366U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111637763A (en) * | 2020-05-19 | 2020-09-08 | 涡阳县沪涡多孔矸石砖有限公司 | A cooling tower water inlet anti-clogging and easy-to-clean mechanism |
| CN113251820A (en) * | 2021-05-11 | 2021-08-13 | 江西方舟流体科技有限公司 | Wet cooling tower water flow recovery device |
| CN113251820B (en) * | 2021-05-11 | 2022-07-15 | 江西方舟流体科技有限公司 | Wet cooling tower water flow recovery device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201203229Y (en) | Purifying device | |
| CN113499656A (en) | Waste gas zero discharge system based on sludge drying and control method thereof | |
| CN210154366U (en) | Central air conditioning of frequency conversion is with cooling tower | |
| CN106482223A (en) | A kind of all-fresh air air cleaner | |
| CN107366993A (en) | Air purification humidifier | |
| WO2022257463A1 (en) | Humidifying air conditioner and control method therefor | |
| CN210568942U (en) | Air conditioner air supply device of dust-free workshop | |
| CN204902070U (en) | Integral type of cooling down - disinfect evaporation air conditioner | |
| CN203928164U (en) | The humiture that is applicable to frequency conversion machine room is independently controlled vaporizing and cooling air conditioning device | |
| CN202419877U (en) | Fresh air box | |
| CN205401259U (en) | Take spiral article filtering's clean scavenger fan | |
| CN218627149U (en) | A cooling and humidifying air purifier | |
| CN206683129U (en) | An air conditioner fan with humidification and haze removal function | |
| CN202885142U (en) | Water curtain de-dusting humidifying spinning air conditioning unit | |
| CN204956007U (en) | Air purification device is assisted to vehicle air conditioner water -cooling | |
| CN214139955U (en) | A coolable garbage compartment for kitchen trash cans | |
| CN114165857A (en) | Indoor refrigeration central system of water-cooling heat pump circulation | |
| CN209427003U (en) | A kind of air-conditioning cabinet for ship's space | |
| CN209609488U (en) | A kind of fresh air system of farm adjustable wind direction and removable odor function | |
| CN208519885U (en) | A kind of two-way air purifier of movement | |
| CN220707606U (en) | Ventilation and cooling equipment | |
| CN218794766U (en) | Ventilation device for forging furnace | |
| CN205435322U (en) | Water curtain clearing machine sprays | |
| CN112278667A (en) | A rubbish railway carriage or compartment that can cool down for kitchen garbage bin | |
| CN212841950U (en) | Water storage box for central air conditioner |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 250101 556, production building, 2766 Yingxiu Road, high tech Zone, Jinan City, Shandong Province Patentee after: Shandong Beilin Energy Engineering Co.,Ltd. Address before: 250101 556, production building, 2766 Yingxiu Road, high tech Zone, Jinan City, Shandong Province Patentee before: Jinan Beilin Electromechanical Equipment Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200317 |