CN210152264U CN201920887093.2U CN201920887093U CN210152264U CN 210152264 U CN210152264 U CN 210152264U CN 201920887093 U CN201920887093 U CN 201920887093U CN 210152264 U CN210152264 U CN 210152264U
Authority
CN
China
Prior art keywords
fixed
water
wall
sleeve
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920887093.2U
Other languages
Chinese (zh)
Inventor
林立伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920887093.2U priority Critical patent/CN210152264U/en
Application granted granted Critical
Publication of CN210152264U publication Critical patent/CN210152264U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses a water and electricity warm up hole construction equipment that reserves, the installation structure comprises a sleeve, it has two symmetric distributions's rectangle mouth to open on the sleeve pipe circumference outer wall, and installs sealing mechanism on the sleeve pipe, sealing mechanism includes the closing plate, and rotates on the closing plate and peg graft and have the screw rod, and the screw thread has cup jointed the lantern ring on the screw thread outer wall of screw rod, the screw rod bottom mounting has the bearing, and is fixed with two deflectors of symmetric distribution on the bearing circumference outer wall, and it has the guide way to open on the deflector, sliding joint has the slider in the guide way, and all is fixed with the dead lever on two sliders, and dead lever one end is fixed with the grip block with rectangle mouth specification adaptation, movable mounting has same coupling mechanism between dead lever and the lantern ring. The utility model discloses can seal the entrance to a cave after the sleeve pipe is dismantled, avoid producing the falling object injury people or personnel and step on incident such as empty falling, can also play spacing clamping action to the closing plate, prevent that the closing plate from taking place to rock.

Description

Water and electricity warm up hole construction equipment that reserves
Technical Field
The utility model relates to a warm hole construction technical field that reserves of water and electricity especially relates to a warm hole construction equipment that reserves of water and electricity.
Background
In industrial and civil building construction, a reserved hole of a water and electricity heating concrete slab is indispensable, so that in many years, along with the rapid pace of building construction, most units neglect the importance of water heating and electricity installation engineering in building construction, particularly, the inconspicuous water and electricity heating pipeline is reserved and embedded, exquisite engineering is created, satisfactory service is provided, and the detail work of water and electricity heating installation subsection engineering needs to be considered.
The existing reserved hole construction device is inconvenient to seal a hole after being disassembled, a cover plate slightly larger than the size of the hole is adopted to cover the hole usually, the cover plate can move along with the walking of constructors, potential safety hazards exist in construction, and if the existing reserved hole construction device is not closed in time, safety accidents such as falling of people or stepping of people by falling from high altitude falling objects can be caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a water and electricity heating reserved hole construction device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a water and electricity warm hole construction equipment that reserves, includes the sleeve pipe, it has two symmetric distributions's rectangle mouth to open on the sleeve pipe circumference outer wall, and installs sealing mechanism on the sleeve pipe, sealing mechanism includes the closing plate, and rotates on the closing plate and peg graft and have the screw rod, and the screw thread has cup jointed the lantern ring on the screw thread outer wall of screw rod, the screw rod bottom mounting has the bearing, and is fixed with two deflectors of symmetric distribution on the bearing circumference outer wall, and it has the guide way to open on the deflector, sliding joint has the slider in the guide way, and all is fixed with the dead lever on two sliders, dead lever one end be fixed with the grip block of rectangle mouth specification adaptation, movable mounting has same coupling mechanism between dead lever and the lantern.
Further, coupling mechanism includes the movable rod, and the movable rod both ends all are fixed with the pivot, has cup jointed the axle sleeve in the pivot, two axle sleeves respectively with dead lever and lantern ring fixed connection.
Furthermore, a rotating handle is fixed at the top end of the screw rod.
Furthermore, a limiting ring is fixed at the top end of the circumferential outer wall of the sleeve.
Furthermore, the outer wall of the bottom of the sleeve is provided with an embedding groove, and a rubber pad is bonded in the embedding groove.
Furthermore, rubber bulges are distributed at equal intervals at the bottom of the rubber pad.
The utility model has the advantages that:
1. can accomplish the construction work of reserving the entrance to a cave through sheathed tube setting, take out the sleeve pipe after waiting for the concrete setting and accomplish the construction of reserving the hole, can seal the sleeve pipe top in addition under sealing mechanism's effect, prevent that impurity from getting into in the sleeve pipe.
2. Can seal the entrance to a cave after the sleeve pipe is dismantled through the setting of sealing mechanism upper seal plate, avoid producing falling object injury people or personnel and step on incident such as empty falling, in addition under the drive of screw rod, can drive the lantern ring downstream, and then drive grip block lateral movement until with the contact of entrance to a cave inner wall, play spacing clamping action to the closing plate, prevent that the closing plate from taking place to rock.
3. Through setting up of deflector, guide way, movable rod and slider can play the transmission supporting role when screw rod drive grip block, improve the joint strength between the device structure, increase its durability.
Drawings
FIG. 1 is a schematic sectional view of an embodiment 1 of a construction device for a water-electric heating reserved hole according to the present invention;
FIG. 2 is a schematic perspective view of a construction device for a water and electric heating reserved hole according to embodiment 1 of the present invention;
FIG. 3 is a schematic view of a sealing mechanism sealing installation structure of a water and electric heating reserved hole construction device provided by the utility model;
fig. 4 is the utility model provides a water and electricity warm up reserves hole construction equipment's embodiment 2 sectional structure schematic diagram.
In the figure: the device comprises a sleeve 1, a fixed rod 2, a clamping plate 3, a limiting ring 4, a sealing plate 5, a screw 6, a rotating handle 7, a movable rod 8, a shaft sleeve 9, a lantern ring 10, a sliding block 11, a guide plate 12, a guide groove 13 and a rubber pad 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
Example 1
Referring to fig. 1-3, a water and electricity warm reserved hole construction equipment, including sleeve pipe 1, it has two symmetric distribution's rectangle mouth to open on the sleeve pipe 1 circumference outer wall, and install sealing mechanism on the sleeve pipe 1, sealing mechanism includes closing plate 5, and it has screw rod 6 to rotate the grafting on the closing plate 5, the lantern ring 10 has been cup jointed to the screw thread on the screw thread outer wall of screw rod 6, 6 bottom fixings of screw rod have the bearing, and be fixed with two deflectors 12 of symmetric distribution on the bearing circumference outer wall, it has guide way 13 to open on the deflector 12, sliding joint has slider 11 in the guide way 13, and all be fixed with dead lever 2 on two sliders 11, 2 one end of dead lever is fixed with the grip block 3 with rectangle mouth specification adaptation, movable mounting has same coupling mechanism between dead lever 2 and the lantern ring 10.
Wherein, coupling mechanism includes movable rod 8, and 8 both ends of movable rod all are fixed with the pivot, has cup jointed axle sleeve 9 in the pivot, two axle sleeves 9 respectively with dead lever 2 and lantern ring 10 fixed connection.
Wherein, the top end of the screw 6 is fixed with a rotating handle 7.
Wherein, a limiting ring 4 is fixed at the top end of the circumferential outer wall of the sleeve 1.
The working principle of the embodiment is as follows: sleeve pipe 1 can accomplish the construction work of reserving the entrance to a cave, take out the construction of accomplishing the reservation hole with sleeve pipe 1 after waiting for the concrete to solidify, can seal sleeve pipe 1 top under sealing mechanism's effect in addition, prevent that impurity from getting into in the sleeve pipe 1, sealing mechanism upper seal plate 5 can seal the entrance to a cave after sleeve pipe 1 dismantles, avoid producing the falling object injury people or personnel and step on incident such as empty falling, in addition under the drive of screw rod 6, can drive lantern ring 10 downstream, and then drive 3 lateral motion of grip block until with the entrance to a cave inner wall contact, play spacing clamping action to seal plate 5, prevent that seal plate 5 from taking place to rock, deflector 12, guide way 13, movable rod 8 and slider 11 can play the transmission supporting role when 6 drive grip block 3 of screw rod, improve the joint strength between the device structure, increase its durability.
Example 2
Referring to fig. 4, the present embodiment of a construction device for a water and electricity heating reserved hole is different from embodiment 1 in that an embedding groove is formed on the outer wall of the bottom of a sleeve 1, a rubber pad 14 is bonded in the embedding groove, and rubber protrusions are arranged at the bottom of the rubber pad 14 and distributed at equal intervals.
The working principle of the embodiment is as follows: the rubber pad 14 can be more conveniently detached during the detachment operation of the sleeve 1 by utilizing the deformation capacity of the rubber pad, so that the bonding acting force between the sleeve 1 and the surface of the template is reduced.
In the description of this patent, it is to be understood that the terms "coaxial," "bottom," "one end," "top," "middle," "other end," "upper," "one side," "top," "inner," "front," "center," "two ends," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the patent and for simplicity in description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In this patent, unless expressly stated or limited otherwise, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate, or they may be connected internally or in an interactive relationship with each other, and unless otherwise specifically limited, the specific meaning of the above terms in this patent will be understood by those skilled in the art according to the specific circumstances.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A water and electricity heating reserved hole construction device comprises a sleeve (1) and is characterized in that two rectangular openings which are symmetrically distributed are formed in the circumferential outer wall of the sleeve (1), and the sleeve (1) is provided with a sealing mechanism which comprises a sealing plate (5), a screw rod (6) is rotatably inserted on the sealing plate (5), a lantern ring (10) is sleeved on the outer thread wall of the screw rod (6) in a threaded manner, a bearing is fixed at the bottom end of the screw rod (6), two guide plates (12) which are symmetrically distributed are fixed on the outer wall of the circumference of the bearing, guide grooves (13) are formed on the guide plates (12), slide blocks (11) are clamped in the guide grooves (13) in a sliding way, a fixed rod (2) is fixed on each of the two sliding blocks (11), a clamping plate (3) which is matched with the rectangular opening in specification is fixed at one end of the fixed rod (2), the same connecting mechanism is movably arranged between the fixed rod (2) and the lantern ring (10).
2. A water and electricity warm reserved hole construction equipment according to claim 1 characterized in that, coupling mechanism includes movable rod (8), and movable rod (8) both ends are all fixed with the pivot, have cup jointed axle sleeve (9) in the pivot, two axle sleeves (9) respectively with dead lever (2) and lantern ring (10) fixed connection.
3. A water and electricity heating reserved hole construction device as claimed in claim 1, wherein a rotary handle (7) is fixed at the top end of the screw rod (6).
4. A water and electricity heating reserved hole construction device as claimed in claim 1, wherein a limiting ring (4) is fixed at the top end of the circumferential outer wall of the sleeve (1).
5. A water and electricity heating preformed hole construction equipment according to any one of claims 1-4, characterized in that the outer wall of the bottom of the sleeve (1) is provided with a scarf joint groove, and a rubber pad (14) is bonded in the scarf joint groove.
6. A water and electricity heating reserved hole construction device as claimed in claim 5, wherein the bottom of the rubber pad (14) is provided with rubber protrusions distributed at equal intervals.
CN201920887093.2U 2019-06-13 2019-06-13 Water and electricity warm up hole construction equipment that reserves Expired - Fee Related CN210152264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920887093.2U CN210152264U (en) 2019-06-13 2019-06-13 Water and electricity warm up hole construction equipment that reserves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920887093.2U CN210152264U (en) 2019-06-13 2019-06-13 Water and electricity warm up hole construction equipment that reserves

Publications (1)

Publication Number Publication Date
CN210152264U true CN210152264U (en) 2020-03-17

Family

ID=69762673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920887093.2U Expired - Fee Related CN210152264U (en) 2019-06-13 2019-06-13 Water and electricity warm up hole construction equipment that reserves

Country Status (1)

Country Link
CN (1) CN210152264U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073845A (en) * 2021-03-20 2021-07-06 耿艳 Bushing type structure of building heating and ventilation pipeline
CN114934682A (en) * 2022-05-07 2022-08-23 安徽中擎建设发展有限公司 Waterproof leakage device for reserved opening of building
CN115234020A (en) * 2022-07-11 2022-10-25 中建八局第二建设有限公司 Flexible telescopic hole safety protection device and use method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073845A (en) * 2021-03-20 2021-07-06 耿艳 Bushing type structure of building heating and ventilation pipeline
CN114934682A (en) * 2022-05-07 2022-08-23 安徽中擎建设发展有限公司 Waterproof leakage device for reserved opening of building
CN114934682B (en) * 2022-05-07 2024-03-08 安徽中擎建设发展有限公司 Waterproof leakage device for reserved hole of building
CN115234020A (en) * 2022-07-11 2022-10-25 中建八局第二建设有限公司 Flexible telescopic hole safety protection device and use method

Similar Documents

Publication Publication Date Title
CN210152264U (en) Water and electricity warm up hole construction equipment that reserves
CN212430359U (en) Monitoring equipment convenient to use
CN208232637U (en) A kind of human resources regulate the dedicated file box of reason
CN107069518A (en) A kind of electric component box of drawing and pulling type
CN110984675B (en) Pole erecting device for electric power laying and using method thereof
CN208394740U (en) A kind of well lid draw off gear
CN214756388U (en) Energy data gateway installation auxiliary device
CN209153602U (en) A kind of oral care pull device
CN215331817U (en) Communication tower for electronic information engineering
CN206180525U (en) Terminal box for communication that fixed point was dismantled
CN107947233A (en) A kind of distributed new electric station grid connection constructional device
CN211826945U (en) Adjustable building monitoring equipment
CN212745657U (en) Wireless WIFI camera with rechargeable power source
CN210536175U (en) Cable traction machine
CN210121829U (en) Novel wall face inslot automatic installation pipe card equipment of building decoration construction
CN207369477U (en) A kind of dustproof cover of electric power electrical apparatus component
CN209385081U (en) A kind of well drilling tool hanging apparatus
CN208027860U (en) A kind of fixed protection pedestal for power engineering transformer
CN108862109A (en) A kind of application method of crane set-out device
CN209164823U (en) It is a kind of for tubing connection can spigot-and-socket flaring connection tubing
CN211908234U (en) Pipeline fixing device on construction frame
CN206309262U (en) A kind of tower bar maintenance ladder
CN210947200U (en) Unwrapping wire hole mouth protector
CN210713645U (en) Novel artificial stone plate structure for building
CN212839511U (en) Ball valve structure convenient to scale removal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200317

Termination date: 20210613

CF01 Termination of patent right due to non-payment of annual fee